Welcome

Saskatoon West Connector Route Information Session December 2, 2015 Planning Process

Need for the Project

• Recent growth in and surrounding communities has placed continued pressure on the municipal and provincial road network.

• 7UDIÀFLQWKHUHJLRQLVLQFUHDVLQJDQGPRUHRSWLRQVDUHUHTXLUHG

Objectives

• 7RDVVHVVWKHIHDVLELOLW\RIURXWHVWKDWZLOODVVLVWLQLPSURYLQJWUDIÀFÁRZLQDQG     through the Saskatoon area until the is constructed (unknown timeframe).

• To evaluate the routes in terms of:

- Ease of implementation (cost / time / constraints)

- ,PSURYHPHQWWRWUDIÀFÁRZLQWKH&LW\RI6DVNDWRRQDQGDUHD

- &RRUGLQDWLRQZLWKWKH6DVNDWRRQ)UHHZD\ DOWHUQDWLYHRUDGGLWLRQDOURXWH

Three levels of government are being proactive in addressing growing concerns. Study Area

PROPOSED SASKATOON FREEWAY TOWNSHIP ROAD380

HWY. NO. 14

HWY. NO. 14 HWY. NO. 7

NEAULT ROAD DALMENY ACCESS HWY. NO. 16 NO. HWY.

11TH STREET TOWNSHIP ROAD372

DIEFENBAKER DRIVE

AUCTION MARTROAD 22ND

FAIRLIGHT DRIVE 33RD STREET

BEAM ROAD VALLEY ROAD VALLEY

JUNOR AVENUE

CLAYPOOL DRIVE

11TH STREET

CIRCLE DRIVE HWY. NO. 16 NO. HWY.

SPADINA AVENUE P N

ND ST ND 22

ST 29TH CRESCENT

AVENUE H S Existing MajorRoads Future Roadways Study Area

PROPOSED SASKATOON FREEWAY TOWNSHIP ROAD380

HWY. NO. 14

HWY. NO. 14 HWY. NO. 7

NEAULT ROAD DALMENY ACCESS HWY. NO. 16 NO. HWY.

11TH STREET TOWNSHIP ROAD372

DIEFENBAKER DRIVE

AUCTION MARTROAD 22ND STREET 22ND

FAIRLIGHT DRIVE 33RD STREET

BEAM ROAD VALLEY ROAD VALLEY

JUNOR AVENUE

CLAYPOOL DRIVE

11TH STREET

CIRCLE DRIVE HWY. NO. 16 NO. HWY.

SPADINA AVENUE P N

22ND STREET 22ND 29TH STREET 29TH CRESCENT

AVENUE H S

HWY. NO. 12 LORNE AVENUE (HWY NO. 219) IDYLWYLD DRIVE

2ND AVENUE HWY. NO. 11

51ST STREET

BROADWAY AVENUE 71ST STREET 71ST

SPADINA CLARENCE AVENUE WARMAN ROAD DRIVE MARQUIS

TAYLOR STREET

COLLEGE DRIVE CIRCLE DRIVE CRESCENT

WANUSKEWIN DRIVE

8TH STREET PROPOSED SASKATOON FREEWAY SASKATOON PROPOSED

PRESTON AVENUE PRESTON AVENUE

HWY. NO. 11 CIRCLE DRIVE

CENTRAL AVENUE

ATTRIDGE DRIVE PARKWAY COMMUTER FUTURE NORTH FUTURE MCKERCHER DRIVE

BOYCHUK DRIVE LOWE ROAD

8TH STR

MCORMOND DR

EE Potential Routes North RouteOptions: South RouteOptions: Central Corridor: S2 S1 N3 N2 N1 S3 • • • • • • • • • • • • • • • • • • • • • Along existingHwy7,Hodgson Road Along existingNeaultRoadandDalmeny (Grid 362),and ValleyRoad Access (Grid684) Existing Surface:Pavement Approximate Length:6.5km Existing Surface:Pavement&Gravel Approximate Length:5.4km Along existingBeamRoad Route doesnotcurrentlyexist Approximate Length:5.0km Along ProposedSaskatoonFreewayroute Existing Surface:Pavement Approximate Length:6.4km Along existingDalmenyAccess(Grid684) Existing Surface: Pavement&Gravel Approximate Length:15.0km Existing Surface:Pavement Approximate Length:6.0 km Along 11thStreetBypass Existing Surface:Pavement Approximate Length:3.2 km Along existing22ndStreet

HWY. NO. 7

PROPOSED SASKATOON FREEWAY

RANGE ROAD 3064 RANGE ROAD 3064

HWY. NO. 14 SASKATOON FREEWAY

PROPOSED 380 ROAD TOWNSHIP

HODGSON ROAD HODGSON MERRIL SCHOOL ROAD SCHOOL MERRIL N1 S3

NEAULT ROAD

11TH STREET DALMENY ACCESS

HWY. NO. 16 NO. HWY. TOWNSHIP ROAD 372 ROAD TOWNSHIP S2

22ND STREET DIEFENBAKER DRIVE DIEFENBAKER

N2 BEAM ROAD BEAM

VALLEY S1 FAIRLIGHT DRIVE

ROAD STREET 33RD AUCTION MART ROAD MART AUCTION N3

JUNOR AVENUE RANGE ROAD 3060 CIRCLE DRIVE CIRCLE

CLAYPOOL DRIVE

11TH STREET

SASKATOON FREEWAY CIRCLE DRIVE 16 NO. HWY.

SPADINA AVENUE P

PROPOSED

22ND STREET 22ND 29TH STREET 29TH CRESCENT

AVENUE H

HWY. NO. 12

IDYLWYLD DRIVE IDYLWYLD DRIVE 2ND AVENUE

51ST STREET HWY. NO. 11

BROADWAY AVENUE

71ST STREET 71ST MARQUIS D MARQUIS CLARENCE AVENUE SPADINA

CIRCLE D CIRCLE WARMAN ROAD

8TH ST

COLLE CRESCENT STRE TAYL WANUSKEWIN DRIVE

DRIV

ET OR

RE RIV

E

GE RI Land Use

HWY. NO. 16

TOWNSHIP ROAD 380 PROPOSED 12 NO. HWY.

SASKATOON FREEWAY RANGE ROAD 3060 ROAD RANGE

HWY. NO. 11

RANGE ROAD 3064

DALMENY ACCESS

AUCTION MART ROAD 71ST STREET HWY. NO. 16

MARQUIS DRIVE

BEAM ROAD IDYLWYLD DRIVE IDYLWYLD

WANUSKEWIN DRIVE

PROPOSED

TOWNSHIP ROAD 372 51ST STREET SASKATOON FREEWAY

JUNOR AVENUE CLAYPOOL DRIVE WARMAN ROAD

CIRCLE DRIVE 33RD STREET CRESCENT

DIEFENBAKER DRIVE 29TH STREET

SPADINA IDYLWYLD DRIVE IDYLWYLD

RANGE ROAD 3064 NEAULT ROAD 22ND STREET HWY. NO. 14 22ND STREET 2ND AVENUE COLLEGE

DRIVE AVENUE P AVENUE FAIRLIGHT DRIVE H AVENUE

11TH STREET 8TH STREET

11TH STREET CLARENCE AVENUE

TAYLOR CIRCLE DRIVE STREET CRESCENT

HWY. NO. 7

SPADINA

BROADWAY AVENUE

ROAD CIRCLE DRIVE VALLEY HODGSON ROAD

North Route Options City of Saskatoon Boundary Red Pheasant Cree Nation Reserve

Central Corridor Saskatoon Future Development Saskatoon Airport Authority

South Route Options Light Industrial Airport Proposed Expansion Proposed Saskatoon Freeway Country Residential Conservation Area Potential Constraints

HWY. NO. 16

TOWNSHIP ROAD 380 PROPOSED 12 NO. HWY.

SASKATOON FREEWAY RANGE ROAD 3060 ROAD RANGE P

HWY. NO. 11

P

RANGE ROAD 3064

P

DALMENY ACCESS

P AUCTION MART ROAD 71ST STREET HWY. NO. 16

MARQUIS DRIVE

P

BEAM ROAD

P

P IDYLWYLD DRIVE IDYLWYLD

WANUSKEWIN DRIVE

PROPOSED

P TOWNSHIP ROAD 372 51ST STREET SASKATOON FREEWAY

P

P

JUNOR AVENUE CLAYPOOL DRIVE WARMAN ROAD

P P P

P

P

CIRCLE DRIVE 33RD STREET CRESCENT P

P

DIEFENBAKER DRIVE 29TH STREET

SPADINA IDYLWYLD DRIVE IDYLWYLD

P

RANGE ROAD 3064 NEAULT ROAD 22ND STREET HWY. NO. 14 22ND STREET 2ND AVENUE COLLEGE

P

P P P DRIVE AVENUE P AVENUE FAIRLIGHT DRIVE H AVENUE

W 11TH STREET 8TH STREET

11TH STREET CLARENCE AVENUE W

W TAYLOR HWY. NO. 7 CIRCLE DRIVE STREET W CRESCENT E E E E E E E E W P P P P P E P SPADINA P E E W P BROADWAY AVENUE EP W P W W W W W W W W EW W W W

E ROAD CIRCLE DRIVE VALLEY HODGSON ROAD E E E

Potential Environmental or Heritage North Route Options P Future SaskPower Line Concern Central Corridor Saskatoon West Swale E SaskEnergy Line

South Route Options Existing Residences W Raw Water Line

Proposed Saskatoon Freeway P SaskPower Line Next Steps

7KLVLVRQO\WKHÀUVWVWHSRIPDQ\7KHQH[WVWHSLVWRIXUWKHUGHYHORSURXWH options by: • Gathering and reviewing input and feedback from this open house. • 5HYLHZLQJURXWHVDQGDVVRFLDWHGWUDIÀFSURMHFWLRQV • Assessing constraints. • Developing preliminary cost estimates. 2SWLRQVZLOOEHUHÀQHGIRUIXUWKHUHYDOXDWLRQEDVHGRQWKHDERYH ,QIRUPDWLRQ6HVVLRQ1R Mid  • )XUWKHUGHYHORSPHQWRIDOWHUQDWLYHVFRVWVDQGUHTXLUHPHQWV Thank You For Attending!

View more information at: http://www.highways.gov.sk.ca/saskatoon_west-connector

Information Session No. 2 is anticipated to occur in Mid 2016.