THE UPONOR INFRA CUSTOMER MAGAZINE » ISSUE 2/2019

FISHGLOBE REVOLUTIONISES THE FUTURE OF STRUCTURES FOR MARINE CONDITIONS Page 6 SAFEGUARDING THE DRINKING IN URBAN AREAS IS CRITICAL Page 8 FLOW MEASUREMENT REVEALS LEAKS IN THE WATER SUPPLY NETWORK Page 12 Dear reader, he water supply and wastewater infrastructure in many regions across Europe is ageing. Despite the high quality of drinking water in the Nordic countries, the condition of the old pipe networks poses challenges. For example, Tin Finland most of the network was built between 1960 and 1990 and in the biggest cities parts of the network are over 100 years old. According to a recent study in Finland (ROTI 2019), 12% of the sewer network and 12% of the potable water network has deteriorated and there is an increasing need to renovate the old networks to both ensure water quality and minimise water losses. In Finland, 68 million m3 of mains water is lost every year and a substantial part of this is due to leakages (SYKE 2018). In Sweden, the total leakage of clean drinking water is about 15% on average, corresponding to 99 million m3 (Svenskt Vatten 2019). This is not only a waste of clean drinking water – resources used to collect, treat and pump the drinking water are also wasted. Losses of water, and in issue 2/2019 particular leakages, are relevant for distribution network efficiency in all European countries. New innovations are needed to help solve these challenges. On p. 12, you can read about how our new Water Monitoring Services are helping the city of Pori in Finland to monitor 4 In Brief 16 Industrial its leakages. Finland is not the only country with solutions network challenges. In Poland, Warsaw 6 Marine solutions A polyethylene pipe was selected recently suffered from a significant leakage FishGLOBE V5, a fish farming facility for the raw water pipeline in Jaworzno Power Plant in southern Poland to in its sewer network into the Vistula built and delivered to FishGLOBE AS in Stavanger in southwestern Norway, is ensure failure-free water supply River that flows through the city. Uponor the world’s largest PE plastic structure for the plant. participated in the rescue operation, designed for marine conditions. building an over one kilometre long 18 Stormwater temporary pipeline in just eight days Uponor IQ pipes to stop the leakage into the river. 8 Water supply provided a simple, effective and On p. 22, you can read about how 50 New solutions are needed to ensure reliable stormwater solution in Secure the water supply the reliability and long-term security Vantaa, southern Finland. Uponorians carried out this impressive of drinking water supply. feat. We are very proud of this. 20 Renovation Old pipe networks are not the 11 Water supply only challenge that cities are facing. A project completed in Vellinge, with fresh water tanks When Skaraborgsvatten in southern Urbanisation is increasing the need southern Sweden, resulted in an Sweden had to replace its old intake innovative new way of using to repurpose old industrial sites pipeline, Uponor Infra provided a Wehopanels to renovate pumping for better uses. New methods are turnkey solution. stations. required to secure the long-term safety of the drinking water. Uponor 12 Water Monitoring 22 Wastewater Weholite potable water tanks are individually designed, was the first to launch to market Services A temporary pipeline was produced, a fully plastic barrier pipe for The Water Monitoring Services delivered and connected in just eight equipped and prefabricated according to the customer’s potable water networks. Read more enable real-time monitoring of water days when a wastewater collector needs and requirements. The welded tanks are 100% about this unique product on p. 8. supply networks. Any deviations in was damaged in Warsaw, Poland. watertight, and their lightweight construction enables fast the network can be located quickly. I hope you enjoy this latest installation. issue of Pipe World! 14 Stormwater Potable water tanks can be used in many different Easy installation was key in the Sebastian Bondestam extension of an old stormwater line in a applications, such as raw water buffer tanks, alkalisation President, Uponor Infra busy harbour in Auckland, New Zealand. tanks and more. By installing a tank as a permanent part of the water network, you will ensure a cost-efficient supply of fresh water for years to come. PUBLISHER Uponor Infra Ltd » www.uponor.com/infra » EDITOR IN CHIEF Mr Sebastian Contact us for your next potable water project! Bondestam » EDITORIAL BOARD Mr Sebastian Bondestam, Ms Marlene Fremleson-Ohlis, PVC PE PP www.uponor.com Mr Vesa Kiiskinen » EDITOR Viestintätoimisto Supliikki, Ms Outi Järvelä, Tel. +358 40 577 1844 » PRINTER Grano Oy » ISSN 2489-8864 (print), ISSN 2489-8872 (online) pipe world ISSUE 2/2019 3

Uponor_Weholite tanks 215x280 Pipe World.indd 1 14.11.2019 12.40.44 The first 100% plastic An effective solution to take the pressure drinking water pressure Weholite off the public stormwater network IN BRIEF License to Kenya pipe for contaminated soil Uponor IQ tanks provide an effective, safe and long-term solution for stormwater treatment in a new housing complex that is under construction in Aarhus, southern Denmark. Thanks to the IQ tank’s modular construction, the housing complex has PROJECT FACTS several options for recycling stormwater before it is drained into the public network. Country: Denmark City: Aarhus IN A NEW DEVELOPMENT in the heart of Aarhus, IQ tanks will function as water reservoirs, where Project: IQ tanks for a stormwater solution the second-largest city in Denmark, a new a water brake ensures that the water is retained Period of construction: housing complex is currently under construction. and slowly led out into the public network. August 2019–September 2019 This interesting housing complex features both Builder: NREP and CASA A/S five-storey residential units and 47 smaller Sustainable options for future solutions Brian Eriksen terraced houses. The 47 stormwater tanks for the terraced Constructor: Based on calculations made during the housing complex in Aarhus are currently only Products and services: 47 IQ tanks, preconstruction development process, the designed for the collection and retention of length 3,000mm and ø 800, manholes, Ultra WWW.UPONOR.COM/INFRA Classic pipes and fittings, and onsite service consultant predicted that handling stormwater stormwater. But thanks to the IQ tank’s modular from the 47 terraced house roofs during heavy construction, the housing complex actually has rainfall would pose challenges. Therefore, several options for recycling the stormwater the consultant chose to install an effective before it is drained into the public network. stormwater solution to take the pressure off the With a few simple adjustments, the designer public stormwater network. can, for instance, add a filtered pump solution UPONOR Barrier PLUS is the first fully plastic pressure pipe for drinking water capable UPONOR INFRA Oy and the owners of Plasco Below the patio of each house, an Uponor for purification of stormwater, meaning that of withstanding even the toughest soil pollutants. The reason behind its resistance is Ltd Tanzania have signed a Weholite Licensing IQ tank is now being installed for stormwater secondary stormwater can be collected from the a polymer barrier protection layer. Agreement to expand the manufacture of the collection. Due to their critical location below tank and used for purposes such as watering One of the challenges faced by conventional drinking water piping solutions is that Weholite pipe to Kenya. the residents’ patios and gardens, Uponor Infra gardens and washing cars. contaminants can penetrate traditional PE pipes. For this reason, either cast iron In addition to Uponor Infra’s own production recommended IQ tanks as an easy-to-install, By recycling the stormwater using future or concrete piping has been typically used for drinking water transport and delivery of Weholite, there are licensees in the UK, safe, and longer-term solution. solutions, homeowners will be able to save on in contamination risk areas. A further concern is that a commonly used solvent, Iceland, Oman, Malaysia, Thailand, Japan, The tanks are connected in series, so when expenses, while reducing the load on the public trichloroethylene (TCE), can corrode aluminium layered barrier pipes. Brazil, France, Turkey, Tanzania, Canada and the stormwater chamber is full and stormwater stormwater network. In that way, homeowners Uponor Barrier PLUS is a solution that incorporates the ease and flexibility of now also in Kenya. is led into the IQ tank, the water is conducted can contribute to efficient use of the globe’s plastic piping with the resilience and security against contaminants of cast iron pipes. Plasco is a Tanzanian manufacturer of PE-HD to the next tank in the series as they fill up. The shared water resources. n The polymer barrier layer protects the water from the pollutants, making Uponor Barrier and U-PVC pipes and fittings that has been PLUS a reliable and long-lasting solution that is easy to install. a Weholite licensee since 2017. The new Uponor Barrier PLUS not only mitigates the risks involved in building on potentially production facilities will be located in Nairobi, contaminated land, but also protects the water supply from future risks, such as Kenya. chemical spills or other accidents above ground. It is also a plus for the environment, The Weholite product line, invented by as it is fully recyclable. Uponor Infra (formerly KWH Pipe) in the 1980s, As cities and populations consists of polyolefine pipe, fittings and grow, there is a need to fabricated assemblies. The structured-wall reclaim lands previously PE-HD Weholite pipe is available in various The Weholite family Appointments deemed unfit for universal sizes, with inside diameters of up to 3,500mm. public and private use. The pipe is used extensively worldwide in UPONOR INFRA There is a risk, especially low pressure/gravity service applications for meets up in Vaasa in former industrial sites, potable water, stormwater, sewage and various DENMARK UPONOR INFRA organised the Weholite seminar in Finland this September. that the soil contains other liquids. Weholite fabricated assemblies At the seminar, almost all Weholite Licensees from Europe, Asia, Africa Bo Holm Sørensen has pollutants that can infiltrate are designed for special functions, such as and Latin America met up in the coastal city of Vaasa. been appointed Sales ordinary pipes. The risk manholes, retention tanks and even individual During the two-day seminar, they attended many presentations about Director for the overall is not exclusive to these family-sized sewage treatment units for non- new products and heard about challenging and interesting projects sales force in Denmark sites – even existing built urban regions. carried out around the world. as of 1 August 2019. areas may face challenges. Weholite products manufactured at the Especially the new innovative products and structures developed with In his new role, Bo will The consequences can be Nairobi factory are expected to be available Wehopanel in recent years sparked plenty of interest and discussion. continue to focus on particularly drastic when it by the end of 2020. n Among other projects, the seminar presented a fish farming facility Participants were very pleased with how well planned and organised further developing Uponor comes to drinking water. delivered to FishGLOBE AS in Norway – it is the world’s largest plastic the event was. They praised it as a valuable opportunity to share ideas, Infra’s position in the market. Bo has been Uponor Barrier PLUS is More info about Weholite licensing structure designed for marine conditions. thoughts and experiences and to learn new things. In addition to the employed by Uponor since 1996. He has played available in diameters from www.weholite.com The seminar also focused on a wide range of issues related to quality, excellent organisation of the event, the participants appreciated its open, a leading role in sales throughout his career. 32 to 250mm in pressure raw materials and recycling. Current themes highlighted by the visiting relaxed, enthusiastic and energetic atmosphere. In the words of many of classes PN10 and PN16. n presenters also inspired lively discussion at the seminar. those who attended: it was truly a meeting of the Weholite family! n

4 pipe world ISSUE 2/2019 pipe world ISSUE 2/2019 5 Welding and construction got under way in FishGLOBE revolutionises December 2018. A fully automated facility At its Vaasa plant, Uponor Infra manufactured robot-welded Wehopanels the future of plastic structures measuring as much as 3 x 8 metres from 250 x 200 x 20mm profiles for use as the functional shell and internal structures of the globe. A Weholite pipe with an internal diameter of three metres was made to MARINE SOLUTIONS for marine conditions serve as its central pipe. “The panels were also sawn to their correct dimensions before transport As tall as an apartment building. A diameter of 22 metres. A volume of 3,500 cubic metres. FishGLOBE V5, to Norway.” a fish farming facility built and delivered to FishGLOBE AS in Stavanger in southwestern Norway, Its six water feed pipes, which also serve as the support structures of the facility, are 1,100mm pressure pipes. The water feed pipes supply is the world’s largest PE plastic structure designed for marine conditions. The first fish – 250,000 young the facility with seawater – which is then treated and discharged back salmon, or smolts – were transferred into this futuristic-looking facility in November. into the sea through the central pipe. FishGLOBE is a closed and fully automated fish farming system. he Norwegian company FishGLOBE AS has spent many FishGLOBE wanted to build it using PE100 plastic – but it had to Technical equipment and an integrated feeding unit are installed in the years on the development of a floating fish farming be strong enough to withstand the harsh conditions of the Norwegian upper section of the facility. FishGLOBE also differs from other closed facility with an enclosed structure. After the first demo Sea and support the massive size of the structure, which weighs systems in that the upper section is also enclosed. This ensures that version as well as the V2 and V3 prototypes, which 200,000 kilos. waves cannot introduce salmon lice and other parasites into the habitat measured 10 and 70m3 respectively, the company Many were sceptical about the project. Arne Berg, the founder of – the fish can thus live their first year in safe conditions. started designing the V5 about three years ago. In FishGLOBE AS, who headed up product development, says that none In the FishGLOBE, young salmon – smolts – are grown from a size of terms of size, it was a great leap forward – this facility is intended of the engineers he consulted initially believed that the facility could 100 grams to one kilo, after which they are moved to the next facility. T 3 Plastic has numerous advantages for full-scale production and has 3,500m of space for fish, with a be manufactured using PE plastic. in marine conditions A massive welding and construction project height of 18 metres and diameter of 22 metres. But his plans soon gained momentum. When Uponor Infra heard about the project, the company contacted FishGLOBE – its extremely The highly durable Wehopanels and Weholite pipes developed by Uponor The panels and pipes were delivered to Stathelle in southwestern Norway

PHOTOS Kari Karjalainen, Uponor » Karjalainen, Kari TEXT Outi Järvelä » PHOTOS strong Wehopanels and Weholite pipes, made from layered PE profile, Infra can be dimensioned and equipped individually for countless in December 2018. Welding and construction then got under way. would be the perfect solution. FishGLOBE was soon also convinced applications, such as tanks, foundation slabs, support structures, “The construction project was a massive undertaking. In addition to that they’d found the right choice. underground pumping station chambers and floating or submerged Uponor Infra’s own team, the Norwegian subcontractor ØPD AS worked marine structures. In recent years, many innovative new products and on it,” says Kari Karjalainen. structures have been developed using Wehopanel. The facility was lifted into the sea in July 2019 and towed to its final “This project is the only one of its kind in the world. No PE plastic location in Lysefjord, near Stavanger in southwestern Norway. The final structure of this size has ever before been designed and built for use welding work, completion of the technical equipment and facility testing in marine conditions,” says Kari Karjalainen, Export Manager at were then carried out. Uponor Infra. The facility was anchored to the seabed with 12 anchor points made Karjalainen says that the project has been very interesting and of PE plastic that have been designed to withstand more than 25 tonnes challenging. of force. “The design, manufacturing and construction processes have all been extremely demanding. We got the opportunity to really make the most A much larger FishGLOBE is already being designed of our expertise and decades of experience in plastic construction.” The customer, RyFish, introduced the first fish into the facility in Karjalainen says that a Wehopanel profile was customised for November. They are expected to grow to a size of one kilo by April 2020. FishGLOBE, as no panels this strong and large had been produced before. "Two FishGLOBE facilities of the same size are planned to be “The calculation results ran to hundreds of pages, to ensure the delivered to Lysefjord in 2020. The design work has already begun and durability of the structure in marine conditions with rough waves the manufacture of profiles and panels can get under way in Vaasa as and currents.” soon as everything is finalised.” Karjalainen believes that FishGLOBE will revolutionise not only The development of FishGLOBE will not end here. The much larger marine fish farming, but also the future of other plastic structures FishGLOBE V6 is already being designed. designed for marine conditions. “It will have a volume of 31,000m3, with capacity for 2,000 tonnes of “Success in the project opens the door to new opportunities to build a fish. Its diameter will be 44 metres and its height 30 metres. The system variety of large-scale plastic applications for marine conditions. Plastic will weigh 1,000 tonnes,” says Karjalainen. n The facility was lifted into has undeniable advantages – it’s a durable material with a lifespan of the sea in July 2019. over a hundred years. Thanks to its flexibility, it doesn’t develop cracks Watch a video about FishGLOBE: that lead to breakage – and there is no risk of corrosion, either.” https://www.youtube.com/watch?v=XxzfNCGpnRs

6 pipe world ISSUE 2/2019 pipe world ISSUE 2/2019 7 Safeguarding WATER SUPPLY WATER the drinking water in urban areas is critical As cities and populations grow, there is a need to reclaim lands previously deemed unfit for universal public PHOTOS Uponor » TEXT Timi » PHOTOS Petersen and private use. However, there is a risk, especially in former industrial sites, that the soil contains toxins that can infiltrate ordinary pipes. The consequences can be particularly drastic when it comes to drinking water. It is obvious that new solutions are needed to ensure the reliability and long-term security of drinking water supply.

s urbanisation continues to accelerate globally, commu- nities are faced with a new challenge. Cities are expan- ding beyond their traditional limits and need to look into Arepurposing sites previously utilised as in- dustrial areas to accommodate their growing population. All over the world former manufacturing and stock areas, shipyards, harbours, fuelling facilities, and industrial complexes are being relocated from the centres of cities into more Zero tolerance for risk taking convenient and less population-critical areas plastic piping, as well as cast and ductile iron use plastic pipes layered with aluminium. and the land is being reclaimed for urban in Denmark. More than half of them can be Uponor Barrier PLUS pipes through the gaskets. This method has had its own drawbacks – The safety and security of inhabitants is development. problematic for either human health, drinking is the first fully plastic The risk of penetration of chemical soil the greatest of these is that hydrocarbon obviously of paramount importance. In pressure pipe for This raises a new challenge for urban water or the environment (Danske Regioner, drinking water capable pollution into drinking water in the distribution compounds that have entered the soil through particular, purity of the drinking water planning and municipal building. Much of the 2019). of withstanding even network has been discussed and investigated. A the use of chlorinated organic solvents, such provided for the area needs to be assured. Some land base at such sites has been contaminated the toughest soil. mapping was published in a report by Svenskt as trichloroethylene (TCE), can corrode the hydrocarbons when entering the drinking water Conventional solutions over decades of industrial operation by the Vatten (2012). When certain types of plastic aluminium layer over time. give an unpleasant odour and taste, while some chemicals and processes used in the area. are no longer enough pipes without a barrier layer and sealing rings A review shows that chlorinated solvents can have more adverse consequences. In Denmark, the Danish regions have the Soil in all urban areas contains contaminants; in iron pipe systems are exposed to high represent 41% of environmentally hazardous On top of safeguarding the drinking water responsibility for managing the risks posed this is the consequence of normal urban concentrations of petroleum pollution, the substances in the soil that may seep into the supply against contaminants already in the by soil pollution. According to a systematic activity. However, in some areas, pollutants plastic swells and becomes more permeable aquatic environment (Danske Regioner, 2019). soil, the gravity of the risks involved makes it mapping, more than 37,000 contaminated are exceptionally prevalent and toxic. Due to (Svenskt Vatten, 2012). Aluminium-reinforced pipes are not recyclable, critical to anticipate possible accidental spills in and possibly contaminated land areas exist their properties they can permeate regular The conventional solution has been to which is a requirement on more and more sites. the future as well. Zero tolerance for risk taking

8 pipe world ISSUE 2/2019 pipe world ISSUE 2/2019 9 PERMEABILITY PE100 UPONOR Strong, safe and flexible OF CONTAMINANTS PRESSURE PIPE BARRIER PLUS PIPE

CHLORINATED ALIPHATIC HYDROCARBONS Skaraborgsvatten in the south of Sweden has replaced its old intake pipeline made of WATER SUPPLY WATER 1,1-DICHLOROETHYLENE - X wood with a new one made of polyethylene. The new system was not only easy and fast to install 1,2-DICHLOROETHANE [1,2-DCA] - X – it is also impact resistant and capable of withstanding high levels of mechanical stress. CIS-1,2-DICHLOROETHYLENE - X DICHLOROMETHANE [DCM] - X TETRACHLOROETHYLENE - X karaborgsvatten, which this year is celebrating its 60th Uponor’s solution consisted of a solid wall pipeline made of TETRACHLOROETHYLENE [PCE] - X anniversary, is jointly owned by the cities of Skövde, polyethylene. This type of pipeline can take local settlements, and TRANS-1,2-DICHLOROETHYLENE - X Falköping and Skara, in southern Sweden. Combined, is long-lasting, easy to install, impact resistant, and capable of TRICHLOROETHYLENE [TCE] - X they supply water to a local population of approximately withstanding high levels of mechanical stress. The scope of Project VINYL CHLORIDE - X 100,000 people. Their cooperative retrieves raw water from Services included detailed design with all related calculations, material Uponor » » PHOTOS AROMATIC HYDROCARBONS SLake Vättern, which is then pumped through a 10km-long pipeline supply, welding of the pipeline and assembly of concrete collars BENZENE - X to supply clean potable water to surrounding municipalities. Every as well as dredging, submersion, backfilling, pressure testing and BENZO(A)PYRENE - X day, close to 24,000m3 of drinking water is supplied. commissioning of the new intake pipeline with related components.

ETHYLBENZENE - X Easy installation of the pipeline was an TEXT Uponor P-DICHLOROBENZENE - X A complete, easy-to-install solution important factor, since varying weather TOLUENE - X The old intake pipeline to take water from PROJECT FACTS conditions are often a challenge for ma-­­ XYLENE - X Lake Vättern was made of wood. Its age and Reference: Skaraborgsvatten rine projects. In this case, the changeable ISO OCTANE - X the fact that it had started to leak meant that Country: Sweden weather conditions on Lake Vättern, Swe- X=no permeation it had to be replaced. However, in order to Construction type: New construction den’s second largest lake, were something supply Skaraborgsvatten with premium Year: 2019 of which Skaraborgsvatten was quite aware. Hydrocarbon compounds are common contamination sources in soil. Some of them are converted from, for example, quality cold water, the new intake pipe- System: Potable water/pressure pipe Material deliveries, all of which were petroleum-derived chemicals such as gasoline, kerosene or bitumen, while others have been used as solvents. line had to be installed at a greater depth, Product: Intake and transmission line: finalised this year, consisted of 1,550 met- further out into the lake. For this purpose, 1,550 metres of pressure water res of pressure water supply pipes with a Skaraborgsvatten decided to contact pipe DN1,100mm SDR17 dimension of DN1,100 and pressure ra- Uponor Infra. Customer: Skaraborgsvatten ting of SDR17, and 430 concrete collars is the norm in today’s society and the expected with such repurpose building, they are also Uponor Infra Project Services was able Contractor: Uponor Infra Project Services specially designed for this project and standard in all infrastructure construction. realising that they can install Uponor Barrier to provide a turnkey solution. installation circumstances. n MORE THAN 37,000 PLUS -type of piping in urban, heavily trafficked The ease of plastic CONTAMINATED sites to ensure the integrity of the drinking with uncompromised protection AND POSSIBLY water supply if new spills occur in the area. The ease, efficiency and long lifecycle provided CONTAMINATED As more authorities grow aware of the Uponor Infra supplied by plastic piping has made it the most popular LAND AREAS EXIST issue at hand and risk-aversity increases, the 1,550 metres of pressure water choice for most modern piping needs. It is a application of reliable, easy to handle and pipes, and concrete collars specially designed for the project. critical factor in assuring economic feasi- IN DENMARK. cost-efficient Barrier PLUS will no longer be a bility and a convenient installation process novelty, but standard solution. Barrier PLUS in successful building projects. As a result, helps avoid unnecessary risks, while ensuring Uponor’s customers approached the company the reliability and long-term security of with a request to create a solution that From novelty to drinking water solutions. n combines the convenience of plastic piping a standard solution while providing an additional level of safety Municipalities and authorities are taking a for the drinking water supply. proactive stand to assure the safety of drinking Years of extensive research, development and water. Legislation has been put in place to relentless testing led to the launch of Uponor enforce the use of solutions that negate these REFERENCES Barrier PLUS. A multi-layered fully plastic risks. In Denmark, for example, requirements Bäckström, M., Eklund, M., Wikström, pipe, it combines the ease and convenience have been passed into law, whereby all sites, A.-S. W. & AB, V. &. M. A., 2012. Genomträngning of plastic with uncompromised protection regardless of their prior use, need to have a av kemiska markföroreningar till dricksvatten i from any traces of pollutants in the land base, drinking water solution that takes into account distributionsnätet, 2012-14, u.o.: Svenskt Vatten AB. including the relatively prevalent, highly toxic the possible pollutants in the soil. Danske Regioner, 2019. I sikre hænder and corrosive solvent trichloroethylene (TCE). As cities and authorities are becoming more - Regionernes arbejde med jordforurening 2018, And it is completely recyclable. and more aware of the problems associated u.o.: Danske Regioner.

10 pipe world ISSUE 2/2019 pipe world ISSUE 2/2019 11 The drilling saddles make it possible to install the sensors in pressurised pipes.

Information straight from the pipes UPONOR WATER MONITORING SERVICES Porin Vesi has earlier measured water flow only at its waterworks. Flow monitoring and leak detection "We met Uponor representatives at the Finnish Water Utilities • Real-time monitoring service Association event last year, and they told us about the Water Monitoring that tracks water flow, volume, direction, Services. We thought it sounded very promising, so we decided to try pressure and temperature. the flow monitoring solution,"says Halminen. • Even small silent leaks can be detected Uponor Water Monitoring flow meters were installed in the pipes and located in time, preventing pipe bursts.

WATER MONITORING SERVICES MONITORING WATER early this year, now enhancing network maintenance. • Real-time alerts in exceptional situations. “We wanted to monitor the Meri-Pori area more closely, as it has • Sensor installation without interrupting had leakage problems over the years. Meri-Pori is an independent water distribution. section of our network and one of the city’s three pressure zones. In Water quality monitoring addition to flow meters installed in the pipes, separate measurement • Real-time monitoring service that analyses points were set up in the pumping station and water tower in this area. the size, shape and quantity of particles and microbes in water. All these measurement points are now displayed in the Uponor Water Monitoring user interface.” • A highly sensitive detection system that detects even small changes quickly, Meri-Pori is an extensive area in the western part of the city, on enabling the network owner to immediately the coast of the Bothnian Sea. It is a peninsula with close to 9,000 take the necessary steps. inhabitants and the well-known Yyteri sand beach. The area also has • Real-time alerts in exceptional situations. plenty of industry, including wind farms and Finland’s largest coal • Historical records collected by the system can power plant. be used in event investigation. Flow measurement “This area is on the periphery of the network. Leaks and other exceptional situations easily lead to problems, as there are few backup water pipelines,” says Jouko Halminen. PHOTOS Marja Seppälä » TEXT Outi Järvelä » PHOTOS reveals leaks in Managing leaks in time Porin Vesi installed the chambers and drilling saddles supplied The Water Monitoring Services developed by Uponor Infra enable real- by Uponor on its own. Uponor then installed the Water Monitoring time monitoring of water supply networks. Deviations in the network measuring devices in them. Water distribution did not have to be the water supply network can then be detected and located quickly. Water Monitoring Services interrupted due to installation – the drilling saddles made it possible keep track of flow and water quality, and detect leaks. to install the sensors in pressurised pipes. The Water Monitoring Services developed by Uponor Infra enable real-time monitoring of Water Monitoring Services designed for flow monitoring and Sensors installed in the pipes now measure the volume and direction water supply networks – deviations in the network can then be detected and located quickly. leak detection measure water flow, volume, direction, pressure and of flow and transmit the data over the mobile network to Uponor Infra’s Pori, a coastal city in southern Finland, started monitoring an area on the periphery of its temperature. Thanks to real-time information, even small silent leaks cloud-based monitoring system. This system analyses the data. If the can be detected in time, preventing large pipe bursts. flow limits set in the system are exceeded, the measurement point water supply network where leaks had caused problems over the years. “It has been estimated that in Finland, as in many other countries, sends an alert to mobile phones and computers. about 17 per cent of clean water is what we call non-revenue water – The data can also be fed into the waterworks automation system orin Vesi, the municipal water utility, is responsible for water that is lost before it reaches the customer. Leaks are the main if necessary, but Pori monitors the flow data over a browser-based the procurement, treatment and distribution of water to reason behind this. Leaking water costs cities and municipalities service provided by Uponor. almost 85,000 inhabitants. The company’s water supply hundreds of thousands of euros per year. Sudden leaks also cause “At the moment, we don’t track the data in real time. The data is network measures about 850 kilometres. substantial maintenance costs and interruptions in supply,” says Sales updated in the system at six-hour intervals. In addition, we have set As in many other Finnish cities, the network is ageing Manager Jussi Niemelä from Uponor Infra. the flow limits in the system so that we don’t get an alert for minor Pand leaks have not been avoided. The city’s financial plan for 2019- Niemelä points out that water leakage is not just a waste of natural deviations,” says Halminen. 2021 seeks to reduce the amount of water leaking from the water resources: it also leads to extra consumption of energy and chemicals He says that the system has enhanced awareness of flow and water supply network to no more than 15 per cent and the number of water and inefficient utilisation of waterworks. consumption in the area. pipe leaks to under 50 per year. “The system has worked very well. Now we know more accurately Pori spends about EUR 2 million each year on renovating its water Installation works do not interrupt water distribution what is going on in the network. We can react rapidly to any leaks.” supply and sewerage network. The pipes in which the Water Monitoring measuring devices were According to Uponor’s Jussi Niemelä, it’s great that water utilities “Last year, we renovated about 11 kilometres of the network. Pori installed are all from different decades – the newest is 10 years old, are interested in the service. is an old city and the oldest sections of its water supply network date while the oldest dates to the 1970s. “Leak management can extend the useful life of existing infrastructure back to the 1930s,” says Jouko Halminen, Water Supply Manager “The pipe sizes also vary. The smallest has a diameter of 160mm, by several years and help allocate funds for renovations more accurately,” at Porin Vesi. the largest 400mm,” says Jouko Halminen. he says. n

12 pipe world ISSUE 2/2019 pipe world ISSUE 2/2019 13 The massive Weholite pipes arrived at the end of September from Uponor’s licensed manufacturer in Thailand.

STORMWATER the excavation while work is ongoing. However, the project will be completed on Berg says that the easy installation of schedule.”

Weholite gives a significant advantage in Weholite has plenty of demanding projects. applications – around the world “Although the pipes are massive in size, they are light and easy to handle. It would be very Berg says that Weholite has many attractive difficult to install concrete, glass fibre or steel applications in Australia, New Zealand and pipes in this project, due to the soil conditions Asia. PHOTOS Uponor » » PHOTOS and time limitations.” “Many power plants are currently being built in the developing countries of Asia. Weholite Support during is highly suitable for use as water intake and the entire installation discharge pipelines at power plants, chemical The Weholite pipes were produced by Uponor refineries, treatment plants, etc.” Infra’s licensed manufacturer in Thailand, “Weholite pipes and tanks are also excellently

TEXT Matti Välimäki TEXT Matti Välimäki which has supplied Weholite pipes to many suited for desalination plants that produce other projects in its home market and drinking water from seawater. There are many countries such as the Philippines, Vietnam desalination plants in this region.” and Cambodia. “An expert from Uponor’s Vaasa factory was on A global network hand to ensure that they were produced exactly ensures smooth deliveries to specifications. In the case of pipes of this size, In addition to its own plants in Europe, Uponor you have to be very careful about the dimensions, Infra has licensed manufacturers in Europe, EASE OF weights, tolerances and ring stiffness.” Asia, Africa and Latin America. Uponor is supplying the pipe materials for “Thanks to our extensive partner network, the project, including special parts and redu- we can easily deliver anywhere in the world,” INSTALLATION IS KEY cers, complete with installation drawings says Berg. and instructions. The company also provides “We provide end-to-end service for our Weholite pipes are light and easy to install. They really come into their own in a project in the harbour support during the entirety of the installation customers’ projects – we design, we supply of Auckland, the largest city in New Zealand – the extension of an old stormwater line using massive work. the materials and if necessary we also handle pipes with an internal diameter of 3–3.5 metres. In this busy harbour area, it is not possible to carry out “Everything has gone well. The ship stopped installation. For instance, the installation for cargo in Australia and New Guinea so the of pipes on the seabed requires specialist large-scale excavation work. The soil of the region and strong tides pose their own challenges. trip took a little bit longer than expected. expertise and equipment.” n

t the end of September, the a kilometre further away,” says Ulf Berg, the installation work or to dig a long excava- cargo ship TS Delta arrived Export Manager at Uponor Infra Project tion. For this reason, the line will be built in in Auckland, the largest city Services. short segments with 15-metre pipe sections.” in New Zealand, carrying At the same time, the harbour area is being “Furthermore, there’s no space to weld massive Weholite pipes spruced up for the event. For instance, old pipes on site. The pipes will be lowered into Awith a diameter of 3–3.5 metres. oil tanks will be demolished and the area the trench and connected with concrete The pipes were transported from Thailand will be asphalted. weights, after which the pipe profiles will for use in a project to extend the old be filled with water.” stormwater line of the Auckland Wynyard Easy installation is particularly Strong tides in the area pose an additional Wharf terminal further from the harbour. important in demanding projects challenge. “In March 2021, Auckland will host the Auckland has the country’s largest cargo “The work must be done at low tide. At America’s Cup, a major sailing event. A harbour. It is quite a challenging site for high tide, the water rises almost to the edges pipe that discharges the city’s stormwater installation works. of the excavation.” into the sea is located in the event area. “The harbour area is busy. This means that The soil in this area is also challenging – The discharge site is now being moved half it’s not possible to set aside a large area for many support structures have to be built in

14 pipe world ISSUE 2/2019 pipe world ISSUE 2/2019 15 PE PIPE SYSTEMS INDUSTRIAL SOLUTIONS INDUSTRIAL ARE BECOMING 2018. This required the mobilisation of more Although the Jaworzno power unit has not AN INCREASINGLY than 170 transports. Every delivery had to be been commissioned yet, the raw water pipe- carried out according to the procedures of the line is already in operation. In such difficult POPULAR construction site. Due to the need to unload working conditions, the proposed construction CHOICE DUE TO and arrange for the storage of the materials, technology proved to be the only one that THEIR RELIABILITY. the site had to be notified in advance of each provided real operational safety for this water delivery. supply system. Providing real operational safety Electricity for several million people In 2018, an average of 2,200 people worked

TAURON Polska Energia S.A. » Energia Polska TAURON occurs is particularly demanding and involves each day on the construction site of the 910 Since last year, individual technological systems increased risk. Therefore, in order to avoid MW unit in Jaworzno. have been handed over for commissioning in potential failures, the pipeline for the new During peak workload, three operators at the Jaworzno. Plant and system tests have been power unit in Jaworzno was constructed using Uponor Infra manufacturing unit in Kleszczów carried out since autumn. The high efficiency

PE pipes with increased strength parameters. worked simultaneously on the DN910 and unit will reduce CO2 emissions by 30% and The main advantage of PE pipes is their DN980 pipes using three welding machines. emissions of other gases by more than 50%. flexibility, which allows for significant elon- The pipe welding work was carried out from It will produce up to 6.5TWh of energy per gation without structural failure. This en- December 2017 to September 2018. year for as many as 2.5 million households. PHOTOS TEXT Uponor » PHOTOS Ensuring sures continuity of operation especially in The total cost of construction will reach about areas threatened by landslides or tremors. PLN 6 billion (EUR 1.4 billion) and the unit is

Furthermore, PE pipes are welded, creating expected to be in operation for at least 30 years.

a homogeneous pipeline – it does not have Reliability is the key issue a failure-free gasket connections that could become unsealed due to severe mining damage. PROJECT FACTS The project in Jaworzno is not the first of its Project: Raw water supply system kind undertaken by Uponor Infra in Poland. Flexibility and careful planning for the construction of a 910MW power Previously, Uponor Infra has been involved water supply unit in the Jaworzno II Power Plant The new block in Jaworzno will receive water in the construction of power units at the Total pipeline length: from the Dziećkowice reservoir. The water Bełchatów and Kozienice power plants. It At the end of the year, a new power unit with a capacity of 910MW will be ready in the Jaworzno Approximately 9km pipeline is approximately 9km long, of which also participated in the modernisation of a Power Plant in southern Poland. One of the key elements influencing the efficient operation Products: Pressure pipes: approximately 6km is laid in an open trench PE100 PN16, SDR11 DN980, cooling water system and circulation system of the new power unit is the pipeline that supplies water to both the cooling system and the gas and approximately 3km is constructed using PE100 PN10, SDR17 DN910, for Zakłady Azotowe Puławy (Azoty Group) desulphurisation plant. Any failure within this system could result in the shutdown of power generation. the trenchless technique, relining. and fittings and in the renovation of industrial and cooling To ensure its failure-free operation, polyethylene pipe was selected for the raw water pipeline. In total, 201 WehoPipe DN910 pipes with a Construction technology: water pipelines for Synthos S.A. Other projects length of 15m each and 386 WehoPipe DN980 Open trench, relining implemented for the industry have included pipes, also each 15m long, were produced at Manufacturer and the supply of pipelines for the transportation the Uponor Infra factory in Kleszczów for the supplier of pipes and fittings: of flotation waste and process water to the construction of the raw water pipeline. Uponor Infra Sp. z o.o. Żelazny Most tailings pond owned by the hen planning the raw water damage has occurred and, consequently, in references on the failure-free operation of its Due to the high pace of pipe-laying, Additional services: Technical KGHM Polska Miedź Group. Prototype consultations at the design stage, pipeline, the investor, Tauron places where the use of separable connections products in similar conditions and provided production was carried out in two parallel projects, such as a floating intake for KGHM, change from GRP to PE technology, Wytwarzanie S.A., assumed would be very risky. a warranty for the entire system, both for the lines in order not to cause supply stoppages pipe welding and supervision of welding have also been carried out. that it would consist of GRP The system’s failure-free operation was cru- material and welds. Thanks to this, Uponor Infra and therefore not to hold up the works – work carried out by the contractor Uponor Infra is planning further large pipes. cial, as stopping the operation of a power plant was chosen as a pipe supplier for the project. this required Uponor Infra to ensure a high Contractor: Uniserv S.A. contracts in the industrial sector this year WHowever, Uponor Infra was able to provide an due to failure would result in financial losses degree of flexibility and careful planning of Investor: Tauron Wytwarzanie S.A. – due to its advantages, the PE pipe system Why choose polyethylene pipes? alternative solution that would better meet the of as much as several million PLN – hundreds the production and delivery schedule. Jaworzno III Power Plant is becoming an increasingly popular choice the customer’s needs in view of the fact that the of thousands of euros – each time. The construction of buildings and infrastruc- Deliveries of pipes and fittings took place in among investors, for whom reliability is the pipeline was to be built in areas where mining Uponor Infra could also provide five-year ture facilities in areas where mining damage the period from October 2017 to September key issue. n

16 pipe world ISSUE 2/2019 pipe world ISSUE 2/2019 17

UPONOR IQ INFILTRATION STORMWATER An easy and reliable PIPE SYSTEM Perforated infiltration pipe system suitable for handling both small and large amounts of stormwater. Thanks to their open structure, stormwater solution the pipes have a large useful capacity, ensuring Uponor IQ infiltration pipes were installed for the first time in Finland in the loading effective attenuation and infiltration. Applications include parking areas, retail plots, and parking area of Volvo Truck Center’s central warehouse – they provide a simple, roads and crossings, as well as industrial areas. cost-effective and reliable stormwater solution. Stormwater from a wide area can now be safely Light, durable and safe system that is simple infiltrated and attenuated on site before being channelled into a stormwater basin. to design, quick to install and easy to maintain. The required number of pipes can be installed end-to-end or next to each other. IQ infiltration he Volvo Truck Center’s central warehouse is located from GeoUnion Oy, says that he first considered using stormwater pipes can also be connected to a pre-existing in Vantaa, close to Helsinki, the capital of Finland. Its pipes that would be perforated before installation. stormwater line. new loading and parking area was asphalted, which “However, I heard about the new IQ infiltration pipes and Geotextile is only required on the edges of called for a solution to effectively and reliably channel contacted Uponor right away,” says Mäntysalo. the excavation to separate soil layers. Only the

» Olli Häkämies TEXT Kirsi Riipinen » PHOTOS bottom of the excavation under the pipe is levelled. stormwater runoff from the area. On this area, water Uponor IQ infiltration pipes had not been previously used in Tomi Lempinen (to the left), Uponor, Tapio Kalliola, EKE-Rakennus, 2 IQ infiltration pipes are available in diameters Taccumulates on about 8,300m of asphalt and roof surfaces, and Finland, but had already been installed at numerous sites in Sweden. and Tommi Heikkinen and Markku Hurskainen, Hyvinkään Tieluiska 2 are satisfied with the fast and easy installation. of 600 and 1,200mm. A 315-mm pipe can be on about 1,000m of lawn. “After a discussion with Uponor, I was convinced that IQ used as an inspection pipe. Uponor’s new IQ infiltration pipes were selected as the solution infiltration pipes would be an excellent fit for the property.” to infiltrate and attenuate stormwater on site before it is channelled “The load bearing capacity of IQ pipes was clear to us right Effective attenuation and infiltration into the stormwater basin at the edge of the area. from the start. It’s easier to design the system when we know what “If these pipes hadn’t been available on the market, we would IQ infiltration pipes are light, durable and easy to install. Thanks load the pipes will withstand and how much backfill we need on have had to order them as tailor-made,” says the customer, Tapio to the ready-made holes in them, water is infiltrated steadily top of the pipes.” Kalliola, Vice President of EKE-Rakennus Oy. through the sides and bottom. Due to their large useful capacity, Many factors must be taken into consideration in the design The designer of the site’s stormwater solution,Matti Mäntysalo these pipes infiltrate and attenuate stormwater effectively. of stormwater solutions. What is the surface area of the roofs on Mäntysalo says that perforating similar pipes on site is more the property? For instance, is the plot surfaced with asphalt or challenging, and generates unwanted waste. lawn? From how large of an area must stormwater be infiltrated “It requires quite a bit of work to determine how punching or channelled? In which kind of soil conditions will the stormwater holes in the pipe will impact its load bearing capacity. Stormwater solution be installed? solutions are often required in parking and traffic areas with “The soil also posed a challenge in the Volvo loading and constant heavy traffic load. This poses particular challenges for parking area, as one end is on bedrock, the other on soft soil,” design.” says Mäntysalo. Lightweight pipes are easy to lift into the excavation. Light and easy to install Hyvinkään Tieluiska Oy handled the installation works in Vantaa. A total of 50 metres of IQ 1,200mm infiltration pipes were installed at the site. Kimmo Nyman, Supervisor at Hyvinkään Tieluiska, praises Stormwater management is the pipes for their light weight, which made them easy to install. increasingly important The work went smoothly: the pipes were lifted one at a time by the excavator and transferred to the trench, which was located Both Kalliola from EKE-Rakennus and Mäntysalo from GeoUnion close to the centre of the plot. intend to use IQ infiltration pipes in the future too, thanks to their “It was also convenient that we didn’t have to excavate the entire ease of installation. trench at once, unlike in the case of most stormwater solutions.” “The pipes are easy to install. The holes punched in the pipes No geotextile is required around the pipes, and this also speeds result in steady water infiltration, and they are not easily clogged.” up and simplifies the work. Mäntysalo says that even more attention must be paid to Hyvinkään Tieluiska had a three-person team on the site. stormwater management due to climate changes. “We could have even done the job with two guys. We spent a “Our municipal building inspection authorities have already total of two days on installation, including the excavation work,” started demanding the installation of stormwater solutions on u says Nyman. detached house plots, too.” n

18 pipe world ISSUE 2/2019 pipe world ISSUE 2/2019 19 pumping stations are currently prioritised for renovation work, PE hollow profiles not only become floating-resistant and one of which is located in Höllviken. Höllviken pumping station, leak-proof but also highly resistant to aggressive liquids and INNOVATIVE, which is made of concrete, has started to deteriorate due to subsidence in the ground. As this design solution involved age and the long-term effects caused by hydrogen sulphide in a much shorter installation time, we decided to opt for the the untreated wastewater. innovative, reliable and sustainable solution from Uponor Infra

RENOVATION Project Services,” explains Anders Densfelt from EnviDan. RELIABLE Completely in line with the needs Light, highly durable and easy-to-install Wehopanel structures and requirements of the customer can be dimensioned and equipped for various purposes, such – AND INSTALLED Following the inspections and status assessments, EnviDan AB as tanks, foundation slabs, support structures and pumping made a proposal for the renovation of pumping station SK01 station buildings. Wehopanels are also excellent for renovation. in Höllviken, one of the three prioritised stations. The collaborative project between the municipality of IN 11 DAYS The renovation of pumping station SK01 required a multi- Vellinge, EnviDan AB, AF Bygg Syd and Uponor Infra Project strategy solution which took into consideration the high Services resulted in an innovative new way of using Wehopanels Completely in line with the customer’s needs – that was groundwater table, and, due to the crumbling concrete, a self- to renovate pumping stations. exactly what a solution designed with Wehopanel guaranteed supporting and hydrogen sulphide-resistant construction design. As pumping station SK01 is used for transporting Quick installation when an old pump station in Vellinge municipality, southern wastewater from Falsterbo, Skanör, Ljunghusen and Höllviken The prefabricated Wehopanel solution offered a quick and easy

PHOTOS Uponor » TEXT Uponor » PHOTOS Sweden needed to be renovated and modernised. to Klagshamn wastewater treatment plant, it was very important installation, which took only 11 days. to keep the installation period as short as possible. The incoming The construction work was carried out by AF Bygg Syd, sewage was pumped through a temporary system while the a construction company whose core business is focused on renovation was in progress. new production and renovation of water and wastewater The idea was to design a self-supporting and dense treatment plants as well as pumping stations in the south of construction of polyethylene that could be lifted into the existing Sweden. wastewater pump basin. “This was a very exciting pilot project for us, as we have “Uponor Infra Project Services presented us with a design previously only installed traditional pipeline systems from solution using Wehopanel – completely in line with the Uponor,” says Mattias Hedvall, Water and Wastewater Project customer’s needs and requirements. When filled with concrete, Manager. n

PROJECT FACTS The project resulted in an innovative Reference: Renovation of new way of using Wehopanels to renovate pumping stations. pumping station SK01 Country: Sweden Location: Höllviken Construction type: Renovation he municipality of Vellinge is located in the important as a high level of competence. You might have the Year: 2019 expansive Öresund Region, a cross-border best products to offer, but if you don’t have the competence, System: Weholite Product: Wehopanel structure cooperative region that encompasses Skåne in it will all fall to pieces in the end,” says Max Persson, Director pumping station. H = 6 metres, southern Sweden and East Denmark. It boasts of Water Resources at the municipality of Vellinge. W = 5.6 metres, L = 8.7 metres a beautiful landscape and a large, diverse labour Renovation and modernisation needed Customer: Municipality of Vellinge market. Industry is thriving and there is also a Consultant: EnviDan AB, Malmö Tvibrant cultural and social scene. Vellinge has several wastewater pumping stations. Domestic Contractor: AF Bygg Syd and The municipal water and wastewater systems were built in wastewater is discharged into the pumping stations, from where Gata & Väg Väst AB the 1960s–70s. Inspections and inventories of the systems are it is then pumped up one level into the wastewater pipeline Subcontractor: Uponor Infra carried out on a continuous basis. The municipality is currently system and onto the next pumping station, until it reaches its Project Services working on the development of an infrastructure renewal plan final destination – the Klagshamn wastewater treatment plant. that targets minimum annual improvements of 0.6% over the EnviDan AB, a consultancy company, was commissioned to next two decades. carry out inspections and status assessments on seven pumping The infrastructure renewal plan gives, among other things, stations. Though new municipal pumping stations have been top priority to qualities such as sustainable products with a long added over the years, an inspection showed some to be in life span. Another important factor when hiring the services need of renovation and modernisation due to the heavy impact of varying companies is the level of competence. on the concrete structure during several decades, including “These days, long-term experience of an industry is not as the replacement of existing pumping pits and pumps. Three

20 pipe world ISSUE 2/2019 pipe world ISSUE 2/2019 21 A 250-metre section of the 2,200-metre pipeline was laid on a pontoon bridge. WASTEWATER xxxxxxxxxxxxx PHOTOS Uponor » TEXT Uponor » PHOTOS

Fighting against an Uponor Infra joined the ecological disaster pipes using butt welding.

total length of 2,200 metres was laid on a pontoon bridge, which the in a world-record time Polish Army had built on the river. Once the pipes had been delivered to the construction site, Uponor Rapid action was critical when a sewage collector broke Infra joined them using butt welding, which ensured the strength of the in Warsaw, Poland, causing a massive waste spill into the structure along its entire length and, most importantly, of the joints. Vistula River. Uponor Infra’s crew worked 24 hours a day in The welding of 146 joints took six and a half days. order to stop the pollution of the river. A temporary pipeline Working hard 24 hours a day was produced, delivered and connected in just eight days. The pace of the work was staggering. Uponor Infra’s crew worked 24 hours a day in order to stop the pollution of the river. Six operational teams were sent to the construction site. A total of around 50 employees were involved in the project, including personnel from the technical, production, prefabrication, logistics, sales and marketing departments. An emergency pipeline t the end of August this year in Warsaw, a major In spite of the fast pace, all work was carried out under proper ready in eight days failure occurred in the system transferring supervision and in accordance with health and safety rules. sewage to Czajka, one of the largest wastewater Due to the malfunction, it was decided to perform a controlled discharge After 12 days of controlled discharge into the Vistula River, sewage treatment plants in Poland. Both lines of the GRP of the waste into the Vistula River, as well as build temporary pipelines. from seven districts of left-bank Warsaw flowed to the Czajka plant wastewater collector, located under the bed of The temporary installation was operated and supervised by the Polish again, and no more waste ran into the river. the Vistula River, were damaged. As a result, Army and the State Water Management Company, Wody Polskie. Reliable PE pipes around 3,000 litres of sewage spilled into the Rapid action was critical. As a rule, such projects are carried out river every second. over a period of months, but Uponor Infra was able to produce, deliver Once again, it was proven that PE pipes are a perfect solution for The situation in the capital city was being followed everywhere in and connect the pipes required for temporary pipelines in eight days. even the most difficult operating conditions thanks to their high APoland, since the sewage discharge also affected all the cities located According to Wojciech Skowyrski, Chief Engineer of Construction quality, strength parameters, flexibility and fast installation. Resistant to on the Vistula River north of the city. The Vistula River crosses Poland at the State Water Management Company, this was a world record. abrasion, corrosion and exposure to certain chemicals, they provide a and eventually reaches the Baltic Sea in the north, which also caused Uponor Infra supplied two 1,100m sections of 1,000mm PE pipes durable and reliable solution for applications such as process pipelines concern in other countries around the Baltic Sea. to the construction site. An approximately 250-metre section of the at chemical plants or cooling-water pipelines at power plants. n

22 pipe world ISSUE 2/2019 pipe world ISSUE 2/2019 23 Uponor Barrier PLUS Plus performance. Plus possibilites.

The first fully plastic pressure pipe for drinking water capable of withstanding even the toughest pollutants is called Uponor Barrier PLUS. The reason behind its resistance is a polymer barrier protection layer. It combines the ease and flexibility of plastic piping with resilience and security against contaminants, including TCE.

ȤȤThe first 100% plastic infra barrier pipe ȤȤSafeguards drinking water from toxic chemicals ȤȤ50+ years of service life

www.uponor.com 24 pipe world ISSUE 2/2019

Uponor Barrier PLUS 215x280 Pipe World.indd 1 7.11.2019 18.49.02