Sectorwise Detail of Central Projects

Sectorwise Detail of Central Projects

SECTORWISE DETAIL OF CENTRAL PROJECTS Petroleum INDIAN OIL CORPORATION LIMITED SN Project Name DOA Cost Original Cost Anti. EXPenditure 1 MSQ UPGRADATION PROJECT AT BARAUNI 4/2008 1492.00 1492.00 458.01 REFINERY Power NATIONAL THERMAL POWER CORPORATION SN Project Name DOA Cost Original Cost Anti. EXPenditure 2 BARH STPP(3X660MW) NTPC 12/2003 8692.97 8692.97 4500.68 3 BARH STPP STAGE -II 2/2008 7341.04 7341.04 619.47 POWER GRID CORPORATION OF INDIA LIMITED SN Project Name DOA Cost Original Cost Anti. EXPenditure 4 TRANSMISSION SY. ASSOCIATED WITH BARH 12/2005 3779.46 3779.46 3178.77 GENER. PROJECT(P.GR.) Railways EAST CENTRAL RAILWAYS SN Project Name DOA Cost Original Cost Anti. EXPenditure 5 MUZAFFARPUR-SITAMARHI(NL),ECR 3/1997 100.00 332.75 43.72 6 JAYANAGAR-DARBHANGA-NARKATIA 4/1997 233.00 501.69 278.12 GANJ(GC),ECR 7 KHAGARIA-KUSHESHWAR ASTHAN (NL) (ECR) 3/1997 78.23 162.87 57.38 8 MANSI-PURNIA (EXTENSION OF MANSI- 4/1996 114.01 322.87 33.00 SAHARSA) GAN 9 HAJIPUR-SUGAULI VIA VAISHALI (NL), ECR 4/2003 324.66 528.65 22.26 10 ISLAMPUR - NATESAR,ECR 4/2001 64.35 64.35 26.01 11 SAKRI- HASSANPUR 12/1996 96.03 89.70 62.33 12 JEHANABAD - BELA, ECR 4/2003 75.00 75.00 0.00 SECTORWISE DETAIL OF CENTRAL PROJECTS 13 PUNPUN - TAREGANA:ECR 4/1999 49.42 49.42 65.89 14 TAREGNA - JEHANABAD 4/2003 43.62 43.62 3.09 15 SONPUR - HAJIPUR,ECR 4/2003 53.97 86.29 24.64 16 RAJGIR-TILAIYA (NL), ECR 4/2001 180.82 180.82 230.44 17 DANIAWAN-BIHARSARIF (NL), ECR 4/2001 104.79 104.79 34.13 18 BIHARSHARIFF-BARBIGHA (NL), ECR 4/2001 103.86 103.86 28.93 19 BARBIGHA - SHEKHPURA + NEORA-DANIAWAN 4/2002 120.23 120.23 220.17 (NL), ECR 20 PATNA GANGA BRIDGE (NL), ECR 4/2001 624.47 1480.71 445.84 21 RAIL-CUM-ROAD BRIDGE AT MUNGER (NL), 4/2002 921.00 921.00 236.87 ECR 22 KOSI BRIDGE (NL), ECR 4/2002 323.41 322.95 32.59 EASTERN RAILWAYS SN Project Name DOA Cost Original Cost Anti. EXPenditure 23 KIUL-KAJRA DOUBLING 4/2002 23.73 23.73 23.30 GAUGE CONVERSION SN Project Name DOA Cost Original Cost Anti. EXPenditure 24 SITAMARHI-RAXAUL-NARKATIAGANJ (GC) 4/1997 501.69 501.69 312.32 NORTH EAST FRONTIER RAILWAY SN Project Name DOA Cost Original Cost Anti. EXPenditure 25 NEW B.G. LINE FROM ARARIA TO GALGALIA 9/2006 300.00 529.88 19.12 (THAKURGUNG) NORTH EASTERN RAILWAY SN Project Name DOA Cost Original Cost Anti. EXPenditure SECTORWISE DETAIL OF CENTRAL PROJECTS 26 MAHARAJGANJ-MASRAKH (NL) - NER 4/2003 104.10 113.75 40.35 27 EKMA-JIRADI (NER) 6/2005 78.34 89.74 45.32 28 EKMA-CHHAPRA-MANKAPUR 4/2004 60.00 62.30 71.86 SIGNALLING & TELECOMMUNICATIONS SN Project Name DOA Cost Original Cost Anti. EXPenditure 29 ER-CONTINUOUS TRACK CIRCUT.+ABS 4/2003 37.19 41.00 12.44 WORKSHOPS & PRODUCTION UNIT SN Project Name DOA Cost Original Cost Anti. EXPenditure 30 SETTINGUP OF WAGON POH SHOP-SONPUR 3/2006 89.20 89.20 0.00 31 CHHAPRA-SETTING UP OF WHEEL 3/2005 470.09 881.19 86.35 MANUFACTURING PLANT 32 HARNOUT -SET.UP OF W/S TO UND. POH OF 4/2003 98.74 224.51 41.39 UP TO50 COAC. WS&PU Road Transport & Highways NATIONAL HIGHWAYS AUTHORITY OF INDIA SN Project Name DOA Cost Original Cost Anti. EXPenditure 33 SIMRAHI TO RING-BUND (MISSIONG LINE) 12/2003 100.50 100.50 154.86 (BR-4) 34 RINGBUNDS TO JHAJHANPUR (BR-6) 12/2003 340.00 340.00 384.69 35 PURNEA-GOYAKOTA SEC.(EW) (NS AND EW-PH- 4/2000 205.73 205.73 0.00 I) KM.419-KM.447, NH-31 36 JHAJHARPUR TO DARBANGA (BR-7) 12/2003 340.00 340.00 214.44 37 MUZZAFFARPUR TO MEHSI (LMNHP-12), 12/2003 275.00 275.00 197.32 KM.520 TO 480, NH-28 38 PURNEA-FORBESGANJ (BR-2) PHASE-II, 12/2003 310.00 310.00 359.26 KM.268 TO 230, NH-57 39 KOSI BRIDGE INCLUDING APPROACHES AND 12/2003 418.04 418.04 223.00 GUIDE BOND AND AFFLUX-BOND (BR-5) SECTORWISE DETAIL OF CENTRAL PROJECTS 40 DARBHANGA-MUZAFFARPUR, NH-57 (NHAI) 12/2003 305.00 305.00 331.71 41 DARBHANGA-MUZAFFARPUR(KM 30 TO KM 0), 12/2003 291.80 291.80 353.40 NH-57 (NHAI) 42 FORBESGANJ TO SIMRAHI (NH-57)(NHAI) 12/2003 332.94 332.94 129.64 43 KOTWA TO DEWAPUR(10 LMNHP),NH-28 12/2003 240.00 240.00 145.49 PHASE-II, KM.440 TO KM.402 44 PURNEA-FORBESGANJ (BR-1) PHASE-II, 12/2003 276.00 276.00 333.60 KM.309 TO 268, NH-57 45 MEHSI TO KOTWA (LMNHP-II), PH.II, 12/2003 239.00 239.00 179.05 KM.480 TO KM.440, NH-28 Telecommunications BHARAT SANCHAR NIGAM LIMITED SN Project Name DOA Cost Original Cost Anti. EXPenditure 46 BIHAR TELECOM CIRCLE PHASE-V.1, 2G &3G 4/2007 366.00 366.00 0.00 Urban Development CENTRAL PUBLIC WORKS DEPARTMENT SN Project Name DOA Cost Original Cost Anti. EXPenditure 47 CONSTRUCTION OF 494 FAMILY FOR CRPF 5/2001 26.80 26.80 30.01 48 CONSTRUCTION OF RES.QTR.TYPE 1 TO IV 9/2002 20.32 20.32 11.46 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    4 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us