Notice of Road Closure Gawcott Rd A.Indd
Total Page:16
File Type:pdf, Size:1020Kb
24/7 Freephone Community Helpline 08081 434 434 Notice of Road Closure January 2019|www.hs2.org.uk Duration of work High Speed Two (HS2) is the new high speed railway for Britain.Further 21 January until utility works need to be completed by SGN as part of existing work in 17 February 2019 Gawcott Road (Perry Hill). The road closure is required to complete the Normal working hours: relocation of the Pressure Reduction Station. The works include: Monday to Friday - All works associated with the connection of supplies from the 8am-6pm. new Pressure Reduction System. Saturday 8am-1pm - Excavations in the road and verge. Quiet set up and break - Removal of the Old Pressure Reduction System. down one hour before - Installation of the permanent road access. and after these hours. What to expect Road Closure Gawcott Road (Perry Hill) will be closed between the junction at School Complete road closure of Hill and Werner Terrace near to Calvert Green to West Street junction Gawcott Road (Perry Hill) from the 21 January 2019 until the 17 February 2019. from School Hill/Werner Terrace junction and West Street junction. A diversion route via School Hill and Portway Road will be in place. Access to the sailing club will still be maintained from the Calvert Green Access only to Greatmoor end of the works. Sailing Club. What we will do How will this affect me? Diversion routes in place This is a complete road closure which includes pedestrians and cyclists. via School Hill and You may experience some traffic delays, please make allowances when Portway Road. planning your journey. If you have a question about HS2 or our works, please contact our helpdesk on 08081 434 434 or email [email protected] 24/7 Freephone Community Helpline 08081 434 434 24/7 Freephone Community Helpline 08081 434 434 NoticeNotice ofof NoticeNotice ofof RoadRoad ClosureClosure RoadRoad ClosureClosure www.hs2.org.uk www.hs2.org.uk Road Diversion Map Gawcott Road Closure Road Diversion Map Diversion Steeple Claydon ENDS Diverted ç traffic ROAD traffic AHEAD Diverted CLOSED ç ROAD Calvert Portway Road CLOSED Gawcott Road ROAD CLOSED Grebe Lake Portway to Steeple Claydon Road ç ç Diverted ROAD traffic Diverted CLOSED traffic ç Diverted traffic School Hill Diversion Calvert çDiverted ENDS traffic Charndon KeepingNotice of groundyou informed Weinvestigation are committed to keeping youw orksinformed about work on HS2. This includes ensuring you know what to expect and when to expect it, as well as how we can help. Residents’ Charter and Commissioner AugustThe Residents’2018 | www.hs2.org.uk Charter is our promise to communicate as clearly as we possibly can with Contact usDuration of work people who live along or near the HS2 route. If you have any questions about this Highwww.gov.uk/government/publications/hs2 Speed Two (HS2) is the new high speed railway-residents for Britain.- notification of worksTuesday, please28 August get to in Friday 19 October 2018 As parchartert of the preparation work for HS2, we will be carrying out groundtouch. investigationWe also have works an along independent Old Oak Common Residents’ Lane between Tuesday 28 August and Working Hours between 8am FridayCommissioner 19 October 2018. whose The job works is to are make required sure to wehelp keep in the to detailed design of 24/7 freephoneto 6pm 08081 434 434 the theline promisesof route. we make in the Charter and to keep it under constant review. Find reports at: Our contractors may also be on The work will take place at a number of locations along the pavement to provideMinicom 08081 456 472 www.gov.uk/government/collections/hs2-ltd- site for one hour’s start up and information about the ground and groundwater characteristics, as well as the residents-commissioner [email protected] before and after the location of buried foundations and structures. You can contact the Commissioner at: above hours. [email protected] Write to: How will this impact me? What to expect Construction Commissioner High Speed Two (HS2) Limited We Thewill beConstruction alternating work Commissioner’s on the west and role east is toside s of Old Oak CommonTwo LaneSnowhill Suspension and relocation of the Wells House Road bus footpathmediate. and monitor the way in which HS2 Ltd Snow Hill Queensstopsway on Old Oak Common manages and responds to construction complaints. To allow a safe working environment, lane closures will be in place withBirmingham the B4Lane 6GA You can contact the Construction Commissioner footpath being diverted around the worksites. During this period traffic along Old (Route 228) Oakby Common emailing Lane complaints@hs2 will be controlled-cc.org.uk by a two way traffic light system.Website www.hs2.org.uk The following traffic FromProperty 28 August, andthe bus compensation stop BP5286 (Route 228) will be suspended anTod keep up to date with what is management measures will be temporarilyYou can movedfind out 50 all meters about north. HS2 and properties along happening in your area, visit: in place: Fromthe 30 line August of route to 31 byAugust visiting: four parking spaces will be suspended inwww. Wells Househs2.commonplace.is/ - Carriageway closure and Roadwww.gov.uk/government/collections/hs2 with single file road signage also being in place.-property This is to enable delivery of 2-way traffic lights equipmentFind out for if theyou’re survey eligible works. for compensation at: - Footpath relocation within www.gov.uk/claim-compensation-if-affected-by-hs2 From 31 August to 13 September the west side footpath will be closed, and the traffic management pedestrians will be diverted to the east side footpath. Bus stop 5287 (both east and area. westHolding bound) will us be tosuspended account and temporarily moved 150 meters north. If you are unhappy for any reason you can make a - Suspension of parking bays. Fromcomplaint 13 to 14 Septembervia the helpline. bus stop For BP5285 more will details be suspended on our and temporarily moved 80 meters north, with bus stop BP5286 being suspended and temporarily complaints process, please visit our website: moved 130 meters south. What we will do www.hs2.org.uk/how-to-complain/ Inform you in advance of any From 14 to 20 September bus stop BP5285 will be suspended and temporarily moved 120 meters north, with bus stop BP5286 being suspended and temporarily changes to the dates shown moved 150 meters south. Keep all sites safe and secure Please contact us if you’d like a free copy of this document in large print, Braille, audio or easy read. From 14 September to 16 November the west side footpath will be relocated, Ensure that all sites are You can also contact us for help and information in a different language. allowing pedestrian access. From the 17 October to 6 November the east side reinstated to the required footpathHS2 Ltd will is committed be closed toand protecting pedestria personalns will information. be diverted If toyou use wish the to wknowest side more about how we usestandard your personal. information footpath.please see our Privacy Notice (https://www.gov.uk/government/publications/high-speed-two-ltd-privacy-notice). High Speed Two (HS2) Limited registered in England and Wales Registered offi ce: Two Snowhill, Snow Hill Queensway, Birmingham B4 6GA Company registration number: 06791685. VAT registration number: 181 4312 30..