puyallupPuyallupMOVES puyallupPuyallupMOVES puyallupPuyallupMOVES puyallupPuyallupMOVES MOVESMOVESMOVESMOVES MOVES Prepared by Puyallup puyallupPuyallup City of Puyallup MOVES MOVES 1001 - 4th Avenue Active TransportationpuyallupPuyallup Plan puyallupPuyallup Suite 4120 , WA 98154 MOVES MOVES 206.576.4220 puyallupPuyallup puyallupPuyallup puyallupPuyallupMOVES puyallupPuyallupMOVES puyallupPuyallupMOVES puyallupPuyallupMOVES puyallupPuyallupMOVES puyallupPuyallupMOVES puyallupPuyallupMOVES puyallupPuyallupMOVES puyallupPuyallupMOVES puyallupPuyallupMOVES puyallupPuyallupMOVES puyallupPuyallupMOVES puyallupPuyallupMOVES puyallupPuyallupMOVES ACTIVE TRANSPORTATION PLAN PuyallupMOVES

NEAR-TERM BICYCLE PROJECTS

This Active Transportation Plan provides a long-term vision for making Puyallup a great place to walk and roll. To kick start this process, this chapter details four projects that were identified as the first step towards implementing the long-term vision for bicycling in Puyallup:

1) 5th Street NW/4th Street NW, 2A) 5th Avenue SW/4th Avenue SE, 2B) 7th Avenue SW/SE, and 3) Shaw Road.

These four projects were selected due to a combination of location, safety benefits, connectivity considerations, and feasibility of implementation. The projects are shown in Figure A. These projects are a subset of the projects listed in the Chapter 5 Medium-Term Bicycle Project list.

To facilitate near-term implementation of the four projects included in this chapter, the following details are provided:

• a project description,

• anticipated benefits,

• before and after photo simulation graphics,

• cost estimates,

• potential grant sources, and

• data needs.

Why Are These Bicycle Projects Needed? In 2014, the City embarked upon an effort to rethink its transportation system. While Puyallup is served by a very complete vehicular system, the City offers fewer complete connections for walking and biking. This Active Transportation Plan seeks to begin completing the City’s multimodal system through investments over the next several decades.

In order to kick start this evolution, this Plan identifies four early implementation projects, which would serve key activity areas of the City, such as Downtown, the Sounder Station, Puyallup’s extensive regional trail system, and Shaw Road. Providing complete and comfortable connections in these parts of the City will make walking and cycling a safer, more viable option for people who live, work, and play in Puyallup, including those who cannot or do not choose to drive.

As the city grows to 50,000 residents in 2030 and beyond, it is critical to build a transportation system that offers a variety of options for the diverse population that will call Puyallup home.

PUYALLUP ACTIVE TRANSPORTATION PLAN Figure A: Near-Term Bicycle Projects

W a Sim p E ons ato C e

r v

k E C E r

E

A k E

E

e

e E

N

e C v v h

e

e t a

v

t

A A v

l

v

0 S d

A

A

n h w A 1

t

n t

h a

s d

1 e i

a t h 8 l 1

n t E l

d 43rd S 4 t Ct E

0

i R

m 2

2 0

1 r d 1 d

e

4 7

1 e

R E

e

1

r

M D F C e h R c r h i d s a e E u l la 48th St E 23rd x R d

E Ave NW E Puyallup St

e

v

A M R T E iv d o o er Puyallup d n d n d Rd R ta g E 2 Valley Sports d E V e 8 is w Complex 53rd ta Street Ct E D o N r o Le E er d v mn e e e Su D e v Rd e r 16th Ave NW Val s A ley k t E eigh E H r u E

e a a e

v e Ave E y Dr v v A w r l V A F i A al n le x d y A d a v W M e i

E o m N Levee Rd

N d

o

i

k . t R i r W v r

e W S r e R y Main St

N o d r

h

t r M

t

w e

S Skate e t 6 v Maple St 10 N h e th 2 h Sam Park A C Ste t Peach wa 8 Ave d E State Academy St y N rt NW n R St 1 to t A ous v Park W H i e E r

N Veterans e Pa h r o k St

W

t v i

t

r W Park

S E N A T S 5

a t c ew h

P t r

o N h 1

a t

m rt 7th B e t A S Av e a e e NW t n v 4 Rd e 1 st v 4 o

S d k e n E E l A i D

h

W r E

t

N r

A

B W

N

h

1

t Grayland e t d C t N

1

S l 5th A n a ve NW sCrk S 7 rk 4th Ave NW t Park

h

s e S T m

t W a E illow St

o u d

c 5

o N S

n p m 3r d Ave t NW 2 2nd o

a S r R 2nd Ave NW P d Ave NE \ 3

W Main Ave E S E E Main Ave 3 0 S

t

S r 7 2

t n d E S S t E d

t

S e v 1

E

S v e \

d A v

W

F d

r r

A S 5t 4 e h t n 3 h F 2A Ave SW t t n

2 h 2 I 8

S t Ave S 9 W

4

W

h F

t 3

S 6t h h Av e 1 8 9 SW t 7th W DeCoursey t

1 S

S

W

A

1

W

t S

W Park h E 1 S Ave B SW

E

t S

t S 7th Ave SE S

t

8 S

6

S

t E

t

S

t

1

A S S S

h

S

h

B t 4 9th Av t h e 2 SW t 9th A h ve h 4 S S t E

0 t

7

t -

1 3 5 h 80th St E 3

1 t

B 1

1

7

3 E 10th Ave SE 1

5 r

Meeker Creek E F Clarks S D 9

i S t r - Creek Open Space t

l w S

4 a e 84th St E S

i

n Park h

v t E r 12th A t d ve S i E s 7 a 5

D 1 2 4 F d 2 v - Silver l r ds B E Creek hlan A Hig V

A i 15th Ave SW 15th Av s E e S

A E t A - a

e m

3 v E D b l a B A r e e t e Brown t E r s 2 S d v n y B r e W

7 A o t g n Community l C 19th S v d S 6 m i 2 d E d E Garden t k E R S

S 7 n h

S S D o S r A t a ve SW t o r E D

0 l h r 4 t S D

t B 2 i 3

h u 5 r Dead t k _

F 9 r Man's

E o Wildwood 23rd S 20th A Pond ve SE w

t t 96th St E Park Woodbine S Ave S E e W 3

h Cemetary S 2 t 3rd Ave SE W E t

7 y N d S

S

t i l Cherokee v d i

d t l r P w R d h S

r Park B a t o o 5 i r 2 G 3 o w h

W k F

r d

d E r t S o 4 D a S o e e 6 P r v r t A e h o e S 3 10 S n E 0th St E s Rainier

E

h k e w

t t i B

t

e k S E

s Woods

W l

v r 0

t B S v 1 2 7th Ave S SE a

2

S

A d Park

t d

2

t P

S

d

S

s e

n h Shared Use Path

h

t

a o

t

l

8 p 9 Under Construction d

104th St E 31st Ave SW 1 o 3 o 1st Ave S r E

o P 33r W d A s \ Bradley ve S e Lake Park E g Dr wood or E c k a n Ma r a Manorwood D

P t

\ r 3 Park 3 a S 7th Av I e SE p E m S c G 112th St E a t r 39th Ave SW R S

A 39th Ave SE h

s \ t

e t 5

E

v

n

A

e

e

v

n

A m

a

E

i

h P

d

e

t i i c u p 43rd Av v e SE

r

4 e o l E

A e i E 7

E E n

D e E e

h e

e v e R M t

e 118t v s \ h S v t E v d A 0 E v E A o A A h

j 8

A t

h

h E h n

6 t

h t

t

a 3 t

e 120 8 8 th St 6 E 1

v 0

9

7

8 m

2 A

h

1 h Military Rd E a

t

4 s \

r 1 23rd St E 9 122nd St E s e 124th St E U \ : C

Sharrow City of Puyallup Police Station Figure 0.1 Bike Boulevard Fairgrounds School Bicycle Projects - Near Term Regional Growth Bike Lane Center Fire Station Shared Use Path

NEAR-TERM BICYCLE PROJECTS Project 1: 5th Street SW/NW & 4th Street NW

Project Description This project would add a parking protected bike lane on one side of 5th Street SW/ NW and 4th Street NW and a buffered bike lane on the other side from 7th Avenue SW in the south to River Road in the north. Parking would be removed on one side of the street. The block in front of Meeker Elementary School would have buffered bike River Rd lanes on both sides of the street, as this block does not have parking. The project would also add sharrows between River Road and the Riverwalk Trail. Additionally, this project would seek to narrow vehicle travel lanes to discourage speeding.

Project 1 would be a major connector for cyclists between downtown Puyallup and 4th St NW the Riverwalk Trail, and it connects to multiple schools and the Puyallup Sounder station. Figures B and C show what this project could look like. The total estimated cost of this project is $2.4M, which is dependent on the number of traffic signal modifications necessary and costs for widening around the railroad crossing. C

Project Benefits W Stewart Ave • This project would provide access to Meeker Elementary School, Puyallup High School, the Riverwalk Trail, the Puyallup station, and Sparks Stadium. 5th St NW/SW • Numerous studies have shown that protected bike lanes and buffered bike lanes increase safety and result in fewer injuries than comparable streets with no bike infrastructure.

• Buffered bike lanes and protected bike lanes appeal to a wider cross-section of bicycle users than non-buffered bike lanes or sharrows, as they contribute to the perception of safety – a key factor in whether people choose to bike. B

• Buffered bike lanes provide space for cyclists to pass other cyclists without encroaching into the adjacent motor vehicle lane. 7th Ave SW • Numerous studies have found that protected bike lanes and buffered bike lanes increase bicycle ridership, supporting the “if you build it, people will ride” concept. Key Destinations For example, after buffered bike lanes were installed on Philadelphia’s Spruce and Pine streets, bike traffic increased 95 percent and the number of people biking on the sidewalks fell 22 percent (Bicycle Coalition of Greater Philadelphia).

Figure B: Improvements in front of Meeker Elementary School

Before After

PUYALLUP ACTIVE TRANSPORTATION PLAN Potential Grant Sources • WSDOT Pedestrian and Bicycle Safety Program State funds geared towards increasing pedestrian/bicycle safety. The grant can be used for planning and design only, or for all project phases. The next funding cycle is in 2018.

• WSDOT Safe Routes to School (SRTS) State funds geared toward encouraging children to walk and bike to school. The grant can be used for construction only or all project phases, and spot improvements are often more successful than corridor improvements. The next funding cycle is in 2018.

Additional Data Needs • Census information on Puyallup population as a whole and census tracts/block groups surrounding the project – especially regarding minority and low-income populations, seniors, people with disabilities, and limited English proficiency populations.

• Number of bicyclist/pedestrian collisions in the project area for 3 years prior (fatal, serious, and evident collisions)

• Bicycle/pedestrian counts in project area

• Posted travel speed, operating speed, and target speed in project area

• Counts of different crossing accommodations, as defined in the grant application

• Percentage of the population in the project location census tract(s) living below the poverty line

• State biennium quarterly cash flow (planned expenditures to bill to WSDOT)

• Counts of children that live within one mile of schools in project area (separate counts for each school) and mode of transportation to school (if applying for SRTS)

• Percentage of children eligible to receive free and reduced-price meals at schools in project area (if applying for SRTS)

PROJECT PHASE COST ESTIMATE Planning & Engineering/Design $257,000 Construction $1,668,000 Other (Environmental Mitigation, Contingency) $449,000 TOTAL $2,373,000

Figure C: Improvements on 4th St NW near the Sounder Train Station

Before After

NEAR-TERM BICYCLE PROJECTS Project 2A: 5th Avenue SW & 4th Avenue SE

Project Description Project 2A would convert 5th Avenue SW and 4th Avenue SE into a bike boulevard, providing a safe east-west connection for cyclists. The bike boulevard would begin at 18th Street SW in the west and terminate at 7th Street SE in the east, with safe bicycle crossings at six busy intersections, including South Meridian and 5th Street SW. This project utilizes wayfinding signs, pavement markings, and speed bumps to discourage motor vehicle through-trips. Bike boulevards are relatively easy to implement, as they are on low volume residential streets and do not require new paving. A photo simulation of what this project could look like is shown in Figure D. The total estimated cost of this project is $532,000, which is dependent on the number of intersection modifications necessary. This project could be implemented with or without Project 2B.

Project Benefits • This project would provide direct access to Meeker Elementary School, Maplewood Elementary School, Kalles Junior High School, De Coursey Park, Pioneer Park, Sparks Stadium, and downtown Puyallup destinations along or near South Meridian, such as restaurants, the library, the Puyallup Farmers’ Market, and City Hall. It also provides nearby access to Aylen Junior High and Puyallup High School on West Pioneer Ave to the north.

• Bike boulevards are a great way to encourage cycling for a wide range of skill levels, as they appeal to the most timid and novice riders who may not be comfortable riding alongside cars on busier streets.

• Many bicycle boulevard design features not only benefit people on bicycles, but also help create and maintain “quiet” streets that benefit residents and improve safety for all road users (NACTOUrban Bikeway Design Guide).

Key Destinations 2nd St SW W Pioneer Ave S Meridian 18th St SW 7th St SE 5th St SW

D 4th Ave SE 5th Ave SW

Figure D: Proposed Bike Boulevard on 5th Avenue SW

Before After

PUYALLUP ACTIVE TRANSPORTATION PLAN Potential Grant Sources • WSDOT Pedestrian and Bicycle Safety Program State funds geared towards increasing pedestrian/bicycle safety. The grant can be used for planning and design only, or for all project phases. The next funding cycle is in 2018.

• WSDOT Safe Routes to School (SRTS) State funds geared toward encouraging children to walk and bike to school. The grant can be used for construction only or all project phases, and spot improvements are often more successful than corridor improvements. The next funding cycle is in 2018.

Additional Data Needs • Census information on Puyallup population as a whole and census tracts/block groups surrounding the project – especially regarding minority and low-income populations, seniors, people with disabilities, and limited English proficiency populations.

• Number of bicyclist/pedestrian collisions in the project area for 3 years prior (fatal, serious, and evident collisions)

• Bicycle/pedestrian counts in project area

• Posted travel speed, operating speed, and target speed in project area

• Counts of different crossing accommodations, as defined in the grant application

• Percentage of the population in the project location census tract(s) living below the poverty line

• State biennium quarterly cash flow (planned expenditures to bill to WSDOT)

• Counts of children that live within one mile of schools in project area (separate counts for each school) and mode of transportation to school (if applying for SRTS)

• Percentage of children eligible to receive free and reduced-price meals at schools in project area (if applying for SRTS)

PROJECT PHASE COST ESTIMATE Planning & Engineering/Design $19,000 Construction $400,000 Other (Environmental Mitigation, Contingency) $113,000 TOTAL $532,000

NEAR-TERM BICYCLE PROJECTS Project 2B: 7th Avenue SW/SE

Project Description Project 2B would add a parking protected bike lane on one side of 7th Avenue SW and a buffered bike lane on the other side from 18th Street SW in the west to South Meridian in the east. Parking would be removed on one side of the street. Between South Meridian and 7th Street SE, the project would add 5 foot bike lanes on both sides of the street. Project 2B also seeks to narrow vehicle travel lanes to discourage speeding. Like Project 2A, this project would provide a major east-west connection for cyclists. This project is an alternative to Project 2A that could replace or supplement it. That said, different types of cyclists may feel more comfortable using one facility type over the other, so there are advantages to implementing both projects. Figures E and F show what this project could look like. The total estimated cost of this project is $870,000.

Project Benefits • This project would provide access to De Coursey Park, Kalles Junior High School, Sparks Stadium, Puyallup Nazarene Church and other churches, and downtown Puyallup destinations along or near South Meridian.

• Numerous studies have shown that protected bike lanes and buffered bike lanes increase safety and result in fewer injuries than comparable streets with no bike infrastructure.

• Buffered bike lanes and protected bike lanes appeal to a wider cross-section of bicycle users than non-buffered bike lanes or sharrows, as they contribute to the perception of safety – a key factor in whether people choose to bike.

• Buffered bike lanes provide space for cyclists to pass other cyclists without encroaching into the adjacent motor vehicle lane.

• Numerous studies have found that protected bike lanes and buffered bike lanes increase bicycle ridership, supporting the “if you build it, people will ride” concept. For example, after buffered bike lanes were installed on Philadelphia’s Spruce and Pine streets, bike traffic increased 95 percent and the number of people biking on the sidewalks fell 22 percent (Bicycle Coalition of Greater Philadelphia). 18th St SW S Meridian 5th St SW 7th St SE

E F

7th Ave SW 7th Ave SE

Key Destinations

Figure E: Improvements connecting to De Coursey Park

Before After

PUYALLUP ACTIVE TRANSPORTATION PLAN Potential Grant Sources • WSDOT Pedestrian and Bicycle Safety Program State funds geared towards increasing pedestrian/bicycle safety. The grant can be used for planning and design only, or for all project phases. The next funding cycle is in 2018.

• WSDOT Safe Routes to School (SRTS) State funds geared toward encouraging children to walk and bike to school. The grant can be used for construction only or all project phases, and spot improvements are often more successful than corridor improvements. The next funding cycle is in 2018.

Additional Data Needs • Census information on Puyallup population as a whole and census tracts/block groups surrounding the project – especially regarding minority and low-income populations, seniors, people with disabilities, and limited English proficiency populations.

• Number of bicyclist/pedestrian collisions in the project area for 3 years prior (fatal, serious, and evident collisions)

• Bicycle/pedestrian counts in project area

• Posted travel speed, operating speed, and target speed in project area

• Counts of different crossing accommodations, as defined in the grant application

• Percentage of the population in the project location census tract(s) living below the poverty line

• State biennium quarterly cash flow (planned expenditures to bill to WSDOT)

• Counts of children that live within one mile of schools in project area (separate counts for each school) and mode of transportation to school (if applying for SRTS)

• Percentage of children eligible to receive free and reduced-price meals at schools in project area (if applying for SRTS)

PROJECT PHASE COST ESTIMATE Planning & Engineering/Design $94,000 Construction $611,000 Other (Environmental Mitigation, Contingency) $165,000 TOTAL $870,000

Figure F: Improvements adjacent to Kalles Junior High School

Before After

NEAR-TERM BICYCLE PROJECTS Project 3: Shaw Road

Project Description This project would extend the shared use path that is currently being constructed on Shaw Road from Manorwood Drive to 23rd Avenue SE. The new sections from 39th Avenue SE to Manorwood Drive (south segment) and 23rd Ave SE to 12th Avenue SE (north 12th Ave SE segment) could be completed together or separately, as funding allows. The proposed widened roadway will include two through lanes, a two way left turn lane, sidewalk on one side, shared use path with planter one side, traffic signal fiber interconnect and other

ITS improvements, LED street lighting, landscaping, and ADA-compliant curb ramps. Shaw Rd Figures G and H show what this project could look like. The total estimated cost of these segments is $42.2M, but terrain challenges and right-of-way acquisition costs could influence this estimate.

Project Benefits • Shared use paths are a great way to encourage more walking and bicycling. 23rd Ave SE • Increases pedestrian/bicycle access from residential neighborhoods to Puyallup’s extensive regional trail system, Rainier Woods Park, Sunrise Elementary, Shaw Road

Elementary, Wildwood Park Elementary, Ferrucci Junior High, and other destinations. Shaw Rd Shaw • Increases visibility and safety along the corridor for both vehicle and pedestrian users through the installation of new lighting and streetscape.

• The three-lane cross-section provides a dedicated turn lane and further separates northbound and southbound traffic, which will make Shaw Road safer.

• Increases comfort and safety along the corridor. Shared use paths tend to attract bicyclists with a wide range of skill levels, including novice riders and young children, as the buffer increases actual and perceived safety. Manorwood Dr

• Complements the phase currently under construction, extending the pedestrian/ bicycle network to the north and south. Current Condition Photo Simulations • Improves traffic operations on Shaw Road. Shaw Road ADT is estimated at Near 25th Ave. Ct., looking North approximately 16,500, with a peak hour Volume to Capacity Ratio (V/C Ratio) of 1.0. 39th Ave SE Without changes to Shaw Road, the peak hour V/C Ratio was expected to increase to 1.3 by the year 2030. Once the project under construction is complete, the V/C Key Destinations ratio is expected to be approximately 0.8 in the year 2030, but extending the project Under Construction would further improve the V/C ratio. Figure G: Improvements Under ConstructionCurrent on Shaw Condition Road Photo Simulations Near 25th Ave. Ct., looking North

Before OptionAfter A Option B

PUYALLUP ACTIVE TRANSPORTATION PLAN Shaw Road Improvement Project

Option A Option B

Shaw Road Improvement Project Potential Grant Sources • Surface Transportation Block Grant (formerly STP) & Congestion Mitigation and Air Quality (CMAQ) Federal Highway Administration (FHWA) funds distributed through the Puget Sound Regional Council (PSRC). The next funding cycle for both grants is in 2018.

• Transportation Alternatives (formerly TAP) FHWA funds distributed through PSRC. The next funding cycle is in 2017.

• WSDOT Pedestrian and Bicycle Safety Program State funds geared towards increasing pedestrian/bicycle safety. The next funding cycle is in 2018.

• WSDOT Safe Routes to School (SRTS) State funds geared toward encouraging children to walk and bike to school. Spot improvements are often more successful than corridor improvements. The next funding cycle is in 2018.

Note: The current project phase is being funded by local, WA Transportation Improvement Board, and STP funding. Language can be pulled from the existing applications.

Additional Data Needs • Census information on Puyallup population as a whole and census tracts/block groups surrounding the project – especially regarding minority and low-income populations, seniors, people with disabilities, and limited English proficiency populations • For Surface Transportation Block Grant and CMAQ: Average daily transit ridership along the corridor; daily peak period transit trips; current and expected bicycle/pedestrian counts; average bicycle and pedestrian trip lengths; expected improvement to LOS, average speed, and average vehicle delay • For Transportation Alternatives: Key milestones for right of way and construction phase • For WSDOT funds: see the data needs listed under Projects 1, 2A, and 2B

NORTH SEGMENT SOUTH SEGMENT PROJECT PHASE COST ESTIMATE* COSTCurrent ESTIMATE* Condition Photo Simulations Planning & Engineering/Design $6,759,000 $1,079,000 Near Forest Green Blvd., looking North Right of Way $6,140,000 $262,000 Construction $14,693,000 $2,698,000 Other (Environmental Mitigation, Contingency) $9,350,000 $1,224,000 TOTAL $36,942,000 $5,263,000 *Costs based on per mile estimates from the 2016-2021 Transportation Improvements Plan Figure H: Improvements Under ConstructionCurrent on Shaw Condition Road Photo Simulations Near Forest Green Blvd., looking North

Before OptionAfter A Option B

NEAR-TERM BICYCLE PROJECTS

Shaw Road Improvement Project

Option A Option B

Shaw Road Improvement Project

This page left blank ACTIVE TRANSPORTATION PLAN

CONTENTS

1 | Puyallup Today ...... 1 Community Engagement ...... 2

2 | Existing Conditions ...... 6 Bicycling ...... 6 Pedestrians ...... 8 Bicycling and Pedestrian Safety ...... 15 Travel Corridors ...... 16 Key Destinations ...... 18 Travel Mode Data ...... 21 Anticipated Growth in Travel ...... 21 Active Transportation Analysis ...... 22

3 | Alternative Travel Modes ...... 24 Bus Transit ...... 24 Commuter Train Service ...... 26 Transportation Network Companies ...... 26 Active Transportation Programs ...... 27

4 | System Implementation ...... 29 Land Use ...... 30 Pedestrians ...... 32 Bicycling ...... 32 Network Completeness and Connectivity ...... 32

5 | Active Networks ...... 35 Pedestrian Network ...... 35 Bicycle Network ...... 37 Summary of Projects ...... 44

6 | Implementation Checklist ...... 46

ACTIVE TRANSPORTATION PLAN

FIGURES Figure 1. Survey Respondents Live, Work, and Play in Puyallup ...... 3 Figure 2. Summary Location of Improvements ...... 5 Figure 3. Existing Bicycling and Pedestrian Facilities in Puyallup ...... 7 Figure 4. Existing Pedestrian Facilities in Downtown Puyallup...... 10 Figure 5. Existing Pedestrian Facilities near South Hill Mall ...... 11 Figure 6: Existing Pedestrian Facilities near Elementary Schools ...... 13 Figure 7: Existing Pedestrian Facilities near Elementary Schools ...... 14 Figure 8. Puyallup Road Map/Road Classification Map ...... 17 Figure 9: Key Destinations and Trip Generators ...... 19 Figure 10. Active Transportation Analysis Heat Map ...... 23 Figure 11: Pierce County Transit Southeast Bus Service Map ...... 25 Figure 12. Puyallup Zoning Map ...... 31 Figure 13. Pedestrian Priority Network ...... 33 Figure 14. Bicycle Priority Network ...... 34 Figure 15: Proposed Pedestrian Accommodations ...... 36 Figure 16. Long Term Bicycle Network Projects ...... 38 Figure 17. Medium‐Term Bicycle Projects ...... 40

TABLES Table 1. How People Travel in Puyallup ...... 21 Table 2. Puyallup Bus Service ...... 25 Table 3. Bicycle Typologies ...... 37 Table 4. Proposed Projects and Facility Types ...... 44

ACTIVE TRANSPORTATION PLAN

1 | PUYALLUP TODAY Every trip begins and ends with a form of active transportation, such as walking and bicycling. These most basic modes serve as the foundation for a successful transportation system. The active transportation environment is as much about a sense of place (spaces for events, sidewalk cafes, gathering places for conversation, enjoying art and green spaces, and window‐shopping) as it is accessibility for all. This Active Transportation Plan provides a framework for implementing policies and programs to achieve the City’s Vision, which is: Provide a safe, balanced, and efficient multi-modal transportation system that is consistent with the City’s overall vision and adequately serves anticipated growth. The facilities and programs described within are proposed to enhance safety, mobility, accessibility, and provide inviting places to be active in Puyallup. An additional resource for removing barriers and improving access is the City’s Americans with Disabilities Act (ADA) Transition Plan. The framework for developing programs and projects employs the following priorities:  Provide connectivity to support local travel in Puyallup.  Improve safety for all road users in Puyallup through street designs that accommodate all modes.  Encourage placemaking and the creation of a vibrant, walkable identity for Puyallup’s downtown.

This document includes the following Chapters: Chapter 1: Puyallup Today. This chapter summarizes information received through interactions with the community in‐person and through the projects website, and the bicycling audit. Chapter 2: Existing Conditions. This chapter describes the current state of pedestrian and bicycling facilities in Puyallup. Chapter 3: Alternative Travel Modes: This chapter describes available travel corridors and key destinations in Puyallup, summarizes the anticipated growth in travel in the City and Regional Growth Centers, and identifies some likely trends in the way people travel. Chapter 4: System Implementation: This chapter describes the projects and programs that will help achieve the City’s vision and priorities summarized above. Chapter 5: Active Networks: This chapter describes the medium and long term projects for the pedestrian and bicycle network. Chapter 6: Implementation Checklist: This chapter provides a way for Puyallup to monitor progress in implementing the Active Transportation Plan.

Chapter One: Puyallup Today page 1 ACTIVE TRANSPORTATION PLAN

COMMUNITY ENGAGEMENT The Puyallup community played a central role in the development of Puyallup Moves and this Active Transportation Plan. The outreach process included stakeholder workshops, open house events, online outreach in the form of a mapping exercise and survey, a bicycle audit, elected official presentations, and an ongoing focus on direction from the public, represented by the community vision, priorities and the Transportation Element. Community feedback guided the overall direction of Puyallup Moves. An important component in the development of the active transportation network was to understand the “whys” and “why nots” of what influences how people choose to travel. The following community engagement activities shaped the development of this plan. The City held open houses in Summer 2013 and Spring 2015 to gather active transportation strategies from the community and later to validate the draft Puyallup Moves Implementation Strategy. The open houses focused on exploring City transportation goals and facility types, and identifying transportation needs and prioritization methods for funding and locating projects.

Stakeholders, community members, and city staff shared visions, goals, and priorities for walking, bicycling, and transit access improvements. Input from physical and virtual workshops greatly informed the development of this Active Transportation Plan.

Chapter One: Puyallup Today page 2 ACTIVE TRANSPORTATION PLAN

A digital mapping exercise and online survey allowed community members and stakeholders to share their ideas and input. Over 200 people who live, work and/or play in Puyallup used the online tools to provide input as summarized in Figure 1 summarizes these results.

Figure 1. Survey Respondents Live, Work, and Play in Puyallup

Community members and stakeholders were also asked the following questions about their community and travel choices:  How do you travel in Puyallup?  What factors influence your travel decisions?  Where should the City focus its efforts in prioritizing projects?  How well does the current transportation system meet your needs?  How would you like to see future congestion addressed?  What factors prevent you from walking and rolling to your destinations?

COMMUNITY RESPONSES

How People Travel The automobile was the most used method of travel: over 90 percent of respondents drive a car at least three times per week. Over 50 percent of respondents stated that walking is a primary mode of travel for at least one trip per week, while about 25 percent of respondents travel on bicycle one or more times per week.

Chapter One: Puyallup Today page 3 ACTIVE TRANSPORTATION PLAN

Top Strategies for Addressing Congestion The community highlighted their desire for an increase in multimodal transportation investments. Individuals ranked their top strategies for handling increased traffic congestion, and the most popular responses were:  Better connections to the larger region through express transit, rail, and improved freeways  Easier ways to get around on foot and/or by bike

Respondents also noted that increased traffic congestion is not acceptable. The City’s Transportation Element provides policies, projects, and programs to address vehicle capacity and mobility in Puyallup. In addition, the development of the future pedestrian and bicycle network considered the impacts to all modes in its development.

Prioritizing Projects The community recommended prioritizing transportation improvements if they: 1. Improve connectivity between major destinations (cross‐town routes) 2. Address a location(s) with safety (collisions) concerns 3. Are near businesses / downtown

How Should the City Invest in Transportation? When considering how the City was focusing its transportation investments, people indicated the City should increase investment efforts in sidewalks, bike lanes, and street capacity. Over 90 percent of respondents also indicated the City should at least maintain or increase efforts in bicycle parking, crosswalks, and street connectivity. Compared to current investment levels, people indicated the City should maintain its investments in highway access and not increase spending levels.

Where are Improvements Needed? Nearly 25 percent of respondents indicated that a lack of facilities was the greatest reason they did not walk, bike or roll to destinations. This was the most frequently selected response for the greatest barrier to walking and rolling. Residents also indicated that it takes too long to bike or walk to destinations. The online mapping tool provided the opportunity for community and stakeholders to identify where and what type of improvements or issues they experienced in Puyallup; people indicated where congestion was a concern, lighting could be improved, This image shows the lack of delineated facilities for cyclists, as better walking and bicycling facilities well as conflicts between parked cars and the pedestrian realm. could be provided, and more.

Chapter One: Puyallup Today page 4 ACTIVE TRANSPORTATION PLAN

These comments are summarized in Figure 2 and were evaluated for inclusion in a list of recommended projects in the Transportation Element and this Active Transportation Plan.

Figure 2. Summary Location of Improvements

WALKING AND BICYCLING AUDITS City staff conducted a walking and bicycle audit of proposed facilities around town. This audit evaluated pedestrian and bicyclist comfort (a wide range of walking and bicycling skill levels were represented), route selection, and appropriateness of the recommended solutions.

A walking and bicycling audit evaluated corridors throughout the City. Riders represented casual to experienced skill levels to provide greater perspective in developing facility recommendations

Chapter One: Puyallup Today page 5 ACTIVE TRANSPORTATION PLAN

2 | EXISTING CONDITIONS Active transportation, most commonly bicycling and walking, in Puyallup is evolving. The Active Transportation Plan and the Transportation Element update are part of that process. The City of Puyallup is planning for an interconnected transit, walking, and bicycling network that will improve the quality of life, safety, sustainability, and mobility for all users. This chapter provides a snapshot of the state of bicycling and pedestrian accommodations in Puyallup today, so that we can identify the needs for the future. In addition, the City is developing an American with Disabilities Act (ADA) Transition Plan, which focus on city‐owned right of way and facilities. The ADA Transition Plan will identify barriers to mobility and access and propose project to remove those barriers.

BICYCLING The existing bicycling network in Puyallup consists primarily of trails in parks and the Riverwalk Trail along the Puyallup River. The Riverwalk Trail is approximately 5 miles in length and is located along the Puyallup River between the westerly city limit and the western trailhead of the existing Foothill Trail (see Figure 3). There is a missing piece of the trail between 5th Street NE and 9th Street NE. The city recently installed sharrows and improved directional signage on 5th Street NE to connect the missing segment. At its eastern end, the Riverwalk Trail provides an on street connection to the Sumner Link Trail, which was completed in 2014. Bicyclists and pedestrians can use the sidewalk on the west side of the E. Main Avenue Bridge to connect between the trails. The Sumner Link Trail is an eight‐mile long, paved trail that also connects to both the King County Interurban Trail and Lakeland Hills Trail. There is also one off‐street, shared‐use path located along the northwest side of Fairview Drive adjacent to the State Events Center property. The nine‐ foot wide, paved path runs for approximately 0.3 miles from the orange parking lot driveway to the green parking lot driveway. On its north end, the path connects to a sidewalk on the northwest side of Fairview Drive. There are also a number of trails located in parks, as well as natural, riparian and watershed areas throughout the City. These include trails such as those in Clark’s Creek Park, Wildwood Park, Bradley Lake Park, Manorwood Park, and Sam Peach Park (also see Figure 3). Other parks also have intra‐park trails. Currently, there are no on‐street bicycle facilities other than the sharrows on 5th Street NE. The Riverwalk Trail provides a scenic and mostly separated space for people to walk and bicycle along the Puyallup River.

UV161

Chrisella Rd

Ave

ND UV167 122 48 THSt W Valley Hwy

Wapato C reek UV167 Freeman Rd N Meridian

e

v A Valley Ave e

e

k u Main St River Rd n a ¡ w l i 167 Stewart Ave M UV Traffic St

St NE ¡n TH UV410 5 ¡n ¡n E Main W Pioneer

E Pioneer

St NW

Th

5

84 TH St

Clarks Creek RD S Meridian 23 Ave 96 THSt UV512

104 TH St

FruitlandAve

Shaw Rd TH TH 37 Ave 112 St TH TH 39 Ave TH 39 Ave 112 St

0 0.25 0.5 1 UV162 Miles

Figure 3 Curb Ramp Existing Bicycling and Pedestrian Facilities in Puyallup Sidewalk Multi-use Trail n¡ Trail Access City of Puyallup ACTIVE TRANSPORTATION PLAN

BICYCLE PARKING Offering bicycle parking is essential to encouraging bicycle use. People are more likely to try bicycling if they know they have a place to store their bike at their destination. There are several places in Puyallup where bicycle parking is currently provided. There are six bike racks provided in front of City Hall and within the parking garage on S. Meridian, five bike racks on S. Meridian between Stewart Avenue and Pioneer Avenue, three bike racks adjacent to the Puyallup Public Library, and bicycle lockers and racks at ’s Puyallup Station. City code currently provides that all commercial, industrial, institutional, and recreational uses which require 25 or more parking spaces shall provide a designated bicycle parking area to accommodate a minimum of five bicycle spaces. The code also provides for further review of sites with additional parking spaces or anticipated high bicycle traffic to potentially provide additional bicycle parking above the minimum.

Bicycle storage lockers are provided at the Puyallup Sounder Station. Bicycle parking is essential to encouraging bicycle use.

PEDESTRIANS The City is actively increasing sidewalk coverage every year and approximately 70 percent of Puyallup’s streets currently have sidewalks. Sidewalks are generally available along all arterials, local streets within the central business district, and in newer subdivisions. Some older residential areas currently have an incomplete sidewalk network or sidewalk maintenance needs. Particularly in the downtown and South Hill areas, crosswalks and pedestrian signals are provided at most major intersections. Special midblock pedestrian crossings are also provided with flashing lights to increase visibility. The trail network in Puyallup’s parks provides recreational walking opportunities. PEDESTRIAN NETWORK COMPLETENESS Sidewalks are provided on most major streets in Puyallup as well as on many residential streets. A review of pedestrian facilities within a quarter mile of major pedestrian destinations was

Chapter Two: Existing Conditions page 8 ACTIVE TRANSPORTATION PLAN completed to evaluate network completeness. Analysis areas included downtown Puyallup and the Sounder Station, South Hill Mall, and Elementary Schools. This analysis helped identify pedestrian projects that would improve connectivity and accessibility. Projects relating to curb ramp upgrades for ADA compliance will be addressed in the City’s ADA Transition Plan, which will also address areas with sidewalk gaps. The following section summarizes the network completeness analysis.

Downtown Puyallup and Sounder Station The regular street grid character of the downtown area allows for good pedestrian connections. As shown in Figure 4, most streets in and near downtown Puyallup have sidewalks on both sides. Downtown is bisected by the Burlington Northern/Santa Fe (BNSF) railway (generally runs east‐ west), which limits north‐south pedestrian crossing to five locations in and near downtown: 7th Street NW, 5th Street SW, Meridian, 2nd/3rd Street NE, and 5th Street SE. The Puyallup River limits travel to the northeast, with a single crossing at 5th Street NE/Veterans Bridge. SR 512 also restricts pedestrian travel to the east and south. Pedestrians must cross SR 512 at E Main Street, E Pioneer Avenue, 7th Avenue SE, or Meridian. Pedestrian connectivity between downtown and points west is much better, with the small block pattern continuing until Clark’s Creek. Sound Transit and the City are discussing pedestrian access improvements as part of the Sounder Station Access Project and are working to establish which specific improvements will be included in Sound Transit’s project funding.

South Hill Mall Sidewalks are provided on most major streets within a quarter mile of the South Hill Mall, as shown on Figure 5. However, block sizes are larger near the mall, resulting in lowered accessibility for pedestrians. This can be fixed by installing midblock crossings along SR 161 in places where pedestrian crossings are desired and by improving internal circulation near the mall and other pedestrian destinations. SR 512 also acts as a barrier for pedestrians heading north of the mall. Pedestrians are able to cross SR 512 on 9th Street SW. No sidewalks are provided on 31st Avenue SW, which provides an east‐west crossing over SR 512 north of the mall. Presently, this connection prohibits pedestrian use and directs pedestrians to 9th Street SW.

Chapter Two: Existing Conditions page 9 8ThAve NW

St NW

Th

Th 4

St NW St NW 7 Ave NW StNE

StNE

Rd Nd

Rd

Th

3 2

NMeridian 3

4

StNE

St NE

Nd

Th

2

5 5ThAve NW

St NW

Th

St NW

7 Th

St NW Th 4 Ave NE

6 Th Th

5 St NE 4 Ave NE

Th

W Stewart 2 Rd 3 Ave NW E Stewart Ave 2NdAve Nw ¤n 2NdAve NE W Main E Main E Main W Meeker E Meeker W Pioneer UV512 E Pioneer

St SW E Pioneer

Th

6 Th

StSE 4 St SE Ave SW ¤n St SE

Th

¤n Rd Th

4

3

5 5Th Ave Sw ¤n 4ThAve SE

StSE

St SW StSW

Nd

Th Th

2

St SW Th 7 Ave SW 5 4 Th Th 7 Ave SE 7

SMeridian

9ThAve SW 9ThAve SE

10Th Ave SW

10ThAve SE

StateHwy 161

0 250 500 1,000

Feet

Figure 4 Curb Ramp Condition Sidewalk Downtown Business District Existing Pedestrian Facilities Passed 1/4 Mile Buffer Area Mapped Feature 1/4 Mile Radius of Needs Improvement ¤n Sounder Station Downtown Business District Failed Pioneer Park No Ramp Exists StSW UV512

Th

5 27ThAve SE S Meridian S

AveE

Th

94

Th

Ave EAve 30 Ave Sw Th

Th 30 Ave SE

90 Th 104 St E 31StAve SW 31StAve SE

UV161 S Hill Park Dr

35ThAve SE

South StSE

Hill Mall Th

5 37ThAve SE

St SW

Th

9

112ThSt E 39ThAve SW StSE

Rd

3

StSW

Ave E

Th

7

Nd

92

S Meridian

Ave E

Th

94

116ThSt E 43RdAve SE

118ThSt E 0 250 500 1,000

Feet

Figure 5 Curb Ramp Condition Sidewalk Existing Pedestrian Facilities Passed 1/4 Mile Buffer Area 1/4 Mile Radius of Needs Improvement South Hill Mall Failed No Ramp Exists ACTIVE TRANSPORTATION PLAN

Elementary Schools As shown on Figures 6 and 7, Maplewood, Meeker, and Stewart elementary schools have the highest pedestrian accessibility with sidewalks provided on most streets within a quarter mile of each school. Fruitland and Shaw Road elementary schools have the poorest pedestrian accessibility, with most streets within a quarter mile of each school lacking sidewalks. The City of Puyallup, the Puyallup School District, and neighborhood groups, have made a commitment to provide safe access to the City’s schools through the State Safe Routes to School (SRTS) program. Puyallup was recently awarded two SRTS grants. The completed Wildwood Park Elementary School Safety Improvement project included new pedestrian paths, lighting, and curb ramp improvements. The second awarded project is for crosswalk improvements adjacent to Meeker Elementary, Stewart Elementary, and Aylen Junior High, and included new pedestrian‐ activated flashing beacons, upgraded curb ramps, educational materials and events, and speed emphasis and crosswalk violation patrols. Another SRTS candidate project is adjacent to Fruitland Elementary School and includes building new sidewalk and crosswalk improvements to connect a new residential area. The City of Puyallup has compiled travel data for four schools in the City as part of their SRTS applications. Of the three elementary and one junior high school analyzed, 82 percent of students live within a two‐mile radius of their respective school. However, only one percent of all students bike to school and only 14 percent walk to school.

Chapter Two: Existing Conditions page 12 Puyallup River 4TH AV NW Maplewood Elementary School W STEWART Traffic¬ 3St River Rd Main St Stewart Ave Milwaukee Ave 3RdAVE NW ¬2 5 W Pioneer ¬ E Main

ST NW

Th W MAIN ¬3 E Pioneer ¬4 ¬6 16

W PIONEER VU512 ¬7

Th ¬1 4 AVE SW

Rd

SMeridian Th 23 Ave 96ThSt 5 AVE SW ¬8 Th 104 St St 31 Ave

FruitlandAve Shaw Rd 7ThAVE SW

Th Th 112 St Th 39 Ave 39 Ave ¬9 0 0.5 1 2 0 250 500 1,000

Miles FeetW STEWART

¬1 Fruitland Elementary School ¬4 Meeker Elementary School 84ThST E

ST SW W MAIN

Th

14

W PIONEER AVE 87Th ST E

FIRLAND DR 15Th AVE SW Th 4 AVE SW

S MERIDIANS

AVE EAVE

Nd

72

7ThAVE SW

0 250 500 1,000 0 250 500 1,000 Rd 23 AVE SW 23ThAVE SW

Feet S FRUITLAND Feet

13TH AV NW ¬2 Karshner Elementary School Figure 6 Existing Pedestrian Facilities

ST NW near Elementary Schools

Th 10ThAVE NW 1/4 Mile Radius of

18 Elementary School Locations

8ThAVE NW Curb Ramp Condition Sidewalk

Passed Public Elementary School Property

ST NW Needs Improvement Th 1/4 Mile Buffer Area

11 Failed 5ThAVE NW 4ThAVE NW No Ramp Exists W STEWART

STNW

Th

18 3RdAVE NW 0 250 500 1,000

Feet

ST NW

Th

16 ¬5 Stewart Elementary School Milwaukee Ave ¬8 Wildwood Elementary School

UV512 23RdAVE SE

ST NE

ST NE

Th

Th

5

4

ST NE

Nd

2

ST SE

Th

S MERIDIANS

20 E MAIN AVE

W PIONEER AVE ST SE

Th

18 4TH AVE SW

0 250 500 1,000 0 250 500 1,000 Feet «¬6 Feet

5TH ST NE ¬6 Spinning Elementary School ¬9 Sunrise Elementary School

E MAIN AVE WIL DW O O D

P E PIONEER AVE A R

K

SHAW RD E D

R

39ThAVE SE

7ThAVE SE

ST SE

Th

13 UV512

0 250 500 1,000 0 250 500 1,000

Feet Feet

¬7 Shaw Road Elementary School Figure 7 E PIONEER Existing Pedestrian Facilities near Elementary Schools 1/4 Mile Radius of Elementary School Locations

ST SE

Th

25

SHAW RDSHAW E Curb Ramp Condition Sidewalk

Passed Public Elementary School Property Needs Improvement 1/4 Mile Buffer Area

ST SE

St Failed

21 No Ramp Exists

12ThAVE SE

0 250 500 1,000

Feet ACTIVE TRANSPORTATION PLAN

BICYCLING AND PEDESTRIAN SAFETY There have been several pedestrian fatalities in Puyallup in the past few years and the City has been placed on WSDOT’s list of Cities of Concern for Pedestrian Safety. Between 2010 and 2013, approximately 80 collisions involved nonmotorized users in Puyallup. Collisions were primarily distributed at locations throughout the city, indicating that there are no “hotspots” for nonmotorized collisions. Providing bicycling and pedestrian facilities that are safe and comfortable for a range of user types is an urgent priority. As Puyallup begins to develop nonmotorized projects, facility design will be key in ensuring a safe and connected network for all users. A number of factors are considered as part of the nonmotorized facility design process:  Auto Volumes: the nonmotorized facility type may be different depending on the auto volumes in corridors where the facility is proposed. As auto volumes increase, more separation for nonmotorized users is preferred.  Auto Speeds: similar to auto volumes, auto speeds also influence the type of nonmotorized facility that is compatible with the corridor. As auto speeds increase, the needed degree of separation of the bicycle facility also increases.  Traffic Mix: corridors with certain types of traffic mixes, such as corridors with high freight truck percentages, may be more compatible with different facility types.  Expected Users: the expected user type and volume on the nonmotorized facility is an important consideration to ensure safety of users on the facility. Particular facilities and/or design characteristics (facility width, markings, degree of separation) may be safer for certain combinations of users (recreational users versus commuters, for example).  Topography: Steep grades can be difficult for some users to traverse. In areas where topography is steep, additional separation from autos may be necessary to reduce the potential for conflict with slower moving cyclists.  Land Use: the land use along a corridor may have an impact on the type of nonmotorized users on the facility as well as the type and frequency of vehicle movements.  Driveways and Access Points: corridors that have a high number of driveways or access points to businesses or homes may require particular design considerations to avoid vehicle‐nonmotorized conflicts, such as signage, markings, and/or degree of separation.  Roadway Function: the type of nonmotorized facility may change depending on the roadway function, i.e. local, rural, arterial. The roadway function may influence the number of vehicles, time of day vehicle traffic is high, and allocation of right‐of‐way space.  Roadway Characteristics: total roadway width, lanes widths, and conditions at intersections, can influence what type of facility is implemented in a corridor in relation to other corridor needs.

Each of the characteristics mentioned above influenced the facility type and location of proposed facilities included in this implementation strategy to provide safer places for walking and bicycling.

Chapter Two: Existing Conditions page 15 ACTIVE TRANSPORTATION PLAN

TRAVEL CORRIDORS Travel corridors connect land uses; in Puyallup, travel corridors are mostly roadways with sidewalks but also include some trails and bus and rail transit lines. Cities typically classify their roadways by the number of vehicles the roadway could accommodate; state routes and arterials are designed for faster and more frequent vehicles including transit while local streets are generally designed for slower speeds and less vehicle traffic. The availability of nonmotorized facilities varies with sidewalks generally provided on collectors and arterials. Puyallup uses the following classifications (also illustrated in Figure 8):  State Routes  Arterials: Major and Minor  Collectors: Major and Minor  Local Streets

The pattern the street system takes is also important to consider for connectivity: the northern portion of Puyallup, roughly between the Puyallup River and 12th Avenue, has a relatively well‐ connected street grid. The southern and eastern portions of the city are characterized by larger blocks and curvilinear streets, which can make direct connections more difficult.

Chapter Two: Existing Conditions page 16 W

E 36th St E E

a e 37th Street Ct E e

v p v

A P a A ark t S o h d t E 39th St E t

n Cr 8 2 k 0 0 4 t 4 h St E ve E 1 A 1

Simons Crk n Chrisella Rd E 110th EAve a 41st St E d St E i r d 43 i C r a e 6th St NE l d M 44th St E 43rd St Ct E we 102nd Ave E Ave 102nd ll R 45th Street Ct E 45th S t E d 46th St E E E Ave 145th

FreemanRd E

R iv 49th St E 48th St E er R d 23rd Ave NW Todd Rd E Puyallup St E 50th St E K a Puyallup r 85th Ave EAve85th sh ValleySports n E er R d N Levee Rd E Complex d E g 82nd Ave 82nd E Ave M e 52nd St E 5 on w Valley Ave 3rd Stree ta o E t Ct E o e

V Fryar Ave is d v e t a AveSteele A

v D r E D d A 16th Ave NW r o E E o e 56th S t

e W k u 57th St E a R w l iv i er N Levee Rd Rd 59th St E M Valley Ave Skate E nSt W SamPeach Park Mai N

Stewart Ave E t Park Maple St

26th St NW

S d r N Meridian Ave 6 n Rd E State St

3 Veterans 2n Housto 2 Traffic St 21st 21st NWSt d Park B St E 119th Ave e E

9th St NW

W

18th St18th NW W n s C N la Taco N Grayland to t m 13th St NE a t n R Park Kincaid Ave S r d S

k 4th St NW s E Dr E Cherry Ave C St11th NW d r d k W Stewart Ave r n 3 Alder Ave 2

Sumner Ave 4th Ave NW 7th St NW

3rd St 3rd NE St

5th St NE

cE 3rd Ave NW l 4th St NE M r R 15th St 2nd Ave NW o o y 16th St 71st St E s P W Main Ave e l E Main Ave

P 72nd St l E

E 4th Ave SW S ve 74th St E

t DeCoursey SW St 17th A

4thSt SE

S Park St 3rd SW 7th Pl SE Inter

d

E

r

E

S

2nd SESt

3 S 18th 18th St SW 6th Ave SW

t

t

14th St SE St 14th

S SE St 16th 7th Ave SW S 7th Ave SE h

h

t

t E

134th Ave E134th Ave

4th St SW St 4th 8th Ave SW 0

2nd St2nd SW S

1 5

13th 13th St SE 1 t 16th 16th St SW 9th Ave SW 9th Ave SE S 80t h h St E

t

5

Clarks 10th Ave SE 2 82nd St E F Creek i

l Park

13th 13th St SW a

84th St E r Shaw Rd n

d 12th Ave SE

Silver 21st SESt D

r Creek H 86th St E E ighlan

14th 14th St SW d 14th Ave SE S s

t 87th St E B

V S is l

t v a SE St 27th d 88th St E h 15th Ave SW 15th A A

ve SE t D

m 4 r Brown be 3 Community r E Blv S Garden SE d r 5th St SE D 9th St SE r S D E e 72nd EAve g

19th Ave SW te d 19th Ave SE n E tal Ri

o ys

S r 7th StSW m C Dead 28thStSE

k Man'sPond l 21st Ave SW o Wildwood Park P o Woodbine r h 20th Ave SE B t 96th St E 23rd Ave SW Cemetary 7 E 2 S

Cherokee t

97th St E lvd Park S

B o d

o h

r W

D S w 24th Ave SE t k E 6

t S

u 3 r

S a e

7th St SE 7th v 21st 21st SWSt e a A 43rd St SE

h 2 t L 5th a 26th St SE 0 t P E 1 0th St E a r S k 5 h

t s

C p S Rainier u 27th Ave SE W 28th h r Woods 102nd St E Ave SE t

D E 8 Park

i S ld 1 r 30th Ave SW w t 104th St E o S 31st Ave SW 11thSt SE o d 31st Ave SE

38th 38th St SE

h 41st SESt Bradley t P 0 Lake a 33rdAv 4 r e Park k S Dr E Manorwood 106th St E Park E

e v

9th SWSt A

Fruitland EAve 83rd Ave E Ave 83rd 37th Av e h 8 t

8 S E 0

t 112th St E 3 h 39th Ave SW 1 39th Ave SE A

v

e

E

92nd Ave E Ave 92nd 43rd Ave SW 43rd Ave SE 115th St E 117th St E Pipeline Rd E 116th St E E 118th St E e E v d A R

h

E Meridian Ave t ry 120th St E 120th Ave E 6

74th EAve a 13 t Woodland AveE 86th 86th EAve i il

E M

80th AveE 0 0.25 0.5 1 e

v

78th AveE 123rd St E

A 122nd St E 81st Ave81st E

h

124th St E Miles t

0 9

Figure 8 Major Arterial City of Puyallup Proposed Roadway Classification Fairgrounds Minor Arterial 2015 Transportation Element Major Collector Urban Growth Boundary

Minor Collector ACTIVE TRANSPORTATION PLAN

KEY DESTINATIONS Key destinations (shown on Figure 9) are places to and from which people want to connect. These are areas of the City that have an attraction for all residents and should be accessible by numerous travel modes, including walking, biking, and rolling. These areas are important because as we connect destinations together we provide greater access, comfort, and experiences for people of all ages and abilities to walk and roll. Some destinations, such as schools and community centers, require additional consideration in the design and implementation of connecting facilities because of who the users could be—children, families, and people of all mobility levels who are sometimes traveling during busy travel times. DOWNTOWN PUYALLUP The downtown business district is home to restaurants, stores, civic destinations such as City Hall and the public library, and different events such as the Puyallup Farmer’s Market at Pioneer Park. Downtown Puyallup is a Puget Sound Regional Council (PSRC) designated regional growth center, which indicates that it has been identified as a regional concentration of housing and employment growth. EVENTS CENTER Puyallup is home to the largest fair in the State – over one million people attend the Washington State Fair in September over 17 days each year, and over 1,900 employees are hired to serve them. There is also a three‐day Spring Fair that attracts over 100,000 people each April. Several other major events occur throughout the year at the Fair Events Center. There is a nine‐foot shared‐use path provided along the northwest side of Fairview Drive, which connects the orange parking lot driveway and the green parking lot driveway. On its north end, the path connects to a sidewalk on the northwest side of Fairview Drive. Sidewalks are available on the streets surrounding the fairgrounds, but are sometimes limited to one side of the street. Marked and signalized crossings are available at most locations to access the fairgrounds, and curb ramps have recently been installed at several intersections surrounding the fairgrounds. SOUNDER STATION The Sounder Station located in Downtown provides access to Sound Transit’s Lakewood‐Seattle Sounder commuter rail line. Almost 1,100 people use the Puyallup Station every day to access Sounder Train or Express Bus service. Sidewalks are available on adjacent streets to the Sounder Station; dedicated bicycle facilities are currently not available. Bike lockers and a bike rack are provided at Puyallup Station, and bicycle commuters are also able to bring their bikes on Sounder trains. Sound Transit is planning improvements for this Station, include expanded parking and additional service in the future. Sound Transit and the City are discussing modal improvements and are working to establish which specific improvements will be included in Sound Transit’s project funding for all modes. SOUTH HILL MALL The South Hill Mall and surrounding commercial area is a major retail and commercial destination. South Hill is also a designated regional growth center. This area provides sidewalks along most streets with some midblock connections to surrounding land uses. Large parking lots surround most of the retail uses in this area. A transit center is provided along 39th Avenue SW and routes (4, 400, 402) and the Puyallup Connector serve this location. PIERCE COLLEGE PUYALLUP Pierce College is located in the South Hill area. Nearly 3,900 students enrolled on the campus in fall 2013. Pierce College offers Associate’s degrees, certificate programs, and the “Running Start” program. Currently, the campus is primarily accessed by car or transit.

Chapter Two: Existing Conditions page 18 UV161

Chrisella Rd

Ave

ND UV167 W Valley Hwy 122 48 THSt

Freeman Rd Wapato Creek UV167 N Meridian

Valley Ave Traffic St Main St River Rd

Milwaukee Ave Stewart Ave

St NE

TH Puyallup River UV410 ¤n 5 E Main W Pioneer E Pioneer

St NW

TH

5

84 THSt

UV512 RD Clarks Creek 23 Ave 96 THSt

S Meridian

TH ST 104 St 31 Ave

FruitlandAve

Shaw Rd 37 THAve TH TH 112 St 39 TH Ave 39 Ave TH

Woodland Creek 112 St

UV162 0 0.25 0.5 1

Miles

Figure 9 Pierce College Puyallup Retirement Community Key Destination and Trip Generators n¤ Sounder Station

Public School Park City of Puyallup Downtown/South Hill Business Districts Fairgrounds MultiCare Good Samaritan Hospital ACTIVE TRANSPORTATION PLAN

MULTICARE GOOD SAMARITAN HOSPITAL This hospital employs over 2,000 people in central Puyallup and serves as the regional medical center for eastern Pierce County. There are recently‐constructed sidewalks and pedestrian crossings on many of the surrounding streets. This area also has other medical center and support facilities surrounding the hospital. SCHOOLS The Puyallup School District operates neighborhood schools that serve the City and surrounding areas, which include:  Fruitland Elementary  Sunrise Elementary  Karshner Elementary  Wildwood Elementary  Maplewood Elementary  Aylen Junior High  Meeker Elementary  Ferrucci Junior High  Shaw Road Elementary  Kalles Junior High  Spinning Elementary  Puyallup High School  Stewart Elementary

The Puyallup School District also determines when school bus transportation is available; per School District Policy #6600, students living within the one‐mile walking radius for elementary schools, 1.25 mile walking radius for junior high schools, and 1.5 mile walking radius for high schools and have access to safe pedestrian facilities, school bus transportation may not be provided. The School Advisory Committee recommends safe walking routes to school and the school board adopts walk routes. PARKS AND RECREATION AREAS The City’s park system consists of three community parks and 12 neighborhood parks or recreation centers (see Figure 9). The City’s parks and recreation areas feature ball fields, playgrounds, walking paths, ponds, a dog park, a skate park, community gardens, picnic areas, an indoor recreation center, a pavilion, and restrooms. The City recently updated their Parks, Recreation, and Open Space (PROS) Plan, which proposes policies, programs, and projects to improve these areas in the City of Puyallup. City staff responsible for guiding the development of the PROS Plan were key to developing this Active Transportation Plan. RETIREMENT COMMUNITIES Retirement communities are also generators of non‐motorized trips. Many residents of retirement communities no longer drive their own vehicles, so they are dependent on privately‐operated shuttles, public transportation, and walking or biking to get to doctors’ appointments, residences of family and friends, and shopping/dining destinations. There are about ten retirement communities in Puyallup, and at least three proposed facilities, located in a north‐south corridor roughly centered on S. Meridian and on 43rd Avenue SE.

Chapter Two: Existing Conditions page 20 ACTIVE TRANSPORTATION PLAN

TRAVEL MODE DATA PSRC conducts household surveys to collect data on how people travel in the Puget Sound Region. This is the best available dataset on which modes people use to travel to, from, and within Puyallup. The data from the survey includes 1,628 Puyallup‐based trips and the mode share results are summarized in Table 1. Combined, walking and biking account for 4.3 percent of all trips in Puyallup. Walking and biking increases in share to 5 percent when travel to and from work is removed. Overall, these results are typical for suburban communities like Puyallup, where most travel is via car. It is important to note that household travel surveys tend to underreport recreational travel like jogging, cycling, or dog walking so actual active transportation mode share may be somewhat higher than reported by the PSRC data.

ANTICIPATED GROWTH IN TRAVEL The City of Puyallup and Pierce County have experienced an increase in the number of vehicles on roadways. This is attributed to the following population growth between 2000 and 2010:  The City of Puyallup’s population increased by 12%, from 33,011 to 37,022.  Pierce County’s population increased by 13%, from 700,820 to 795,225.

By 2030, it is projected that Puyallup’s population will be approximately 50,000 residents and Pierce County’s will reach approximately 967,600. This increase will add to the congestion that the traveling public experiences today. To help address this congestion, the Transportation Element proposes to increase the share of walking and bicycling (mode split goals) in the Downtown and South Hill Regional Growth Centers. To achieve these goals, the City will modify land use and zoning designations, and develop programs and projects to encourage the use of walking, bicycling, and transit. Table 1. How People Travel in Puyallup

Mode City of Puyallup Drove Alone 44.1% Carpooled 46.4% Public Transportation 1.2% Walked 4.1% Bicycle 0.2% Other 3.9% Source: PSRC Spring 2014 Household Survey

Chapter Two: Existing Conditions page 21

ACTIVE TRANSPORTATION PLAN

ACTIVE TRANSPORTATION ANALYSIS The way people travel is greatly influenced by the built environment described in this chapter. The built environment includes land use and travel corridors, and key destinations people travel to, such as where they live, work, play, shop, and recreate. Planning for the future, Puyallup Moves also provides an understanding of how people could travel based on anticipated travel growth and travel mode data. Active transportation is defined as any human‐powered mode of transportation, such as walking and biking. Figure 10 displays areas that are attractive for active transportation in Puyallup. A description of the active transportation analysis process is provided below.

ESTIMATING ACTIVE TRANSPORTATION To forecast areas that have higher levels of active transportation, several indices of pedestrian and bicycling demand were evaluated. Each index was chosen based on its relationship between the built environment and travel patterns. A composite score was then calculated to determine the relative attractiveness of one area over another for active transportation. To estimate pedestrian and biking demand in Puyallup, eight indices were evaluated:  Proximity to attractions  Proximity to schools  Proximity to parks  Proximity to transit  Population density  Employment density  Diversity of land use  Age (8‐80)

Each index was weighted based on the strength of its relationship with walking and biking, and measured at the census block level using spatial analysis software. Each census block was then assigned a composite score based on how accessible or attractive it was for walking and biking. Generally, greater potential for active transportation happens with a mix of the indices (proximity, density, and diversity) coupled with walking and bicycling facilities that provide greater comfort for users. Puyallup’s downtown provides a vibrant walking environment with access to businesses, civic buildings, and public open spaces.

Chapter Two: Existing Conditions page 22 UV161

Chrisella Rd

Ave

ND UV167 122 48 THSt W Valley Hwy

Wapato C reek UV167 Freeman Rd N Meridian

e

v A Valley Ave e

e

k u Main St River Rd a

w l i 167 Stewart Ave M UV Traffic St

St NE TH UV410 5 E Main W Pioneer

E Pioneer

St NW

Th

5

84 TH St

Clarks Creek RD S Meridian 23 Ave 96 THSt UV512

104 TH St

FruitlandAve

Shaw Rd TH TH 37 Ave 112 St TH TH 39 Ave TH 39 Ave 112 St

0 0.25 0.5 1 UV162 Miles

Figure 10 Estimated Demand for Active Transportation Facilities Estimated Demand for Active Transportation Facilities High

Low ACTIVE TRANSPORTATION PLAN

3 | ALTERNATIVE TRAVEL MODES Walking is the oldest and most affordable and environmentally friendly form of transportation. Walking often begins and ends most of our trips – we walk to and from our destinations, such as the bus stop; our cars; bicycle racks; the train; lunch spots; coffee shops; and much more. Bicycling can also begin and end many of our trips if we are within a comfortable distance from our destinations or connections – we bicycle to and from the bus stop, the Sounder Station; places to play and work, and more. These active modes of transportation can be linked with transit and other forms of shared transportation, such as rideshare, vanpool, transportation network companies (such as Uber or Lyft) to create a safe, balanced, and efficient multi‐modal transportation system. As part of an active transportation network, these modes help to make transportation affordable, convenient, flexible, and environmentally friendly for everyone. The following section summarizes transit and other ride sharing opportunities in Puyallup that help support the active transportation network.

BUS TRANSIT Pierce Transit and Sound Transit provide local bus and regional express bus service with connections in Puyallup. The majority of transit riders access bus transit service by driving to a parking lot or on‐street parking and then walk to connect to transit. Pierce Transit bus service in Puyallup typically operates on 30‐minute headways or greater during both weekdays and the weekend. Headways are the scheduled time between buses serving a bus stop. Table 2 summarizes bus transit service with connections in Puyallup (as of Spring 2016). Bus service every 15‐minutes or less is considered frequent transit service. Figure 11 illustrates Pierce Transit’s southeast region service map, which shows the corridors in which transit operates in Puyallup. The Puyallup Connector, Route 425, is a local route that provides service to key Puyallup and South Hill community destinations including medical, shopping, and recreation. The Puyallup Connector is a local route designed by and for the community. This connector is an example of coordination between Puyallup residents and staff and Pierce Transit.

Sound Transit and Pierce Transit, such as Route 402, provides key connections to other parts of the region.

Chapter Three: Alternative Travel Modes page 24 ACTIVE TRANSPORTATION PLAN

Table 2. Puyallup Bus Service

Route Route Name Weekday Frequency (minutes) Approximate Time of Service Number PT 4 Lakewood – South Hill Mall 30 6:15 am - 6 pm PT 425 Puyallup Connector 30 9:30 am - 6 pm PT 495 South Hill Mall Transit Center 20 - 30 4 pm - 7 pm PT 402 Meridian 60 5:30 am – 8:30 pm PT 409 Puyallup-Sumner 60 7 am - 7 pm PT 400 Puyallup-Downtown Tacoma 30 - 60 5 am – 8:30 pm ST 578 Puyallup-Seattle 60 8:30 am - Midnight (PT) Pierce Transit (ST) Sound Transit

Figure 11: Pierce County Transit Southeast Bus Service Map

Chapter Three: Alternative Travel Modes page 25 ACTIVE TRANSPORTATION PLAN

COMMUTER TRAIN SERVICE The Sound Transit Lakewood‐Seattle Sounder commuter train serves Puyallup Station. The Puyallup Sounder train station is located between W. Stewart Avenue and W. Main Avenue just west of S. Meridian (SR 161). There are eight trains to Seattle in the morning that depart approximately every 20 minutes between 5 am to 8 am. There are two trains to Seattle in the afternoon approximately 30 minutes apart starting at 4:30 pm. Trains from Seattle arrive twice in the morning and then every 20 minutes from 4 pm to 7 pm.

Sounder is a weekday commuter service, and there is no regular weekend schedule. Sounder does serve selected events on Saturdays and Sundays such as Seahawks, Sounders, and Mariners games.

TRANSPORTATION NETWORK COMPANIES Ridesharing programs, such as Lyft and Uber, carpool, and Vanpool systems help reduce the number of vehicles on the road and support active transportation. This type of service is currently available in Puyallup. In addition, these services provide extensions to transit at destinations within the Puget Sound region, such as Tacoma and Seattle. Also, these companies are continuing to evolve how they integrate with other modes; Uber recently announced a program to request vehicles with bike racks. Lyft and Uber have also introduced new programs, called Lyft Line and UberPool, which allow customers to combine their ride with other people who are traveling in generally the same direction. These companies have found that many people use their services as a last mile solution, which helps to reduce single occupancy vehicle use and encourages a more integrated, active transportation network. Pierce Transit also provides information and assists in organizing commuter vanpools.

Chapter Three: Alternative Travel Modes page 26 ACTIVE TRANSPORTATION PLAN

ACTIVE TRANSPORTATION PROGRAMS There are a number of programs that the city can implement to support and encourage nonmotorized travel in Puyallup. The projects and programs described in this section help develop a support structure that can increase people’s exposure to walking, biking, and rolling. BIKE SHARING Bike sharing delivers the benefits of bicycling to a broad audience. By replacing car trips, it helps the environment, improves health, reduces road congestion, boosts the economy, reduces parking, increases mobility and traffic safety, and introduces new audiences to bicycling. Bike sharing is great for short trips and errands around town and increases access to bicycling. To be successful, a critical mass of stations is needed. Other cities in the Puget Sound are considering bike share programs and a program called Pronto! Cycle Share was recently implemented in Seattle. Other lower cost bike share programs could include free bicycles that can be checked out. HELMET KIOSKS Paired with bike share stations, helmet kiosks improve safety and reduce barriers to bicycling. According to the National Highway Traffic Safety Administration, bike helmets can reduce the risk of head injuries by as much as 85% and brain injuries by as much as 88%. All cyclists are required to wear helmets under Pierce County’s Bicycle Helmet Law. WAYFINDING A wayfinding signage system is a highly visible component for navigating the built environment. Wayfinding signs inform pedestrians, bicyclists, and motorists while enhancing the City’s identity. Signage can communicate destinations, direction of travel, and the time/distance to these places. This can increase accessibility to the bicycle and pedestrian system and awareness that bicyclists and pedestrians use certain routes. BIKE PARKING People are more likely to try cycling if they know that they have a place to store their bike at their destination. Bike parking also encourages bicycling for short trips and errands. Bicycle racks can also be used to showcase public art and enhance the aesthetics of an area. Bicycle parking is currently required by Puyallup code for certain development sizes. Also, the City could develop code to stipulate or incentivize the provision of other supportive facilities such as bicycle storage areas, showers, lockers, and more. BIKE SUPPORT FACILITIES Support facilities can make biking a more attractive and/or realistic option for a variety of trip purposes. Such facilities can include amenities such as bike repair stations, which provide secured tools and an air pump to fix flat tires or adjust brakes, changing areas, lockers, and showers near employment centers, and water fountains. Bike support facilities should be considered within downtown and along trails, where biking volumes are highest, as well as in other strategic locations throughout city. STREET CLOSURES Street closures involve opening a city street for several hours for people to walk, bike, shop, and enjoy their community while reducing car travel on that street. A street becomes an open plaza, a performance space, a recreational space, and/or a space to connect with neighbors. Closures can be temporary for a few hours to a day, or can become permanent. These events encourage pedestrians and cyclists to use space otherwise dedicated to vehicles and can increase awareness of all users. Meeker Days is an example where streets are closed for a festival.

Chapter Three: Alternative Travel Modes page 27 ACTIVE TRANSPORTATION PLAN

EDUCATION Classes can serve as an introduction for anyone considering cycling and are a way to become familiar with bicycling in vehicle traffic. Classes can be held in a classroom as well as on‐road, to apply safe riding techniques. Alternatively, cities like San Francisco offer classes for bus and taxi drivers to learn to share the road with cyclists. Providing education to both cyclists and motorists can increase the understanding between these groups and lead to better sharing of the road. Additionally, nonprofit groups like the Cascade Bicycle Club frequently partner with communities in the Puget Sound region to provide a variety of education opportunities, from adult classes to bike rodeos for kids. PEDESTRIAN OR BICYCLING AUDITS Auditing activities can be a powerful workshop tool for redesigning and visioning the community. These events bring people together to walk or ride and discuss facilities that work well for active transportation, and those that need improvement. Audits are short walks or bike rides that are educational, fun, healthy, democratic, and inspirational. These audits can also incorporate wheelchairs and strollers for a more complete perspective of users. ARTISTS AND COMMUNITY The opportunity to connect with the arts community can enliven pedestrian and bicycle spaces. Coordination with artists and community groups can encourage connections with the community through artistically inspired bike racks, wayfinding, branding, and other improvements. Arts Downtown, an all‐volunteer, non‐profit organization is an example; their mission is to curate Puyallup’s Outdoor Sculpture Gallery; they began in 1995 and have a collection of 47 pieces located around town. ENCOURAGE Programs for encouraging bicycling and walking, such as employer incentive programs, multi‐ modal access guides, and Walk‐and Bike‐to‐School Days, can keep up the momentum and support for walking and rolling. These programs can build a broad‐based support and can help secure financial resources from both the public and private sector. COUNTERMEASURES How we plan for and design walking and bicycling facilities is constantly changing. Through education, City staff can keep up on the latest innovative designs and best practices. Facility examples include bicycle lanes, bicycle boxes, curb bulbs, chicanes and bicycle signals, among other things. AMBASSADORS A group of walking ambassadors can be organized and trained to lead walks that inspire, connect, and inform the community. A series of walking audits that involve the community, elected officials, and city staff can provide an assessment of the community and identify barriers and opportunities to walking. Audits can also provide the City with information on the pedestrian environment and provide recommendations for improving and encouraging walking. Friends of the Riverwalk Trail is a local ambassador, with the mission to connect communities by promoting, enhancing and protecting the Puyallup Riverwalk Trail as a safe, accessible, environment for healthier bodies, alternative transportation and recreation for all.

Chapter Three: Alternative Travel Modes page 28 ACTIVE TRANSPORTATION PLAN

4 | SYSTEM IMPLEMENTATION The facilities and programs described within this chapter are proposed to enhance safety, mobility, accessibility, and provide inviting places to be active in Puyallup. They were developed using a framework that employed the following priorities:  Provide connectivity to support local travel in Puyallup.  Improve safety for all road users in Puyallup through street designs that accommodate all modes.  Encourage placemaking and the creation of a vibrant, walkable identity for Puyallup’s downtown.

Puyallup envisions a future transportation system that serves all users and modes of travel by offering a safe and robust network of walkways, bicycle facilities, intersections, and roadways. This chapter summarizes Puyallup’s vision for its future pedestrian and bicyclist transportation network and the infrastructure improvements that will get the City there. As identified in the Transportation Element, most of the improvements are focused on the development of a ‘layered’ transportation network, which focuses less on providing vehicular capacity and more on accommodating all modes of travel. Many of the future improvements focus on providing safer and more complete facilities for walking, bicycling, and riding transit in order to improve access and mobility for all road users. INTRODUCTION TO THE LAYERED NETWORK It can be a challenge for a single roadway to meet the demands and expectations of all modes at any given time. This is also generally not desirable from a user or a planning perspective. In response to this challenge, the City of Puyallup has adopted a layered network approach that focuses on how the City’s transportation network can function as a system to meet the needs of all users. In such a system, individual travel modes are prioritized on different facilities throughout the overall network—the concept of a layered network is illustrated to the right. The City will implement this layered network through a system of roadway typologies that define each street’s user priorities and associated infrastructure needs.

Chapter Four: System Implementation page 29 ACTIVE TRANSPORTATION PLAN

MODAL NETWORKS Streets in Puyallup serve different travel purposes, and the modal networks therefore prioritize a different balance of users on each corridor. Determining how the entire transportation network fits together in Puyallup requires identifying desirable streets for each mode, combining them to locate overlaps, and then assigning priority to certain modes. The following sections present the priority networks for each mode. The City’s recently adopted Transportation Element provides guidance on the priority development areas for pedestrians and bicyclists. In addition, the Transportation Element provides additional guidance on a proposed multimodal level of service standard based on system completeness and facility type.

LAND USE The places people live, work, and play is influenced by how a city and surrounding communities guide where development occurs. One way a city can influence where people live, work, and play is through zoning. Zoning allows a city to encourage specific development, such as homes, parks, and businesses, to occur in targeted areas of the city. The city can also influence the form of these developments, such as being compact and comfortable, and reducing the need to drive to complete some trips. It is important to consider land use when planning for transportation because it provides insight into areas where more people may concentrate their travel. The main commercial areas in Puyallup, where people tend to shop, are located downtown and in the South Hill area; these areas are zoned Central Business District and general commercial as shown in Figure 12. Downtown and South Hill are linked by S. Meridian with properties along this roadway zoned for the fairgrounds, general commercial, and high density multiple‐family residential. Other areas of commercial and industrial land use are located in the northern portions of the City along Valley Avenue E, River Road, and E. Main Avenue. Much of the remaining City area is zoned for public facilities and single‐family residential. It is important to consider that areas of commercial, industrial, and dense residential land use tend to have more concentrated trips and can be supportive of alternative modes of travel such as transit, whereas areas of low density residential tend to have dispersed trip patterns more conducive to trips made by personal vehicle.

Chapter Four: System Implementation page 30 UV161

Chrisella Rd

Ave

ND UV167

122 48TH St W Valley Hwy

Freeman Rd Wapato C reek UV167 N N Meridian

Valley Ave

River Rd Main St

Milwaukee Ave 167 Stewart Ave UV Traffic St

St

TH 410 5 Puyallup River UV E Main W Pioneer

St E Pioneer

RD

3

S Meridian

84TH St

Clarks Creek RD S Meridian 23 Ave 96TH St UV512

TH ST 104 St 31 Ave

FruitlandAve

Shaw Rd 37TH Ave TH TH 112 St 39 Ave TH 39 Ave 112TH St

Woodland Creek

UV162

0 0.25 0.5 1

Miles

OP - Professional Office RM-20 - High Density Multiple-Family Residential Figure 12 CB - Community Business RM-CORE - Downtown-Oriented High Density Multiple-Family Residential CBD - Central Business District RS-04 - High Urban Density Single-Family Residential CBD-CORE - Central Business District Core RS-06 - Urban Density Single-Family Puyallup Zoning Map CG - General Commercial RS-08 - Medium Density Single-Family CL - Limited Commercial RS-10 - Low Urban Density Single-Family Residential RMX - River Road Mixed Use RS-35 - Very Low Density Single-Family Residential CMX - Shaw-Pioneer Community Mixed Use PF - Public Facilities ML - Limited Manufacturing MED - Medical MP - Business Park FAIR - Fair PDC - Planned Community Development ARO - Agriculture, Recreation and Open Space PDR - Planned Residential Development City of Puyallup RM-10 - Medium Density Multiple-Family Residential ACTIVE TRANSPORTATION PLAN

PEDESTRIANS While Puyallup’s local streets may not need fully separate sidewalks or paths due to their low traffic volumes and slow speeds, the City’s arterials and commercial collectors do warrant pedestrian infrastructure. Dense areas with commercial land uses and streets that serve schools, parks, and churches are particularly important for safe walking, as they support more pedestrians and may have a larger portion of vulnerable users than other streets. Figure 13 highlights the Pedestrian Priority Network, which specifies where pedestrian infrastructure should be provided in the long term. In addition to the presence of pedestrian facilities along a corridor, the City also emphasizes the importance of safe pedestrian crossings. Particularly downtown and within a quarter mile of schools, the City is looking to provide enhanced crossings at regular intervals. Also, Safe Routes to School Programs are opportunities to provide enhanced PRIORITY NETWORKS consideration in close proximity to schools. Also, school circulation and safety studies evaluating the interaction Priority Networks are corridors where the City of the pick‐up/drop‐off areas are components to has decided to focus bicycling and pedestrian enhancing safety at schools. improvements. Facility recommendations for many of the priority network corridors are included in the Active Transportation Plan. BICYCLING Similar to pedestrian conditions, many of Puyallup’s local streets tend not to need fully separate pathways and trails or on street markings such as bike lanes. This is due to their low traffic volumes and slow speeds. The City’s arterials and commercial collectors do warrant enhanced bicycle infrastructure. Dense areas with commercial land uses and streets that serve schools, parks, and churches are particularly important for safe bicycling, as they support more bicyclists. Figure 14 highlights the Bicycle Priority Network, which specifies where bicycle infrastructure should be provided in the long term. This Active Transportation Plan further refines this network, as described in Chapter 5.

NETWORK COMPLETENESS AND CONNECTIVITY Network completeness and connectivity of Puyallup’s active transportation network is defined as the ability of a variety of user types to access and travel to many destinations safely. Because the majority of Puyallup’s bicycle network is currently located within parks, system completeness and connectivity is low. The pedestrian network in Puyallup provides higher connectivity as sidewalks are provided in most primary travel corridors and in activity centers with high pedestrian use. The City also has a Sidewalk Link program which infills short missing segments of sidewalks to increase completeness and connectivity. One potential way to increase connectivity is to form partnerships with various property owners that provide informal network connections. For instance, while a route through a school campus, church, or shopping center may not be a formal part of the City’s bike facilities, a partnership could provide increased awareness of route availability or actually connect facilities between the city and informal network.

Chapter Four: System Implementation page 32 W a Sim p ons ato Cr Crk k

Caldwell Rd E

110th Ave E Ave 110th 43rd St Ct E

21st St NE St 21st

108thAveE

70th Ave E70thAve

114th Ave E Ave 114th

Rd E Rd

142nd Ave E Ave 142nd

Meridian Ave E Ave Meridian Dechaux Freeman Chrisella Rd E

Rd E

23rd 48th St E Ave NW Puyallup St

River Rd E Puyallup Monta Vista Dr E Valley Sports Todd Rd E Edgewood Dr E Complex 82nd Ave E Ave 82nd 53rd Street Ct E N Levee Rd E Sumner 16th Ave NW Valley Heights Ave Dr E Valley Ave E AveE FryarAve

N Levee Rd Milwaukee River Rd Skate Main St Ave Wood Sam Park Maple St 10th AveMeridian N 26thNWSt Peach Ave Stewart Ave E Cherry Park Ave NW State St Academy St 18th St NW St 18th Veterans Houston Rd E Park Park St Tacoma Rd E W Stewart Ave

15th 7th Ave NW Benston Dr E

St NW St

4th

4th St NWSt4th C Grayland NE St l Ave Alder a rksCrk Park 11th 5th Ave NW 4th Ave NW NW St 7th Tacoma Rd NWSt Willow St

5th St NE St 5th 3rd Ave NW Ave Sumner

2nd 2nd

St NE St 2nd Ave NW Ave NE W Main Ave St SE E Main Ave 3rd 72nd St E 5th 4th Ave SW Ave SW SE St 23rd Inter Ave DeCoursey 6th Ave SW 7th E Ave 134th

Park SW St 18th

2nd St SE St 2nd

11th Ave SW

St SW St 7th Ave SE

16th St SW St 16th

9th Ave SW 2nd St SW St 9th Ave SE

7th St SW St 7th

14th St SW St 14th 80th St E

13th St SW St 13th 15thSt SE Clarks Meeker Creek SE St 13th

10th Ave SE SE17thSt Firland Dr Creek Open Space 84th St E Park 12th Ave SE Silver

Fairview Dr SE St 25th Creek SE St 21st Highlands Blvd 15th Ave SW 15th Ave SE Vista Dr Amber Blvd SE Brown Community Garden 19th Crystal Ridge 72nd Ave E Ave 72nd Ave SW Dr SE BrookmonteDr SE Dead 34th St SE Man's SW St 5th Fruitland Ave E SE St 9th Wildwood Pond 23rd Woodbine Park 20th Ave SE 96th St E Ave SW Cemetary Wildwood 23rd Ave SE Cherokee

7th St SE St 7th Park Dr Park 25th Green Blvd Forest Ave SE Rainier SE St 43rd 100th St E Woods ShawRd SE St 36th Park 27th Ave SE

20th

St SE St

21st St SW St 21st ParkwoodBlvd

9th St SW St 9th 104th St E 31st Ave SW SE St 18th 31st Ave SE Bradley 33rd Ave SE Woodland Ave E Ave Woodland Lake Park

ManorwoodManorwood Dr Park 37th Ave SE 112th St E 39th Ave SW Rampart Dr E 39th Ave SE

5thSt SE

Pipeline Rd E 43rd Ave SE

74th Ave E Ave 74th 118th St E

E Meridian AveMeridianE

80th Ave E Ave 80th

120th St E 136th Ave E

98th Ave E Ave98th

78th Ave E Ave 78th

86th Ave E Ave 86th

120th Ave E Ave 120th Military Rd E 123rd St E 94th Ave E Ave 94th 122nd St E 124th St E C:\Users\ahmanjos\Documents\ArcGIS\Packages\ProposedBikePriorityNetwork_20D672B3-AAAE-47E4-953B-04A8BA9F98FF\v103\ProposedBikePriorityNetwork.mxd

Arterial - Sidewalk (1 side) City of Puyallup Trail Access Figure 13 Collector - Sidewalk (1 side) Fairgrounds Police Station Priority Pedestrian Network Future Pedestrian Facility Regional Growth School 2015 Transportation Element Existing Pedestrian Facility Center Fire Station Existing Shared Use Path Future Shared Use Path FigureFigure 1 3 W Valley Ave E a Sim p ons ato Cr Crk k Caldwell Rd E

110th Ave E Ave 110th 43rd St Ct E

21st St NE St 21st

108thAveE

70th Ave E70thAve

114th Ave E Ave 114th

Rd E Rd

142nd Ave E Ave 142nd

Meridian Ave E Ave Meridian Dechaux Freeman Chrisella Rd E

Rd E

23rd 48th St E Ave NW Puyallup St

Monta Vista Dr E River Rd E Todd Rd E Edgewood Dr E Puyallup Valley Sports 82nd Ave E Ave 82nd Complex 53rd Street Ct E N Levee Rd E Sumner 16th Ave NW Valley Heights Ave Dr E

AveE FryarAve

N Levee Rd Milwaukee River Rd

Main St Ave Wood Skate Maple St 10th AveMeridian N 26thNWSt Sam Park Ave Stewart Ave E Cherry Peach Ave NW State St Academy St 18th St NW St 18th Park Houston Rd E Veterans Park St Tacoma Rd E W Stewart Ave Park

15th 7th Ave NW Benston Dr E

St NW St

4th

4th St NWSt4th

St NE St

C Grayland Ave Alder la 11th 5th Ave NW rksCrk 4th Ave NW NW St 7th Park Tacoma Rd NWSt Willow St

5th St NE St 5th 3rd Ave NW Ave Sumner

2nd 2nd

St NE St 2nd Ave NW Ave NE * W Main Ave

St SE 3rd * 72nd St E 5th 4th Ave SW Ave SW SE St 23rd Inter Ave 6th Ave SW DeCoursey 7th * E Ave 134th

18th St SW St 18th

Park SE St 2nd 11th Ave SW

St SW St 7th Ave SE

16th St SW St 16th

9th Ave SW 2nd St SW St 9th Ave SE

7th St SW St 7th

14th St SW St 14th 80th St E

13th St SW St 13th 15thSt SE

13th St SE St 13th

10th Ave SE SE17thSt Firland Dr Clarks Meeker Creek Open Space 84th St E Creek Park 12th Ave SE

Fairview Dr SE St 25th

Silver SE St 21st Creek Highlands Blvd 15th Ave SW 15th Ave SE Vista Dr Amber Blvd SE

Brown Community 19th Crystal Garden Ridge 72nd Ave E Ave 72nd Ave SW Dr SE BrookmonteDr SE 34th St SE Dead SW St 5th Fruitland Ave E Man's SE St 9th Pond 23rd Wildwood 20th Ave SE 96th St E Ave SW Woodbine Park Cemetary Wildwood 23rd Ave SE 7th St SE St 7th Cherokee Park Dr Park 25th Green Blvd Forest Ave SE SE St 43rd 100th St E Rainier SE St 36th Woods 27th Ave SE

20th St SE St Park

21st St SW St 21st ParkwoodBlvd

9th St SW St 9th 104th St E 31st Ave SW SE St 18th 31st Ave SE 33rd Ave SE Bradley Lake Park

Manorwood Dr Manorwood 37th Ave SE Park 112th St E 39th Ave SW Rampart Dr E 39th Ave SE

5thSt SE

Pipeline Rd E 43rd Ave SE

74th Ave E Ave 74th 118th St E

E Meridian AveMeridianE

80th Ave E Ave 80th

120th St E 136th Ave E

98th Ave E Ave98th

78th Ave E Ave 78th

86th Ave E Ave 86th

120th Ave E Ave 120th Military Rd E 123rd St E 94th Ave E Ave 94th 122nd St E 124th St E C:\Users\ahmanjos\Documents\ArcGIS\Packages\ProposedBikePriorityNetwork_20D672B3-AAAE-47E4-953B-04A8BA9F98FF\v103\ProposedBikePriorityNetwork.mxd

Sharrows City of Puyallup Trail Access School Figure 14 Bike Boulevard Fairgrounds Police Station Fire Station Regional Growth Bicycle Priority Network Bike Lane Center 2015 Transportation Element Shared Use Path Potential Corridor Existing Trail

* Only one of the alignments will be constructed ACTIVE TRANSPORTATION PLAN

5 | ACTIVE NETWORKS This chapter describes the near term planned improvements by the City and others as well as priority enhancements for the next phase of the active transportation plan. Because the City developed a multimodal level of service policy, this section also summarizes the improvements necessary to meet a minimum provision for pedestrians and bicycling, which is described further in the Transportation Element. As new facilities are implemented, Public Works staff should review whether additional modifications to the transportation network are necessary to ensure safety (for example, lowering speed limits on streets where bike facilities are proposed). All improvements will require staff and maintenance resources to be managed and maintained over time. The cost estimates provided at the end of this chapter for improvements represent one‐time capital costs only. Thus, these life‐ cycle costs should be considered as projects that are programmed into the City’s capital program. PEDESTRIAN NETWORK CURRENT PEDESTRIAN PROJECTS The City is currently working on the following enhancements:  The Shaw Road Widening Project will provide an east side shared use path and west side sidewalk between 23rd Avenue SE and Manorwood Drive. Construction will begin in 2017.  23rd Avenue SE Complete Streets will provide sidewalks from S. Meridian to 9th Street SE.  Sidewalk link program to construct missing links in the sidewalk network. Sound Transit and the City are also discussing a number of pedestrian access improvements as part of the Sounder Station Access Project. Projects discussed include the following:  ADA accessibility improvements for intersection curb ramps at Stewart Avenue, Main Avenue, 5th Street SW, 7th Street SW, and S Meridian.  Street lighting enhancements on 5th Street NW between the station and 7th Avenue SW.  Signal improvements are also proposed at the following locations: o 7th Street NW and W Stewart Avenue will be fully signalized, o 5th Street SW at the planned Eagles Garage: a new pedestrian signal is proposed, o 3rd Street SE and E Main Avenue: a flashing beacon is proposed; o 5th Street SW and W Pioneer Avenue: accessible pedestrian signal retrofit, o 5th Street SW and W Main Avenue: accessible pedestrian signal retrofit, o S Meridian and W Main Avenue: accessible pedestrian signal retrofit, o S Meridian and W Stewart Avenue: accessible pedestrian signal retrofit.  Sidewalk improvements are proposed on W Stewart Avenue between S Meridian and 3rd Street NW, and along the proposed Eagles Garage and Parking Lot (7th Street NW, 3rd Avenue NW, 6th Street NW, and 2nd Avenue NW).  Pedestrian bridge over 5th Street SW between the proposed Eagles Garage and the Sounder Station. The two agencies are working to establish which specific improvements will be included in Sound Transit’s project funding, and to determine the method of delivery for those improvements. FUTURE PROJECTS Pedestrian improvements include sidewalks and improved crossings. An analysis of areas where sidewalks are missing indicated a number of sidewalk improvements to be included as part of this implementation strategy. Figure 15 represents the improvements that would allow the City to meet its yellow standard for pedestrian amenities.

Chapter Five: Active Networks page 35 W a Simon p s C ato rk Crk Caldwell Rd E

110th Ave E Ave 110th 43rd St Ct E

21st St NE St 21st

108thAveE

70th Ave E70thAve

114th Ave E Ave 114th

Rd E Rd

142nd Ave E Ave 142nd

Meridian Ave E Ave Meridian Dechaux Freeman Chrisella Rd E

Rd E

23rd 48th St E Ave NW Puyallup St

River Rd E Puyallup Monta Vista Dr E Valley Sports Todd Rd E Edgewood Dr E Complex 82nd Ave E Ave 82nd 53rd Street Ct E N Levee Rd E Sumner 16th Ave NW Valley Heights Ave Dr E Valley Ave E AveE FryarAve

N Levee Rd Milwaukee River Rd Skate Main St Ave Wood Sam Park Maple St Peach 10th AveMeridian N 26thNWSt Ave Stewart Ave E Cherry Park Ave NW State St Academy St 18th St NW St 18th Veterans Houston Rd E Park Park St Tacoma Rd E W Stewart Ave

15th 7th Ave NW Benston Dr E

St NW St

4th

4th St NWSt4th C Grayland NE St l Ave Alder a rksCrk Park 11th 5th Ave NW 4th Ave NW NW St 7th Tacoma Rd NWSt Willow St

5th St NE St 5th 3rd Ave NW Ave Sumner

2nd 2nd

St NE St 2nd Ave NW Ave NE W Main Ave St SE E Main Ave 3rd 72nd St E

5th 4th Ave SW Ave SW SE St 23rd Inter Ave DeCoursey 6th Ave SW Park 7th E Ave 134th

18th St SW St 18th

2nd St SE St 2nd

11th Ave SW

St SW St 7th Ave SE

16th St SW St 16th

9th Ave SW 2nd St SW St 9th Ave SE

7th St SW St 7th

14th St SW St 14th 80th St E

13th St SW St 13th 15thSt SE Clarks Meeker Creek SE St 13th

Open Space 10th Ave SE SE17thSt Firland Dr Creek Park 84th St E Silver 12th Ave SE

Fairview Dr SE St 25th

Creek SE St 21st Highlands Blvd 15th Ave SW 15th Ave SE Vista Dr Amber Blvd SE Brown Community Garden 19th Crystal Ridge 72nd Ave E Ave 72nd Ave SW Dr SE Dead BrookmonteDr SE 34th St SE Man's SW St 5th Fruitland Ave E Pond SE St 9th Wildwood 23rd Woodbine Park 20th Ave SE 96th St E Ave SW Cemetary Wildwood 23rd Ave SE Cherokee 7th St SE St 7th Park Park Dr 25th Green Blvd Forest Ave SE Rainier SE St 43rd 100th St E Woods ShawRd SE St 36th Park 27th Ave SE

20th

St SE St

21st St SW St 21st ParkwoodBlvd

9th St SW St 9th 104th St E 31st Ave SW SE St 18th 31st Ave SE Bradley 33rd Ave SE

Woodland Ave E Ave Woodland Lake Park

ManorwoodManorwood Dr Park 37th Ave SE 112th St E 39th Ave SW Rampart Dr E 39th Ave SE

5thSt SE

Pipeline Rd E 43rd Ave SE

74th Ave E Ave 74th 118th St E

E Meridian AveMeridianE

80th Ave E Ave 80th

120th St E 136th Ave E

98th Ave E Ave98th

78th Ave E Ave 78th

86th Ave E Ave 86th

120th Ave E Ave 120th Military Rd E 123rd St E 94th Ave E Ave 94th 122nd St E 124th St E C:\Users\ahmanjos\Documents\ArcGIS\Packages\ProposedBikePriorityNetwork_20D672B3-AAAE-47E4-953B-04A8BA9F98FF\v103\ProposedBikePriorityNetwork.mxd

Arterial - Sidewalks (1 side) City of Puyallup Trail Access Figure 15 Collector - Sidewalks (1 side) Fairgrounds Police Station New Pedestrian Facility Proposed Pedestrian Accomodations Regional Growth School 2015 Transportation Element Existing Pedestrian Facility Center Fire Station

Figure 3 ACTIVE TRANSPORTATION PLAN

BICYCLE NETWORK This section summarizes the major corridors for implementing the bicycle component of the active transportation plan. To guide the development of the bicycle network a map of preferred corridor facilities was developed and shown in Figure 16. The proposed projects are an update and refinement to the Bicycle Priority Network included in the 2015 Transportation Element. It should be noted that this is a long term project list. PROPOSED BICYCLE TYPOLOGIES Four types of bicycle facilities are being considered for future facilities in Puyallup, all of which have the ability to serve a variety of user groups. Table 3 provides more information on the four bicycle typologies. Table 3. Bicycle Typologies

Chapter Five: Active Networks page 37 W a Sim p ons ato Cr Crk k Caldwell Rd E

110th Ave E Ave 110th 43rd St Ct E

21st St NE St 21st

108thAveE

70th Ave E70thAve

114th Ave E Ave 114th

Rd E Rd

142nd Ave E Ave 142nd

Meridian Ave E Ave Meridian Dechaux Freeman Chrisella Rd E

Rd E

23rd 48th St E Ave NW Puyallup St

Monta Vista Dr E River Rd E Todd Rd E Edgewood Dr E Puyallup Valley Sports 82nd Ave E Ave 82nd Complex 53rd Street Ct E N Levee Rd E Sumner 16th Ave NW Valley Heights Ave Dr E Valley Ave E AveE FryarAve

N Levee Rd Milwaukee River Rd

Main St Ave Wood Skate Maple St 10th AveMeridian N 26thNWSt Sam Park Ave Stewart Ave E Cherry Peach Ave NW State St Academy St 18th St NW St 18th Park Houston Rd E Veterans Park St Tacoma Rd E W Stewart Ave Park

15th 7th Ave NW Benston Dr E

St NW St

4th

4th St NWSt4th

St NE St

C Grayland Ave Alder la 11th 5th Ave NW rksCrk 4th Ave NW NW St 7th Park Tacoma Rd NWSt Willow St

5th St NE St 5th 3rd Ave NW Ave Sumner

2nd 2nd

St NE St 2nd Ave NW Ave NE * W Main Ave St SE E Main Ave 3rd * 72nd St E 5th 4th Ave SW

2nd St SE St 2nd Ave SW SE St 23rd Inter Ave 6th Ave SW DeCoursey 7th * E Ave 134th Park SW St 18th 11th Ave SW

St SW St 7th Ave SE 16th St SW St 16th 9th Ave SW 9th Ave SE

7th St SW St 7th

14th St SW St 14th 80th St E

13th St SW St 13th 15thSt SE

13th St SE St 13th

10th Ave SE SE17thSt Firland Dr Clarks Meeker Creek Open Space 84th St E Creek Park 12th Ave SE

Fairview Dr SE St 25th

Silver SE St 21st Creek Highlands Blvd 15th Ave SW 15th Ave SE Vista Dr Amber Blvd SE

Brown Community 19th Crystal Garden Ridge 72nd Ave E Ave 72nd Ave SW Dr SE BrookmonteDr SE 34th St SE Dead SW St 5th Fruitland Ave E Man's SE St 9th Pond 23rd Wildwood 20th Ave SE 96th St E Ave SW Woodbine Park Cemetary Wildwood 23rd Ave SE 7th St SE St 7th Cherokee Park Dr Park 25th Green Blvd Forest Ave SE SE St 43rd 100th St E Rainier ShawRd SE St 36th Woods 27th Ave SE

20th St SE St Park

21st St SW St 21st ParkwoodBlvd Shared Use Path

9th St SW St 9th Under Construction 104th St E 31st Ave SW SE St 18th 31st Ave SE 33rd Ave SE Woodland Ave E Ave Woodland Bradley Lake Park

5th St SE St 5th Manorwood Dr Manorwood 37th Ave SE Park 112th St E 39th Ave SW Rampart Dr E 39th Ave SE

Pipeline Rd E 43rd Ave SE

74th Ave E Ave 74th 118th St E

E Meridian AveMeridianE

80th Ave E Ave 80th

120th St E 136th Ave E

98th Ave E Ave98th

78th Ave E Ave 78th

86th Ave E Ave 86th

120th Ave E Ave 120th Military Rd E 123rd St E 94th Ave E Ave 94th 122nd St E 124th St E C:\Users\ahmanjos\Documents\ArcGIS\Packages\ProposedBikePriorityNetwork_20D672B3-AAAE-47E4-953B-04A8BA9F98FF\v103\ProposedBikePriorityNetwork.mxd

Sharrow City of Puyallup Trail Access Figure 16 Bike Boulevard Fairgrounds Police Station Long-Term Bicycle Network Projects Regional Growth Bike Lane Center School Shared Use Path Fire Station Existing Trail

* Only one of the alignments will be constructed ACTIVE TRANSPORTATION PLAN

CURRENT BICYCLE PROJECTS The City is currently working on the following enhancements:  The Shaw Road Widening Project will provide an east side shared use path and west side sidewalk between 23rd Avenue SE and Manorwood Drive. Construction is scheduled to begin in 2017.

Sound Transit and the City are currently discussing a number of bicycle access improvements in the Puyallup Station area as part of the Sounder Station Access project including:  Stewart Avenue from 7th Street NW to 23rd Street NW: this will provide a two‐way protected bicycle lane along the south side of Stewart Avenue or protected bike lanes on both north and south sides of Stewart Avenue.

The two agencies are working to establish which specific improvements will be included in Sound Transit’s project funding, and to determine the method of delivery for those improvements. NEAR-TERM BICYCLE PROJECTS Near‐term bicycle projects are explained in greater detail in the supplemental chapter that is part of this plan. These projects include 5th Street NW/4th Street NW, 5th Avenue SW/4th Avenue SE, 7th Avenue SW/SE, and Shaw Road. MEDIUM-TERM BICYCLE PROJECTS The following section summarizes the corridors illustrated in Figure 17. It includes a description of the proposed facility type, connections, implementation considerations, how the project fits the vision, and estimated project costs. These future projects were developed with public and staff input; additional transportation engineering is needed to finalize corridor improvements and costs. Other future projects that are considered spot improvements are not specifically called out in this plan, but are typically included in the near‐term Transportation Improvement Program. Known project examples include the following:  Flashing beacons at 15th Avenue SW near Silver Creek  Striped crossing at 14th Street SW for the nearby trail at Meeker Creek

Chapter Five: Active Networks page 39 W a Sim p ons ato Cr Crk k Caldwell Rd E

110th Ave E Ave 110th 43rd St Ct E

21st St NE St 21st

108thAveE

70th Ave E70thAve

114th Ave E Ave 114th

Rd E Rd

142nd Ave E Ave 142nd

Meridian Ave E Ave Meridian Dechaux Freeman Chrisella Rd E

Rd E

23rd 48th St E Ave NW Puyallup St

Monta Vista Dr E River Rd E Todd Rd E Edgewood Dr E Puyallup Valley Sports 82nd Ave E Ave 82nd Complex 53rd Street Ct E N Levee Rd E Sumner 16th Ave NW Valley Heights Ave Dr E Valley Ave E AveE FryarAve

N Levee Rd Milwaukee River Rd

Main St Ave Wood Skate Maple St 10th AveMeridian N 26thNWSt Sam Park Ave Stewart Ave E Cherry Peach Ave NW State St Academy St 18th St NW St 18th Park Houston Rd E Veterans Park St Tacoma Rd E W Stewart Ave Park

15th 7th Ave NW Benston Dr E

St NW St

4th

4th St NWSt4th

St NE St

C Grayland Ave Alder la 11th 5th Ave NW rksCrk 4th Ave NW NW St 7th Park Tacoma Rd NWSt Willow St

5th St NE St 5th 3rd Ave NW Ave Sumner

2nd 2nd

St NE St 2nd Ave NW Ave NE * W Main Ave St SE E Main Ave 3rd * 72nd St E 5th 4th Ave SW 23rd St SE St 23rd Ave SW SE St 2nd Inter Ave 6th Ave SW DeCoursey 7th * E Ave 134th Park SW St 18th 11th Ave SW

St SW St 7th Ave SE 16th St SW St 16th 9th Ave SW 9th Ave SE

7th St SW St 7th

14th St SW St 14th 80th St E

13th St SW St 13th 15thSt SE

13th St SE St 13th

10th Ave SE SE17thSt Firland Dr Clarks Meeker Creek Open Space 84th St E Creek Park 12th Ave SE

Fairview Dr SE St 25th

Silver SE St 21st Creek Highlands Blvd 15th Ave SW 15th Ave SE Vista Dr Amber Blvd SE

Brown Community 19th Crystal Garden Ridge 72nd Ave E Ave 72nd Ave SW Dr SE BrookmonteDr SE 34th St SE Dead SW St 5th Fruitland Ave E Man's SE St 9th Pond 23rd Wildwood 20th Ave SE 96th St E Ave SW Woodbine Park Cemetary Wildwood 23rd Ave SE 7th St SE St 7th Cherokee Park Dr Park 25th Green Blvd Forest Ave SE SE St 43rd 100th St E Rainier ShawRd SE St 36th Woods 27th Ave SE

20th St SE St Park

21st St SW St 21st ParkwoodBlvd Shared Use Path

9th St SW St 9th Under Construction 104th St E 31st Ave SW SE St 18th 31st Ave SE 33rd Ave SE Woodland Ave E Ave Woodland Bradley Lake Park

Manorwood Dr Manorwood 37th Ave SE Park 112th St E 39th Ave SW Rampart Dr E 39th Ave SE

5thSt SE

Pipeline Rd E 43rd Ave SE

74th Ave E Ave 74th 118th St E

E Meridian AveMeridianE

80th Ave E Ave 80th

120th St E 136th Ave E

98th Ave E Ave98th

78th Ave E Ave 78th

86th Ave E Ave 86th

120th Ave E Ave 120th Military Rd E 123rd St E 94th Ave E Ave 94th 122nd St E 124th St E C:\Users\ahmanjos\Documents\ArcGIS\Packages\ProposedBikePriorityNetwork_20D672B3-AAAE-47E4-953B-04A8BA9F98FF\v103\ProposedBikePriorityNetwork.mxd

Sharrow City of Puyallup Police Station Figure 17 Bike Boulevard Fairgrounds School Medium-Term Bicycle Network Projects Regional Growth Bike Lane Center Fire Station Shared Use Path

* Only one of the alignments will be constructed ACTIVE TRANSPORTATION PLAN

A. West Stewart Avenue/2nd Avenue NE Facility Type: Separated Bicycle Lanes/ Sharrows Cost: $5.0 million Riverwalk Trail Access on 26th Street NW, then aligned generally east-west through Location: downtown between 26th Street NW and the 9th Street NE/Riverwalk Trail access How this Fits the Vision:  Acts as a collector for other facilities located between the Riverwalk Trail, residential areas, and the downtown area  Encourages active forms of transportation to transit and shopping destinations  Compliments safe routes to schools and alerts drivers of the presence of cyclists  Provides a separated facility preferred by a wider range of cyclist comfort levels for portions of project Connections: Implementation Considerations:

 Provides a cross-town connection  On arterial with heavy traffic nd  Provides access to downtown destinations  May require modification of parking (parts of Stewart and 2 Avenue NE) th th  Along a transit route or right-of-way widening (26 Street NW and Stewart between 26 Street rd  Direct access to the Sounder Station NW to 23 Street NW)  Nearby access to Karshner Elementary,  Portion of corridor is proposed by Sound Transit as part of Sounder Aylen Junior High (south side of tracks), Station Access Project th th Puyallup High School (south side of tracks),  Portion from 7 Street NW to 9 Street NE/Riverwalk Trail Access would Stewart Elementary School consist of sharrows  Direct connection to Riverwalk Trail

B. 4th Street NW/5th Street SW/Fairview Drive/9th Street SW Facility Type: Separated Bicycle Lanes Cost: $8.9 million Aligned generally north-south through downtown between Riverwalk Trail and 39th Avenue Location: SW How this Fits the Vision:  Encourages active forms of transportation for a range of user types  Compliments transit in the corridor  Provides a north-south cross-town connection  Acts as a collector for other facilities located between the Riverwalk Trail, residential areas, the fairgrounds, South Hill Mall, and the downtown area  Connects growth centers  This corridor would benefit from subsequent projects to make connections to schools and parks. Connections: Implementation Considerations:  Connects both regional growth centers  A portion of this project is on the near-term project list  Direct access to fairgrounds, downtown  On arterial with heavy traffic destinations, Sounder Station, South Hill  Grade is steep in portions of the corridor th rd st th Park and Ride, and Puyallup Skate Park  Requires right-of-way widening between 30 and 23 Ave, 21 and 15 th th th  Access to Riverwalk Trail Ave, 9 and 7 Ave, the railroad crossing an 4 Avenue NW th th  Nearby access to Puyallup High School  May require sewer/water improvements between 9 and 7 th th rd st th  Restriping between 39 and 30 Ave, between 23 and 21 Ave, 15 to 9th Ave, and north of 4th Avenue NE to Riverwalk Trail  Requires loss of parking on 4th Street NW north of River Road  Could require wall removal  Could construct in phases with first phase including downtown section  Transitions north of River Road to bicycle in-lane markings  Requires coordination with transit facilities along portions of the corridor

Chapter Five: Active Networks page 41 ACTIVE TRANSPORTATION PLAN

C. 7th Street NW Facility Type: Sharrows Cost: $20,000 Aligned generally north-south through downtown, includes crossing of railroad tracks Location: between 5th Avenue NW and W Main Street How this Fits the Vision:  Encourages active forms of transportation for a range of user types  Provides a north-south connection across the railroad tracks  Alerts drivers of the presence of cyclists Connections: Implementation Considerations:

 Connects facilities north and south of the railroad tracks  No special treatments at railroad  Provides direct access to downtown destinations and  Striping only with possible modification of parking Sounder Station from residential areas north of downtown  Provides direct access to Puyallup High School

D. 5th Street SE/7th Street SE Facility Type: Shared Use Path Cost: $7 million Aligned generally north-south through South Hill between 23rd Avenue SW and 43rd Location: Avenue SE. How this Fits the Vision: Encourages active transportation by a range of user types Connections: Implementation Considerations:  Provides access through South Hill  Right-of-way widening would likely be required th th  Connects residential areas to the south of South Hill, Bradley  Corridor between 39 and 37 Avenue is problematic Lake Park and YMCA  Signal upgrades required at four intersections

E. 5th Street NE/SE Facility Type: Sharrows Cost: $30,000 Location: Aligned generally north-south through downtown between 5th Avenue NE and E Pioneer How this Fits the Vision:  Enhances potential safe routes to school by alerting drivers to the presence of cyclists  Provides connection from residential area to trails and into downtown  Connects to regional trail network  Provides a north-south corridor in east part of downtown  Acts as a collector for other facilities located between downtown and the Riverwalk Trail Connections: Implementation Considerations:  Provides direct access to Riverwalk Trail, JP Stewart Elementary  Crosses railroad School, downtown destinations, and residential areas  Could require modification of parking  Provides nearby connection to Kalles Junior High

Chapter Five: Active Networks page 42 ACTIVE TRANSPORTATION PLAN

F. Riverwalk Trail Missing Link Facility Type: Shared Use Path Cost: $0.5 – 2.6 million per mile* Aligned generally northwest-southeast between existing termini of the Riverwalk Trail near Location: 5th Street NE and 9th Street NE How this Fits the Vision:  Completes regional trail  Provides a cross-town connection  Encourages active transportation by a range of users Connections: Implementation Considerations:

 Connects to regional trail network  Would require acquisition of right-of-way along shoreline  Could require mitigation for shoreline impacts *Typical costs for building new trail

G. Connection between Riverwalk Trail and Foothills Trail Facility Type: Shared Use Path Cost: $0.5 – 2.6 million per mile* Aligned generally north-south between existing terminus of the Riverwalk Trail at E Main Avenue and the existing terminus of the Foothills Trail at 134th Avenue E. Location(s): Three different possible alignments are identified in the city’s Parks, Recreation and Open Space plan. How this Fits the Vision:  Connects the regional trail system  Encourages active transportation by a range of users Connections: Implementation Considerations: th  Connects regional trail system  Connection could be constructed on 134 Avenue E,  Connections to other facilities traveling into Puyallup on Inter Ave/Shaw Road E, or on new right-of-way between two termini  Could require acquisition of right-of-way *Typical costs for building new trail / Alignment on 134th Avenue E could cost $80,000 assuming striping only

H. Wildwood Park Drive Facility Type: Bike Lanes Cost: $130,000 Location: Aligned generally north-south between 39th Avenue SE and 23rd Avenue SE How this Fits the Vision:  Enhances potential safe routes to school  Encourages active transportation by a wide range of users  Acts as a collector facility for other facilities in South Hill area Connections: Implementation Considerations:  Provides connection to Pierce College and Ferrucci Junior High School  Could require right-of-way widening  Provides nearby connections to Sunrise Elementary School and Wildwood Park Elementary School  Connection through South Hill and residential areas  Provides direct access to Wildwood Park

Chapter Five: Active Networks page 43 ACTIVE TRANSPORTATION PLAN

SUMMARY OF PROJECTS Table 4 summarizes the proposed project locations and facility types for longer‐term recommended improvements not described in the medium‐term list above. Table 4. Proposed Projects and Facility Types

Roadway Name Limits Type of Facility

Riverwalk Trail 20th St NW to Urban Growth Area limit Shared Use Path Valley Ave NE N Meridian Ave to Milwaukee Ave Bike Lanes Milwaukee Ave Valley Ave NE to Milwaukee bridge Bike Lanes 18th St SW 5th Ave SW to 7th Ave SW Bike Boulevard 43rd Ave SE S Meridian to 110th Ave E Bike Lanes 110th Ave E 4rd Ave SE to Bonneville Power ROW Trail Bike Lanes 15th Ave SE/SW 14th St SW to 9th St SE Bike Lanes S Fruitland 112th St E to Pioneer Way E Bike Lanes E Main Ave Shaw Rd to Riverwalk Trail Access Shared Use Path 31st Ave SW S Fruitland to S Meridian Bike Lanes 17th St SW/23rd Ave SW 31st Ave SW to 9th St SW Sharrows 5th Ave NW 5th St NE and 7th St NW Sharrows 23rd Ave SE S Meridian to Shaw Rd Bike Lanes 9th St SE 15th Ave SE to 23rd Ave Se Bike Lanes S Meridian 43rd Ave SE to 31st Ave SE Shared Use Path Manorwood Drive Wildwood Park Dr to Shaw Rd E Sharrows Forest Green Blvd 23rd Ave SE to Shaw Rd E Sharrows Cherokee Blvd/31st Ave SE Wildwood Park Dr to Shaw Rd E Sharrows 18th St NW River Road (Highway 167) to W Stewart Ave Sharrows 11th St NW Puyallup River (Riverwalk Trail) to W Stewart Ave Sharrows 4th St NW Puyallup River (Riverwalk Trail) to River Road Sharrows 17th St SW --> 4th Ave NW --> 12th St NW W Pioneer Ave to W Pioneer Ave Sharrows E Pioneer 7th St SE to Shaw Road Shared Use Path E Pioneer 5th St SE to 7th St SE Sharrows 9th Ave SW / 9th Ave SE / 7th St SE 14th St SW to E Pioneer St Bike Boulevard 9th St SW 15th Ave SW to Main Bike Boulevard 4th St NE Riverwalk Trail Access/9th Ave NE to 2nd Ave NE Sharrows 3rd St SW Main St to 9th Ave SW Bike Boulevard 25th St SE and 15th Ave SE E Pioneer St to Brookmonte Dr SE Bike Boulevard 12th Ave SE Shaw Rd E to 25th St Bike Boulevard E Main Ave/ Spring St 5th St SE and 9th St SW Bicycle Boulevard

Chapter Five: Active Networks page 44 ACTIVE TRANSPORTATION PLAN

Roadway Name Limits Type of Facility 13th St SE E Pioneer St to 7th Ave SE Bike Lane 13th St SE 7th Ave SE to 12th Ave SE Sharrows 12th Ave SE 7th St SE to 13th St SE Sharrows 9th St SE and 10th St SE 12th Ave SE to 7th Ave SE Bike Boulevard 11th St SW 9th Ave SW and W Pioneer Ave Bike Boulevard 14th St SW W Pioneer Ave to 15th Ave SW Sharrows Wildwood Park Drive/31st Ave SE intersection to Connection to Bradley Lake (new ROW) Shared Use Path Bradley Lake Pipeline Rd E S Fruitland Ave to 94th Ave E Shared Use Path Bonneville Power ROW Trail 110th Ave E to Shaw Rd E Shared Use Path N Meridian--->Valley Ave E Riverwalk Trail/bridge to 7th St NW Shared Use Path 35th Ave SE S Meridian to 5th St SE Shared Use Path Brookemonte Drive SE 23rd Ave SE and Shaw Road Bike Boulevard

Chapter Five: Active Networks page 45 ACTIVE TRANSPORTATION PLAN

6 | IMPLEMENTATION CHECKLIST When the Active Transportation Plan is adopted, the City should monitor progress in implementing the Plan using the checklist proposed in this section. This checklist is broken into categories for pedestrian facilities, bicycle facilities, mobility, and community engagement. Each category has quantitative measures that should be tracked biannually. The City can use this checklist to monitor progress in implementing the Active Transportation Plan.

Category Quantitative Measurement

Feet of sidewalk added in priority areas Dollars spent on ADA improvements Pedestrian Facilities Dollars spent on improving or adding crossing facilities

Feet of bike facility added Bicycle Facilities New bike parking added Completed missing links

Mobility Commute mode‐share

Community Engagement Periodic online survey results

Chapter Six: Implementation Checklist page 46