Bridge Safety Standards Compliance Manual Final.Pdf

Total Page:16

File Type:pdf, Size:1020Kb

Bridge Safety Standards Compliance Manual Final.Pdf Bridge Safety Standards Compliance Manual October 2018 Office of Railroad Safety Bridge Safety Standards Compliance Manual Table of Contents CHAPTER 1 – INTRODUCTION AND GENERAL GUIDANCE.......................................................... 1 INTRODUCTION TO THIS MANUAL ............................................................................................... 1 SAFETY .................................................................................................................................... 1 BRIDGE SAFETY OVERSIGHT ..................................................................................................... 1 ACTIVITY-CODE SPECIFIC GUIDANCE ......................................................................................... 2 PRIORITIZING OVERSIGHT ACTIVITIES ........................................................................................ 4 OPENING CONFERENCE ............................................................................................................ 6 CLOSING CONFERENCE ............................................................................................................ 6 DEFECT TRACKING ................................................................................................................... 6 CHAPTER 2 – FIELD REPORTING PROCEDURES AND FORMS .................................................... 8 INTRODUCTION ......................................................................................................................... 8 INSPECTION REPORT, FORM FRA F6180.96 .............................................................................. 8 General Instructions ............................................................................................................ 8 Special Instructions–Inspections from/to State Lines ........................................................... 9 Defect Line Item Form FRA F6180.96 ................................................................................10 Violation Recommended Line Item Form FRA F6180.96 ....................................................10 VIOLATION REPORT NARRATIVE – FORM FRA F6180.111 .........................................................11 General Instructions ...........................................................................................................11 Submission of Photographs as Evidence ............................................................................12 Statements of Witness ........................................................................................................13 SOURCE CODES ......................................................................................................................17 MULTIDISCIPLINE ACTIVITY CODE TABLE OF DEFINITIONS ...........................................................19 BRIDGE AND TRACK ACTIVITY CODE TABLE OF DEFINITIONS.......................................................29 DEFECT CODES .......................................................................................................................39 INSTRUCTIONS, FORM FRA F6180.96, INSPECTION REPORT .....................................................45 INSTRUCTIONS, FORM FRA F6180.111, TRACK VIOLATION REPORT FORM .................................54 CHAPTER 3 – BRIDGE SAFETY STANDARDS ............................................................................. 58 INTRODUCTION ........................................................................................................................58 SUBPART A – GENERAL ...........................................................................................................59 § 237.1 Application .............................................................................................................59 § 237.3 Responsibility for compliance .................................................................................60 § 237.5 Definitions ..............................................................................................................63 § 237.7 Penalties ................................................................................................................64 § 237.9 Waivers ..................................................................................................................65 SUBPART B – RAILROAD BRIDGE SAFETY ASSURANCE ..............................................................65 § 237.31 Adoption of bridge management programs ..........................................................65 § 237.33 Content of bridge management programs ............................................................66 SUBPART C – QUALIFICATIONS AND DESIGNATIONS OF RESPONSIBLE PERSONS .........................70 § 237.51 Railroad bridge engineers ....................................................................................70 § 237.53 Railroad bridge inspectors ...................................................................................71 § 237.55 Railroad bridge supervisors .................................................................................72 § 237.57 Designation of individuals ....................................................................................72 SUBPART D – CAPACITY OF BRIDGES .......................................................................................73 § 237.71 Determination of bridge load capacities ...............................................................74 § 237.73 Protection of bridges from over-weight and over-dimension loads .......................78 i Bridge Safety Standards Compliance Manual SUBPART E – BRIDGE INSPECTION ...........................................................................................79 § 237.101 Scheduling of bridge inspections ........................................................................79 § 237.103 Bridge inspection procedures .............................................................................81 § 237.105 Special Inspections ............................................................................................82 § 237.107 Conduct of bridge inspections ............................................................................84 § 237.109 Bridge inspection records ...................................................................................84 § 237.111 Review of bridge inspection reports ...................................................................90 SUBPART F – REPAIR AND MODIFICATION OF BRIDGES ..............................................................91 § 237.131 Design ...............................................................................................................91 § 237.133 Supervision of repairs and modifications ............................................................92 SUBPART G – DOCUMENTATION, RECORDS, AND AUDITS OF BRIDGE MANAGEMENT PROGRAMS ..93 § 237.151 Audits; general ...................................................................................................93 § 237.153 Audits of inspections ..........................................................................................93 § 237.155 Documents and records .....................................................................................94 APPENDIX A – SUPPLEMENTAL STATEMENT OF AGENCY POLICY ON THE SAFETY OF RAILROAD BRIDGES .................................................................................................................................95 APPENDIX B – SCHEDULE OF CIVIL PENALTIES ........................................................................102 CHAPTER 4 – EXCEPTIONS TO THE STANDARDS .................................................................... 106 INTRODUCTION ......................................................................................................................106 DEFECT REPORTS .................................................................................................................107 VIOLATION REPORTS .............................................................................................................107 Knowledge Standard ........................................................................................................108 Criteria Affecting the Seriousness of a Noncomplying Condition .......................................108 Complaint and Accident Investigations .............................................................................111 COMPLIANCE ORDERS AND COMPLIANCE AGREEMENTS ..........................................................111 General Instructions .........................................................................................................111 Procedures .......................................................................................................................111 Documentation .................................................................................................................112 EMERGENCY ORDERS ............................................................................................................113 General Procedures .........................................................................................................113 Technical Considerations ................................................................................................. 114 Scheduling ........................................................................................................................114 Inspection .........................................................................................................................114
Recommended publications
  • A Synthesis of Modern Rail Transportation Engineering Practices Donald D
    University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln Open-Access* Master's Theses from the University Libraries at University of Nebraska-Lincoln of Nebraska-Lincoln 9-1977 A Synthesis of Modern Rail Transportation Engineering Practices Donald D. Cook University of Nebraska-Lincoln Follow this and additional works at: http://digitalcommons.unl.edu/opentheses Part of the Civil Engineering Commons Cook, Donald D., "A Synthesis of Modern Rail Transportation Engineering Practices" (1977). Open-Access* Master's Theses from the University of Nebraska-Lincoln. 37. http://digitalcommons.unl.edu/opentheses/37 This Thesis is brought to you for free and open access by the Libraries at University of Nebraska-Lincoln at DigitalCommons@University of Nebraska - Lincoln. It has been accepted for inclusion in Open-Access* Master's Theses from the University of Nebraska-Lincoln by an authorized administrator of DigitalCommons@University of Nebraska - Lincoln. A SYNTHESIS OF MODERN RAIL TRANSPORTATION ENGINEERING PRACTICES by Donald D. Cook A THESIS Presented to the Faculty of The Graduate College in the University of Nebraska In Partial Fulfillment of Requirements For the Degree of Master of Science Department of Civil Engineering Under the Supervision of Dr. Edward R. Post Dr. Patrick J. McCoy Dr. Edward N. Wilson Lincoln, Nebraska September, 1977 ACKNOWLEDGEMENTS I wish to thank Dr. E. R. Post, Dr. P. T. M~Coy, and Dr. E. N. Wilson, my thesis advisory corrmittee for their assistance. Thanks are also due Sharon Nichols and Kim Seip whose typing skills saved me a great amount of anguish and Gary Steffans who assisted with the chapter on signaling.
    [Show full text]
  • UPPER CANADA RAILWAY SOCIETY BOX 122 STATION "A" TORONTO, ONTARIO Photo
    UPPER CANADA RAILWAY SOCIETY BOX 122 STATION "A" TORONTO, ONTARIO Photo On Oct. 15, 1989, CPR's yard trackage in Goderlch, Ont. was almost completely dismantled, this being the western terminus of the 80- mile Goderlch Sub. from Guelph. This view, looking west toward Lake Huron, shows the station (which, hopefully, will survive) and the engine shed, right. ^^^^^ Western visitor: two of these Edmonton Transit trolley coaches are in Toronto for tests. The bodies were built by General Motors and the motors and controls by Brown Boveri; the 100-unit order commenced service in the Alberta capital eight years ago. This view of 178 was taken in Edmonton on July 13, 1983. _Dave Chalmers Survivor: 60 years young and still apparently going strong in CPR Engineering Dept. service was former ore car 376784, photographed on a siding beside the railway's West Toronto Shop, Nov. 4, 1989. It was built by Canadian Car & Foundry to the designs of the Hart- Otis Car Co.; the 25-foot car was designed to hold 80 tons of nickel ore. The railway ordered several hundred such cars in the 1920s. __john D. Thompson UCRS Newsletter • January 1990 * 3 CP Rail's New The tenninal will have four 609 metre (2,000 foot) working tracks under three gantry cranes, along with six storage and makeup tracks of similar length. The accompanying cross- sectional schematic shows the positioning of the cranes relative to the tracks. The facility will be connected to the MacTier VAUGHAN Subdivision by two 1,525 metre (5,000 foot) lead tracks; a wye track layout wfll permit access and egress from both north and south.
    [Show full text]
  • Port Comprehensive Market Study 2020
    Heartland Port Project Comprehensive market study 2020 May 2020 Title 0 Contents Executive summary ............................................................................................................................1 1. Introduction ...................................................................................................................................7 1.1 Objective ............................................................................................................................................. 8 1.2 Structure of the report ........................................................................................................................ 8 1.3 The Heartland Port—project location and study area ........................................................................ 9 2. Freight transportation system in Central Missouri ......................................................................... 10 2.1 Missouri’s freight network ................................................................................................................ 10 2.2 Highways ........................................................................................................................................... 10 2.2 Railroads............................................................................................................................................ 13 2.3 Waterways and public and private ports, marine terminals, and docks .......................................... 13 2.3.1 Marine Highways ......................................................................................................................
    [Show full text]
  • 5 - 2 Pre-Feasibility Study on Coal Transportation
    5 - 2 PRE-FEASIBILITY STUDY ON COAL TRANSPORTATION BETWEEN QASIM AND LAKHRA BY RAILWAY Appendix 5-2 PREPARATORY SURVEY ON LAKHRA COAL FIRED THERMAL POWER PLANT CONSTRUCTION PROJECT IN PAKISTAN PRE-FEASIBLITY STUDY ON COAL TRANSPORTATION BETWEEN QASIM AND LAKHRA BY RAILWAY FINAL REPORT October 2016 Japan International Cooperation Agency (JICA) NIPPON KOEI CO., LTD. Appendix 5-2 Appendix 5-2 PROJECT LOCATION MAP Appendix 5-2 Preparatory Survey on Lakhra Coal-Fired Thermal Power Plant Construction Project in Pakistan Pre-feasibility Study on Coal Transportation between Qasim and Lakhra by Railway Final Report Preparatory Survey on Lakhra Coal-Fired Thermal Power Plant Construction Project in Pakistan Pre-feasibility Study on Coal Transportation between Qasim and Lakhra by Railway FINAL REPORT TABLE OF CONTENTS Executive Summary Chapter 1 Introduction ...................................................................................................................... 1 1.1 Background of the Project ........................................................................................................ 1 1.2 Project Scope ............................................................................................................................ 2 1.3 Study Purpose .......................................................................................................................... 3 Chapter 2 Existing Railway Facilities ............................................................................................... 4 2.1 Key Feature of
    [Show full text]
  • FEATURES the World's Leading and Only Monthly Magazine for the Dry
    i DRY CARGO DC international WWW.DRYCARGOMAG.COM ISSUE NO. 237 JULY 2020 FEATURES Bauxite & Alumina Trades Inland Rail & Barge Bulker Classification Cranes Containerized Bulk Handling & Technology The world’s leading and only monthly magazine for the dry bulk industry CONTENTS E-Crane, manufacturer of high production bulk material and scrap cranes. We at E-Crane DCi offer tailor-made solutions to meet your needs for high productivity and reliable handling of scrap, grain, coal, cement clinker, or any other bulk material, while striving to optimize your operation, increase efficiency, and lower costs. E-Crane Worldwide Koekoeklaan 53 9991 Adegem, Belgium T: +32 (9) 378 04 44 E: [email protected] E-Crane USA 1332 Freese Works Place Galion, OH 44833, USA M: +1 (614) 579 3732 T: +1 (419) 468 0090 E: [email protected] PUBLISHERS Jason Chinnock WWW.DRYCARGOMAG.COM JULY 2020 issue [email protected] Andrew Hucker-Brown [email protected] EDITORIAL Louise Dodds-Ely Editor [email protected] Jay Venter Deputy Editor featuring... [email protected] Samantha Smith Directories TRADE & COMMODITIES [email protected] Bernice van Wyk Office Manager Solid support for grain and soya trade 2 [email protected] US moves to oust China as Brazil’s main trading partner 3 SALES BAUXITE & ALUMINA TRADES: COVID-19 EXACERBATES AN ALREADY DIFFICULT MARKET 4 Matthew Currin Senior Sales [email protected] Executive Zack Venter Advertisement Sales [email protected] Executive SHIPPING & TRANSPORT CORRESPONDENTS ABB pioneers drydock-to-drydock turbocharger service
    [Show full text]
  • Connecting Maritime Supply Chain Professionals for More Than 100 Years! P Ort F Acilities
    Connecting Maritime Supply Chain Professionals for more than 100 Years! P ORT F ACILITIES “The Voice of Port Industries” Build Connections & Discover Opportunity Join the VMA at VAmaritime.com 757-622-2639 21 PORT FACILITIES Hampton Roads Harbor ........................................................ 21 Hampton Roads Port Facility Guide .............................................. 24 Hampton Roads Terminal Summary .............................................. 32 General Cargo Terminals ....................................................... 41 Coal Terminals ................................................................ 49 Refrigerated Facilities ......................................................... 52 Dry Bulk and Grain Handling Facilities ........................................... 53 Liquid Bulk Terminals .......................................................... 56 ACILITIES Marine Cargo Terminals ....................................................... 62 F ORT P Commercial Marine Facilities guide The Commercial Marine Facilities Guide is a continuation of VMA providing valuable resources for the maritime business community. www.vamaritime.com/PortFacilities The VMA Commercial Marine Facilities Guide is an online reference tool for those doing business in Virginia, the Mid-West, or internationally. Our guide promotes the private and public marine cargo terminals and extensive cargo handling capabilities offered in Virginia’s Ports. Break Bulk Coal Container Dry Bulk Liquid Bulk Passenger Refrigerated RO/RO PORT FACILITIES
    [Show full text]
  • Marine Industrial Coatings, LLC Facilities/East
    VMA Tab 2 Port Facilities/East Coast Ad 2/21/14 8:53 AM Page 1 SHIP REPAIR & DRYDOCKS East Coast Repair and Fabrication is a marine repair facility. Our services include Ship Repair Dry-docks, state-of-the-art high capacity fabrication and extensive off-site mobile repair crews.. East Coast Repair and Fabrication, LLC is a leading force in the Marine, Industrial and Commercial sectors, specializing in: • Dry dock • Shop Fabrication • Mobile Repair Crews • Ship Alterations and Conversions • Small Boats • New Construction • Voyage Repairs CONTACT US P ORT East Coast Repair & Fabrication, LLC. Norfolk Virginia 757.455.9600 F [Emergency calls 757.342.4539] ACILITIES http://www.ecrandf.com EMPLOYMENT AGENCY Staffing Solutions Company committed to delivering the highest quality in services for the marine industrial and commercial markets. • Mid-Management • Supervisors • Skilled Trades • Labors Our standard: Total Customer Satisfaction! CONTACT US HORIZON | Chesapeake, Virginia 23325 PHONE: 757.965.4590 | TOLL FREE: 866.368.9273 | FAX: 757.965.7914 [email protected] | www.horizonservicesllc.com Marine Industrial Coatings, LLC Masters in coatings of marine and industrial equipment, components, structures and surfaces. Painting with Non-High Solids Q Blasting including Blast Protection Painting with 100% Solids Coatings Q Preparation and Preservation of Dampening Tiles Lead Abatement Q Blast and Paint Shop Facility for Raw Material or Fabricated Structures ~ MARINE COATINGS ~ CONTACT US >ÀiÊEÊ`ÕÃÌÀ>Ê >Ì}Ã]Ê °ÊÊNÊÊ*ÀÌÃÕÌ Ê6À}>ÊÓÎÇäÎ *"
    [Show full text]
  • Lake and River Port Facilities 6.6.1
    CHAPTER 6 6.6 LAKE AND RIVER PORT FACILITIES 6.6.1. INTRODUCTION Water ports, by nature, are inter‐modal. People and freight traveling by water must arrive and depart by another transportation mode. Inter‐modal connectors are roads that provide access to water ports or rail services. Truck and other vehicular congestion on or near the inter‐modal connections affect ports that rely on trucks for commodity transfer. Improvements to roadways that connect to ports increase the efficiency of ports, benefit trade, and contribute to employment growth and regional productivity. With statistics such as fourth, ⅓, 58.8 million and 5.7 billion – as in: • Fourth in the nation for total water tonnage moved • The Ohio River System accounting for ⅓ of all annual U.S. inland waterborne commerce by tonnage • The Lake Erie System annually accommodates 58.8 million tons of commodities moving to, from and within Ohio • $5.7 billion in the annual value of Ohio port shipments on Lake Erie In 2001, more than 58,800,000 tons of commodities moved to, from, and within Ohio on the Great Lakes; this was a 7% decline from 63.3 million tons from 1995. The annual value of Ohio port shipments on Lake Erie equals $5,700,000,000. Coal accounts for 22,000,000 tons (39%) of the state’s total traffic‐iron ore, and represents 13,200,000 tons (22%) of the State’s total Great Lake tonnage. There are no water ports located in either Mahoning or Trumbull Counties. However, the two Ports of Ashtabula and Conneaut are located on Lake Erie north of the Eastgate planning area in northern Ashtabula County.
    [Show full text]
  • Hopper Car -Wikipedia Page 1 of 2
    Hopper car -Wikipedia Page 1 of 2 Hopper car A hopper car (US) or hopper wagon (UIC) is a type of railroad freight car used to transport loose bulk commodities such as coal, ore, grain, and track ballast.[1][2][3] Two main types of hopper car exist: covered hopper cars, which are equipped with a roof, and open hopper cars, which do not have a roof. This type of car is distinguished from a gondola car in that it has opening doors on the underside or on the sides to discharge its cargo. The development of the hopper car went along with the development of automated handling of such commodities, with automated loading and unloading facilities. Covered hopper cars are used for bulk cargo such as grain, sugar, and fertilizer that must be protected from exposure to the weather. Open Two-bay hopper cars of the Reading hopper cars are used for commodities such as coal, which can suffer exposure with less detrimental effect. Hopper cars have been used by Railroad railways worldwide whenever automated cargo handling has been desired. "Ore jennies" is predominantly a term for shorter open hopper cars hauling taconite by the Duluth, Missabe and Iron Range Railway on Minnesota's Iron Range. A rotary car dumper permits the use of simpler and more compact (because sloping ends are not required) gondola cars instead of hoppers. Covered hoppers, though, are still in widespread use. 8/7/2018 Contents Special hopper trains Swedish iron ore hopper (mineral Typical American freight car weights and wheel loads onwagon), built in 1900 Etymology See also References External links Kambarka Engineering Works hopper car to transport track ballast, Special hopper trains Library 1 750 mm (2 ft 5 ⁄2 in) gauge The Coke Express, a unit train of hopper cars loaded with coke, with the words "Coke Express" painted on the sides of the hoppers.
    [Show full text]
  • Mrr 199801.Pdf
    Mechanical • threaded metal truss rods and turnbuckles • two precision 5-pole can motors • fully detailed trucks with brake beams and shoes • operating piston rods with reverse linkage • metal truck springs • complete operating metal valve gear • keyed stainless steel axles • diecast I-beam frames • chemically-blackened, machined-metal wheels with spokes • modular gear box with metal motor mounts • blackened screws • crankshaft and motor blocks made from engineering plastic • eight sealed ball bearing races (two per axle) Cab Detail and Lighting • all-wheel drive • directional headlight and backup light • gear reduction for prototypical slow-speed operation • interior cab light • removable cab roof Exterior Detail • flickering, load-synchronized LED's in firebox and ash pan • 3600 boiler (no parting lines) for realistic fire glow • smoke generator with on-off switch • sliding windows and operating roof hatch • finely detailed stack base with bolts • prototypically painted cab interior • hinged, blackened-brass screen spark arrester • engineer and fireman figures and seat boxes • cast metal whistle • complete backhead detail including steam gauge with piping, • machined brass pop valves and bell turret, throttle, sight glass, fittings and stay bolts, • bell and whistle cords operating firebox door and grate shaker • engraved builder's and number plates • operating coalboard • blackened metal handrails and stantions • miscellaneous tools and accessories • water siphon hose with detailed siphon head • super-detailed diecast air pump with unions, Support Material valves and metal piping • comprehensive video on Shay history • "poling pockets," front and rear and model maintenance • wood grain detail on deck, running boards and end beams • 36 page Owner's and Maintenance Manual • end beams with nut, bolt and washer detail • maintenance screwdriver • hinged ash pan grates • removable coupler shanks Ely Thomas Lumber Co.
    [Show full text]