Interior the Following Appropriations Requests Were Submitted by Senator
Interior The following appropriations requests were submitted by Senator Merkley to the Appropriations Committee for consideration as part of the Interior, Environment and Related Agencies appropriations bill for fiscal year 2011. Bend Surface Water Project - $2,000,000 EPA, Bend, OR The Surface Water project has three major components: water treatment, pipeline replacement, and hydroelectric development. Funds will be put toward the estimated overall $71,000,000 cost of the project, which is to construct a water treatment plant, replace an 11 mile water pipeline, and install a small hydroelectric facility, gaining 1.2 MW of green power, further defraying the long term cost of the project. The project is required in order to replace aging infrastructure, and comply with EPA LT2 drinking water regulations governing surface water. Eastside Sewer Interceptor Project: Oak to Antler - $1,375,000 City of Redmond, Redmond, OR The east side of Redmond is poised for significant industrial and commercial growth. The City’s Desert Rise Industrial Park (State Certified, 75 shovel ready acres), Pioneer Business Park (40 acre, incubator lots), Crown Mill redevelopment (70 acre former sawmill), Greenway Business Campus (220 acre ―green-themed‖ re-development) and several other planned development or redevelopment projects exist east of US 97 and the BNSF rail line. Full buildout of the east side industrial development cannot occur without construction of a planned large diameter sewer line which parallels the BNSF rail line and intercepts/collects wastewater effluent from all east side development. The project, known as the Eastside Sewer Interceptor Project, will also have the capacity to serve the potential 900-acre large lot Department of State Land (DSL) project south of the Deschutes County Fairgrounds and Expo Center.
[Show full text]