Agenda No. 3 F. No. 8-101/2014-FC Sub: Diversion of 78.00 Ha of Forest

Total Page:16

File Type:pdf, Size:1020Kb

Agenda No. 3 F. No. 8-101/2014-FC Sub: Diversion of 78.00 Ha of Forest Agenda No. 3 F. No. 8-101/2014-FC Sub: Diversion of 78.00 ha of forest land in favour of the Eastern Coalfields Ltd., Burdwan for Jhanjra Underground Coal Mining Project at Raniganj Coalfield under Durgapur Forest Division, West Bengal. The State Government of West Bengal vide their letter No. 494-For/O/L/10T-04/14 dated 5th March, 2014 submitted a fresh proposal for diversion of 78.00 ha of forest land in favour of the Eastern Coalfields Ltd., Burdwan for Jhanjra Underground Coal Mining Project at Raniganj Coalfield under Durgapur Forest Division, West Bengal. The proposal was considered by the Forest Advisory Committee in its meeting on 22nd December, 2014. The State Government has reported subsidence in earlier mining areas and, accordingly, the user agency has been requested to submit a detailed 3-D subsidence report from CMPDI on the likelihood of subsidence of the proposed area. Now, in response to Ministry’s letter of even number dated 30.01.2015, the State Government of West Bengal vide their letter No. 699-For/O/L/10T-04/14 dated 07th April, 2015 have sent a copy of the detailed 3D subsidence report from CMPDI furnished by the ECL Authority (ps.302-325/c). The facts related to the proposal as contained in the State Government’s letter dated 05th March, 2014 are given below in the form of factsheet: FACT SHEET 1. Name of the Proposal Diversion of 78.00 ha of forest land in favour of the Eastern Coalfields Ltd., Burdwan for Jhanjra Underground Coal Mining Project at Raniganj Coalfield under Durgapur Forest Division, West Bengal. 2. Location (i) State West Bengal (ii) District Burdwan 3. Particulars of Forests: (i) Name of Forest Division Durgapur and Forest area involved. 78.00 ha (ii) Legal status/Sy.No. (iii) Map Protected Forest Attached (p. 34-36/c & 293-297/c). 4. Density of vegetation 0.5% 5. Species-wise (scientific Enclosed (ps. 42/c). names) and diameter class- Sal Piyal, Piyal, Mohua, Sidha, Bahera, Bhalai, wise enumeration of trees (to Akashmoni, Rahara, Halda, Neem, Kasai, be enclosed. In case of Peasal, Asan, Euc. Piyal, Gammar, etc. irrigation / hydel projects enumeration at FRL, FRL-2 meter & FRL-4 meter also to be enclosed) 6. Brief note on vulnerability of Not significant, land is of plain topography. the forest area to erosion 7. Approximate distance of the It is a part of 78 ha out of 1034 ha forest land proposed site for diversion from boundary of forest. 8. Whether forms part of No National park, Wildlife Sanctuary, Biosphere Reserve, Tiger Reserve, Elephant Corridor, etc. (if so, details of the area and comments of the Chief Wildlife Warden to be annexed) 9. Whether any rare/ endangered/ No unique species of flora and fauna are found in the area. If so details thereof 10. Whether any protected No archaeological/ heritage site/defence establishment or any other important monuments is located in the area. 11. Whether the requirement of The entire forest land as proposed 78.00 ha is a forest land as proposed by the part of the whole project of 1034.00 ha. The user agency in col. 2 of Part-I forest land may be considered AVOIDABLE. is unavoidable and barest The forest area may be exempted from the minimum for the project, if no project as it is a continuous and compact patch recommended area item-wise which will act as a green belt. with details of alternatives examined. 12. Whether any work of in i. Renewal of mining lease not yet done for violation of the Forest Jhanjra Area project over 90.30 ha of (Conservation) Act, 1980 has forest land. Till the ECL authority been carried out (Yes/No). If continuing mining illegally at Jhanjra yes details of the same area. including period of work done, ii. All concerns are informed vide letter No. action taken on erring 1274/8-3 dt. 12.10.2011, 1699/8-3 dt. officials. Whether work in 14.12.2011, etc. violation is still in progress. iii. CAG has raised serious objection iv. Yes the work in violation still in progress. 13. Whether clearance under the Yes. Environmental clearances for the original Environment (protection) Act, project has been obtained vide MoEF’s No. 1986 is required? J11015/20/82 ENV-5/1A.11 dated 29.03.1993. Regarding environmental clearance for expansion project, terms of reference (TOR) was obtained as part of Cluster no. 12 on 2.12.2011 and draft EIA & EMP is being prepared for the complete cluster of which, the present project is a part. 14. Compensatory Afforestation (i) Details of non-forest As the proposal is for underground mining, area/degraded forest area accordingly applicant there will be no harm on identified for CA, its distance the forest above the mining area. from adjoining forest, number Hence, it need not compensatory afforestation of patches, size of each scheme. patches. (ii) Map showing non-forest/ -do- degraded forest area identified for CA and adjoining forest boundaries. (iii) Detailed CA scheme including -do- species to be planted, implementing agency, time schedule, cost structure, etc. (iv) Total financial outlay for CA -do- (v) Certificate from the competent -do- authority regarding suitability of the area identified for CA and from management point of view. 15. Catchment Area Treatment - 16. Rehabilitation of Oustees a) No of families involved Nil b) Category of families Nil c) Details of rehabilitation Not applicable plan 17. Cost Benefit Ratio Under process 18. Total Cost of the Project Rs. 147.25 crores 19. Recommendation i. DFO Forest area may be subsided (p. 41/c). As the surface of forest land will be disturbed ii. CCF due to subsidence, the case is not recommended for approval (p. 45/c). iii. Nodal Officer Since the project is being undertaken for the benefit of the country, as a whole, the proposal may be approved in line with the provision of Forest Conservation Ac, 1980 together-with the terms and conditions contained therein and its subsequent amendments (p. 47/c). Recommended (p. 47/c). iv SG 20. Division/ District profile (i) Total Geographical area of the 7024 sq. km. district (ii) Total Forest area/Divisional 28067.74 ha Forest area (iii) Total area diverted 260.3302 ha, cases – 5 nos. since 1980 (iv) Total compensatory 260.3302 ha afforestation stipulated in the district/division since 1980 on a) Forest land including penal compensatory afforestation b) Non-forest land (v) Progress of Compensatory Afforestation as on date a) Forest land 3.63 ha b) Non-forest land 225.13 ha. 21. Specific recommendations of Inspected on 12.09.2013 and 13.09.2013 the the DCF for acceptance or proposed site. otherwise of the proposal with There is no historical/archaeological/ heritage reasons site but some of the species like Peal, Kachmola, Setisal, Kosai, Velai and Sal come naturally. As forest is free from any biotic interference sometimes migratory elephant take shelter in it. This is one of the sources of ethno-medicinal plants & NTFP for Tribal Community of surrounding area. This is to focus that the people of this belt mainly are of Tribal Community, the JFMC will be affected greatly. As the 78.00 ha forest land is the part of the project of 1034.00 ha. The forest area may be subsided. As a result a natural green belt will be retained. Remarks: 1. Justification for locating the project: Total Geological coal reserve is 62.22 mt. of which 21.19 mt. almost 34% of total available. Coal of good quality is lying below forest area at exploitable depth. Locating project outside the forest area will limit the available reserve. The proposed forest cover under acquisition is in the continuity to the forest cover lying within the existing leasehold area. Coal below forest cover, if unexploited then the sterile coal left, will accrue a national loss of Rs. 8337 cr. 2. Copy of approved CMPDIL Project report with Plan (ps. 49-194/c). 3. Certificate from Chief Mining Officer, Govt. of West Bengal that after making review of the plan and record pertaining to the proposal, it reveals that no such major coal seam is likely to be available adjacent to the mine boundaries of the exiting mine in non-forest land area which can be extracted economically (p. 8/c). 4. The new proposal for diversion of 78 ha forest land is in continuity of the earlier approved forest land (90.30) ha. Further, proposal for renewal of lease of the said forest land (90.30) ha in question, has been applied and the same is under process with MoEF, Govt. of India. 5. Copy of environmental clearance for the original project obtained (ps. 11-12/c). 6. Undertaking to bear the cost of raising and maintenance of compensatory afforestation and/or penal compensatory afforestation as well as cost of protection and regeneration of Safety Zone etc. as per the scheme prepared by the State Government. (p. 13/c & 231/c). 7. Revenue Plan-A 1:3960 showing 90.30 ha forest land sent along with proposal for renewal of lease (p. 35/c). 8. Revenue Plan-B 1:3950 showing new proposal for diversion of 78 ha forest land (p. 34/c). 9. Survey of India toposheet on RF 1:50000 (ps. 36/c). 10. Land schedule (ps. 14-33/c & ps. 232-250/c). 11. The detail report regarding compliance to the conditions stipulated regarding Forest Rights Act issued vide circular No. 11-9/1998-FC(Pt.) issued by the District Magistrate Burdwan attached at ps.
Recommended publications
  • Annual Report & Accounts 2011-12
    ANNUAL REPORT & ACCOUNTS 2011-12 ering ow In p d m ia E EASTERN COALFIELDS LIMITED ( A Subsidiary of Coal India Limited ) SANCTORIA , P.O. DISHERGARH, DIST. BURDWAN CONTENTS Page No. 1. Management/Bankers/Auditors 1 2. Bankers / Auditors / Vision / Missiom Statement 2 3. Notice of Annual General Meeting 3 4. Chairman's Statement 4 5. Directors' Report 6 6. Comments of the Comptroller and Auditor General of India 98 7. Auditors' Report and Management's Reply 99 8. Balance Sheet as on 31st March, 2012 113 9. Profit & Loss Accounts for the year ended 31st March, 2012 115 10. Cash Flow Statement for the year ended 31st March, 2012 117 11. Notes forming part of Balance Sheet 119 12. Notes forming part of Profit & Loss Accoint 146 13. Significant Accounting Policies 159 14. Notes on Accounts 164 EASTERN COALFIELDS LIMITED MANAGEMENT DURING 2011-12 MANAGEMENT AS ON 21st MAY, 2012 FUNCTIONAL DIRECTORS: FUNCTIONAL DIRECTORS: Shri Rakesh Sinha Shri Rakesh Sinha Chairman-cum-Mg. Director Chairman-cum-Mg. Director Shri S.K. Srivastava Shri S.K. Srivastava Director (Personnel) Director (Personnel) Shri S. Chakravarty Shri S. Chakravarty Director (Technical) Opn. Director (Technical) Opn. Shri N. Kumar Shri A.K. Soni Director (Technical) P&P Director (Finance) (Upto 31.01.2012) Shri A.K. Soni PART-TIME OFFICIAL DIRECTORS: Director (Finance) Shri A.K. Sinha Director (Finance), CIL PART-TIME OFFICIAL DIRECTORS: Shri D.N. Prasad Shri A.K. Sinha Director (Technical), Ministry of Coal Director (Finance), CIL Shri D.N. Prasad SPECIAL DIRECTOR APPOINTED BY BIFR: Director (Technical) Shri K.K.
    [Show full text]
  • EC 11A Designated Location Identity
    10/12/2018 PrintForm11aList Print ANNEXURE 5.11 (CHAPTER V, PARA 25) FORM -EC 11A Designated location identity (where List of applications for transposition of entry in electoral roll Revision identity applications have been Received in Form - 8A received) Constituency (Assembly /£Pandabeswar) From To @ 2. Period of receipt of applications (covered in this list) 1. List number date 07/10/2018 date 07/10/2018 3. Place of hearing* Details of person whose entry is to be transposed Serial Details of Part/Serial number§ Date of applicant (As Name of person no. of roll Present place of Date/Time of of receipt given in Part V whose entry is in which EPIC No. ordinary hearing* application of Form 8A) to be transposed name is residence included NHS/32/170 ,CHHORA G.P ,PURE RADHASHYAM RADHASHYAM SITALPUR 1 07/10/2018 73 / 29 NSX1109222 KURMI KURMI COLLIERY ,BAHULA ,, PASCHIM BARDHAMAN NHS/32/170 ,CHHORA G.P ,PURE MRAAWQATI MRAAWQATI SITALPUR 2 07/10/2018 73 / 1 NSX1109206 DEVI DEVI COLLIERY ,BAHULA ,, PASCHIM BARDHAMAN N002 ,BANGKOLA COLLIERY BidHIchand BidHIchand 3 07/10/2018 76 / 63 NSX1470178 ,UKHRA Gope Gope ,UKHRA ,, PASCHIM BARDHAMAN N0258 ,BANKOLA ,BANKOLA 4 07/10/2018 Sorit Sengupta Sorit Sengupta 86 / 48 NSX1697861 ,NABAGRAM ,, PASCHIM BARDHAMAN N0258 ,BANKOLA ,BANKOLA 5 07/10/2018 Shriya Sengupta Shriya Sengupta 86 / 51 NSX1504380 ,NABAGRAM ,, PASCHIM BARDHAMAN N0258 ,BANKOLA ,BANKOLA 6 07/10/2018 Ajay Senagupt Ajay Senagupt 86 / 50 WB/38/263/420292 ,NABAGRAM ,, PASCHIM BARDHAMAN 7 07/10/2018 Ashish Senagupt Ashish Senagupt 86 / 52 WB/38/263/420002
    [Show full text]
  • List of Polling Station
    List of Polling Station 1 Assembly Name with No. : Kulti (257) Sl. No. Part No. Polling Station with No. 1 1 Sabanpur F.P.School (1) 2 2 Barira F.P.School (N) (2) 3 3 Barira F.P.School (S) (3) 4 4 Laxmanpur F.P.School (4) 5 5 Chalbalpur F.P.School (Room-1) (5) 6 6 Dedi F.P.School (6) 7 7 Kultora F.P.School (W) (7) 8 8 Kultora F.P.School (E) (8) 9 9 Neamatpur Dharmasala Room No.1 (9) 10 10 Jamuna Debi Bidyamandir Nayapara Room no.1 (10) 11 11 Jamuna Debi Bidyamandir , Nayapara Room no.2 (11) 12 12 Neamatpur F.P.School (12) 13 13 Neamatpur F.P.School (New bldg) (13) 14 14 Neamatpur F.P.School (Middle) (14) 15 15 Adarsha Janata Primary School Bamundiha, Lithuria Rd, R-1 (15) 16 16 Adarsha Janata Primary School Bamundiha, Lithuria Rd, R-2 (16) 17 17 Jaladhi Kumari Debi High School (R-1) (17) 18 17 Jaladhi Kumari Debi High School (R-2) (17A) 19 18 Belrui N.G.R. Institution (18) 20 19 Islamia Girls Jr High School, Neamatpur (R-1) (19) 21 20 Islamia Girls Jr High School , Neamatpur(R-2) (20) 22 21 Neamatpur Dharmasala (R-3) (21A) 23 21 Neamatpur Dharmasala (R-2) (21) 24 22 Sitarampur National F.P.School (22) 25 23 Eastern Railway Tagore Institute Room No.1 (23) 26 24 Eastern Railway Tagore Institute Room No.2 (24) 27 25 Belrui N.G.R. Institution Room (North) No.2 (25) 28 26 Belrui N.G.R.
    [Show full text]
  • Lions Clubs International Club Membership Register Summary the Clubs and Membership Figures Reflect Changes As of April 2005
    LIONS CLUBS INTERNATIONAL CLUB MEMBERSHIP REGISTER SUMMARY THE CLUBS AND MEMBERSHIP FIGURES REFLECT CHANGES AS OF APRIL 2005 CLUB CLUB LAST MMR FCL YR MEMBERSHI P CHANGES TOTAL DIST IDENT NBR CLUB NAME STATUS RPT DATE OB NEW RENST TRANS DROPS NETCG MEMBERS 5360 026072 ASANSOL 322C3 4 04-2005 34 0 0 0 -4 -4 30 5360 026076 BURDWAN 322C3 4 04-2005 120 4 2 0 -13 -7 113 5360 026107 PURULIA 322C3 4 04-2005 13 9 0 0 -1 8 21 5360 026109 RANIGANJ 322C3 4 04-2005 73 1 0 0 -1 0 73 5360 026112 ASANSOL EAST 322C3 4 04-2005 57 0 0 0 0 0 57 5360 030995 DURGAPUR 322C3 4 03-2005 61 4 0 0 -2 2 63 5360 033252 BANKURA 322C3 4 04-2005 75 2 0 0 -2 0 75 5360 033606 BOLPUR-SANTINIKETAN L C 322C3 4 11-2004 10 0 0 0 0 0 10 5360 033777 DURGAPUR EAST 322C3 6 10-2004 7 0 0 0 -7 -7 0 5360 034247 PANAGARH BAZAR 322C3 4 04-2005 54 4 0 0 0 4 58 5360 038374 ASANSOL GREATER 322C3 4 04-2005 34 4 0 1 -12 -7 27 5360 040708 KATWA 322C3 4 04-2005 30 1 0 0 -4 -3 27 5360 040819 SEHARA BAZAR 322C3 4 09-2004 15 0 0 0 0 0 15 5360 042235 JHALDA 322C3 4 03-2005 19 1 0 0 -1 0 19 5360 042346 KALNA 322C3 4 04-2005 36 1 0 0 0 1 37 5360 044118 GALSI 322C3 4 04-2005 29 2 2 0 -1 3 32 5360 046898 BOHAR 322C3 4 01-2005 22 0 0 0 0 0 22 5360 050777 NALHATI 322C3 4 04-2005 12 4 0 0 -1 3 15 5360 051803 SURI TOWN 322C3 4 04-2005 17 0 0 0 -2 -2 15 5360 053152 NEAMATPUR 322C3 4 03-2005 26 0 0 0 0 0 26 5360 053944 ANDAL 322C3 4 03-2005 36 1 0 1 -4 -2 34 5360 054060 MANKAR 322C3 4 04-2005 17 0 0 0 -3 -3 14 5360 054737 BISHNUPUR 322C3 4 01-2005 11 2 0 0 0 2 13 5360 057317 BURDWAN BIJOY TORAN 322C3 4
    [Show full text]
  • Lions Clubs International Club Membership Register Summary the Clubs and Membership Figures Reflect Changes As of September 2004
    LIONS CLUBS INTERNATIONAL CLUB MEMBERSHIP REGISTER SUMMARY THE CLUBS AND MEMBERSHIP FIGURES REFLECT CHANGES AS OF SEPTEMBER 2004 CLUB CLUB LAST MMR FCL YR MEMBERSHI P CHANGES TOTAL DIST IDENT NBR CLUB NAME STATUS RPT DATE OB NEW RENST TRANS DROPS NETCG MEMBERS 5360 026072 ASANSOL 322C3 4 08-2004 34 0 0 0 -2 -2 32 5360 026076 BURDWAN 322C3 4 07-2004 120 4 1 0 -5 0 120 5360 026107 PURULIA 322C3 4 08-2004 13 9 0 0 -1 8 21 5360 026109 RANIGANJ 322C3 4 09-2004 73 0 0 0 -1 -1 72 5360 026112 ASANSOL EAST 322C3 4 09-2004 57 0 0 0 0 0 57 5360 030995 DURGAPUR 322C3 4 09-2004 61 2 0 0 0 2 63 5360 033252 BANKURA 322C3 4 09-2004 75 0 0 0 0 0 75 5360 033606 BOLPUR-SANTINIKETAN L C 322C3 4 08-2004 10 0 0 0 0 0 10 5360 033777 DURGAPUR EAST 322C3 7 7 0 0 0 0 0 7 5360 034247 PANAGARH BAZAR 322C3 4 09-2004 54 3 0 0 0 3 57 5360 038374 ASANSOL GREATER 322C3 4 09-2004 34 1 0 0 -10 -9 25 5360 040708 KATWA 322C3 4 09-2004 30 0 0 0 0 0 30 5360 040819 SEHARA BAZAR 322C3 4 09-2004 15 0 0 0 0 0 15 5360 042235 JHALDA 322C3 4 09-2004 19 1 0 0 0 1 20 5360 042346 KALNA 322C3 4 09-2004 36 1 0 0 0 1 37 5360 044118 GALSI 322C3 4 08-2004 29 0 0 0 -1 -1 28 5360 046898 BOHAR 322C3 4 08-2004 22 0 0 0 0 0 22 5360 050777 NALHATI 322C3 4 08-2004 12 2 0 0 -1 1 13 5360 051803 SURI TOWN 322C3 4 09-2004 17 0 0 0 -1 -1 16 5360 053152 NEAMATPUR 322C3 4 09-2004 26 0 0 0 0 0 26 5360 053944 ANDAL 322C3 4 08-2004 36 0 0 0 0 0 36 5360 054060 MANKAR 322C3 4 07-2004 17 0 0 0 -1 -1 16 5360 054737 BISHNUPUR 322C3 4 09-2004 11 0 0 0 0 0 11 5360 057317 BURDWAN BIJOY TORAN 322C3 4 09-2004 13 1
    [Show full text]
  • Eastern Coalfields Limited (A Subsidiary of Coal India Ltd.)
    HALF YEARLY ENVIRONMENT CLEARANCE COMPLIANCE REPORT OF CLUSTER 12 J-11015/76/2011-IA.II(M) FOR THE PERIOD OF OCTOBER 2018 TO MARCH 2019 Eastern Coalfields Limited (A subsidiary of Coal India Ltd.) \ Eastern Coalfields Limited (A Subsidiary of Coal India Limited) Office of the Agent Jhanjra Project Colliery P.O.: Laudoha (8.O.), PIN: 713385 Dist.: Burdwano W.B. Ph: 0341- 2670618,, Fax: 0341-2672352 UNDERTAKING lnformation provided in Half yearly EC compliance report for the period September 2018 to March 2019 in respect of Jhanjra UGP of Cluster no. 12 is true to the best of my knowledge: S. No. Name of the mine Name of the Manager Signature of the Manager 1. Jhanjra UG P, K. Mondal V. a\\ <->551 c\ \el"dr\ G.M. (M)y'A$ent Project CollierY W.^U" Phone: (034 l) 2667 481(O) Fax: (03 4I) 2667274(O) BASTERN COALFIELDS LIMITED (A Subsidiary of Coal India Limited) O/o The Agent, Sonepur Bazari project PO: Sonepur-7L3378, Dist.: Paschim Bardhaman UNDERTAKING Information provided in half yearly EC compliance report for the period Oct,1g to March'19 in respect of the following mines of Cluster no. !2 is true to the best of my knowledge: sL. MINES NAME OF THE AGENT SIGNATURE OF THE NO. AGENT t Sonepur Bazari OCP ShriAmitanjan Nandi rl Agent/ oponent Half Yearly EC Compliance report in respect of mines under (Cluster 12), ECL Period:- October 2018 to March 2019 SPECIFIC CONDITIONS Grant of EC is only for the non-forest area plus the forest area within the mining lease for which FC is available.
    [Show full text]
  • Compensation Payment : List-5 66,059 Beneficiaries
    COMPENSATION PAYMENT : LIST-5 66,059 BENEFICIARIES District Beneficiary Name Beneficiary Address Policy Number Chq.Amt.(Rs.) PRADIP KUMAR VILL-BARABAKRA P.O-CHHATNA, BANKURA 107/01/11-12/000466 4,500 KARMAKAR DIST-BANKURA, PIN-722132 VILL-BARAKALAZARIYA, P.O- BANKURA JABA BAURI 107/01/11-12/000476 2,000 CHHATNA, DIST-BANKURA, SITARAM VILL- PANCHABAGA, P.O- BANKURA 107/01/11-12/000486 9,000 KUMBHAKAR KENDUADIHI, DIST- BANKURA, HIRENDRANATH PAL, KATJURIDANGA, BANKURA HIRENDRANATH PAL 107/01/11-12/000499 8,000 POST+DIST- BANKURA. AT- GOBINDANAGAR BUS STAND, BANKURA SAMBHU SING DINABANDHU PALLY, P.O- 107/01/11-12/000563 1,500 KENDUADIHI, DIST- BANKURA, NIRUPAMA ROY , C/O- SANTANU ROU, BANKURA SMT- NIRUPAMA ROY AT- EAST OF MUNICIPAL HIGH 107/01/11-12/000629 5,000 SCHOOL, VILL- KODALIA, POST- KOSTIA, DIST- BANKURA MONGAL LOHAR 107/01/11-12/000660 5,000 BANKURA, PIN-722144. VIVEKANANDA PALLI, P.O+DIST- BANKURA KHOKAN GORAI 107/01/11-12/000661 8,000 BANKURA VILL-RAMNAGAR, P.O-KENJAKURA, BANKURA AJOY KUMBHAKAR 107/01/11-12/000683 3,000 DIST-BANKURA, PIN-722139. VILL-GOYALHATI, P.O-NIKUNJAPUR, BANKURA SHAKUNTALA BAURI 107/01/11-12/000702 3,000 P.S-BELIATORE, DIST-BANKURA, VILL-GUALHATA,PO-KOSTIA,PS- BANKURA NILIMA DAS 107/01/11-12/000715 1,500 BELIATORE,DIST-BANKURA VILL- MOYRASOLE, P.O+P.S- BARJORA, BANKURA RINKU KHAN 107/01/11-12/000743 3,000 DIST- BANKURA, KAJURE DANGA,MILAN PALLI,PO- BANKURA DINESH SEN 107/01/11-12/000763 6,000 KENDUADIHI,DIST-BANKURA KATJURE DANGA,GOBINDANAGAR BANKURA MUKTA GARAI ROAD,PO-KENDUADIHI,DIST- 107/01/11-12/000766 9,000 BANKURA BANKURA ASHISH KARAK VILL BHUTESWAR POST SANBANDHA 107/01/12-13/000003 10,000 VILL-SARENGA P.O-SARENGA DIST- BANKURA SARADINDU HANSDA 107/01/12-13/000007 9,000 BANKURA PIN-722150 KARTICK CHANDRA RAJGRAM(BARTALA BASULIMELA) BANKURA 107/01/12-13/000053 8,000 HENSH POST RAJGRAM DIST BANKURA VILL JIRRAH PO JOREHIRA PS BANKURA MAYNARANI MAJI 107/01/12-13/000057 5,000 CHHATNA DIST BANKURA STATION MORE PO + DIST BANKURA BANKURA PADMA BAURI 107/01/12-13/000091 4,500 PIN 722101 W.B.
    [Show full text]
  • Final Population (Villages and Towns), Burdwan, West Bengal
    CENSUS 1971 WEST BENGAL FINAL POPULATION (VILLAGES AND TOWNS) BURDWAN DISTRICT DIBEOTOBATB OJ' CENSUS OPERATIONS WEST BENGAL PRE F A-C E The final population totals of 1971 down to the village' level will be presented, a.long with other demographic da.ta" in the District Census Handbooks. It will be some more months before we can publish the Handbooks for all the districts of the State. At the request of the Government of West Bengal, we are therefore bringing out this special publication in the hope that it will meet, a.t .least partly. the immediate needs of administrators, planners and scholars. Bhaskar Ghoae ' 10th February, 1975 Dfredor oj OenB'U8 Operatiou \ West Bengal CONTENTS PAGE BURDWAN DISTRICT Asansol Subdivision :3 1 P. S. Chittaranjan 4 J. p. S. Salanpur 5 3 P. S. Kulti 6 4 P. S. Hirapur 7 5 P. S. Asansol 8 Barabanl 6 P. S. (, •.1 7 P. S. Jamuria 10 R P. S. Raniganj Durgapur Subdivision II 9 P. S. Ondal 12 10 P. S. Faridpur 13 11 P. S. Durgapur 14 12 P. S. Kaksa 15 13 P. S. Bud Bud Sadar Subdivision 16-17 14 P. S. Ausgram 18-19 15 p. S. Galsi 20-21 16 P. S. Khandaghosh 22-24 17 P. S. Raina 25-26 18 P. S. Jamalpur 27-29 19 p. S. Memari 30-31 20 P. S. Burdwan 21 P. S. Bhatar 32-33 Katwa Subdivision 22 P. S. Mongalkote 34-35 23 P. S. Ketugram 36-37 24 P. S. Katwa 38-39 Kalna Subdivision 25 P.
    [Show full text]
  • Annual Report & Accounts 2019-20
    Eastern Coalfields Limited (A subsidiary of Coal India Limited) ANNUAL REPORT & ACCOUNTS 2019-20 EASTERN COALFIELDS LIMITED (A subsidiary of Coal India Limited) www.easterncoal.nic.in Mission To produce and market the planned quantity of coal and coal products efficiently and economically in an eco-friendly manner with due regard to safety, conservation and quality. Vision To emerge as a global player in the primary energy sector committed to provide energy security to the country by attaining environmentally & socially sustainable growth through best practices from mine to market. CONTENTS Sl.No. Contents Page No. 1. Management ............................................................................................ 04 2. Bankers/Auditors .................................................................................... 06 3. Notice of Annual General Meeting ........................................................... 08 4. Chairman’s Statement ............................................................................. 11 5. Operational Statistics/Financial Position ................................................. 15 6. Profile of Directors ................................................................................... 33 7. Boards’ Report ......................................................................................... 37 8. Comments of the Comptroller and Auditor General of India .................... 128 9. Auditors Report and Management’s Reply ............................................... 130 10. Balance Sheet
    [Show full text]
  • Of 3 OFFICEORDER Consequent Upon the Recommendation of the Departmental Selection Committee, the Competent Au
    Page 1 of 3 ईट셍न कोलफील्ड्स लललिटेड EASTERN COALFIELDS LIMITED कोल इंडिया का एक अंग (A Subsidiary of Coal India Limited) अध्यक्ष- सह प्रबन्धक निर्देशक का कायाालय, Office of the Chairman-Cum-Managing Director, सं啍टोरिया, पो-दर्दशेिगढ़, जिला-वधामाि, Sanctoria, PO: Dishergarh, Dist. Burdwan. West Bengal - 713333. पजचिम बंगाल-713333 Office of the General Manager (P&IR). महाप्रबंधक(का/औ.स.) का कायाालय CIN-U10101WB1975GOI030295. CIN-U10101WB1975GOI030295. Telefax- 0341-2523586. फ़ै啍स- 0341-2523586. Website: www.easterncoal.gov.in Website: www.easterncoal.gov.in Ref. NO. ECL/CMD/Rectt/SRD/Clerk-17/32/240 Date: 29th May, 2017. O F F I C E O R D E R Consequent upon the recommendation of the Departmental Selection Committee, the Competent Authority has accorded approval for selection of the following employees as “Clerk” Grade-III from amongst the SC/ST eligible departmental candidates of ECL who applied against the notification no: ECL/CMD/Rectt/SRD/Clerk-17/32/2102 dated 07.02.2017 under special drive. On being selected, they are hereby posted in the Areas/Units/Estb. as given against their names: List of SC category candidates Sl. Previous Father’s U. Man ROLL New place of N Name place of Unit Name Caste Name No. NO posting o posting Samiran Lt. Sukumar 1 192231 Jhanjra MIC SC 50521 Jhanjra Area Mondal Monday Lt-Dilip Raju Narsamuda 2 Kumar 190649 Sodepur SC 50612 Sodepur Area Paswan Colliery Paswan Raghunath Lt. Fela Ram 3 132604 Satgram Nimcha SC 50591 ECL,Hq.
    [Show full text]
  • Office of the General Manager, Jhanjra Area 7,85,579.00 7860.00 286.00 45 EASTERN COALFIELDS LIMITED JHANJRA AREA
    1 EASTERN COALFIELDS LIMITED JHANJRA AREA (A Subsidiary of Coal India Limited - PO – Jhanjra (B. O.) -713385 A Maharatna Company) Dist: Burdwan, W. B. Office of the General Manager, Jhanjra Area NIT No.: GM /JNR/Civil/e-Tender/14-15/2064 Date :23.02.15 e-TENDER NOTICE 1. Tenders are invited on-line on the website https://ecltenders.gov.in from the eligible bidders having Digital Signature Certificate (DSC) issued from any agency authorized by Controller of Certifying Authority (CCA), Govt. of India and which can be traced up to the chain of trust to the Root Certificate of CCA, for the following work: Tendered Cost Application fee Period of (excluding Earnest Description of work (Nonrefundable) Completion service tax) Money (In ₹.) (Including VAT @ (In Days) (In ₹.) 14.5%) (In ₹.) Construction of Bituminous Road (balance) at POCP railway siding under Jhanjra 7,85,579.00 7860.00 286.00 45 Area. 2. Time Schedule of Tender : Sl. Particulars Date Time No. a. Tender e-Publication date 03.03.15 15.00 Hours b. Document download start date 03.03.15 15:30 Hours c. Document download end date 15.03.15 17.00 Hours d. Bid Submission start date 04.03.15 11.00 Hours e. Bid submission end date 15.03.15 17.00 Hours f. Start date for seeking Clarification on-line 03.03.15 15.30 Hours g. Last date for seeking Clarification on-line 11.03.15 17.00 Hours h Last date for giving clarification on line 13.03.15 12.00 Hours i Last date of receipt of Application fee & EMD 18.03.15 17.00 Hours j Technical Bid Opening date 19.03.15 11:00 Hours 3.
    [Show full text]
  • District Survey Report, Paschim Bardhaman District, West Bengal
    DISTRICTISO 9001:2015 & ISO 14001:2015 Certified Company SURVEY REPORT (For mining of minor minerals) As perPASCHIM Notification BARDHAMANNo. S.O.3611 (E) New D DelhiISTRICT, dated 25 TH Of July 2018 Ministry of Environment, Forest and Climate Change (MoEFCC) PREPARED BY: RSP GREEN DEVELOPMENT AND LABORATORIES PVT. LTD. ISO 9001:2015 & ISO 14001:2015 Certified Company QCI-NABET ACCREDITED CONSULTANT AUGUST, 2021 DISTRICT SURVEY REPORT, PASCHIM BARDHAMAN DISTRICT, WEST BENGAL CONTENTS SL. TOPIC DETAILS PAGE NO. NO CONTENT I - II ABBREVIATIONS USED III - IV LIST OF TABLES V - VI LIST OF MAPS VII LIST OF ANNEXURES VIII CONFIDENTIALITY CLAUSE IX ACKNOWLEDGEMENT X FIELD PHOTOGRAPHS XXI 1 PREFACE 1 2 INTRODUCTION 2 - 4 3 GENERAL PROFILE OF THE DISTRICT 5 - 22 a. General information 5 - 7 b. Climate condition 7 - 9 c. Rain fall (month wise) and humidity 9 - 10 d. Topography and terrain 10 - 11 e. Water course and hydrology 11 - 12 f. Ground water development 12 - 15 g. Drainage system (general) 16 h. Demography 16 - 18 i. Cropping pattern 18 - 19 j. Landform and seismicity 19 k. Flora 20 - 21 l. Fauna 21 - 22 4 PHYSIOGRAPHY OF THE DISTRICT 23 - 26 o General landform 23 o Soil & Rock pattern 23 - 25 o Different geomorphological units 25 - 26 5 LAND USE PATTERN OF THE DISTRICT 27 - 33 . Introduction 27 - 29 a. Forest 30 b. Agriculture & Irrigation 31 c. Horticulture 32 d. Mining 32 - 33 6 GEOLOGY 34 - 36 Regional geology 34 - 35 Local geology 36 7 MINERAL WEALTH 37 - 39 Overview of the mineral resources (covering all minerals) 37 - 39 I PREPARED BY: RSP GREEN DEVELOPMENT AND LABORATORIES PVT.
    [Show full text]