24/7 Freephone Community Helpline 08081 434 434 Notice of Road Closure

January 2019|www.hs2.org.uk Duration of work

High High Speed Two (HS2) is the new high speed railway for Britain. 21 January until Further utility works need to be completed by SGN as part of existing 3 March 2019 work in Road (Perry Hill). The road closure is required to Normal working hours: complete the relocation of the Pressure Reduction Station. The works include: Monday to Friday 8am-6pm. - All works associated with the connection of supplies from the new Pressure Reduction System. Saturday 8am-1pm - Excavations in the road and verge. Quiet set up and break - Removal of the Old Pressure Reduction System. down 1 hour before and after these hours. - Installation of the permanent road access. - A two week proving period prior to completing works in the road. What to expect - Ensuring a constant flow of gas to the houses and businesses in Complete road closure of the area. Gawcott Road (Perry Hill) Road Closure from School Hill/Werner Gawcott Road (Perry Hill) will be closed between the junction at Terrace junction and School Hill and Werner Terrace near to Calvert Green to West Street West Street junction. junction from the 21 January 2019 until the 3 March 2019. Access only to This extension of the closure is to allow a testing period for the new Greatmoor Sailing Club. plant and associated equipment prior to disconnecting the old pressure reduction station, this process will ensure a constant flow of gas to What we will do the houses and businesses in the area. The extension will also enable Two Diversion routes Western Power to complete their works. are in place. SGN will be investigating options to potentially open the road prior to 1. Non HGV traffic the 3 March 2019. via School Hill and Portway Road. How will this affect me? 2. HGV traffic via This is a complete road closure which includes pedestrians and cyclists. West Street, You may experience some traffic delays, please make allowances when Addison Road, planning your journey. Werner Terrace.

If you have a question about HS2 or our works, please contact our helpdesk on 08081 434 434 or email [email protected] 24/7 Freephone Community Helpline 08081 434 434 24/7 Freephone Community Helpline 08081 434 434

Notice of NoticeNotice ofof Road Closure RoadRoad ClosureClosure

www.hs2.org.uk Gawcott Road Closure Road Diversion Map

HG DIRSIN ADDISN RAD

A HG DIRSIN FT TRN SIGN HG DIRSIN ND SIGN

HGV traffic via West Street, Addison Road, Werner Terrrace HG DIRSIN WST STRT

PRR HI RAD Non HGV Traffic HGV DIVERSION via Portway Road ADDISON ROAD and School Hill

A HG DIRSIN FT TRN SIGN

Grebe Lake HG DIRSIN WRNR TRRAC Notice of Road Closure Calvert

www.hs2.org.uk Road Diversion Map eeping you informed We are committed to keeping you informed about work on HS2. This includes ensuring you know what to expect and when to expect it, as well as how we can help.

Residents’ Charter and Commissioner The Residents’ Charter is our promise to communicate as clearly as we possibly can with Contact us people who live along or near the HS2 route. If you have any questions about this www.gov.uk/government/publications/hs2-residents- notification of works, please get in charter touch. We also have an independent Residents’ Commissioner whose job is to make sure we keep to the promises we make in the Charter and to keep it freephone 08081 434 434 under constant review. Find reports at: inicom 08081 456 472 www.gov.uk/government/collections/hs2-ltd- residents-commissioner [email protected] You can contact the Commissioner at: [email protected] Write to: Construction Commissioner igh peed o imited The Construction Commissioner’s role is to o nohill mediate and monitor the way in which HS2 Ltd no ill ueensay manages and responds to construction complaints. irmingham You can contact the Construction Commissioner by emailing [email protected] esite www.hs2.org.uk Property and compensation o keep up to date ith hat is You can find out all about HS2 and properties along happening in your area isit the line of route by visiting: www.hs2.commonplace.is/ www.gov.uk/government/collections/hs2-property Find out if you’re eligible for compensation at: www.gov.uk/claim-compensation-if-affected-by-hs2

olding us to account If you are unhappy for any reason you can make a complaint via the helpline. For more details on our complaints process, please visit our website: www.hs2.org.uk/how-to-complain/

Please contact us if you’d like a free copy of this document in large print raille audio or easy read ou can also contact us for help and information in a different language

HS2 Ltd is committed to protecting personal information. If you wish to know more about how we use your personal information please see our Privacy Notice (https://www.gov.uk/government/publications/high-speed-two-ltd-privacy-notice). Approximate location of ground investigation works

High Speed Two (HS2) Limited registered in and Wales Registered offi ce: Two Snowhill, Snow Hill Queensway, Birmingham B4 6GA Company registration number: 06791685. VAT registration number: 181 4312 30.