SECTORWISE DETAIL OF CENTRAL PROJECTS

Petroleum INDIAN OIL CORPORATION LIMITED

SN Project Name DOA Cost Original Cost Anti. EXPenditure 1 MSQ UPGRADATION PROJECT AT 4/2008 1492.00 1492.00 458.01 REFINERY

Power NATIONAL THERMAL POWER CORPORATION

SN Project Name DOA Cost Original Cost Anti. EXPenditure 2 BARH STPP(3X660MW) NTPC 12/2003 8692.97 8692.97 4500.68

3 BARH STPP STAGE -II 2/2008 7341.04 7341.04 619.47

POWER GRID CORPORATION OF LIMITED

SN Project Name DOA Cost Original Cost Anti. EXPenditure 4 TRANSMISSION SY. ASSOCIATED WITH BARH 12/2005 3779.46 3779.46 3178.77 GENER. PROJECT(P.GR.)

Railways EAST CENTRAL RAILWAYS SN Project Name DOA Cost Original Cost Anti. EXPenditure 5 -(NL),ECR 3/1997 100.00 332.75 43.72

6 JAYANAGAR--NARKATIA 4/1997 233.00 501.69 278.12 GANJ(GC),ECR

7 KHAGARIA-KUSHESHWAR ASTHAN (NL) (ECR) 3/1997 78.23 162.87 57.38

8 MANSI-PURNIA (EXTENSION OF MANSI- 4/1996 114.01 322.87 33.00 SAHARSA) GAN

9 - VIA VAISHALI (NL), ECR 4/2003 324.66 528.65 22.26

10 ISLAMPUR - NATESAR,ECR 4/2001 64.35 64.35 26.01

11 SAKRI- HASSANPUR 12/1996 96.03 89.70 62.33

12 JEHANABAD - BELA, ECR 4/2003 75.00 75.00 0.00

SECTORWISE DETAIL OF CENTRAL PROJECTS

13 PUNPUN - TAREGANA:ECR 4/1999 49.42 49.42 65.89

14 TAREGNA - JEHANABAD 4/2003 43.62 43.62 3.09

15 SONPUR - HAJIPUR,ECR 4/2003 53.97 86.29 24.64

16 RAJGIR-TILAIYA (NL), ECR 4/2001 180.82 180.82 230.44

17 DANIAWAN-BIHARSARIF (NL), ECR 4/2001 104.79 104.79 34.13

18 BIHARSHARIFF-BARBIGHA (NL), ECR 4/2001 103.86 103.86 28.93

19 BARBIGHA - SHEKHPURA + NEORA-DANIAWAN 4/2002 120.23 120.23 220.17 (NL), ECR

20 GANGA BRIDGE (NL), ECR 4/2001 624.47 1480.71 445.84

21 RAIL-CUM-ROAD BRIDGE AT MUNGER (NL), 4/2002 921.00 921.00 236.87 ECR

22 KOSI BRIDGE (NL), ECR 4/2002 323.41 322.95 32.59

EASTERN RAILWAYS

SN Project Name DOA Cost Original Cost Anti. EXPenditure 23 KIUL-KAJRA DOUBLING 4/2002 23.73 23.73 23.30

GAUGE CONVERSION SN Project Name DOA Cost Original Cost Anti. EXPenditure 24 SITAMARHI-- (GC) 4/1997 501.69 501.69 312.32

NORTH EAST FRONTIER RAILWAY

SN Project Name DOA Cost Original Cost Anti. EXPenditure 25 NEW B.G. LINE FROM ARARIA TO GALGALIA 9/2006 300.00 529.88 19.12 (THAKURGUNG)

NORTH EASTERN RAILWAY

SN Project Name DOA Cost Original Cost Anti. EXPenditure SECTORWISE DETAIL OF CENTRAL PROJECTS

26 MAHARAJGANJ-MASRAKH (NL) - NER 4/2003 104.10 113.75 40.35

27 EKMA-JIRADI (NER) 6/2005 78.34 89.74 45.32

28 EKMA--MANKAPUR 4/2004 60.00 62.30 71.86

SIGNALLING & TELECOMMUNICATIONS

SN Project Name DOA Cost Original Cost Anti. EXPenditure 29 ER-CONTINUOUS TRACK CIRCUT.+ABS 4/2003 37.19 41.00 12.44

WORKSHOPS & PRODUCTION UNIT

SN Project Name DOA Cost Original Cost Anti. EXPenditure 30 SETTINGUP OF WAGON POH SHOP-SONPUR 3/2006 89.20 89.20 0.00

31 CHHAPRA-SETTING UP OF WHEEL 3/2005 470.09 881.19 86.35 MANUFACTURING PLANT

32 HARNOUT -SET.UP OF W/S TO UND. POH OF 4/2003 98.74 224.51 41.39 UP TO50 COAC. WS&PU

Road Transport & Highways NATIONAL HIGHWAYS AUTHORITY OF INDIA

SN Project Name DOA Cost Original Cost Anti. EXPenditure 33 SIMRAHI TO RING-BUND (MISSIONG LINE) 12/2003 100.50 100.50 154.86 (BR-4)

34 RINGBUNDS TO JHAJHANPUR (BR-6) 12/2003 340.00 340.00 384.69

35 PURNEA-GOYAKOTA SEC.(EW) (NS AND EW-PH- 4/2000 205.73 205.73 0.00 I) KM.419-KM.447, NH-31

36 JHAJHARPUR TO DARBANGA (BR-7) 12/2003 340.00 340.00 214.44

37 MUZZAFFARPUR TO (LMNHP-12), 12/2003 275.00 275.00 197.32 KM.520 TO 480, NH-28

38 PURNEA-FORBESGANJ (BR-2) PHASE-II, 12/2003 310.00 310.00 359.26 KM.268 TO 230, NH-57

39 KOSI BRIDGE INCLUDING APPROACHES AND 12/2003 418.04 418.04 223.00 GUIDE BOND AND AFFLUX-BOND (BR-5)

SECTORWISE DETAIL OF CENTRAL PROJECTS

40 DARBHANGA-MUZAFFARPUR, NH-57 (NHAI) 12/2003 305.00 305.00 331.71

41 DARBHANGA-MUZAFFARPUR(KM 30 TO KM 0), 12/2003 291.80 291.80 353.40 NH-57 (NHAI)

42 FORBESGANJ TO SIMRAHI (NH-57)(NHAI) 12/2003 332.94 332.94 129.64

43 KOTWA TO DEWAPUR(10 LMNHP),NH-28 12/2003 240.00 240.00 145.49 PHASE-II, KM.440 TO KM.402

44 PURNEA-FORBESGANJ (BR-1) PHASE-II, 12/2003 276.00 276.00 333.60 KM.309 TO 268, NH-57

45 MEHSI TO KOTWA (LMNHP-II), PH.II, 12/2003 239.00 239.00 179.05 KM.480 TO KM.440, NH-28

Telecommunications BHARAT SANCHAR NIGAM LIMITED SN Project Name DOA Cost Original Cost Anti. EXPenditure 46 TELECOM CIRCLE PHASE-V.1, 2G &3G 4/2007 366.00 366.00 0.00

Urban Development CENTRAL PUBLIC WORKS DEPARTMENT

SN Project Name DOA Cost Original Cost Anti. EXPenditure 47 CONSTRUCTION OF 494 FAMILY FOR CRPF 5/2001 26.80 26.80 30.01

48 CONSTRUCTION OF RES.QTR.TYPE 1 TO IV 9/2002 20.32 20.32 11.46