Project Fact Sheet
Total Page:16
File Type:pdf, Size:1020Kb
ENVIRONMENTAL IMPACT STATEMENT 500MW WAWA PUMPED- STORAGE HYDROPOWER PROJECT ANTIPOLO CITY AND THE MUNICIPALITIES OF SAN MATEO AND RODRIGUEZ, RIZAL EXECUTIVE SUMMARY Project Fact Sheet Name of Project 500MW Wawa Pumped-Storage Hydropower Project Project Location Rizal Province Project Area City of Antipolo and Municipalities of San Mateo and Rodriguez Nature Type of Project Hydropower Pumped-Storage Proposed Installed Capacity 500MW Summary of Major Major Components Brief Description Components Lower Reservoir Dam height = 47m Storage volume = 9.7million cubic meters(Mcm) Upper Reservoir Dam height = 84m Dam crest elevation = 552.4masl Full supply level = 550.45masl Excavated base = at 468masl Storage volume = 6.2 million cubic meters (Mcm) Dam Type = RCC With 4 Saddle Dams Tunnel Diameter = 6m H2O velocity(in tunnel) = 5m/s Length = 1,300m Tailrace canal Length = 868m (from surge shaft to outlet) Powerhouse Cavern Pump-turbine units = 3 units Reversible Francis pump-turbine capacity = 3 x 167MW Project Cost PhP 66 billion (USD1.5 billion) Construction Period 2016 to 2020 Commercial Operation Date Last Quarter 2020 Proponent Name Olympia Violago Water and Power Inc. (OVPI) Proponent Authorized Anthony Jude Violago Representative Director Proponent Address and 14th Floor, OMM-Citra Bldg. Contact Details San Miguel Avenue, Ortigas Center, Pasig City Telephone No. (02) 571-9997 / (02) 910-7888 E-mail Address: [email protected] EIA Preparer Aperçu Consultants, Inc. Preparer Contact Person Lilli Beth S. Yazon Managing Director Preparer Address and Unit 307 Philippine Social Science Center Contact Details Commonwealth Avenue, Diliman, Quezon City Telephone No.: (02) 929-2778 Fax/Tel. No.: (02) 455-2778 E-mail Address: bethyazon @apercu.biz.ph Executive Summary ES-1 ENVIRONMENTAL IMPACT STATEMENT 500MW WAWA PUMPED- STORAGE HYDROPOWER PROJECT ANTIPOLO CITY AND THE MUNICIPALITIES OF SAN MATEO AND RODRIGUEZ, RIZAL Project Description Summary This Environmental Impact Statement (EIS) is prepared for the application of an Environmental Compliance Certificate (ECC) for a pumped-storage hydropower plant project with a 500MW generation capacity. The Project will be known as the 500MW Wawa Pumped-Storage Hydropower Project owned by Olympia Violago Water and Power, Inc. (OVPI), a joint venture between San Lorenzo Ruiz Builders (SLRB) and Hydreq. The power plant will be located within the Wawa River Basin and Montalban River Sub-Basin with the lower reservoir located in Montalban River, which feeds to the Wawa River, and an upper reservoir located in Mt. Purro. About a kilometer long underground tunnel and other conduits consisting of a pressure shaft, penstocks and surge shaft, all to be located underground, will convey stored water from the upper reservoir to the lower reservoir. Power will be generated by 3 x 167MW Francis pump-turbine units. The proposed project is located in the Province of Rizal, hosted by the City of Antipolo and the municipalities of San Mateo and Rodriquez, specifically the barangays of Calawis, Pintong Bukawe and San Rafael, respectively. Specific sitios include Sitio Anipa and Sito Casili, which are home to Dumagats. Thus, a Free Prior and Informed Consent (FPIC) process is being undertaken by NCIP RegIV-A. No households are expected to be inundated but a Social Development Program and an IP Development Program framework have been developed to address impacts on private property. EIA Process Documentation EIA Team The environmental impact assessment was conducted by a team of specialists and consultants who have acknowledged expertise in their respective fields, working in close coordination with the OVPI. Table ES-1 lists the members of the EIA team: Table ES-1 Lists of the EIA Team Composition EMB Registry Module/Section Team Member Company No. Project Management Lilli Beth S. Yazon Aperçu IPCO-094 Project Coordination Diane Shiela C. Castillo Apercu IPCO-295 Project Co-Coordinator Ana Conjares Apercu IPCO-069 Land Use and Pedology Army Perez Apercu IPCO-071 Geology, Geomorphology Emmanuel Ramos, PhD Aperçu IPCO-117 Terrestrial Ecology - Wildlife Diane Shiela Castillo Aperçu IPCO-295 Terrestrial Ecology - Vegetation Tomas Reyes, PhD Aperçu - Hydrology and Hydrogeology Dolly Cleofas, PhD Aperçu IPCO-293 Freshwater Ecology Ma. Vivian Camacho, PhD Aperçu IPCO-213 Water Quality Cordia Jimenez Aperçu IPCO-074 Traffic Study Ana Conjares Apercu IPCO-069 Ambient Air Quality & Noise Aperçu Meteorology/ Climate/ Air Quality Jethro Alden Hipe IPCO-005 Modeling Public Health Roselmo Doval-Santos, MD Aperçu - Socio-economics & Cultural Heritage Krishna Buenaventura, PhD Aperçu IPCO-093 Executive Summary ES-2 ENVIRONMENTAL IMPACT STATEMENT 500MW WAWA PUMPED- STORAGE HYDROPOWER PROJECT ANTIPOLO CITY AND THE MUNICIPALITIES OF SAN MATEO AND RODRIGUEZ, RIZAL The OVPI team who worked closely with the EIA team includes: Mr. Peter McCreanor Mr. Samrinder Nehria Mr. Andres Martin Buldu Mr. Rafael Diezmos Mr. Jonas Azuelo The DENR Review Committee for this project is composed of the following members: Dr. Rosa Perez RevCom Chairman, Air Quality Module Dr. Teresita Perez Biota Module Dr. Soledad Natalie Dalisay People Module Mr. Oskar Cruz Hydrology and Geology Modules Juvy P. Ladisla, BMB Resource Person Engr. Regina Eugenio EMB Case Handler EIA Study Schedule Impact assessment surveys for the Wawa Pumped-Storage Project were undertaken from February to July 2015. Table ES-2 lists the major activities undertaken to complete the environmental impact assessment: Table ES-2 EIA Study Schedule Activity Date Place/Module February 2,2015 – AM Barangay Calawis February 2,2015 – PM Barangay Pintong Bukawe IEC Activities February 3,2015 Barangay San Rafael February 9,2015 SB Council, Rodriguez February 11, 2015 Barangay Council, San Rafael, Rodriguez February 12, 2015 Barangay Calawis, Antipolo City Public Scoping February 13, 2015 Barangay Pinto Bukawe, San Mateo February 17, 2015 Barangay San Rafael, Rodriguez Technical Scoping April 28, 2015 DENR Central Office Data Gathering July 4, 2015 Land Use and Pedology January 26-27, 2015 Geology May 25 – June 5, 2015 Vegetation Terrestrial Ecology May 15 – 19, 2015 Wildlife February 19 & 22, 2015 Hydrology May 24 to June 3, 2015 May 24 to June 3, 2015 Water Quality July 23, 2015 May 22 to May 25, 2015 Freshwater Ecology May 22 to June 17, 2015 Ambient Air and Noise May 13-18, 2015 People (Public Health/Perception Survey) July 3-5, 2015 Cultural Heritage EIA Study Area The proposed project is within the Upper Marikina River Basin Protected Landscape (UMRBPL), which covers two (2) municipalities and one (1) city in Rizal Province. The project components and buffer areas will cover an area of about 450 hectares (excluding Transmission Line) in the following barangays (Table ES-3). Executive Summary ES-3 ENVIRONMENTAL IMPACT STATEMENT 500MW WAWA PUMPED- STORAGE HYDROPOWER PROJECT ANTIPOLO CITY AND THE MUNICIPALITIES OF SAN MATEO AND RODRIGUEZ, RIZAL Table ES-3 Location of Project Facilities Project Component Barangay Municipality/City Upper Reservoir, intake and saddle dam Calawis Antipolo City Lower Reservoir Calawis Antipolo City Pintong Bukawe San Mateo Municipality Magazine area San Rafael Rodriguez Municipality Spoil Dump area 1 San Rafael Rodriguez Municipality Spoil Dump Area 2 Calawis Antipolo City Contractor’s and Engineers Office San Rafael Rodriguez Municipality Switchyard Area San Rafael Rodriguez Municipality Fuel Dump San Rafael Rodriguez Municipality Quarry Areas Calawis Antipolo City Contractor’s Laydown Area Calawis Antipolo City Contractor’s Camp Calawis Antipolo City Underground Power House Calawis Antipolo City Lower Intake and Gate Shaft Area Pintong Bukawe San Mateo Municipality San Rafael Rodriguez Municipality Access Road to Upper Reservoir San Jose Antipolo City Access Road to Lower Reservoir San Juan Antipolo City The areas to be encompassed by the components are: upper and lower dam area with a total of 106 hectares; project facilities such as: spoil dump area, quarry area, office, contractor’s camp, switchyard, magazine, contractor’s laydown area and area for batching plant having 194 hectares and construction and improvements of access roads with a total area of 150 hectares. EIA Methodology The environmental impact assessment was conducted based on the guidelines provided under the Revised Procedural Manual for DAO 2003-30, issued on August 2007 and the EMB MC 2014-05 (Revised Guidelines for Coverage Screening). The scope of and methods for the assessment were agreed upon with the Review Committee at the Technical Scoping meeting that was conducted on April 28,2015. Tabulated below are the sampling methods used, the number of sampling stations sampled, and the parameters and indices analyzed. Table ES-4 EIA Methodology Baseline Sampling Module/Section Stations and/or Parameters or Indices Methodology Land Module Land Use Classification Review of CLUPs Land use Mapping of watersheds using satellite Review of satellite imagery imagery and NAMRIA maps Walk through surveys/ Ground truthing and mapping Pedology Walk through surveys Soil samples at 8 stations Soil augering Parameters: pH ,nitrogen, organic matter, Physico-chemical analysis of phosphorous, potassium, micronutrients soil samples Geology and Review of geological reports and Tectonic Setting Geomorphology hazard maps Seismicity Walk through surveys Geomorphology Geotechnical drilling by OVPI Lithology Hazard identification (erosion, mass movements, flooding, earthquake related hazards, differential settling)