News Monitoring 03 15 2019

Total Page:16

File Type:pdf, Size:1020Kb

News Monitoring 03 15 2019 DATE . •5 r!AN 2019 DAY : ,Frldo INT rryi-F. NTE,ws Strategic Communication and Initiative Service STRATEGIC LEI LII Li COMMUNICATION PAGE I BANNER EDITORIAL CARTOON STORY STORY el%veNEWRIIMI INITIATIVES PAGE LOWER EIREIESEIMMIWason. SERVICE BusinesslVlirror 15 MAR 2019 PAGE I/ DATE Govt to seed clouds 1k to boost water in dams Jalad 'said that the agricul- BT RENE ACOSTA ture department reported that Mesa Dam," he added. W ®reneacostaBM El Nino has already resulted in To remedy the problem, a production loss of P464.3 mil- technical working group which HE government will con- included the MWSS, National duct cloud-seeding op- lion and volume loss of P22.918 million in the agriculture sector Irrigation Administration, the Terations in Regions 2 and weather bureau Pagasa, Manila 12 to counter the ill effects of El as of March 8. "[The] total area affected has Water and the other concession- Nieto, which a water concession- aire, Maynilad, has "committed aire blamed for the water-supply reached 18,679 hectares, affecting 13,679 farmers in.... Regions 9,10, to continue their close coordina- interruption in the eastern part of tion to ensure that water-supply Metro Manila. 11,12, Mirnaropa and BARMM. DA conductedfieldvalidation to assess releases from the Angat Dam are National Disaster Risk Reduc- optimized." tion and Management Council the damage and losses and contin- ues to monitor standing crops in "Cross border gate opening Executive Director Ricardo Jalad shall be done in which 50 MLD said the operations will be con- areas at risk," he said. Severai areas, including Zam- [millions of liters per day] from ducted by planes of the Philippine Maynilad will be delivered to Ma- Air Force in coordination with the boanga city, the province of Zam- boanga Sibugay, Pagadian City and nila Water. MWSS also presented Department of Agriculture (DA) its contingency plans, which in- following the release of P18.3 mil- San Jose in Occidental Mindoro have already declared a state of clude rotating water supply and lion for the activity. Pressure management, energiza- The cloud seeding, which will calamity due to the effects of the El Niiio-spawned drought. tion of Cardona Water Treatment be carried out until March 21 to plant on March 31,2019, that can induce much-need rain, was sup- Other measures provide an additional 50 MLD," posed to have been initiated on DURING the meeting, the council Jalad said. Thursday, according to Jalad, but also discussed the prevailingprob- Among others, the technical the Air Force through its spokes- lem ofwater supplythathas already working group agreed to go for man, Major Aristides Galang, affected more than a million resi- a "nonrevenue" water recovery, said they could only commence dents in the eastern part of Metro utilization of backwash from wa- the operation on Saturday or Manila, most of whom have been ter-treatment plant and deploy- Sunday as the Nomad planes were forced to line up for water rations, ment of water tankers and mobile still being prepared along with especially in the cities of Pasig and water-treatment plants "in which the equipment. Mandaluyong. five units shall come from Manila "So most probably, it is still ten- zJalad said, however, that the Water andthree standbyunits from tative [if it's] on Saturday or Sun- Department of Environment and Maynilad." day, and then the initial area will Natural Resources reported that The MWSS would also activate be Cauayan, Isabela," Galang said, Angat Dam, the main source of wa- its backup deep wells in case there adding that the cloud seeding will ter for Metro Manila, is still within would be need to augment the wa- be undertaken by the 900th Air its normal operating levelat 199.94 ter supply. Force Weather Group. meters of elevation compared to its "On this, hospitals with standby The cloud-seeding activities minimum operating level at 180 deep wellwill be the priority," Jalad were agreed upon by the council in a meters. said. meetinglateWednesdayafternoon. "The decline of La Mesa Dam, Also, the Department of the In- The Department of Social Welfare according to MWSS [Metropoli- terior and Local Government will and Development reported at the tan Waterworks and Sewerage issue a memorandum that will re- meeting it has allocated a standby System], is caused by the increase quire local government units to fund of P11.8 million for family in water-treatment production enact ordinances that would curb food packs as well as cash-for-work of Manila Water. The water al- illegal connections and encourages programs. location of Manila Water from the prudent use of water. MWSS sourced from Angat Dam The ordinances would allow wa- is 18.5 cubic meters per second ter concessionaires and water utili- [1600 million liters per day]," ties to conduct emergency repair of Jalad said. leaks. "The water demand from Ma- nila Water consumers, however, has increased to 20.25 cms [1750 million liters per day], forcing the latter to source the deficit from La 6.4.&STRATEGIC I 11 1=1 1=1 COMMUNICATION UPPER PAGE 1 BANNER EDITORIAL CARTOON STORY STORY wagaSTWIMIR INITIATIVES PAGE LOWER 11.1111.11SMIW SERVICE BusinessMinor 15 MAR 2019 PAGE If DATE 2/2, At Camp Crame, National Police 'chief Police General Oscar Albay- alde has directed all police units in areas affected by the temporary Water shortage in Metro Manila and Rizal to observe water-conserva- tion measures in all camps and of- fices to help avert a possible water crisis in Luzon at the onset of the dry season. PNP spokesman Police Colo- nel Bernard Banac said Albayal- de ordered headquarters support units in camps and facilities af- fected to detail inspectors who will check on wasteful or unnec- essary water usage. "Local PNP units are directed to ensure safety and security of water-service providers against unruly crowd andpersons who may want to provoke chaos in the water- distribution points," Albayalde's directive read. 'Black Friday' SAYAN said it wilbatage a "Black Friday protest" against Manila Wa- ter and MWSS over what it saidwas Manila Water's "corporate greed" that has caused the current water crisis in Metro Manila. "The claim that El Nino is tb blame for the crisis has been ex- posed as a big fat lie. Manila Water has been expanding its customer base even if current facilities are un- able to meet the growing demand. It is Manila Water's obligation to provide the needs of its customers. It has failed to do so," Bayan said in a statement. "Manila Water earned a whop- ping P6.5 billion in 2018 and an- other P6.5 billion in 2017. It was even granted a rate hike of P6.50 per cubic meter spread over five years. It has expanded its opera- tions overseas to include Indone- sia, Thailand And Vietnam. Yet it has failed to provide the necessary facilities to meet the demands in its concession area in Metro Ma- nila," it added. STRATEGIC TLIIL Pa BRACE HOC PAGET BANNER ITORIAL CARTOON UPPER COATTLIUN [CATION STORY STORY giiiim.0111111111111 INITIATIVES PAGE LOWER suRsigallir SERVICE MANILAt 13ULLETIN 'me THE NATION'S LEADING NEWSPAPER :15 MAR 2019 DATE HUE PAGE I/ La Mesa Dam water at its lowest Cloud-seeding operations in Regions 2 and 12 begin By ELLALYN DE VERA-RU1Z PAGASA hydrologist Sonia Ser- to significantly drop due to a weak El and FRANCIS T. WAKEFIELD rano said the new-low was recorded Nino. Thursday, breaching the 68.75 meters Water level at Angat Dam - which a Mesa Dam's water level is in 1998. funnels water to Ipo Dam and then to now down to 68.74 meters, its The lack of rainfall over the La Mesa La Mesa Dam - remains high at 199.63 lowest in 21 years, the Philip- watershed has contributed to the-dwin- meters as of Thursday. It is still above pine Atmospheric, Geophysi- dling level of the water reservoir. its minimum operating level of 180 cal,L and Astronomical Services Admin- PAGASA had earlier said the rainfall meters. istration (PAGASA) said Thursday received by the country could continue To help mitigate the effects 0'13 serves Sto. Nino and Norala towns, La Mesa Dam water... 1 1 is currently closed due to periodic maintenance and will not reopen of the El Ntho, the National Disaster in Koronadal City and the municipali- until May. Risk Reduction and Management ties of Tupi, Norala, and Lake Sebu. For the communal irrigation sys- Council (NDRRMC) said that cloud- "We're hoping that the dry spell tems (CIS), he said the water levels seeding operations started Thursday will not extend to (a) few more months have dropped to as low as 30 percent in Regions 2 and 12. or we will really have a big problem based on their latest monitoring. Undersecretary Ricardo B. Jalad, here," Tibang said in a press brief- Those severely affected were the Civil Defense administrator and ing. CIS facilities in Sitio Supon, Barangay NDRRMC executive director, said the In the case of the Marbel 2 RIS, San Jose in Koronadal City, Barangay cloud-seeding operations have been he said a significant portion of its Tinago in Norala and in Lake Sebu scheduled from March 14 to May 21, 1,700-hectare service area has so far town, he said. 2019, after conducting joint area as- been affected by the decreasing water If the dry spell, which is spawned sessments. supply. by the El Nino phenomenon, would Jalad said P18.3 million has been The irrigation facility, which cov- extend until June or July, Tibang released to the Department of Agri- ers portions of Koronadal City and said a significant portion of the area's culture (DA) regional offices for the Lutayan town in Sultan Kudarat, has irrigated farms would be severely cloud-seeding operations in partner- only served some 729 hectares of affected.
Recommended publications
  • News Monitoring 10 31 2019
    1 0 - 81 - 19: DATE DAY Thursday- m man IhNT INTHAMS Strategic Communication and Initiative Service STRATEGIC UPPER PAGE 1 DANNER EDITORIAL CARTOON COMMUNICATION 45 STORY STORY mailso INITIATIVES PAGF LOWER ,..•••••mr SERVICE Standard DATE 'DENR officials must lead in seedlings survival' By Rio N. Araja d NVIRONMENT Secretary Roy Cimatu on Wednesday vowed to sanction field officers who F would fail to meet the required 85 percent survival rate of planted tree seedlings. "I would like to let somebody take the CENROs as plantation managers," he command responsibility for these areas," said. he told provincial environment and natu- Under the expanded national greening ral resources officers, and community en- program, a frontline field officer must be vironment and natural resources officers. able to meet the 85 percent survival rate "I am designating the PENROs and of planted rate seedlings being contracted to a people's organization. the program this year. "It's very simple. I will relieve you if "I would like to let somebody take you cannot fulfill that. Yes, it's a tall or- the command responsibility for these der. Even if you have to go there at least areas," Cimatu said. every two weeks," he warned. From 2011 to July 2019, almost 2 He expressed his disappointment million hectares have been planted with over the low survival rates for seedlings 1.7-billion tree seedlings. planted in some people's organization- It generated 4.73-million jobs ben- contracted areas ranging only from 35 efiting more than 670,000 upland to 50 percent. dwellers. Most of the planted sites Because of the low survival rates, the have been contracted to POs.
    [Show full text]
  • List of Dams and Reservoirs 1 List of Dams and Reservoirs
    List of dams and reservoirs 1 List of dams and reservoirs The following is a list of reservoirs and dams, arranged by continent and country. Africa Cameroon • Edea Dam • Lagdo Dam • Song Loulou Dam Democratic Republic of Congo • Inga Dam Ethiopia Gaborone Dam in Botswana. • Gilgel Gibe I Dam • Gilgel Gibe III Dam • Kessem Dam • Tendaho Irrigation Dam • Tekeze Hydroelectric Dam Egypt • Aswan Dam and Lake Nasser • Aswan Low Dam Inga Dam in DR Congo. Ghana • Akosombo Dam - Lake Volta • Kpong Dam Kenya • Gitaru Reservoir • Kiambere Reservoir • Kindaruma Reservoir Aswan Dam in Egypt. • Masinga Reservoir • Nairobi Dam Lesotho • Katse Dam • Mohale Dam List of dams and reservoirs 2 Mauritius • Eau Bleue Reservoir • La Ferme Reservoir • La Nicolière Reservoir • Mare aux Vacoas • Mare Longue Reservoir • Midlands Dam • Piton du Milieu Reservoir Akosombo Dam in Ghana. • Tamarind Falls Reservoir • Valetta Reservoir Morocco • Aït Ouarda Dam • Allal al Fassi Dam • Al Massira Dam • Al Wahda Dam • Bin el Ouidane Dam • Daourat Dam • Hassan I Dam Katse Dam in Lesotho. • Hassan II Dam • Idriss I Dam • Imfout Dam • Mohamed V Dam • Tanafnit El Borj Dam • Youssef Ibn Tachfin Dam Mozambique • Cahora Bassa Dam • Massingir Dam Bin el Ouidane Dam in Morocco. Nigeria • Asejire Dam, Oyo State • Bakolori Dam, Sokoto State • Challawa Gorge Dam, Kano State • Cham Dam, Gombe State • Dadin Kowa Dam, Gombe State • Goronyo Dam, Sokoto State • Gusau Dam, Zamfara State • Ikere Gorge Dam, Oyo State Gariep Dam in South Africa. • Jibiya Dam, Katsina State • Jebba Dam, Kwara State • Kafin Zaki Dam, Bauchi State • Kainji Dam, Niger State • Kiri Dam, Adamawa State List of dams and reservoirs 3 • Obudu Dam, Cross River State • Oyan Dam, Ogun State • Shiroro Dam, Niger State • Swashi Dam, Niger State • Tiga Dam, Kano State • Zobe Dam, Katsina State Tanzania • Kidatu Kihansi Dam in Tanzania.
    [Show full text]
  • Biogeochemical Analysis in Relation to Water Quality of Wawa Dam, Rizal, Philippines
    MATTER: International Journal of Science and Technology ISSN 2454-5880 Jacqueline E. Hilario et al. Volume 3 Issue 2, pp.415-432 Date of Publication: 7th November 2017 DOI-https://dx.doi.org/10.20319/pijss.2017.32.415432 BIOGEOCHEMICAL ANALYSIS IN RELATION TO WATER QUALITY OF WAWA DAM, RIZAL, PHILIPPINES Jacqueline E. Hilario Department of Environmental Science, SASTE, Emilio Aguinaldo College, Manila, Philippines [email protected];[email protected] Erwin O. Se Department of Environmental Science, SASTE, Emilio Aguinaldo College, Manila, Philippines [email protected] Jett Edzen S. Garcia Department of Environmental Science, SASTE, Emilio Aguinaldo College, Manila, Philippines [email protected] Jose Jacob D. Almonte Department of Environmental Science, SASTE, Emilio Aguinaldo College, Manila, Philippines [email protected] Rafael Miguel D. Almonte Department of Environmental Science, SASTE, Emilio Aguinaldo College, Manila, Philippines [email protected] Abstract This paper investigates the biogeochemical components of Wawa Dam, to determine its viability for human consumption. Macro-invertebrates and geological structures were assessed in relation to water quality. Quantitative analysis on the physicochemical parameters, such as, pH, temperature, total dissolved solids, total suspended solids, biochemical oxygen demand, dissolved oxygen, nitrates and orthophosphates were done, to compare with the standard criteria set by the Department of Environmental and Natural Resources Administrative Order 90-34, in four consecutive months, covering rainy and dry seasons. Results showed that, Class Insecta © 2017 The author and GRDS Publishing. All rights reserved. 415 Available Online at: http://grdspublishing.org/ MATTER: International Journal of Science and Technology ISSN 2454-5880 with 30.91% were the most abundant macro-invertebrates, while, sedimentary rocks, dominated the geological structures with 69.10%.
    [Show full text]
  • DENR-BMB Atlas of Luzon Wetlands 17Sept14.Indd
    Philippine Copyright © 2014 Biodiversity Management Bureau Department of Environment and Natural Resources This publication may be reproduced in whole or in part and in any form for educational or non-profit purposes without special permission from the Copyright holder provided acknowledgement of the source is made. BMB - DENR Ninoy Aquino Parks and Wildlife Center Compound Quezon Avenue, Diliman, Quezon City Philippines 1101 Telefax (+632) 925-8950 [email protected] http://www.bmb.gov.ph ISBN 978-621-95016-2-0 Printed and bound in the Philippines First Printing: September 2014 Project Heads : Marlynn M. Mendoza and Joy M. Navarro GIS Mapping : Rej Winlove M. Bungabong Project Assistant : Patricia May Labitoria Design and Layout : Jerome Bonto Project Support : Ramsar Regional Center-East Asia Inland wetlands boundaries and their geographic locations are subject to actual ground verification and survey/ delineation. Administrative/political boundaries are approximate. If there are other wetland areas you know and are not reflected in this Atlas, please feel free to contact us. Recommended citation: Biodiversity Management Bureau-Department of Environment and Natural Resources. 2014. Atlas of Inland Wetlands in Mainland Luzon, Philippines. Quezon City. Published by: Biodiversity Management Bureau - Department of Environment and Natural Resources Candaba Swamp, Candaba, Pampanga Guiaya Argean Rej Winlove M. Bungabong M. Winlove Rej Dumacaa River, Tayabas, Quezon Jerome P. Bonto P. Jerome Laguna Lake, Laguna Zoisane Geam G. Lumbres G. Geam Zoisane
    [Show full text]
  • MWSS New Water Source Development Project
    Completion Report Project Number: 35379 Loan Number: 2012 July 2009 Philippines: MWSS New Water Source Development Project CURRENCY EQUIVALENTS Currency Unit – peso (P) At Appraisal At Project Completion (1 September 2003) (11 May 2009) P 1.00 = $0.0182 $0.021 $1.00 = P 55.04 P 47.637 ABBREVIATIONS ADB Asian Development Bank AWUAIP Angat Water Utilization and Aqueduct Improvement Project LDP Laiban Dam Project MLD million liters per day MWCI Manila Water Company, Inc. MWSI Maynilad Water Services, Inc. MWSS Metropolitan Waterworks and Sewerage System NRW nonrevenue water PMO project management office TA technical assistance WRP Wawa River Project NOTES (i) The fiscal year (FY) of the Government and its agencies ends on 31 December. (ii) In this report, “$” refers to US dollars. Vice-President C. Lawrence Greenwood, Jr., Operations 2 Director General A. Thapan, Southeast Asia Department (SERD) Director A. Jude, Energy and Water Division, SERD Team leader Y. Tsujiki, Financial Analysis Specialist, SERD Team members A. Fernando, Assistant Project Analyst, SERD R. Frauendorfer, Principal Urban Development Specialist, SERD In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. CONTENTS Page BASIC DATA i MAP I. PROJECT DESCRIPTION 1 II. EVALUATION OF DESIGN AND IMPLEMENTATION 1 A. Relevance of Design and Formulation 1 B. Project Outputs 3 C. Project Costs 4 D. Disbursements 4 E. Project Schedule 4 F.
    [Show full text]
  • Metro Manila Bridges Project
    Initial Environmental Examination June 2021 Philippines: Metro Manila Bridges Project Prepared by the Department of Public Works and Highways for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 11 May 2021) Currency unit – peso/s (₽) ₽1.00 = $0.02 $1.00 = ₽47.89 ABBREVIATIONS NOTE In this report, "$" refers to United States dollars. This initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section on ADB’s website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. PHI: Metro Manila Bridges Project 3 Priority Bridges, Marikina Initial Environmental Examination TABLE OF CONTENTS EXECUTIVE SUMMARY ..............................................................................................................................10 I. INTRODUCTION ..................................................................................................................................18 A. RATIONALE ......................................................................................................................................................................... 18 B. OBJECTIVES OF THE PROJECT
    [Show full text]
  • 2020 Year End Accomplishment Report
    Metropolitan Waterworks and Sewerage System CORPORATE OFFICE 2020 YEAR END ACCOMPLISHMENT REPORT Description Page EXECUTIVE SUMMARY 3 TABLE OF Part I ENSURED CONTINUITY OF WATER SECURITY PROJECTS CONTENTS A Ample, Stable Supply 5 B Water Security and Reliability 6 Projects • Angat Water Transmission 6 Improvement Project • Bigte-Novaliches Aqueduct No. 7 7 Project • New Centennial Water Source- 7 Kaliwa Dam Project • Bulacan Bulk Water Supply Project 8 Stage 3a • Sumag River Diversion Project and 9 Umiray-Angat Transbasin Facilities Long-Term Rehabilitation Project • Feasibility Study for the Construction 10 of Ipo Dam 3 • Long-Term Water Supply Source for 10 Metro Manila C Milestones in Concessionaires’ 11 CAPEX Projects Part II EFFECTIVE AND EFFICIENT OPERATIONS A Safe and Adequate Amount of Water 13 Supply B Responsibility for Sewerage and 13 Sanitation Service Part III CREATIVITY AND PARTNERSHIPS IN MANAGING OUR ASSETS A Best and highest use of our assets 15 through inter-government partnerships B Revenue-yielding measures 15 C Use of MWSS' assets for the 15 Administration's key transportation projects D Transfer of Ownership of Used Motor 16 Vehicles to various LGUs E Implemented a Science-based 16 Watershed Reforestation Part IV FISCAL PRUDENCE & FINANCIAL STABILITY A Financial Performance 17 B Strong EBITDA 17 C Compliance with Statutory Obligations 18 D Borrowing Ceiling 18 1 Page Part V GOOD CORPORATE GOVERNANCE A Improvement in Corporate Governance 19 Scorecard (CGS) Rating by the GCG B Advance remittance of Full Dividends for
    [Show full text]
  • 2019 Mwss Annual Report
    2019 MWSS ANNUAL REPORT Resiliency in the face of 21st Century Challenges 1 | 2019 MWSS Annual Re p o r t TABLE OF CONTENTS Page No. 1. Message from the Chairman 1 2. Message from the Administrator 3. Introduction 4. General Information a) Corporate Profile b) Legal bases c) Background d) Significant events in privatization e) Mission f) Vision g) Community Vision h) Core Values i) Corporate Objectives 5. Fast Facts and Figures 6. MWSS Board of Trustees Accomplishments 7. Water Security Programs a) Bulacan Bulk Water Supply Project b) New Centennial Water Supply Project (NCWS- Kaliwa Dam Project) c) Angat Water Transmission Improvement Project d) Bigte-Novaliches Aqueduct No.7 Project e) Umiray-Angat Transbasin Rehabilitation Project f) Rehabilitation of AHEPP g) Ipo Dam 3 Project 8. Governance a. Corporate Governance Confirmation Statement b. Whistleblowing Policy 2 | 2019 MWSS Annual Report 9. Sewerage and Sanitation 10. Organizational Excellence a) 2019 Performance Evaluation Scorecard (PES): b) First Audit Surveillance of ISO 9001:2015 Certification for the Project Management Division c) 2019 Stakeholder Satisfaction Survey d) Public’s access to information e) 2019 Strategic Planning f) ICT /IT Initiatives g) Procurement Activities 11. Human Resources a. Employee Training and Development Programs a) Hiring of COS b) Newly hired employees in 2019 c) Health, Safety, Sanitation, and Wellness Programs d) Gender and Development programs of MWSS e) PRAISE Committee accomplishments 11. Asset Management a) Donations to Government Offices 12. Partnership Development a) Partnership with International Organizations: Asia Water Council 2019 and Singapore Public Utilities Board b) Earthquake Resiliency Plan for Greater Metro Manila Area c) El Nino Preparedness Measures with Stakeholders d) Carriedo Cup Sportsfest e) Partnership with DOST-ASTI on Disaster risk- reduction and management of Ipo Dam 13.
    [Show full text]
  • A Legacy of Serving Filipino Farmers
    NIA 50 A Legacy of Servingat Filipino Farmers National Irrigation Administration NIA_BOOK Jacket_0512.indd 3 7/21/14 12:00 PM NIA at 50 A Legacy of Serving Filipino Farmers National Irrigation Administration NIA at 50 A Legacy of Serving Filipino Farmers NIA at 50 A Legacy of Serving Filipino Farmers A special publication project of NIA Public Affairs and Information Staff. EDITORIAL BOARD Claro V. Maranan, Administrator Felix M. Razo, Senior Deputy Administrator Modesto G. Membreve, Acting Deputy Administrator for Engineering and Operations Lorna Grace B. Rosario, Acting Deputy Administrator for Administrative and Finance Pilipina P. Bermudez Luzviminda R. Peñaranda Clarizze C. Toribio Pops Marie S. Dadea Lioneil G. dela Cruz Remster D. Bautista Arnulfo P. Tomas Allan John O. Zita Rogelio C. Barretto Copyright 2014 © National Irrigation Administration and Project Brio Media House ISBN 978-971-95962-0-2 All rights reserved. Reproduction in whole or in part by any means without prior written permission from the copyright owners and publishers is prohibited. Published by PROJECT BRIO MEDIA HOUSE [email protected] Executive Editor Jon P. Ave Editor Ces Rodriguez Writers Manny Espinola Antonio Maghirang Photography Raneil Ibay Graphic Artists Mario Sta. Maria Shannon Olaguer Research Assistant Jun Danganan CJ Brillantes Printed in the Philippines C o n t e n t s Preface .......................................................... 6 CHAPTER 2: Where the Water Flows 41 From the Administrators ................................ 9 NIA CAR
    [Show full text]
  • NDRRMC Update Sit Rep 12 Effects of Southwest Monsoon, 12 AUGUST 2012.Mdi
    • There has been a minor increase in the total number of families affected while there is a significant decrease of evacuation centers as evacuees are expected to return to their homes as the damaging effects of heavy rains subside. 3. Casualties (TAB C) • As of 5:00AM, 12 August 2012 , a total of eighty-five (85) persons were reported dead : twelve (12) were victims of landslide, sixty-two (62) died due to drowning, two (2) died due to lightning, three (3) due to electrocution, three (3) due to heart attack / cardiac arrest, two (2) due to fallen trees and one (1) undetermined. • A total of ten (10) persons were injured of whom were victims of landslide, vehicular accident and snake bite. • A total of eight (8) persons are still missing while 62, 846 were rescued . 4. Status of Lifelines 1. Condition of Roads and Bridges (TAB D) • As of 05:00 AM, 12 August 2012 , a total of ten (10) roads and three (3) bridges are not passable to all types of vehicles in Regions I, III, IV-A, CAR and NCR due to flooding. • To date, all roads in Muntinlupa City, Tarlac City, Province of Laguna, Region VI and some roads in the City of Manila that were previously reported obstructed by flood are already passable to all types of vehicles. 2. Status of Dams and Waterways (As of 08:00 PM, 11 August 2012) CURRENT WATER SPILLING DAM GATE OPENING LEVEL (m) LEVEL (m) ANGAT 214. 65 (↑) 210.00 IPO 10 0.39 (↓) 100.80 1 gate / 0.20 m = 37.7 cms LA MESA 79.
    [Show full text]
  • The Study of Water Security Master Plan for Metro Manila and Its Adjoining Areas
    METROPOLITAN WATERWORKS AND SEWERAGE SYSTEM THE REPUBLIC OF THE PHILIPPINES THE STUDY OF WATER SECURITY MASTER PLAN FOR METRO MANILA AND ITS ADJOINING AREAS FINAL REPORT WATER BALANCE STUDY MARCH 2013 JAPAN INTERNATIONAL COOPERATION AGENCY NIPPON KOEI CO., LTD. THE UNIVERSITY OF TOKYO GE JR 13-054 METROPOLITAN WATERWORKS AND SEWERAGE SYSTEM THE REPUBLIC OF THE PHILIPPINES THE STUDY OF WATER SECURITY MASTER PLAN FOR METRO MANILA AND ITS ADJOINING AREAS FINAL REPORT WATER BALANCE STUDY MARCH 2013 JAPAN INTERNATIONAL COOPERATION AGENCY NIPPON KOEI CO., LTD. THE UNIVERSITY OF TOKYO GE JR 13-054 ° ° 125 120 N STUDY AREA W E 15° AURORA S 10° NUEVA ECIJA Pampanga 5° THE PHILIPPINES TARLAC PAMPANGA Umiray Angat BULACAN QUEZON Kaliwa BATAAN Pasig- Marikina Metro RIZAL Manila Legend Laguna Lake Dam (existing) CAVITE LAGUNA Conveyance (existing) Intake (existing) River Basin Provincial Boundary BATANGAS 0102030 km River SCALE Location Map of the Study Area METROPOLITAN WATERWORKS AND SEWERAGE SYSTEM THE REPUBLIC OF THE PHILIPPINES THE STUDY OF WATER SECURITY MASTER PLAN FOR METRO MANILA AND ITS ADJOINING AREAS FINAL REPORT WATER BALANCE STUDY Table of Contents Location Map of the Study Area Abbreviations Page CHAPTER 1 INTRODUCTION ......................................................................... 1-1 1.1 Background of the Study .................................................................................... 1-1 1.2 Objectives of the Study ...................................................................................... 1-2 1.3 Study
    [Show full text]
  • Project Fact Sheet
    ENVIRONMENTAL IMPACT STATEMENT 500MW WAWA PUMPED- STORAGE HYDROPOWER PROJECT ANTIPOLO CITY AND THE MUNICIPALITIES OF SAN MATEO AND RODRIGUEZ, RIZAL EXECUTIVE SUMMARY Project Fact Sheet Name of Project 500MW Wawa Pumped-Storage Hydropower Project Project Location Rizal Province Project Area City of Antipolo and Municipalities of San Mateo and Rodriguez Nature Type of Project Hydropower Pumped-Storage Proposed Installed Capacity 500MW Summary of Major Major Components Brief Description Components Lower Reservoir Dam height = 47m Storage volume = 9.7million cubic meters(Mcm) Upper Reservoir Dam height = 84m Dam crest elevation = 552.4masl Full supply level = 550.45masl Excavated base = at 468masl Storage volume = 6.2 million cubic meters (Mcm) Dam Type = RCC With 4 Saddle Dams Tunnel Diameter = 6m H2O velocity(in tunnel) = 5m/s Length = 1,300m Tailrace canal Length = 868m (from surge shaft to outlet) Powerhouse Cavern Pump-turbine units = 3 units Reversible Francis pump-turbine capacity = 3 x 167MW Project Cost PhP 66 billion (USD1.5 billion) Construction Period 2016 to 2020 Commercial Operation Date Last Quarter 2020 Proponent Name Olympia Violago Water and Power Inc. (OVPI) Proponent Authorized Anthony Jude Violago Representative Director Proponent Address and 14th Floor, OMM-Citra Bldg. Contact Details San Miguel Avenue, Ortigas Center, Pasig City Telephone No. (02) 571-9997 / (02) 910-7888 E-mail Address: [email protected] EIA Preparer Aperçu Consultants, Inc. Preparer Contact Person Lilli Beth S. Yazon Managing Director Preparer
    [Show full text]