GPS Measurements from the Ladakh Himalaya, India: Preliminary Tests of Plate-Like Or Continuous Deformation in Tibet

Total Page:16

File Type:pdf, Size:1020Kb

GPS Measurements from the Ladakh Himalaya, India: Preliminary Tests of Plate-Like Or Continuous Deformation in Tibet GPS measurements from the Ladakh Himalaya, India: Preliminary tests of plate-like or continuous deformation in Tibet Sridevi Jade CSIR Centre for Mathematical Modelling and Computer Simulation, Bangalore 5650037, India B.C. Bhatt Indian Institute of Astrophysics, Bangalore 560034, India Z. Yang Department of Surveying Engineering, Chang’an University, Xi’an 710054, People’s Republic of China R. Bendick† Department of Geological Sciences, and Cooperative Institute for Research in Environmental Sciences, University of Colorado, Boul- der, Colorado 80309-0399, USA and COMET, University of Cambridge, Madingley Road, Cambridge CB3 0EZ, UK V. K . Gaur CSIR Centre for Mathematical Modelling and Computer Simulation, Bangalore 5650037, India and Indian Institute of Astrophysics, Bangalore 560034, India P. Molnar Department of Geological Sciences, and Cooperative Institute for Research in Environmental Sciences, University of Colorado, Boulder, Colorado 80309-0399, USA M.B. Anand Dilip Kumar CSIR Centre for Mathematical Modelling and Computer Simulation, Bangalore 5650037, India ABSTRACT argue for plate-like behavior of the Tibetan large-scale continental tectonics have prevailed. Plateau. Convergence between Ladakh and In one, continental tectonics results from the rela- Observations of relative motion in a geo- the Indian subcontinent at 18.8 ± 3 mm/yr at tive movements of a small number of essentially detic network in Ladakh, India, and across 224° ± 17° (1σ) differs little from estimates of rigid plates of mantle lithosphere, with deep southern Tibet indicate slow shear on the convergence across the central segment of the structure blurred by deformation of the overlying Karakorum fault, rapid east-west extension Himalaya. Finally, lengthening of the baseline thick crust (e.g., Tapponnier et al., 2001); in the across the whole of southern Tibet, and con- between Leh, Ladakh, and Lhasa (in south- other, continental lithosphere undergoes con- stant arc-normal convergence between India eastern Tibet) at 17.8 ± 1 mm/yr or between tinuous deformation (e.g., England and Jackson, and southern Tibet along the Himalayan arc. Leh and Bayi (farther to the southeast) at 18 1989; Molnar, 1988). Asia has provided both the Measurements of ten campaign-style and ± 3 mm/yr, is consistent with an extrapolation source of data for developing these views and the six permanent sites with global positioning of rates of east-west extension of the Tibetan testing ground exploited by supporters of both system (GPS) precise geodesy provide these Plateau based both on shorter GPS baselines views. Among the geological interpretations that bounds on the style and rates of the large-scale (e.g., Lhasa-Simikot) and on diverging slip separate proponents of each view, perhaps none deformation in the Tibet-Himalaya region. vectors of earthquakes in the Himalaya. We is more controversial than the role of strike-slip Divergence between sites at Leh, Ladakh, interpret these results to indicate that Tibet faults. Proponents of plate-like deformation India, and Shiquanhe, western Tibet, as well behaves more like a fl uid than like a plate. argue that slip on major strike-slip faults, at least as slow relative motion among sites within in Asia, occurs rapidly and that these faults con- the Ladakh network, limit right-lateral slip Keywords: geodesy, geodynamics, Tibetan trol the deformation fi eld, such as “the growth of parallel to the Karakorum fault to only 3.4 ± Plateau, Himalaya, Karakorum, continuum the Tibetan highlands” (Tapponnier et al., 2001, 5 mm/yr. This low rate concurs with a recent mechanics. p. 1671). Proponents of continuous deformation, estimate of 3–4 mm/yr for Late Holocene however, consider slip rates on the strike-slip time, but disagrees with the much higher INTRODUCTION faults to differ little from those on normal and rate of 30–35 mm/yr that has been used to thrust faults, and that all faults constitute passive Following the recognition of plate tectonics in markers of discontinuities in the strain fi eld that †Corresponding author e-mail: [email protected]. largely oceanic domains, two extreme views of translate and rotate with a deforming continuum. GSA Bulletin; November/December 2004; v. 116; no. 11/12; p. 1385–1391; doi: 10.1130/B25357.1; 4 fi gures; 2 tables. For permission to copy, contact [email protected] © 2004 Geological Society of America 1385 JADE et al. Of course, where two extremes prevail, show that deformation should be localized at the along strike do not alone preclude a single pole there is always a middle ground; at some level edges of strong inclusions within a deforming for Tibet-India relative velocity, with additional the deformation fi eld seen at the surface of all continuum (e.g., England and Houseman, 1985; constraint on kinematics applied by the geom- continental regions can be described in terms of Neil and Houseman, 1997). etry of the Himalayan arc (Avouac and Tappon- relative movements of blocks of crust. The dis- The other dominant strike-slip fault in the nier, 1993). parity is primarily a function of spatial scale. At Tibetan Plateau is the Karakorum fault, which Concurrent with the underthrusting of India one extreme, blocks may be so numerous (and crosses the western end of Tibet with a south- beneath the Himalaya, southern Tibet deforms therefore small) that their relative movements westerly strike. Prominent linear valleys, clearly by active normal faulting (e.g., Armijo et al., are best treated as resistant inclusions within a recognizable on satellite imagery, follow the 1986; Molnar and Tapponnier, 1978; Ni and continuous medium; at the other, blocks may be fault trace (e.g., Liu, 1993; Molnar and Tap- York, 1978), so that the ESE-WNW dimen- so few (and therefore large) that a description ponnier, 1978). Fresh scarps mark offsets of sion of the region extends. Although a rate of in terms of rigid blocks (plates) provides more alluvial and debris-fl ow fans that are easily seen extension was initially inferred from the varia- insight into the deformation fi eld than con- on the ground and from high-resolution satellite tion in slip vectors of earthquakes along the tinuous deformation. A logical boundary on the imagery (e.g., Brown et al., 2002; Liu, 1993; Himalaya and the rate of convergence across sizes of blocks might be 100 km, for to remain Liu et al., 1992). Peive et al. (1964) inferred the Himalaya (Molnar and Chen, 1982, 1983; strong, smaller ones would almost surely not hundreds of kilometers of right-lateral slip on Molnar and Lyon-Caen, 1989), corroboration include mantle lithosphere. Conversely, blocks this fault, and Peltzer and Tapponnier (1988) both from estimates of rates of slip on normal substantially larger than 100 km should include suggested 650 km of such slip, though Searle faults (Armijo et al., 1986) and from GPS mea- upper mantle. Thus, in the context of testing (1996) has argued for only 120 km. Although surements (Bilham et al., 1997; Jouanne et al., whether continental tectonics is plate-like or the high terrain (~5000 m) both east and west 1999; Larson et al., 1999; Wang et al., 2001) has fl uid-like, let us lump large-block models in of the fault requires Cenozoic crustal thicken- been limited to a fraction of the relevant zone. with the former and small-block models with ing, active faulting is sparse, if present at all, GPS measurements from both the western and the latter. The mechanical properties of crustal on the west side of the fault. Thus, in one view, eastern extremes of the Himalaya test whether blocks may also depend on the time over which this fault would be the boundary of plate-like extension persists throughout the arc and place a deformation is observed. We make the assump- Tibetan lithosphere, and in the other it would tight constraint on the total rate. tion that geodetic velocities are indicative of the mark a shear zone within a deformable region Motivated by these questions concerning the regional velocity over much longer times than if deformation has ceased in parts of the region. rate and direction of movement of the western the time span of observation. Inferred slip rates range from 30 to 35 mm/yr end of the Himalaya with respect to western Perhaps the best testing ground for plate-like (Avouac and Tapponnier, 1993; Liu, 1993; Liu Tibet east of the Karakorum fault, to India, versus fl uid-like behavior is Tibet itself. Major et al., 1992; Tapponnier et al., 2001), to 11 ± and to eastern Tibet, we installed a network of strike-slip faults surround much of the region: 4 mm/yr (Banerjee and Bürgmann, 2002), to GPS control points in Ladakh, India, which lies the Altyn Tagh fault in the north and the Kara- ≤9 mm/yr (Molnar and Lyon-Caen, 1989), to north of the Himalaya and near the western end korum fault in the west of Tibet. The area is ≤8 mm/yr (Searle et al., 1998), and fi nally to of the Tibetan Plateau. A second small array of large enough that if it behaved as a single plate only 3–4 mm/yr (Brown et al., 2002). GPS measurements near the eastern syntaxis (e.g., Avouac and Tapponnier, 1993), slip on the GPS measurements from the western and east- of the Himalaya, east of Lhasa, extends direct 1000-km-scale strike-slip faults should be much ern ends of the Himalaya also allow us to address geodetic observations across the entire extent more rapid that on the network of faults that other aspects of Asian tectonics relevant to the of the southern Tibetan Plateau (Fig. 1) when surrounds blocks of ~100–300 km in dimension plate versus fl uid controversy. For instance, we combined with observations reported in the within Tibet.
Recommended publications
  • 1962 Sino-Indian Conflict : Battle of Eastern Ladakh Agnivesh Kumar* Department of Sociology, University of Mumbai, Mumbai, India
    OPEN ACCESS Freely available online Journal of Political Sciences & Public Affairs Editorial 1962 Sino-Indian Conflict : Battle of Eastern Ladakh Agnivesh kumar* Department of Sociology, University of Mumbai, Mumbai, India. E-mail: [email protected] EDITORIAL protests. Later they also constructed a road from Lanak La to Kongka Pass. In the north, they had built another road, west of the Aksai Sino-Indian conflict of 1962 in Eastern Ladakh was fought in the area Chin Highway, from the Northern border to Qizil Jilga, Sumdo, between Karakoram Pass in the North to Demchok in the South East. Samzungling and Kongka Pass. The area under territorial dispute at that time was only the Aksai Chin plateau in the north east corner of Ladakh through which the Chinese In the period between 1960 and October 1962, as tension increased had constructed Western Highway linking Xinjiang Province to Lhasa. on the border, the Chinese inducted fresh troops in occupied Ladakh. The Chinese aim of initially claiming territory right upto the line – Unconfirmed reports also spoke of the presence of some tanks in Daulat Beg Oldi (DBO) – Track Junction and thereafter capturing it general area of Rudok. The Chinese during this period also improved in October 1962 War was to provide depth to the Western Highway. their road communications further and even the posts opposite DBO were connected by road. The Chinese also had ample animal In Galwan – Chang Chenmo Sector, the Chinese claim line was transport based on local yaks and mules for maintenance. The horses cleverly drawn to include passes and crest line so that they have were primarily for reconnaissance parties.
    [Show full text]
  • Last Post Indian War Memorials Around the World
    Last Post Indian War Memorials Around the World Introduction • 1 Rana Chhina Last Post Indian War Memorials Around the World i Capt Suresh Sharma Last Post Indian War Memorials Around the World Rana T.S. Chhina Centre for Armed Forces Historical Research United Service Institution of India 2014 First published 2014 © United Service Institution of India All rights reserved. No part of this publication may be reproduced or transmitted, in any form or by any means, without prior permission of the author / publisher. ISBN 978-81-902097-9-3 Centre for Armed Forces Historical Research United Service Institution of India Rao Tula Ram Marg, Post Bag No. 8, Vasant Vihar PO New Delhi 110057, India. email: [email protected] www.usiofindia.org Printed by Aegean Offset Printers, Gr. Noida, India. Capt Suresh Sharma Contents Foreword ix Introduction 1 Section I The Two World Wars 15 Memorials around the World 47 Section II The Wars since Independence 129 Memorials in India 161 Acknowledgements 206 Appendix A Indian War Dead WW-I & II: Details by CWGC Memorial 208 Appendix B CWGC Commitment Summary by Country 230 The Gift of India Is there ought you need that my hands hold? Rich gifts of raiment or grain or gold? Lo! I have flung to the East and the West Priceless treasures torn from my breast, and yielded the sons of my stricken womb to the drum-beats of duty, the sabers of doom. Gathered like pearls in their alien graves Silent they sleep by the Persian waves, scattered like shells on Egyptian sands, they lie with pale brows and brave, broken hands, strewn like blossoms mowed down by chance on the blood-brown meadows of Flanders and France.
    [Show full text]
  • ERONET Pre Reqst Format.Xlsx
    Polling Station wise list of Booth Level Officers (BLO) 26-Constituency of LAHDC, Leh-Ladakh No. of P/S Name of Polling station Name of Booth Level Officer Mobile . No 1 01- Thang Sh Sana Ullah 9419864100 2 02 -Tyakshi Sh Mohs Ayoub 9469552752 3 03Waha Pachathang Sh Abdul Rashid 9419534709 4 04 -Turtuk farool Sh Abdul Hamid 9469277933 5 05 -Turtuk youl Sh Ghulam Mohd 9469462863 6 06 -Garari Sh Mohd Omar 9469265938 7 07 -Chulungkha Sh Mohd Ibrahim 9419388079 8 08 -Bogdang Sh Qurban Ali 9419829393 9 09 -Skilkhor Sh. Shamsher Ali 9419971169 10 10-Changmar Sh Mohd Ali Khan 9469265209 11 11- Waris Sh. Ghulam Mohd 9469515130 12 12 -Fastan Sh Ghulam Mohd 9469531252 13 13- Sunudo Sh. Thoskor Spalgyas 9469176699 14 14 -Largyap Gogma Sh. Ali Akbar 9419440193 15 15 -Largyap Yokma Sh Ibrahim Ali 9469732596 16 16 –Pachathang Sh Mohd Hassan 9419386471 17 17 -Terchay Sh Sonam Nurboo 9419880947 18 18 –Skuru Sh Abdul Rashid 9419515915 19 19 -Rakuru Sh Mohd Mussa 9469212778 20 20 -Udmaroo Sh. Tashi Dawa 9419440625 21 21 -Shukur Sh Tsering Dorjey 9469178364 22 22 -Hundri Sh. Stanzin Dorjay 9469617039 23 23 -Hunder Sh Tashi Wangdus 9419550812 24 24-Awaksha Ms. Shakila Bano 9419448032 25 25 -Hunder Dok Ms. Naheda Akhatar 9469572613 26 26 -Skampuk Sh Tsetan Dorjey 9469362975 27 27 -Partapur Sh. Rehbar Hussain 9469571886 28 28 –Diskit-A Sh Rinchen Dorjey 9469165230 29 29-Diskit-B Sh Stanzin Galik 9469292903 30 30 -Burma Sh Stanzin Wangchok 9469213895 31 31 -Charasa Sh Deldan Namgail 9469387070 32 32 –Kuri Mr Punchok Angchok 9419974947 33 33- Murgi Sh.
    [Show full text]
  • Chushul Travel Guide - Page 1
    Chushul Travel Guide - http://www.ixigo.com/travel-guide/chushul page 1 Max: Min: 8.0°C Rain: 21.79999923 22.7999992370605 When To 7060547°C 47mm Chushul Aug Chushul is a valley in Ladakh, in the Cold weather. Carry Heavy woollen. VISIT Max: Min: Rain: state of Jammu and Kashmir in 20.29999923 7.300000190 21.7000007629394 India. 7060547°C 734863°C 53mm http://www.ixigo.com/weather-in-chushul-lp-1186507 Sep Very cold weather. Carry Heavy woollen. Famous For : Places To VisitCity Jan Max: Min: Rain: 6.5mm Freezing weather. Carry Heavy woollen. 16.29999923 2.200000047 7060547°C 683716°C Max: -4.0°C Min: - Rain: It was an airstrip used in the Sino-Indian 19.89999961 2.29999995231628 8530273°C 4mm Oct War. It is close to Rezang La and Panggong Freezing weather. Carry Heavy woollen. Lake at a height of 4360 metres. The Feb Max: Min: - Rain: Chushul village was the block headwaters of Freezing weather. Carry Heavy woollen. 8.300000190 7.800000190 2.70000004768371 734863°C 734863°C 6mm Chanthhang block of Ladakh district prior to Max: -2.0°C Min: - Rain: 17.10000038 1.60000002384185 the 1962 war with china. 1469727°C 8mm Nov Freezing weather. Carry Heavy woollen. Mar Max: Min: -14.0°C Rain: Freezing weather. Carry Heavy woollen. 3.099999904 0.60000002384185 6325684°C 79mm Max: Min: - Rain: 2.299999952 13.10000038 1.70000004768371 316284°C 1469727°C 58mm Dec Freezing weather. Carry Heavy woollen. Apr Max: - Min: - Rain: Freezing weather. Carry Heavy woollen. 1.200000047 18.10000038 1.29999995231628 6837158°C 1469727°C 42mm Max: Min: -8.0°C Rain: 7.400000095 2.20000004768371 367432°C 6mm May What To Very cold weather.
    [Show full text]
  • VALIDATED ASHA DATABASE LEH (LADAKH) AS PER RCH PORTAL Download
    VALIDATED ASHA DATABASE LEH (LADAKH) AS PER RCH PORTAL Download District Block Health Facility Health SubFacility ID Name Designation IsValidated Leh Leh PHC Basgo MAC SPITUK 1061 Lobzang Dolma ASHA Yes Leh Leh PHC Basgo MAC Rumbak 1133 Smt. Phunchok Dolma ASHA Yes Leh Nubra PHC BOGDANG (24X7) Direct Entry(0) 1394 Amina Bano ASHA Yes Leh Nubra CHC DISKET Direct Entry(0) 1396 Sakina Bano ASHA Yes Leh Nubra CHC DISKET MAC HUNDER 1695 Sonam Ladol ASHA Yes Leh Khalsi CHC Khalsi Direct Entry(0) 2646 Padma Diskit ASHA Yes Leh Leh PHC Basgo MAC PHEY 6645 Stanzin Lamo ASHA Yes Leh Leh PHC Basgo Direct Entry(0) 7575 Angchuk Dolma ASHA Yes Leh Leh PHC Basgo MAC Phyang 8764 Sonam Ladol ASHA Yes Leh Nyoma PHC Nyoma Direct Entry(0) 8768 Sonam Chosdon ASHA Yes Leh Nyoma PHC Nyoma Direct Entry(0) 8798 Tsering Tsomo ASHA Yes Leh Tangtsi PHC Tangtsi MAC Chillam 9189 Sonam Chosdol ASHA Yes Leh Tangtsi PHC Tangtsi SC Sato Kargyam 9191 Tsering Disket ASHA Yes Leh Tangtsi PHC Tangtsi SC Durbok 9193 Sonam Dolker ASHA Yes Leh Tangtsi PHC Chushul SC Merak 9206 Tashi Angmo ASHA Yes Leh Tangtsi PHC Tangtsi SC Khera Pulu 9210 Tashi Dolker ASHA Yes Leh Leh PHC Basgo MAC Choglamar 9996 Sonam Dolma ASHA Yes Leh Khalsi AD HANU Direct Entry(0) 10094 Tsering Angmo ASHA Yes Leh Khalsi CHC Khalsi Direct Entry(0) 10103 Tsewang Dolma ASHA Yes Leh Nyoma PHC Nyoma SC Rongo 11174 Chinba Zangmo ASHA Yes Leh Nubra CHC DISKET Direct Entry(0) 11273 Diskit Palmo ASHA Yes Leh Khalsi CHC Khalsi Direct Entry(0) 11775 Ishey Dolker ASHA Yes Leh Khalsi CHC Khalsi Direct Entry(0) 11776
    [Show full text]
  • LEH (LADAKH) (NOTIONAL) I N E Population
    JAMMU & KASHMIR DISTRICT LEH (LADAKH) (NOTIONAL) I N E Population..................................133487 T No. of Sub-Districts................... 3 H B A No of Statutory Towns.............. 1 No of Census Towns................. 2 I No of Villages............................ 112 C T NUBRA R D NUBRA C I S T T KHALSI R R H I N 800047D I A I LEH (LADAKH) KHALSI I C J Ñ !! P T ! Leh Ladakh (MC) Spituk (CT) Chemrey B ! K ! I Chuglamsar (CT) A NH 1A I R Rambirpur (Drass) nd us R iv E er G LEH (LADAKH) N I L T H I M A A C H A L P R BOUNDARY, INTERNATIONAL.................................. A D E S ,, STATE................................................... H ,, DISTRICT.............................................. ,, TAHSIL.................................................. HEADQUARTERS, DISTRICT, TAHSIL....................... RP VILLAGE HAVING 5000 AND ABOVE POPULATION Ladda WITH NAME................................................................. ! DEGREE COLLEGE.................................................... J ! URBAN AREA WITH POPULATION SIZE:- III, IV, VI. ! ! HOSPITAL................................................................... Ñ NATIONAL HIGHWAY................................................. NH 1A Note:- District Headquarters of Leh (Ladakh) is also tahsil headquarters of Leh (Ladakh) tahsil. RIVER AND STREAM................................................. JAMMU & KASHMIR TAHSIL LEH DISTRICT LEH (LADAKH) (NOTIONAL) Population..................................93961 I No of Statutory Towns.............. 1 N No of Census Towns................
    [Show full text]
  • Leh(Ladakh) District Primary
    Census of India 2011 JAMMU & KASHMIR PART XII-B SERIES-02 DISTRICT CENSUS HANDBOOK LEH (LADAKH) VILLAGE AND TOWN WISE PRIMARY CENSUS ABSTRACT (PCA) DIRECTORATE OF CENSUS OPERATIONS JAMMU & KASHMIR CENSUS OF INDIA 2011 JAMMU & KASHMIR SERIES-02 PART XII - B DISTRICT CENSUS HANDBOOK LEH (LADAKH) VILLAGE AND TOWN WISE PRIMARY CENSUS ABSTRACT (PCA) Directorate of Census Operations JAMMU & KASHMIR MOTIF Pangong Lake Situated at a height of about 13,900 ft, the name Pangong is a derivative of the Tibetan word Banggong Co meaning "long, narrow, enchanted lake". One third of the lake is in India while the remaining two thirds lies in Tibet, which is controlled by China. Majority of the streams which fill the lake are located on the Tibetan side. Pangong Tso is about five hours drive from Leh in Ladakh region of Jammu & Kashmir. The route passes through beautiful Ladakh countryside, over Chang La, the third highest motorable mountain pass (5289 m) in the world. The first glimpse of the serene, bright blue waters and rocky lakeshore remains etched in the memory of tourists. There is a narrow ramp- like formation of land running into the lake which is also a favorite with tourists. During winter the lake freezes completely, despite being saline water. The salt water lake does not support vegetation or aquatic life except for some small crustaceans. However, there are lots of water birds. The lake acts as an important breeding ground for a large variety of migratory birds like Brahmani Ducks, are black necked cranes and Seagulls. One can also spot Ladakhi Marmots, the rodent-like creatures which can grow up to the size of a small dog.
    [Show full text]
  • Mix List 01 and 02 of 2019.Xlsx
    ANNEXURE 2nd list of candidates eligible for various posts as shown against each. POST PERMANENT CAN ID: NAME: Parentage D.O.B CATG. APPLIED Remarks ADDRESS: Advt No: FOR Wild Life 02 of Guard/ 2019 778160 ABDUL QAYUM GHULAM MOHD 4/2/1991 ST SUMOOR NUBRA Forest Guard Eligible R/O TURTUK Wild Life 02 of NURBA,DISTICT LEH, Guard/ 2019 5113265 ABDUL RAHIM GH HASSAN 28-03-1996 OM PIN CODE 194401 Forest Guard Eligible 02 of AJAZ ALI CHUCHOT YOKMA General Line 2019 4949728 MUNSHI ALI MUNSHI 19-11-1986 ST LEH LADAKH Teacher Eligible 01 of 2019 30524 ALI ALI MOHAMA 5/4/1985 ST BOGDANG NUBRA Patwari Eligible Wild Life 02 of VILLAGE PARTAPUR Guard/ 2019 3432671 ALI AKBAR MOHD KARIM 15-07-1994 ST NUBRA LEH LADAKH Forest Guard Eligible 01 of 2019 7251 ALI RAZA MOHD HUSSAIN 16-06-1988 ST CHUBAPS PA FIANG Patwari Eligible General Line Teacher/ 02 of BOGDANG, NUBRA, Science 2019 1219899 ALI SHAH ALI REHMAN 4/2/1986 RBA LEH LADAKH Teacher Eligible Field 02 of BOGDANG, NUBRA, Assistant/ 2019 1219899 ALI SHAH ALI REHMAN 4/2/1986 RBA LEH LADAKH Surveyor- II Eligible Wild Life 02 of Guard/ 2019 2535888 ALI SHAH GH MOHD 5/5/1996 ST BOGDANG NUBRA Forest Guard Eligible Wild Life 02 of ZANGSTI LEH Guard/ 2019 7345534 AMAMULLAH MOHD YAQUB 10/3/1999 OM LADAKH Forest Guard Eligible General Line Teacher/ 02 of PO TURTUK NUBRA Science 2019 9568037 AMINA BANOO HUSSAIN 15-02-1995 ST LEH LADAKH Teacher Eligible General Line Teacher/ 02 of AMINA VILLAGE PARTAPUR Urdu 2019 5252187 KHATOON ALI ROZI 1/7/1993 ST NUBRA LEH LADAKH Teacher Eligible Field 02 of AMINA VILLAGE
    [Show full text]
  • समाचार पत्र से चियत अंश Newspapers Clippings
    June 2020 समाचार पत्र से चियत अंश Newspapers Clippings A Daily service to keep DRDO Fraternity abreast with DRDO Technologies, Defence Technologies, Defence Policies, International Relations and Science & Technology Volume: 45 Issue: 1 1 June 2020 35 1 रक्षा िवज्ञान पुतकालय Defenceरक्षा िवज्ञान Science पुतकालय Library रक्षाDefence वैज्ञािनक सScienceूचना एवं प्रल Libraryेखन क द्र Defence Scientific Information & Documentation Centre रक्षा वैज्ञािनक सूचना एव ं प्रलेखन क द्र Defence Scientificमेटकॉफ Informationहाउस, िदली -& 110 Documentation 054 Centre Metcalfe House, Delhi - 110 054 मेटकॉफ हाउस, िदली - 110 054 Metcalfe House, Delhi- 110 054 CONTENT S. No. TITLE Page No. DRDO News 1 DRDO Technology News 1 1. TEDBF: At $71 million flyaway costs, TEDBF It will be cheaper then Rafale 1 M and F-18 E/F Defence News 2-15 Defence Strategic National/International 2-15 2. Daulat Beg Oldi: Read about India’s strategically important airstrip in Ladakh that 2 keeps the Chinese troops in check 3. Chinese air activity goes down, limited troop pullback effected 3 4. Explained: The strategic road to DBO 4 5. China confirms: Both are taking steps to ease LAC situation 6 6. Major Generals exchange ideas, more talks lined up on Sino-Indian stand-off 7 7. Russia does not want to interfere in India-China stand-off: Top lawmaker 8 8. Army plans to expand roles for elite special and airborne forces known for 9 surgical strikes 9. भारतीय सेना को मले 21 हेलकॉटर पॉयलट 10 10.
    [Show full text]
  • ORF Occasional Paper#42
    EARCH S F E O R U R N E D V A R T E I O S N B ORF OCCASIONAL PAPER #42 O MAY 2013 Sino-Indian Border Infrastructure: An Update Rajeswari Pillai Rajagopalan Rahul Prakash OBSERVER RESEARCH FOUNDATION Sino-Indian Border Infrastructure: An Update Rajeswari Pillai Rajagopalan Rahul Prakash OBSERVER RESEARCH FOUNDATION About the Authors Dr. Rajeswari Pillai Rajagopalan is Senior Fellow at the Observer Research Foundation (ORF), New Delhi. Dr. Rajagopalan joined ORF after an almost five-year stint at the National Security Council Secretariat (2003-2007), where she was an Assistant Director. Prior to joining the NSCS, she was Research Officer at the Institute of Defence Studies and Analyses, New Delhi. She was also a Visiting Professor at the Graduate Institute of International Politics, National Chung Hsing University, Taichung, Taiwan in early 2012. She is the author of three books: Clashing Titans: Military Strategy and Insecurity Among Asian Great Powers; The Dragon's Fire: Chinese Military Strategy and Its Implications for Asia; and Uncertain Eagle: US Military Strategy in Asia. Rahul Prakash is a Junior Fellow at Observer Research Foundation. His research interests include technology and security, Chemical, Biological, Radiological and Nuclear (CBRN) issues and security developments in Asia. He has co-authored a report on Chemical, Biological and Radiological Materials: An Analysis of Security Risks and Terrorist Threats in India, an outcome of a joint study conducted by ORF and the London-based Royal United Services Institute. He has also published Issue Briefs on China’s Progress in Space and Rise of Micro Blogs in China.
    [Show full text]
  • Phacoemulsification Surgery in Eye Camps at High Altitude Dr
    74th AIOC 2016, Kolkata This paper was judged as the BEST PAPER of COMMUNITY/ SOCIAL OPHTHALMOLOGY-I Session Phacoemulsification Surgery in Eye Camps at High Altitude Dr. (Maj General) J K S Parihar, Dr. Piyush Kumar Chaturvedi, Dr. Sanjay Kumar Mishra, Dr. Jaya Kaushik he Indian Himalayas cover approximately 591,000 km2 or 18% of TIndia’s land surface and spread over six Himalayan States. District Leh (Ladakh, J&K) form the northern tip of the Indian sub continent with an area of 45110 km2 which probably makes it largest district in the country in terms of area, is one of the coldest and most elevated inhabited region of the world having 113 inhabited villages and one uninhabited village with an altitude ranging from 2900 to 5900 meters. The whole of the district is mountainous region with three parallel ranges of the Himalayas. Between these ranges the Shayok, Indus and Zanskar rivers flow and most of the population lives in the valleys of these rivers. The density of population is 3 person which stands lowest among the inhabited parts of the earth. Approximately 23.30% population is semi urban and remaining 76.17% is rural.1 Surrounded by valleys, barren snow capped mountains, the sparse population which inhabit this region preserving their rare culture are living in inhospitable and inaccessible areas where the wind of modernization never blows. Being a high altitude area it is adorned with surrounding difficult geographic features which compounds the problems of accessibility, transport and communication. The issue of health and health care has always found a back seat in this terrain where survival itself has been a challenge.
    [Show full text]
  • Battle of Rezang La 18 November 1962
    No. 11/2019 AN INDIAN ARMY PUBLICATION November 2019 BATTLE OF REZANG LA 18 NOVEMBER 1962 n epic battle was fought between of their trenches and engaged the enemy in hand ‘C’ Company of l3 KUMAON to hand combat, before attaining martyrdom. Acommanded by Late Major Shaitan After capturing two Platoons, while the enemy Singh, PVC and thousands of invading troops of was regrouping to attack the third Platoon and People`s Liberation Army on 18 November 1962 Company Headquarters, Naik Sahi Ram waited at Rezang La, about 19 miles South of Village for the Chinese to assemble before opening up Chushul, guarding the South-East approach to the Light Machine Gun & killing several Chinese Chushul Valley in Ladakh. soldiers. Major Shaitan Singh resited rest of the Light Machine Guns which kept firing until they The attack on Rezang La was launched on were silenced. The gallant Company Commander 18 November 1962. A patrol from ‘C’ Company received two bursts of Machine Gun fire in his detected the Chinese in their Forward Assembly arm and abdomen while moving from bunker to Area at 0400 hours. The first wave of attack came bunker raising morale of his men and continued to at 0500 hours, which was beaten back with heavy fight despite being seriously wounded. The enemy enemy casualties. On failure of their first attack, was finally stalled at Rezang La. It was due to the the Chinese pounded Rezang La with heavy endless courage, bravery and fighting capability of Artillery and Mortar fire of high intensity. Under the ‘Veer Ahirs’.
    [Show full text]