Executive Sumary of the Full Environmental Assessment Of
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Durham E-Theses
Durham E-Theses Neolithic and chalcolithic cultures in Turkish Thrace Erdogu, Burcin How to cite: Erdogu, Burcin (2001) Neolithic and chalcolithic cultures in Turkish Thrace, Durham theses, Durham University. Available at Durham E-Theses Online: http://etheses.dur.ac.uk/3994/ Use policy The full-text may be used and/or reproduced, and given to third parties in any format or medium, without prior permission or charge, for personal research or study, educational, or not-for-prot purposes provided that: • a full bibliographic reference is made to the original source • a link is made to the metadata record in Durham E-Theses • the full-text is not changed in any way The full-text must not be sold in any format or medium without the formal permission of the copyright holders. Please consult the full Durham E-Theses policy for further details. Academic Support Oce, Durham University, University Oce, Old Elvet, Durham DH1 3HP e-mail: [email protected] Tel: +44 0191 334 6107 http://etheses.dur.ac.uk NEOLITHIC AND CHALCOLITHIC CULTURES IN TURKISH THRACE Burcin Erdogu Thesis Submitted for Degree of Doctor of Philosophy The copyright of this thesis rests with the author. No quotation from it should be published without his prior written consent and information derived from it should be acknowledged. University of Durham Department of Archaeology 2001 Burcin Erdogu PhD Thesis NeoHthic and ChalcoHthic Cultures in Turkish Thrace ABSTRACT The subject of this thesis are the NeoHthic and ChalcoHthic cultures in Turkish Thrace. Turkish Thrace acts as a land bridge between the Balkans and Anatolia. -
Environmental and Social Data Sheet
Luxembourg, 05 February 2013 Environmental and Social Data Sheet Overview Project Name: MARITSA MOTORWAY (FL20060411) Project Number: 20110478 Country: BULGARIA Project Description: Construction of 65.62km new dual carriageway motorway between Plodovitova and Hermanli thus completing the motorway connection between Sofia and the Turkish border on TEN corridors IV and X. EIA required: yes 1 Project included in Carbon Footprint Exercise : no (Details for projects included are provided in section: “EIB Carbon Footprint Exercise”) Summary of Environmental and Social Assessment, including key issues and overall conclusion and recommendation The project is part of the SOP-T which was subject to a strategic environmental assessment following Bulgarian legislation in accordance with SEA Directive 2001/42/EC. The Environmental report was approved in February 21st, 2007. The project falls under the incidence of Annex I of the EIA Directive 2011/92/EC as amended, and therefore subject to an EIA. The assessment process began prior to accession of Bulgaria to EU in the ‘90s with a first positive decision issued on 1994. The assessment was subsequently revised and new positive decisions issued in 2000 and 2007. In 2010 a further assessment was done and a new decision was issued in conformity with local legislation that enacts the relevant European Directives, including in relation with the Natura 2000 network. The project passes in close vicinity of four and crosses three Natura 2000 sites. Following the adoption of specific mitigation measures, the residual impact is expected to be not significant, as confirmed also by the competent authority. Following the application of the mitigation measures, the project will have major residual negative impacts specific to this type of infrastructure project, namely land take, severance and noise. -
Horizontal Issues and Legislative Procedures on 3Rd August, a Meeting of the Development Council Was Carried Out
Implementation of the Structural funds in Bulgaria Monthly brief, August-September 2011 Horizontal issues and legislative procedures On 3rd August, a meeting of the Development Council was carried out. There was a discussion on the priorities of the National Development Programme: Bulgaria 2020 (NDP), which were finally approved. On 20th September a meeting-discussion of the Inter-institutional Working group for the elaboration of the National Development Programme: Bulgaria 2020 was hold. The meeting included a presentation by an expert from the OECD, Mr. Jose Enrique Garcilazo, who presented some analytical findings of the publication Regional Outlook 2011, which provided important information that would be helpful in the process of preparation of the National Development Programme: Bulgaria 2020. On 27th September, a Round Table „From National Goals and Priorities of the National Development Programme: Bulgaria 2020 to Partnership Contract for Development and Investments 2014-2020” was hold in Sofia. A public discussion concerning the elaboration of the National Development Programme: Bulgaria 2020, its strategic goals and priorities, and the main areas of interventions, where the policy’ effects will be most important for the development of the country took place. The main participants of the academic society of the country were invited in the event and expressed their opinion on the process of preparation of the document. Regarding the financial corrections mechanism, a permanent interministerial work group for supporting the managing authorities will be established. The main tasks of the work group will be to discuss different cases where financial corrections will be imposed and to support methodologically the Managing Authorities regarding the process of imposing financial corrections under the OPs. -
Investment in Bulgaria 2018 | 121
Investment in Bulgaria 2018 | 121 Investment in Bulgaria 2018 KPMG in Bulgaria kpmg.com/bg © 2018 KPMG Bulgaria EOOD, a Bulgarian limited liability company and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), a Swiss entity. All rights reserved. Investment in Bulgaria Edition 2018 Investment in Bulgaria 2018 | 3 Preface Investment in Bulgaria is one of a series of booklets published by firms within the KPMG network to provide information to those considering investing or doing business internationally. Every care has been taken to ensure that the information presented in this publication is correct and reflects the situation as of April 2018 unless otherwise stated. Its purpose is to provide general guidelines on investment and business in Bulgaria. As the economic situation is undergoing rapid change, further advice should be sought before making any specific decisions. For further information on matters discussed in this publication, please contact Gergana Mantarkova, Managing Partner. KPMG in Bulgaria Sofia Varna 45/A Bulgaria Boulevard 3 Sofia Street, floor 2 1404 Sofia 9000 Varna Bulgaria Bulgaria Tel: +359 2 96 97 300 Tel: +359 52 699 650 Fax: +359 2 96 97 878 Fax: +359 52 611 502 [email protected] kpmg.com/bg © 2018 KPMG Bulgaria EOOD, a Bulgarian limited liability company and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), a Swiss entity. All rights reserved. -
Driving Restrictions, Goods Transport, 2019 Bulgaria Vehicles
Driving restrictions, goods transport, 2019 Bulgaria Vehicles concerned all goods vehicles over 15t Prohibition permanent till the end of the maintenance works Road concerned road I-1 between km 276+162 and km 282+485 Vehicles concerned all goods vehicles of over 12t total laden weight Prohibition permanent till the end of the maintenance works Road concerned road I-3 between km 193+345 (intersection with the road to Pravetz junction) and km 204+200 (intersection with I-1) Vehicles concerned all goods vehicles of over 15t total laden weight Prohibition permanent Road concerned road I-5, section Tchernootchene – Kardjali The vehicles concerned should use the following routes: · direction Haskovo – Kardjali: road I-5 – road III-505 – Manastir – road III- 507 – Voyvodino – Most – Tchiflik – Kardjali · direction Assenovgrad – Kardjali: road II-58 – road I-5, direction Haskovo – road III-505 – Manastir – road III-507 – Voyvodino – Most – Tchiflik – Kardjali · direction Mineralni Bani – Kardjali: road III-506 – road III-806 – road I-5 – road III-505 – Manastir – road III-507 – Voyvodino – Most – Tchiflik – Kardjali Vehicles concerned all goods motor vehicles of over 12t total laden weight (N3) and the towing of trailers and semi trailers with MPW over 10t (O4) Prohibition Permanent Road concerned I–5 between km 155+250 and km 184 +000 (Shipka Pass) The vehicles concerned should use the route Radnevo – road II-57 – Pet mogili – Novoselez – road II-55 – Mlekarevo – Radevo – Nova Zagora –– road I-6 – Gurkovo – Prohod na Republikata – Veliko Tarnovo. Vehicles concerned all goods vehicles of over 3.5t total laden weight Prohibition permanent till the end of the maintenance works Road concerned road I-5, section overbridge Kirkovo – Makasa Vehicles concerned all vehicles Prohibition permanent Road concerned I-7, section Varbishki Pass The vehicles concerned should use the Kotlenski Pass (I-4 road), the Rishki Pass (II-73 road) or the Prohod na Republikata Pass (road II-55). -
Driving Restrictions, Goods Transport, 2020 Bulgaria Vehicles Concerned
Driving restrictions, goods transport, 2020 Bulgaria Vehicles concerned all goods vehicles over 15t Prohibition permanent till the end of the maintenance works Road concerned road I-1 between km 276+162 and km 285+600 Vehicles concerned all goods vehicles of over 12t total laden weight Prohibition permanent till the end of the maintenance works Road concerned road I-3 between km 193+345 (intersection with the road to Pravetz junction) and km 204+200 (intersection with I-1) Vehicles concerned all goods vehicles of over 15t total laden weight Prohibition permanent Road concerned road I-5, section Tchernootchene – Kardjali The vehicles concerned should use the following routes: direction Haskovo – Kardjali: road I-5 – road III-505 – Manastir – road III-507 – Voyvodino – Most – Tchiflik – Kardjali direction Assenovgrad – Kardjali: road II-58 – road I-5, direction Haskovo – road III-505 – Manastir – road III-507 – Voyvodino – Most – Tchiflik – Kardjali direction Mineralni Bani – Kardjali: road III-506 – road III- 806 – road I-5 – road III-505 – Manastir – road III-507 – Voyvodino – Most – Tchiflik – Kardjali Vehicles concerned all goods motor vehicles of over 12t total laden weight (N3) and the towing of trailers and semi trailers with MPW over 10t (O4) Prohibition permanent Road concerned I–5 between km 155+250 and km 184 +000 (Shipka Pass) The vehicles concerned should use the route Radnevo – road II-57 – Pet mogili – Novoselez – road II-55 – Mlekarevo – Radevo – Nova Zagora – road I-6 – Gurkovo – Prohod na Republikata – Veliko Tarnovo. Vehicles concerned all goods vehicles of over 3.5t total laden weight Prohibition permanent till the end of the maintenance works Road concerned road I-5, section overbridge Kirkovo – Makasa Vehicles concerned all vehicles Prohibition permanent till the end of the maintenance works Road concerned I-7, section Varbishki Pass The vehicles concerned should use the Kotlenski Pass (I-4 road), the Rishki Pass (II-73 road) or the Prohod na Republikata Pass (road II-55). -
Granting of a Concession for Trakia Motorway Interimreport
GRANTING OF A CONCESSION FOR TRAKIA MOTORWAY I N T E R I M R E P O R T __________________________________________________________________ OF THE INVESTIGATION OF TRANSPARENCY INTERNATIONAL – BULGARIA ON THE PROBLEMS RELATED TO THE CONSTRUCTION OF TRAKIA MOTORWAY AS A PUBLIC-PRIVATE PARTNERSHIP BETWEEN THE REPUBLIC OF BULGARIA AND AVTOMAGISTRALA TRAKIA JOINT- STOCK COMPANY SOFIA APRIL 2005 1 CONTENTS I. INTRODUCTION page 3 II. GENERAL OBSERVATIONS AND OBSERVATIONS ON THE TRANSPARENCY OF THE PROCEDURE page 5 III. LEGALITY OF THE PROCEDURES IN THE GRANTING OF THE TRAKIA MOTORWAY CONCESSION page 8 IV. FEASIBILITY OF THE CONTRACT ON THE GRANTING OF THE TRAKIA MOTORWAY CONCESSION page 15 V. CONCLUSION page 29 ANNEXES 2 I. INTRODUCTION This Transparency International – Bulgaria investigation has an exceptional nature. In its practice of observing and investigating privatization and investment projects initiated by the Bulgarian state during the last seven years, Transparency International has always followed the rules, which our international organization applies in its cooperation with the democratic state institutions around the world. These rules include an invitation and the establishment of official relations with the Government in the specific project or contract, the concluding of a cooperation agreement, on the grounds of which our experts gain access to the official documentation, against a confidentiality clause until the final concluding of the deal. The process ends with the publishing of an official report of our organization, which contains an assessment regarding the compliance with the criteria for transparency and legality of the procedures and the final results of the deal. Transparency International’s positive assessment has always been a reliable certificate for the ability of the state institutions to restrict corruption and the conflict of interest in public relations. -
N O CULTURAL SITE LOCATION SHORT DESCRIPTION 1 Museum
Седалище: 6300 Хасков о, у л. „Цар Осв ободител“ 4 Адрес за кореспонденция: Бизнес Инку батор, 6310 Клокотница, Община Хасков о тел: ++359 38 66 50 21; факс: ++359 38 66 48 69 e-mail: [email protected] o www.maritza.inf o N CULTURAL SITE LOCATION SHORT DESCRIPTION o The Historical Museum in Dimitrovgrad is a cultural and scientific institute established in 1951. It is the first museum in Bulgaria for contemporary history. According to its profile it is a comprehensive history museum and has the following departments: - Modern and Most Recent History Department - Ethnography Department - Arts Department - Petko Churchuliev Arts Gallery; - Affiliate - Penyo Penev House Museum - Department of Archaeology. Today it showcases artefacts from the Neolithic Age to modern times, displayed in four exhibition halls. 1 Museum of History town of Dimitrovgrad The hall entitled "Youth-brigade movement in Bulgaria" is one of a kind in Bulgaria, focusing on a complicated and controversial period of the country's recent past – the time frame 1945-1990. Brigade members' uniforms, flags, awards, photos depicting the daily life of youth brigade members, and other items reveal the history of this movement and immerse visitors in the spirit of the times. The Dimitrovgrad Hall reveals the construction of one of Bulgaria's youngest cities, which became a symbol of Socialism in the 1950s. The Archaeology Hall showcases artefacts testifying to the life in the settlements in Dimitrovgrad Municipality, some of which have had a continuous development since the Neolithic period (6th century BC) to the present day. Part of the museum's fund is known as the "Neolithic man" discovered in 2009 during archaeological rescue excavations of the medieval settlement in the Kar Dere locality near the village of Krum close to Dimitrovgrad. -
Annex 1.4. Identified Sites in Terms Oftheir the Historical Periododi- Zation
Седалище: 6300 Хасков о, у л. „Цар Осв ободител“ 4 Адрес за кореспонденция: Бизнес Инку батор, 6310 Клокотница, Община Хасков о тел: ++359 38 66 50 21; факс: ++359 38 66 48 69 e-mail: [email protected] o www.maritza.inf o ANNEX 1.4. IDENTIFIED SITES IN TERMS OFTHEIR THE HISTORICAL PERIODODI- ZATION PERIOD PREHISTORIC /2.5 million years ago - 3300/3000 BC./ Dolmen acropolis, Oryahovo village and Vaskovo village, Lyubimets Prehistoric Thracian Fortress "Golyamo Gradishte", Gorno Bryastovo village, Mineral bani Sunny Clock, Mineralni bani village, Mineral bani Dolmen, Studena village, Kapaklia, Svilengrad municipality Prehistoric and proto-historical yam complex, Kapitan Andreevo village, "Hausa" village, Svilengrad ANCIENT /3300/3000 BC until 800BC/ Thracian Dolmen, village of Zhelezino, Ivailovgrad Rock cult complex "Deaf Rocks", Dabovets village and Malko Gradishte village, Lyubimets municipality Thracian domed tomb, village of Valche pole, municipality of Lyubimets Step foot, village of Oryahovo, municipality Lyubimets Thracian Fortress and Sivri Dikme Shrine, Gorno Pole, Madzharovo Municipality The step of the Virgin Mary, village of Mineralni bani Antique and Medieval Settlement, Svilengrad, Hissarya near the Kanacliiski neighbourhood Tombstone Mound, village of Madjari, Stambolovo Rock Tomb, Popovets, Hambar Tash Area, Stambolovo Tombstone mound, Popovets village, Stambolovo Mogilen necropolis, Stambolovo village, "Dvete Chuki", municipality Stambolovo Mogilev necropolis, Stambolovo village, Illyraska gora municipality Stambolovo -
Industrial Zones Available for Development
INDUSTRIAL ZONES AVAILABLE FOR DEVELOPMENT Table of Contents Sofia ........................................................................................................................................................... 2 Sofia West ................................................................................................................................................. 4 P@rk "Plovdiv" ........................................................................................................................................... 6 Assenovgrad ............................................................................................................................................ 8 Gabrovo ................................................................................................................................................. 10 Svilengrad............................................................................................................................................... 12 Varna West ............................................................................................................................................. 14 Dobrich ................................................................................................................................................... 16 Ihtiman .................................................................................................................................................... 18 Levski ...................................................................................................................................................... -
Early Farming Communities. Spatial Organization and Variability in the Form of the Neolithic Settlements in Southern Bulgaria
EARLY FARMING COMMUNITIES. SPATIAL ORGANIZATION AND VARIABILITY IN THE FORM OF THE NEOLITHIC SETTLEMENTS IN SOUTHERN BULGARIA. Eugenia Orfanidou SCHOOL OF HUMANITIES A thesis submitted for the degree of Master of Arts (MA) in Black Sea Cultural studies January 2016, Thessaloniki, Greece International Hellenic University School of Humanities Black Sea Cultural studies Student name: Orfanidou Eugenia SID: 2201130016 Supervisor: Prof. Duska Urem-Kotsou I hereby declare that the work submitted is mine and that where I have made use of another’s work; I have attributed the source(s) according to the Regulations set in the Student’s Handbook. © January 2016, Eugenia Orfanidou, 2201130016 No part of this dissertation may be copied, reproduced or transmitted without the author’s prior permission. January 2016 Thessaloniki – Greece ii ABSTRACT This dissertation was written as part of the MA in Black Sea Cultural Studies at the International Hellenic University. For the purpose of this study English, German, Greek, French, Serbian and Bulgarian bibliography was used, as also information from the internet. The study focus on the region of South Bulgaria during the Neolithic period, with particular reference to the settlements, their form, distribution and intra-site organization. The study aims at better understanding of the variability in the habitation patterns and the organization of the early farmers in this particular region. To this end general characteristic of the environment and the landscape will be taken into consideration. Details regarding material culture and architectural remains will be also presented. Material culture will be further examined in order to approach the issues of interaction of early farming communities on intra- and inter-regional level. -
22.4.2013 Г. 1 Strategic Framework TEN-T Development T Development
22.4.2013 г. MINISTRY OF TRANSPORT, TRACECA ––ImportantImportant Transport INFORMATION TECHNOLOGY AND COMMUNICATIONS REPUBLIC OF BULGARIA Corridor for Bulgaria REPUBLIC OF BULGARIA –– PRIORITY LINKS AND PROJECTS Dimitar Savov National TRACECA Secretary and Director of the National Transport Policy Directorate 17 April 20201133 MTITC – REPUBLIC OF BULGARIA Strategic Framework TENTEN--TT Development Strategy for the Development of the Transport TEN-T – an important element of the Bulgarian System of the Republic of Bulgaria until 2020 transport policy Operational Programme on Transport 2007-2013 TEN-T Green Paper General Transport Master Plan for Bulgaria Revision of the TEN-T Guidelines Improvement the Transport Connectivity and the Priority development of common interest projects Market Access: Priority 8 from the National with European added value Programme for Development of the Republic of TEN-T planning in 2 layers: Bulgaria: Bulgaria 2020 Core network – includes the most important Strategy for Development of the Transport international links in EU Infrastructure of the Republic of Bulgaria through Comprehensive network – feeds into and distributes the Concession Schemes traffic from the core network MTITC – REPUBLIC OF BULGARIA MTITC – REPUBLIC OF BULGARIA 1 22.4.2013 г. TENTEN--TT Objectives Ensuring the sustainable mobility of persons and goods within an area without internal frontiers in respect to the social and safety conditions, environmental protection and competition Strengthening the economic and social cohesion