Planning and Highways Minutes | Tues 9Th January 2018 Planning

Total Page:16

File Type:pdf, Size:1020Kb

Planning and Highways Minutes | Tues 9Th January 2018 Planning Planning and Highways Meeting Tuesday 9th January 2018 Sutton Coldfield Town Hall 7pm Present Cllrs D Allan (Chairman), L. Allen, Bennett (substitute for Cllr Long) ,Griffin, Horrocks, Perks & Puri. Under item 4(v) of the Town Council Standing Orders, the Town Clerk advised Committee that for this meeting Cllr Bennett would be substituting for Cllr Long. In Attendance Olive O’Sullivan - Town Clerk & Natalia Gorman - Administrative Officer. Karl Randall (Senior Service Manager Engineer), Birmingham City Council. There were 4 members of the public and no press present. The Chairman welcomed everyone to the meeting and invited questions or comments from the public. Tracey Homer, a resident of Froggatts Ride, New Hall ward, spoke about concerns regarding poor parking on Froggatts Ride mainly from residents of Andrew Courts flats. Mr. Randall took the residents details and will investigate and respond to her. Brian Smith, a Four Oaks resident, advised committee that he is not in favour of the proposed Traffic Regulation Order (TRO) in Four Oaks Road as he believes it would have an impact on Irnham Road. Mr. Randall, who is overseeing the proposal made a note of Mr. Smith’s concerns. Martin Pearce, a resident of Four Oaks ward asked Committee if data recorded from Driver Feedback signs would be made public. The Chair confirmed that the data would be reported to the Planning & Highways Committee. 47 Apologies For Absence The Clerk received apologies from Cllrs Cairns & Long. Resolved to accept the apologies received. 48 Declarations of Interest Cllr Puri declared a non-pecuniary interest in item 52 Driver Feedback Signs. Cllr Puri is a resident of Jockey Road. 49 Minutes of Last Meeting Resolved that the minutes of the meeting of Planning & Highways Committee Meeting held on Tuesday 5th December 2017 be signed as a true record of the meeting. 50 Matters Arising Page | 1 Planning and Highways Minutes | Tues 9th January 2018 The Town Clerk advised committee that the informal statutory consultation period for the proposed TRO on Four Oaks Road will end on 12th January 2018. Resolved to note the Town Clerks update. 51 Four Oaks Road Traffic Restrictions The chair welcomed Karl Randall, Senior Service Manager Engineer BCC to the meeting. Mr Randall advised committee that due to a long history of complaints regarding parking concerns on Four Oaks Road, engineers had worked on a scheme in readiness for any funding that might become available. Four Oaks Road is an official designated blue route for emergency services. It is also a designated H.G.V route. As a 4m wide road, obstructions could hinder emergency vehicles and H.G.V’s. The length of the proposed restrictions is around 400 metres. The view of Highways Engineers is that commuters are unlikely to walk 400m away from the station. In order to protect the junction at Irnham Road, the proposed restriction will be extended to 30m of the junction as opposed to the standard 10m. The informal consultation is due to end on 12th January however Mr Randall has confirmed he will accept comments received for a week or so after this date. Mr Randall also confirmed that those residents directly affected by the proposed changes have received a letter detailing the proposed scheme. All correspondence will be evaluated and if necessary the scheme will be altered before being presented at meetings of BCC Transportation Delivery Group and Transport Street Services Group. The business case, i.e. 30 maintenance cost to be met by BCC, would be considered at these meetings. The scheme then goes out to formal statutory 21-day consultation. Mr Randall advised that the estimated timescale for this is March. Resolved to note the update. 7.31pm Cllr Horrocks joined the meeting at this point. 52 Driver Feedback Sign Locations Mr Randall advised committee that three contractors have been approached for quotes in which two have come back with competitive prices for driver feedback signs. Little Sutton Road, Penns Lane, Heath Croft Road and Jockey Road have all been identified as roads that could benefit from a Driver Feedback sign. Each of these roads have evidence showing motorists speeding and overtaking. Finer details including power source and the effect on existing trees will be taken into consideration before a final decision is made. Mr Randall will report back to Committee. Page | 2 Planning and Highways Minutes | Tues 9th January 2018 Resolved that committee agrees driver feedback signs will be installed on Little Sutton Road, Penns Lane, Heath Croft Road and Jockey Road based on the recommendation of BCC Highways Engineers. 53 Performance Information Resolved to note the performance progress report. 7.40pm Karl Randall and the public left the meeting. 54 Planning Applications Four Oaks Ward 30th November - 3rd January 2018 Application SCTC No Number Site Address Development Description Recommendation Erection of first floor forward 34 Bishops Meadow 1 2017/10856/PA and side and single storey No Objection Sutton Coldfield B75 5PQ rear extensions 56 Trinity Road Four Oaks Erection of single storey 2 2017/10469/PA Sutton Coldfield West No Objection forward and rear extensions. Midlands B75 6TJ 316 Clarence Road Sutton Display of one internally 3 2017/10800/PA Four Oaks Sutton Illuminated free standing No Objection Coldfield B74 4LU totem sign Erection of two storey side & 154 Mere Green Road rear extensions and single 4 2017/10796/PA No Objection Sutton Coldfield B75 5DH storey side & forward extensions. 124 Willmott Road Sutton Retention of single storey 5 2017/10780/PA No Objection Coldfield B75 5NW rear extension 170 Walsall Road Four Erection of single storey side 6 2017/10560/PA Oaks Sutton Coldfield No Objection and front extension B74 4RH 189 Dower Road Sutton Erection of first floor side and 7 2017/10704/PA No Objection Coldfield B75 6SZ rear extension 36b Streetly Lane Sutton Erection of single storey rear 8 2017/10702/PA Coldfield Birmingham B74 No Objection extension 4TU 53 Bracebridge Road Four Erection of two storey side 9 2017/10343/PA Oaks Sutton Coldfield No Objection and rear and first floor rear West Midlands B74 2SL Page | 3 Planning and Highways Minutes | Tues 9th January 2018 extension including Juliet balcony to rear. Non-Material Amendment to approval 2017/07063/PA for 1 The Copse Four Oaks amendments to windows and 10 2017/10520/PA Sutton Coldfield doors, re-design of proposed No Objection Birmingham B74 2TS entrance porch and existing bay window and installation of bi-fold doors to orangery Erection of single storey 29 Little Sutton Road forward extension, roof 11 2017/10412/PA Sutton Coldfield West No Objection alterations and installation of Midlands B75 6QH rear dormer window. 15 Becket Close Sutton Erection of first floor side 12 2017/10481/PA Coldfield Birmingham B74 No Objection extension 4XP Erection of first floor side and 155 Clarence Road Four rear and single storey rear 13 2017/10404/PA Oaks Sutton Coldfield No Objection extension including Juliet Birmingham B74 4LB balcony to rear Erection of single storey side 32 Blackroot Road Sutton and rear extensions and 14 2017/10282/PA Coldfield Birmingham B74 No Objection extensions to roof including 2QP dormers to front and rear Lichfield Road Unit 5J Change of use to a tanning 15 2017/10252/PA Mere Green Sutton No Objection shop (sui-generis) Coldfield Birmingham B74 Application for a Certificate 100 Clarence Road Four of Lawfulness for the 16 2017/10060/PA Oaks Sutton Coldfield B74 proposed erection of a single No Objection 4AS storey rear extension including log store. 96 Jordan Road Sutton Erection of single storey rear 17 2017/10330/PA Coldfield Birmingham B75 No Objection extension. 5AE Erection of detached triple garage with office/gym over 1 Heather Court Gardens 18 2017/10167/PA and re-positioning of No Objection Sutton Coldfield B74 2ST vehicular access with automated gates Erection of single and two 175 Little Sutton Lane storey side and rear, two 19 2017/10040/PA Sutton Coldfield West No Objection storey side and front Midlands B75 6SL extensions. Page | 4 Planning and Highways Minutes | Tues 9th January 2018 16 Rocklands Drive Erection of first floor side 20 2017/10269/PA Sutton Coldfield No Objection extension Birmingham B75 6SP 286 Clarence Road Four Installation of dormer 21 2017/10245/PA Oaks Sutton Coldfield No Objection window to rear. West Midlands B74 4LP Sycamore House 3 Erection of single storey Cypress Gardens Sutton 22 2017/10240/PA forward extension and No Objection Coldfield West Midlands canopy to front. B74 2HD 5 Beighton Close Sutton Erection of first floor side 23 2017/09868/PA Coldfield Birmingham B74 No Objection extension. 4YA 139 Walsall Road Four Erection of single storey rear 24 2017/10215/PA Oaks Sutton Coldfield No Objection extension West Midlands B74 4NR Erection of first floor 182 Hill Village Road extension to form two storey 25 2017/10133/PA Sutton Coldfield No Objection dwelling and single storey Birmingham B75 5JG rear extension 187 Lichfield Road Sutton Erection of single storey rear 26 2017/08804/PA Coldifeld West Midlands No Objection extension. B74 2XA New Hall Ward 30th November - 3rd January 2018 Application SCTC No Number Site Address Development Description Recommendation Erection of two storey side and rear and single storey 330 Eachelhurst Road 27 2017/10851/PA front and rear extensions No Objection Sutton New Hall B76 1ER and alterations to driveway surfacing. 175 Penns Lane Sutton Erection of single storey 28 2017/10825/PA Coldfield Birmingham B76 No Objection forward extension 1JU 67 The Boulevard Sutton Erection of single storey and 29 2017/10329/PA Coldfield West Midlands first floor rear extension with No Objection B73 5JE balcony.
Recommended publications
  • HS2 Unlocking the Benefits
    i HS2 Unlocking the benefits West Midlands Connectivity Package ii 2.7 million people live in the West Midlands metropolitan area, the largest urban area outside of London 1 The Connectivity Package will improve regional and local links The High Speed to High Speed Rail Two (HS2) and encourage sustainable Rail Network will growth using the released rail capacity from the West Coast Main Line. Economic benefits will therefore be maximised provide much- across the West Midlands region with capacity constraints on needed additional rail the already congested local transport networks being relieved. capacity connecting Based on international experience of High Speed Rail, the main urban areas implementation of the Connectivity Package to transform the proposed HS2 interchanges into integrated regional of the UK along a transport hubs is fundamental if our businesses are to expand new North-South fast their markets, access a wider workforce and develop local economic networks. Improved connectivity will undoubtedly connection. To capture attract new business and promote innovation across our and maximise the manufacturing and service sectors. distribution of HS2’s The Package will have a positive impact across a range of economic challenges facing Local Enterprise Partnerships potential benefits, (LEPs) in the West Midlands such as slow business cluster authorities across formation, urban youth unemployment and limited access to international gateways. The arrival of HS2 also underpins the West Midlands development plans for Birmingham city centre and UK region have prepared a Central, stimulating further job creation from high-value economic activity in the West Midlands. Delivery of the Transport Connectivity Package will ensure that key locations are effectively linked Package, which will up to HS2 stations overcoming any potential consequences of building HS2 without connections to these places.
    [Show full text]
  • Water Orton Neighbourhood Plan
    Water Orton Neighbourhood Plan 1 Issued by: Water Orton Parish Council Compiled by: The Governance Group Document details Revision: 2020 August 18th File Name: 200818 - Neighbourhood Plan.doc Index Front Page Page 1 Index Page 2 -3 Sections 1. Executive Summary Page 4 - 6 2. Introduction to the plan Page 7 - 11 2. Introduction - The Group Page 12 - 13 2. Introduction - The Structure Page 14 3. Health and wellbeing - Background Page 15 3. Health and wellbeing - Objectives Page 16 3. Health and wellbeing - Supporting data Page 17 - 20 3. Health and wellbeing - Policies Page 21 - 22 4. Housing – Background Page 23 – 25 4. Housing – Objectives Page 26 4. Housing – Supporting data Page 27 – 28 4. Housing – Policies Page 29 – 30 5. Recreation & Leisure – Background Page 31 – 34 5. Recreation & Leisure – Objectives Page 35 5. Recreation & Leisure – Supporting data Page 36 – 45 5. Recreation & Leisure – Policies Page 46 2 6. Green Spaces community Area – Background Page 47 – 48 6. Green Spaces community Area – Objectives Page 49 6. Green Spaces community Area – Supporting data Page 50 – 51 6. Green Spaces community Area – Policies Page 52 – 53 7. Commercial - Background Page 54 7. Commercial - Objectives Page 55 7. Commercial - Supporting data Page 56 - 58 7. Commercial - Policies Page 59 - 60 Index 8. Security and Safety - Background Page 61 8. Security and Safety – Objectives Page 62 8. Security and Safety - Supporting data Page 63 8. Security and Safety - Policies Page 64 9. Character, Heritage Culture – Background Page 65 - 68 9. Character, Heritage Culture – Objectives Page 69 9. Character, Heritage Culture – Supporting data Page 70 - 72 9.
    [Show full text]
  • Water Orton Viaducts Design January 2021
    Water Orton Viaducts Design January 2021 www.hs2.org.uk Introduction Table of Contents High Speed Two (HS2) is the new high-speed line critical for What is a Key Design Element? 1 the UK’s low carbon transport future. It will provide much- needed rail capacity across the country, and is integral to rail Key principles of HS2 design 2 projects in the North and Midlands – helping rebalance the UK Context of Design 3 economy. Delta Junction 5 In spring 2020, we asked for your views on the design of the Water Orton viaducts. Water Orton viaducts design 7 Concrete finish options 9 This year, we’ll submit planning applications for the viaducts to North Warwickshire Borough Council. Construction methodology 11 This booklet includes the latest designs of the Water Orton Traffic management 13 viaducts. Landscape proposal 15 If you’d like more information about our viaduct design Water Orton viaducts sections 17 proposals, please visit our local community website on www.hs2inwarwickshire.co.uk Public engagement feedback 19 Landscape creation 21 Abutments 23 Straddle bents 25 Key views 27 Due to the Coronavirus (COVID 19) pandemic and in response Approaches to design & construction 29 to Government guidance on social distancing it will not be possible to engage directly with community groups in the Keeping you informed 30 usual way. We have therefore created this updated booklet and a virtual space on the HS2 community website. HS2 community website - www.hs2inwarwickshire.co.uk What is a Key Design Element? Key principles of HS2 design Landscape Integration HS2 has classified certain structures or parts of the railway Landscape interfaces with buildings and structures as “Key Design Elements” (KDE), including the Water Orton viaducts.
    [Show full text]
  • Birmingham Aston Park Circuit
    WESLEYAN METHODIST HISTORIC ROLL VOLUME 21 BIRMINGHAM ASTON PARK CIRCUIT Page 157 COLLINGWOOD Charles Allan 150 Victoria Road Aston Birmingham COLLINGWOOD Clara 150 Victoria Road Aston Birmingham COLLINGWOOD Ada Beatrice 150 Victoria Road Aston Birmingham COLLINGWOOD Charles Fielding 150 Victoria Road Aston Birmingham COLLINGWOOD Frances Edith 150 Victoria Road Aston Birmingham COLLINGWOOD Clarrie In Memoriam BARRATT Thomas Hugh 28 Trinity Road Birchfield BARRATT Edith J 28 Trinity Road Birchfield BARRATT Francis M 28 Trinity Road Birchfield BARRATT T E Chester 28 Trinity Road Birchfield BARRATT Ernest In Memoriam BARRATT Elsie E In Memoriam GIBBS Thos In Memoriam GIBBS Mary In Memoriam PEMBER E B 36 Wilton Road, Six Ways Aston JONES Alice GADSBY John 65 Albert Road Aston GADSBY Eliza In Memoriam GADSBY Anne In Memoriam GADSBY John William 65 Albert Road Aston GADSBY May Florence 65 Albert Road Aston GREATOREX Emma Nova Scotia ELLIS Clara E 29 NelsonRd Birchfield DIXON Mary late of Aston Manor Birmingham In Memoriam DIXON John James Station Road Kings Norton BANKS Mabel Winifred 21 Grosvenor Rd Aston HINES John 297 Albert Rd Aston HINES Milly 297 Albert Rd Aston HINES Alfred John [Freddie] In Memoriam HINES Leonard John 297 Albert Rd Aston HINES Edgar Herbert 297 Albert Rd Aston COTTRELL Louie In Memoriam TILDESLEY Betsy 208 Victoria Road Aston TILDESLEY Gertrude 208 Victoria Road Aston Page 158 LOWE Arthur Walter 16 Hatfield Rd Handsworth LOWE Mary Ann 16 Hatfield Rd Handsworth LOWE Frank 16 Hatfield Rd Handsworth LOWE Edwin 16 Hatfield
    [Show full text]
  • Birmingham & District Cricket League (1888)
    BIRMINGHAM & DISTRICT CRICKET LEAGUE (1888) DIVISION ONE CHAMPIONS DIVISION TWO CHAMPIONS 1889 ASTON UNITY 1890 W.B. DARTMOUTH/MOSELEY 1891 MOSELEY 1892 HANDSWORTH WOOD 1893 WALSALL ASTON UNITY 1894 ASTON UNITY ASTON UNITY 1895 MOSELEY WALSALL 1896 ASTON UNITY/WALSALL ASTON UNITY 1897 HANDSWORTH WOOD ASTON UNITY 1898 DUDLEY DUDLEY/WALSALL 1899 KIDDERMINSTER ASTON UNITY/HANDSWORTH WOOD 1900 ASTON UNITY MITCHELLS & BUTLERS 1901 KIDDERMINSTER MITCHELLS & BUTLERS 1902 HANDSWORTH WOOD HANDSWORTH WOOD 1903 HANDSWORTH WOOD HANDSWORTH WOOD 1904 MOSELEY ASTON UNITY 1905 ASTON UNITY/HANDSWORTH WOOD W.B. DARTMOUTH 1906 ASTON UNITY ASTON UNITY 1907 ASTON UNITY MITCHELLS & BUTLERS 1908 MOSELEY KIDDERMINSTER 1909 MITCHELLS & BUTLERS/MOSELEY SMETHWICK 1910 ASTON UNITY/MOSELEY/KIDDERMINSTER MITCHELLS & BUTLERS 1911 MITCHELLS & BUTLERS SMETHWICK 1912 WALSALL STOURBRIDGE 1913 ASTON UNITY MITCHELLS & BUTLERS 1914 MITCHELLS & BUTLERS SMETHWICK 1915-18 NO COMPETITION NO COMPETITION 1919 STOURBRIDGE NO COMPETITION 1920 MOSELEY MOSELEY/ASTON UNITY 1921 OLD HILL ASTON UNITY 1922 WALSALL OLD HILL 1923 MOSELEY OLD HILL 1924 KIDDERMINSTER MITCHELLS & BUTLERS 1925 MITCHELLS & BUTLERS MITCHELLS & BUTLERS/OLD HILL 1926 MITCHELLS & BUTLERS MOSELEY 1927 ASTON UNITY MITCHELLS & BUTLERS 1928 MITCHELLS & BUTLERS MITCHELLS & BUTLERS 1929 KIDDERMINSTER W.B. DARTMOUTH 1930 W.B. DARTMOUTH DUDLEY 1931 MITCHELLS & BUTLERS OLD HILL 1932 W.B. DARTMOUTH MITCHELLS & BUTLERS 1933 W.B. DARTMOUTH/WALSALL MITCHELLS & BUTLERS 1934 W.B. DARTMOUTH MITCHELLS & BUTLERS 1935 WALSALL WALSALL 1936 WALSALL MITCHELLS & BUTLERS 1937 WALSALL MITCHELLS & BUTLERS 1938 MOSELEY MITCHELLS & BUTLERS 1939 ASTON UNITY/MITCHELLS & BUTLERS KIDDERMINSTER 1940 OLD HILL NO COMPETITION 1941 W.B. DARTMOUTH NO COMPETITION 1942 W.B. DARTMOUTH NO COMPETITION 1943 W.B. DARTMOUTH NO COMPETITION 1944 1945 W.B.
    [Show full text]
  • Section 2 – Statement of Significance
    Section 2: Statement of Significance 63 Tame Valley Wetlands Landscape Partnership SECTION 2: Statement of Significance 2.1 Introduction This section describes what is important about the heritage of the Tame Valley Wetlands Landscape Partnership scheme area and why it is significant at a regional and national level. 2.2 Landscape The River Tame runs through the landscape, forming the spine of the rich mosaic of wetland habitats created by sand and gravel extraction. The river valley is flat and broad with gentle slopes. Formerly the rich mineral content of the valley provided a living for the valley’s inhabitants but now, empty of minerals but full of water, the extraction pits and quarries provide a rich habitat for wetland species. The rural parts of the valley around Middleton and Curdworth are mainly farmland whereas the eastern edge has some remaining common and heath. Some small areas of woodland remain but this would have been more extensive in previous centuries. The towns and villages have grown up alongside the river close to broad shallow crossing points. Kingsbury Village and the River Tame © 2013 EA 64 Tame Valley Wetlands Landscape Partnership The need to transport the minerals resulted in an ever increasing network of criss crossing transport routes across the valley, separating communities, but leaving a rich legacy of engineering heritage, and highlighting the Tame Valley’s involvement with key moments in history like the industrial revolution. It is man’s usage of the resources within the Tame Valley that have shaped the landscape that we see today. ...Noisier yet than ever Heaven meant Beset by the traffic’s constant roar Thou’rt now a green island trapped, triangled, Strangled, within the noisy nexus of the nation’s motorways..
    [Show full text]
  • Download Water Orton Neighbourhood Plan NWBC
    Water Orton Neighbourhood Plan 1 Issued by: Water Orton Parish Council Compiled by: The Governance Group Document details Revision: 2021 January 8th File Name (Master): 210108 - Neighbourhood Plan.pptx File Name (copies): 210108 - Neighbourhood Plan.pdf Index Front Page Page 1 Index Page 2 -3 Sections 1. Executive Summary Page 4 - 6 2. Introduction to the plan - History Page 7 - 9 2. Introduction – Threats and changes Page 10 - 11 2. Introduction - The Structure of the document Page 12 3. Health and Wellbeing - Background Page 13 3. Health and Wellbeing - Objectives Page 14 3. Health and Wellbeing - Supporting data Page 15 - 19 3. Health and Wellbeing - Policies Page 20 - 21 4. Housing – Background Page 22 – 24 4. Housing – Objectives Page 25 4. Housing – Supporting data Page 26 – 27 4. Housing – Policies Page 28 – 29 5. Recreation and Leisure – Background Page 30 – 33 5. Recreation and Leisure – Objectives Page 34 5. Recreation and Leisure – Supporting data Page 35 – 44 5. Recreation and Leisure – Policies Page 45 2 6. Green Spaces Community Area – Background Page 46 – 47 6. Green Spaces Community Area – Objectives Page 48 6. Green Spaces Community Area – Supporting data Page 49 – 50 6. Green Spaces Community Area – Policies Page 51 – 52 7. Commercial - Background Page 53 7. Commercial - Objectives Page 54 7. Commercial - Supporting data Page 55 - 57 7. Commercial - Policies Page 58 - 59 Index 8. Security and Safety - Background Page 60 8. Security and Safety – Objectives Page 61 8. Security and Safety - Supporting data Page 62 8. Security and Safety - Policies Page 63 9. Character, Heritage Culture – Background Page 64 - 67 9.
    [Show full text]
  • Attleboro Lane, Water Orton July 2021
    Notification Notice of temporary road closure - Attleboro Lane, Water Orton July 2021 www.hs2.org.uk High Speed Two (HS2) is the new high speed railway for Britain. Balfour What work will we be Beatty VINCI (BBV) is working in partnership with HS2 Ltd to build the new high speed railway in your area. doing? • Installation of a plant The work we will be doing crossing We will be completing two aspects of work • Utility disconnections • Installation of a plant crossing across the Attleboro Lane • Utility disconnections on the houses due to be demolished • Implementation of temporary road closure To complete the works safely, we will implement a temporary road closure on Attleboro Lane. The road closure will be marshalled, so access for residents and pedestrians will still be maintained. The temporary What to expect closure will be in place from Wednesday 4 August for 3 weeks. • Temporary road closure from 4 August for 3 weeks HS2 during the COVID-19 pandemic • Temporary closure of We are continually reviewing the works on our construction sites in line Attleboro Lane with the Government and Public Heath England (PHE) advice on dealing with coronavirus. The Government’s current coronavirus strategy makes • Working hours are 8pm clear that construction activity can continue as long as it complies with until 6am this guidance. The health and safety of our workforce and the • Our workforce on site 1 communities we affect is out key priority. Please be assured that those hour before and after to sites that are currently still working are doing so because they can operate within PHE and construction industry guidelines.
    [Show full text]
  • Driving a Revolution in Rail Services for West Midlanders | December 2018
    Driving a Revolution in Rail Services for West Midlanders | December 2018 Driving a Revolution in Rail Services for West Midlanders West Midlands Rail Executive A 30-year Rail Investment Strategy 2018-2047 December 2018 West Midlands Rail Executive is a movement for change, driving a revolution in rail services for West Midlanders Driving a Revolution in Rail Services for West Midlanders | December 2018 Contents Foreword 1 West Midlands Rail Map 2 1. Executive Summary 3 2. Glossary 6 3. Rail for a Dynamic Region 7 3.1 West Midlands Rail Executive - Who we are 8 3.2 Rail – supporting a vibrant, growing region 8 3.3 An evidenced strategy for investment in the West Midlands Rail Network 2018-2047 9 4. How we have developed our Strategy 10 4.1 How we have developed our strategy 11 4.2 Inputs to our strategy 11 4.3 The timeline for our strategy 12 5. Our Key Investment Priorities 13 6. Delivering the Strategy 23 Appendix – Our Corridor Priorities 25 Driving a Revolution in Rail Services for West Midlanders | December 2018 Foreword by Councillor Roger Lawrence Rail is vital to the West Midlands. West Midlands Rail Executive is pleased to outline our Rail Investment Strategy for delivering better rail services across the whole region over the next 30 years and will support the exciting regeneration and growth plans that exist across all our partner authorities, recognising the role rail can play in connecting people, communities, economies and businesses. In 2018 West Midlands rail services are more frequent, carrying more passengers and taking more journeys off the road than ever before.
    [Show full text]
  • North Warwickshire Neighbourhood Watch Association Core Group Meeting
    North Warwickshire Neighbourhood Watch Association Core Group Meeting Meeting on Thursday 8th July 2021 – 7.30pm Online Zoom Meeting AGENDA 1. Welcome and Introductions. 2. Apologies 3. Open Forum for local groups to raise issues Business Items 4.Minutes of previous meeting and Matters arising. 5.On going action points • Rural Crime Team • Road Shows • Property Marking • Bike Register 6.Police Update on Initiatives 7.Treasurers Report 8.Report on other groups 9.Other Items Future dates for 2021 to be confirmed: All Core Group meetings will start at 7.30 pm Thursday 8th July 2021 7:30pm - Online Zoom Meeting Thursday 19th August 2021 7:30pm - Online Zoom Meeting North Warwickshire Neighbourhood Watch Association is inviting you to a scheduled Zoom meeting. Join Zoom Meeting - Thursday 8th July 2021 7:30pm - Online Zoom Meeting https://zoom.us/j/91469545507?pwd=eDE0L1hQQXVHMzROOW1CUEJtaUo0QT09 Meeting ID: 914 6954 5507 Passcode: 558293 Dial by your location - United Kingdom +44 330 088 5830 +44 131 460 1196 +44 203 481 5237 +44 203 481 5240 +44 203 901 7895 +44 208 080 6591 +44 208 080 6592 Meeting ID: 963 3137 9648 Passcode: 212160 Find your local number: https://zoom.us/u/amKEyRTuC North Warwickshire Policing Area Get to know your Safer Neighbourhood Teams: https://www.warwickshire.police.uk/ Contact your area team if it is not an emergency (see below for contact details). If you wish to report an incident or suspicious activity that is not an emergency dial 101 or call 01926 415000. Report a Crime Online: https://www.warwickshire.police.uk/ro/report/ocr/af/how-to-report-a-crime/ Alternatively you can leave a message anonymously at CRIMESTOPPERS Tel 0800 555 111 DIAL 999 ONLY IN AN EMERGENCY.
    [Show full text]
  • Ecological Appraisal of Land at Water Orton Lane WHS Plastics Ltd. Water
    ECOLOCATION Protected Species Surveys for Development Ryton Organic Gardens Wolston Lane Ryton-on-Dunsmore Warwickshire CV8 3LG 02476 217727 www.gbae.co.uk [email protected] Ecological Appraisal of Land at Water Orton Lane WHS Plastics Ltd. Water Orton Lane Minworth Sutton Coldfield West Midlands B76 9BG For Framptons and WHS Plastics Ltd. (13th October 2014) 2014-08(12) Revision A ECOLOCATION is a trading style of George Burton ARCHITECTURE & ECOLOGY Ltd. Incorporated in England, Registered No. 6458127. Ecological Appraisal 2014-0(12) Land at Water Orton Lane Contents Summary 1. Introduction 2. Legislation 3. Desktop Study 4. Results & Evaluation 5. Conclusion 6. Recommendations 7. References 8. Appendix Report Author: Casey Griffin Grad. CIEEM Report Date:13/10/2014 Quality checked by: Anna Swift, MSc, MCIEEM Quality check date: 13/10/2014 Revision A date: 09/02/2015 ECOLOCATION Ecological Appraisal 2014-0(12) Land at Water Orton Lane Summary • An Ecological Appraisal of an area of land adjacent to an existing warehouse off Water Orton Lane in Minworth, West Midlands was carried out on 25h September 2014. • The proposed development was to include the extension of an existing warehouse/factory unit and associated yard. • The data search revealed a portion of the site to fall within Water Orton Sidings, a selected potential Local Wildlife Site. This information revealed that Water Orton Sidings previously had a diverse flora association. A view of the site on Google Earth indicated that the site has been scrub/woodland since at least 1999 and has remained in this state until at least June 2013 when the last Google Earth aerial was taken.
    [Show full text]
  • Birmingham and Birmingham - Tamworth/Derby Corridors
    Contents 1. The Warwickshire Context 2. Opportunities 3. Developing the Strategy 4. Identified Improvements 5. Making it Happen 2 1. The Warwickshire Context Rail services in Warwickshire make a significant contribution The location of housing and employment growth is highlighted to the local economy, business and local communities, in figure 1.0. This growth will place additional pressure on the helping to make Warwickshire an attractive place in which to existing rail services and infrastructure (e.g. access to live and work. The County Council has an excellent track stations) and present new connectivity opportunities. A key record in delivering rail infrastructure and helping to improve aim of the strategy is to maximise the opportunity for the travel services. Warwickshire intends to continue this support and demands of the 88,000 new households planned to be built investment in the local rail network to help improve wider across Warwickshire and Coventry during the plan period. connectivity, contribute to the delivery of housing and Figure 1.0 The Warwickshire Context employment opportunities and maximise the benefit of economic growth in Warwickshire over the next fifteen years and beyond. This strategy sets out Warwickshire County Council’s ambitious and challenging plans to improve the rail offer in Warwickshire. This Strategy is a non-statutory policy document supporting the Third Local transport Plan but it is intended that it will form part of the Fourth Local Transport Plan when that is prepared. Supporting Warwickshire’s Economy & Growth Warwickshire is a growing County with a population of approximately 550,000 people and a, thriving economy with substantial levels of new housing and employment opportunities committed in local Plans.
    [Show full text]