Feasibility Study for Multi-Purpose Trail Lower Plenty to Viewbank

Total Page:16

File Type:pdf, Size:1020Kb

Feasibility Study for Multi-Purpose Trail Lower Plenty to Viewbank FEASIBILITY STUDY FOR MULTI-PURPOSE TRAIL LOWER PLENTY TO VIEWBANK MAY 2019 Feasibility undertaken by Parks and Recreation Consulting on behalf of Banyule City Council Executive Summary The Lower Plenty to Viewbank Multi-purpose Trail metres wide and will span 40 metres across the river Feasibility Study has been prepared to generate in order to sit above the Melbourne Water 1 in 10 flood information, responses and opinions from community requirements. On either side of the pedestrian bridge groups, individuals and stakeholders in relation to a structure will be raised deck transition sections leading possible multi-purpose trail development along the onto the bridge, designed to comply with the 1 in 100 existing pipeline reserve between Lower Plenty and flood level infrastructure controls. The raised sections Viewbank. The process provides an initial assessment as will extend for 40 metres on either side of the pedestrian to the merits of the proposed trail and the challenges or bridge. The trail surface east of the pedestrian bridge opportunities that it might generate for the surrounding crossing and raised section will be a 3-metre-wide residents and for the wider community. granitic sand or toppings surface through to Bonds Road. The western section of the trail from the river crossing The proposed multi-purpose trail will run along the west to the Plenty River Trail intersection will follow the Melbourne Water pipeline reserve between the Bonds existing 3-metre-wide gravel roadway and will not need Road Rosehill Road corner in Lower Plenty and the any new surface treatment. Plenty River Trail crossing on Martins Lane, Viewbank. The proposed trail will follow the water pipeline reserve The total cost of the proposed trail is estimated at heading west from Lower Plenty down to the Plenty $537,000. The largest investment component of the River, across a new pedestrian bridge crossing with project being the pedestrian bridge crossing over the raised deck trail sections, and continue to the west along Plenty River and the raised decking transitions up to the the existing gravel Martins Lane roadway to the Plenty bridge. Although this cost is significant, it compares well River Trail intersection. The trail will offer a picturesque with other river-based trail projects due to the pipeline and aesthetic experience for all those who travel along it. reserve course being clear and gradual. The opportunity also exists to share some costs with funding partners The consultation process generated a positive response that have accessibility to open spaces and trails as part to the proposal, with a range of benefits suggested as of their charters. a result of the trail development. A large number of community responses were compiled, that when tested The feasibility examined the proposed multi-purpose in conjunction with an analysis of the surrounding trail on the basis of five key criteria being: residential catchment, suggested that the trail would 1. Response to Identified Community Need have an estimated 280 uses per week. This usage would likely be shared between those walking or running along 2. Future Use Potential the trail and those riding a bike. A small number of horse 3. Project Cost Consideration riders may utilise the trail but this would depend on the final infrastructure provided and how that supports the 4. Project Risk accessibility for horse and riders. 5. Project Funding Potential The trail use would be busiest on weekends, with many On the basis of these five criteria, the project is users seeking to link up to existing trail networks or the considered highly feasible. The trail will traverse along parklands at the Viewbank end of the trail. An analysis a lineal reserve, through conservation parklands, a river of the pipeline reserve and adjacent land uses confirms crossing and alongside a golf course and Council park. that the trail alignment would be an aesthetic travel path This location provides the ideal scenario for a local that would encourage walkers to walk the trail purely for trail to provide health and social benefits for the local the experience. Although the steepness of one section community as well as providing a link for transit onto the along the trail adjacent to the Heidelberg Golf Course Plenty River Trail and to other community resources and would create some challenge for bike riders due to the facilities. In this way the proposed trail will be a welcome long steep rise. piece of infrastructure that is consistent with the The proposed trail will pass through land that is subject directions presented in Council’s long-term community to flooding adjacent to the Plenty River. A proposed plans and strategies. flat steel beam pedestrian bridge crossing will be 2.5 Contents 1. Introduction & Background 2 1.1 Feasibility Study Purpose 3 1.2 Project Aims 3 1.3 Methodology 4 1.4 Consultation and Engagement Process 4 1.5 Project and Site History 4 2. Strategic Context 6 2.1 Review of previous studies or concepts 7 2.2 Reference to Council Strategy Documents 8 2.3 Planning Controls 9 3. The Proposed Trail Purpose and Potential Use 12 3.1 Proposed Trail Users 13 3.2 Proposed Trail Values & Benefits 14 3.3 Consultation & Stakeholder Feedback 15 3.4 Defining Shared Trail Development Requirements 22 3.5 Shared Trail Design Standards 24 3.6 Community profile around the Lower Plenty and Viewbank region 25 3.7 Current Recreation Trends 27 4. Proposed Trail Alignment Analysis 28 4.1 Trail Alignment 29 4.2 Trail Head Accessibility 34 4.3 Pipeline Reserve Infrastructure 43 4.4 River Crossing Analysis 44 4.5 Shared Use of Proposed Trail Analysis 47 5. Summary of Key Issues 48 6. Options Assessment 50 6.1 Options for Consideration 51 6.2 Infrastructure Options 52 6.3 Recommended Development 54 7. Feasibility Assessment 56 7.1 Response to Identified Community Need 57 7.2 Future Use Potential 58 7.3 Project Cost Consideration 59 7.4 Project Risk Assessment 60 7.5 Project Funding Potential 61 8. Possible Implementation Process and Strategy 62 9. List of Summary Findings and Recommendations 64 10. Appendices 66 10.1 List of Tables 67 10.2 List of Figures 67 10.3 List of Consultations 67 10.4 References 67 10.5 Images 67 Parks & Recreation Consulting 01 1 Introduction & Background This section provides an introduction into the feasibility study analysis. The main drivers and the objective of the project is described to provide context to the study. This section also confirms the methodology and the process by which key stakeholders have been engaged in the study process. 1.1 Feasibility Study Purpose 1.2 Project Aims This feasibility study provides a situation analysis and 1. To assess, analyse and document the capability feasibility assessment for a proposed multi-purpose of the proposed Lower Plenty to Viewbank multi- trail development between Lower Plenty and Viewbank purpose trail to deliver community benefits and along the Melbourne Water pipe track reserve. The opportunities. investigation and consultation process assesses 2. To investigate and examine the infrastructure the scale of community need, identifies the options requirements to implement a proposed Lower Plenty and considerations for the trail infrastructure and to Viewbank multi-purpose trail. acknowledges constraints or challenges that may exist along the proposed trail path. 3. To collate feedback of stakeholders and the general community in order to inform Council as to the The document includes an assessment of the overall community response to the proposed multi-purpose feasibility of the proposed trail in response to the needs trail. analysis findings, the location and site specifics, the scope of the trail infrastructure required, the feedback 4. To provide an assessment of the feasibility of the from stakeholders and the relationship to other trails and proposed multi-purpose trail on the basis of cost and pathways. The feasibility also provides information as benefit analysis. to the implications for Council including an assessment of capital investment required and a description of the relationships required to develop a community trail on government agency land. Figure 1 - Proposed Multi-purpose Trail Alignment Parks & Recreation Consulting 03 1.3 Methodology The development of this document includes a number of defined processes. These processes gather information, feedback and opinion and then analyse the collected data into a set of conclusions from which to recommend future directions for the multi-purpose trail. The methodology included the following: 1. Stakeholder consultation, engagement and needs investigation 2. Examination of potential future use 3. Trail connections and capabilities review 4. Trail infrastructure requirements investigation 5. Resident and community engagement and feedback 6. Trail reserve condition analysis 7. Options assessment and discussion 8. Design review and costing 9. Feasibility assessment 1.4 Consultation and Engagement Process The consultation and engagement process for this study involved an initial individual consultation with stakeholder groups and authorities to ascertain the possibilities and needs in relation to the proposed trail. This was followed by locality specific consultations for those closest to the proposed trail to acknowledge and reflect on their suggestions, concerns or objections. A broad community wide consultation was also undertaken, which provided the opportunity for all residents, or visitors, to provide feedback in to the feasibility process. Opportunities to provide feedback was therefore provided through set engagements, through topical letters of engagement and also through general community consultation via the ‘Shaping Banyule’ community engagement site. 1.5 Project and Site History Council’s process of community engagement for its public open space strategy and also for its Walking Strategy raised the concept of a possible trail along the Melbourne Water pipeline reserve from Lower Plenty to Viewbank.
Recommended publications
  • Cycling Into the Future 2013–23
    DECEMBER 2012 CYCLING INTO THE FUTURE 2013–23 VICTORIA’s cyCLING STRATEGY Published by the Victorian Government, Melbourne, December 2012. © State of Victoria 2012 This publication is copyright. No part may be reproduced in any process except in accordance with the provisions of the Copyright Act 1968. Authorised by the Victorian Government Melbourne Printing managed by Finsbury Green For more information contact 03 9655 6096 PAGE III CYCLING INTO THE FUTURe 2013–23 VICTORIA’s CYCLING STRATEGY CONTENTS Minister’s foreword v Executive summary vi 1 Cycling in Victoria 1 2 Growing cycling in Victoria 5 Current cycling patterns 5 Potential growth 5 3 Benefits of cycling 8 Healthier Victorians 8 Better places to live 9 Stronger economy 9 Healthier environment 10 4 Strategic framework 11 Direction 1: Build evidence 12 Direction 2: Enhance governance and streamline processes 14 Direction 3: Reduce safety risks 16 Direction 4: Encourage cycling 20 Direction 5: Grow the cycling economy 22 Direction 6: Plan networks and prioritise investment 24 5 Implementation, monitoring and evaluation 29 Appendix 1: Cycling networks, paths and infrastructure 30 PAGE IV CYCLING INTO THE FUTURe 2013–23 VICTORIA’s CYCLING STRATEGY Some of our work in metropolitan Melbourne includes: > a new bridge on the Capital City Trail at Abbotsford > bike lanes along Chapel Street > extensions and improvements to the Federation Trail, Gardiner’s Creek Trail and Bay Trail on Beach Road > Jim Stynes Bridge for walking and cycling between Docklands and the CBD along the Yarra River > Heatherton Road off-road bike path from Power Road to the Dandenong Creek Trail > a bridge over the Maroondah Highway at Lilydale > bike connections to Box Hill and Ringwood > Parkiteer bike cages and bike hoops at 16 railway stations > Westgate Punt weekday services > bike paths along the Dingley Bypass, Stud Road, Clyde Road and Narre Warren – Cranbourne Road > bike infrastructure as part of the Regional Rail Link project > a new trail in association with the Peninsula Link.
    [Show full text]
  • Rides Supplement
    Rides Supplement Camberwell Downhill Gourmet Bike Riders February Ride: Southern Suburbs Date : Sunday 17 th February Meet : Ashburton Station, west side at 9.30am The Ride : We’ll follow the Anniversary Trail south, cross to East Malvern Station then ride via the Urban Forest to Hughesdale Station and pick up the Rosstown Rail Trail. We’ll leave this at Gardenvale and from there follow the Elster and Elwood canals to the Bay. Here we’ll turn north and head up to Beaconsfield Pde. We’ll turn at Pickles St to head for the Gasworks Arts Park and thence to Albert Park where we’ll take a turn around the lake. From there we’ll head up to St Kilda Rd and move onto the tan. This will take us to the Yarra trail and we’ll follow this and the Gardiners Creek Trail back to Ashburton. Refreshments : We’ll stop for a morning coffee at Gardenvale; bring a picnic lunch to have in one of the parks along the way Distance : ~45; Bail outs at Gardenvale and Richmond Contingency plans : If the forecast max is over 30 the ride will be cancelled. For further information contact : Julia Blunden, email: [email protected] . Phone: 9853 5095; Mobile: 0408 501 082 Other Rides for 2008 March 16 th: David & Geraldine - Southbank to Ricketts Point; April 20 th ?; May 18 th , Graeme; June 15 th, David & Geraldine; July 20 th ?; August 17 th ?; September 21 st Val; October 19 th Jack Simpson; November 16 th David & Geraldine Dinners July 11 th ; November 21st Hawthorn Cycle Tours Hawthorn Cycle Tours (run by the Hawthorn Aquatic and Leisure Centre) has 10 bikes (and helmets) available.
    [Show full text]
  • Rides Supplement August 2013
    Rides Supplement August 2013 Ashburton Riders Club ARC is an informal group of cyclists from (mostly), the Ashburton, Glen Iris and Camberwell area who ride for fun, fitness and good company. We seek to be inclusive of, and helpful to, all riders (male and female) and of differing fitness levels. We have approximately 70 cyclists on our email list. We have a regular Sunday 7am ride to Black Rock for coffee. However, there are always more rides of shorter and longer distances and on other days. These alternative rides are organised by ARCers posting a notice on the ARC Forum. We enter many of the main organised rides in Victoria such as Around the Bay, the Great Divide Ride and Amy's Ride. You are welcome to join us for a ride. Schedule of rides: Sunday (every week), 7am to Black Rock for coffee (44k) Monday (every week) Hawthorn velodrome leaving from 8 Audrey Cr at 6.10am, return 7am Tuesday (every week) Carnegie velodrome leaving 6 Rosedale Rd at 6.10am, return 7am Other Rides will appear here if advised to ARCer1 via a Forum message prior to Wednesday 5:00 pm . Rides start from Ashburton Railway Station car park, west/city side of the track unless otherwise stated. Contacts: Tony Landsell’ email: [email protected] or Justin Murphy, email: [email protected] Kew Neighbourhood Learning Centre Bike Riding Group Get back into cycling. Explore the Yarra bike paths. Make sure you have checked your bike is in working order before you come. Rides are between 15km -25km.
    [Show full text]
  • North East Link (NEL) Traffic and Transport Review Expert Evidence Statement
    North East Link (NEL) Traffic and Transport Review Expert Evidence Statement Prepared by: GTA Consultants (VIC) Pty Ltd for North East Link Project on 15/07/19 Reference: V153791 Issue #: Final North East Link (NEL) Traffic and Transport Review Expert Evidence Statement Client: North East Link Project Instructed by: Clayton Utz Hearing Date: 25/07/19 Report Date: 15/07/19 Reference: V153791 Issue #: Final © GTA Consultants (VIC) Pty Ltd [ABN 34 137 610 381] 2019 The information contained in this document is confidential and intended solely for the use of the client for the purpose for which it has been prepared and no representation is made or is to be implied as being made to any third party. Use or copying of this document in whole or in part Melbourne | Sydney | Brisbane without the written permission of GTA Consultants constitutes an infringement of copyright. The intellectual property contained in this Adelaide | Perth document remains the property of GTA Consultants. CONTENTS Introduction 1 1.1. Introduction 1 1.2. Qualifications and Experience 1 1.3. Relationship to Applicant 1 1.4. GTA Peer Review of the TTIA 1 1.5. Further Work Since Preparation of the GTA Peer Review Report 2 1.6. Expert Evidence Statement Scope & Purpose 3 1.7. References 6 1.8. Consideration of Submissions 6 1.9. Summary of Key Issues, Opinions and Recommendations 6 1.10. Declaration 13 Project Background 14 2.1. Introduction 14 2.2. Project Rationale 14 2.3. Key Transport Issues Sought to be Resolved by NEL 18 2.4. Public Works Order 23 2.5.
    [Show full text]
  • Newsletter September 2004 BBUG Meetings Are on the 2Nd Thursday of Each Month, Except January
    Newsletter September 2004 BBUG meetings are on the 2nd Thursday of each month, except January. Next meeting: 7.30pm Thursday 9th September at Swinburne, Hawthorn Campus, TD building (between Park and Wakefield Streets) room TD246. Bikes can be taken upstairs and safely parked near meeting room. At the September meeting we welcome guest Duncan McGregor, chairman of the City of Whitehorse Bicycle Advisory Committee. We have lots in common – Mont Albert Road cycle route in particular. The Boroondara Bicycle Users’ Group (BBUG) is a voluntary group working to promote the adoption of a safe and practical environment for community and recreational cyclists in the City of Boroondara. We have close links with the City of Boroondara, Bicycle Victoria, Bicycle Federation of Australia and other local Bicycle Users’ Groups. BBUG has a web site www.vicnet.net.au/~bdarabug that contains interesting material related to cycling, links to other cycle groups and recent BBUG Newsletters. We also have two Yahoo Groups: Send a blank e-mail to [email protected] to receive this monthly newsletter and occasional important messages. Send a blank e-mail to [email protected] to monitor or join in an ongoing discussion of bike related issues both local and general. All articles in this newsletter are the views and opinions of the authors and do not necessarily represent the views of any other members of BBUG. All rides publicised in this newsletter are embarked upon at your own risk. Boroondara News Boroondara Council votes to implement Principal Bicycle Network in Boroondara On Monday 23 August 2004 Boroondara Council voted to support a plan for the development of the Principal bicycle Network (PBN) in the municipality.
    [Show full text]
  • Northern Metro Region Five Year Plan for Jobs, Services and Infrastructure 2018–2022
    Northern Metro Region Five Year Plan for Jobs, Services and Infrastructure 2018–2022 Northern Metro Region © The State of Victoria Department of Environment, Land, Water and Planning 2018 This work is licensed under a Creative Commons Attribution 4.0 International licence. You are free to re-use the work under that licence, on the condition that you credit the State of Victoria as author. The licence does not apply to any images, photographs or branding, including the Victorian Coat of Arms, the Victorian Government logo and the Department of Environment, Land, Water and Planning (DELWP) logo. To view a copy of this licence, visit creativecommons.org/licenses/by/4.0/ Printed by (Impact Digital, Brunswick). ISBN 978-1-76077-189-8 (Print) ISBN 978-1-76077-190-4 (pdf/online/MS word) Disclaimer This publication may be of assistance to you but the State of Victoria and its employees do not guarantee that the publication is without flaw of any kind or is wholly appropriate for your particular purposes and therefore disclaims all liability for any error, loss or other consequence which may arise from you relying on any information in this publication. Accessibility If you would like to receive this publication in an alternative format, please telephone the DELWP Customer Service Centre on 136 186, or email [email protected] (or relevant address), or via the National Relay Service on 133 677, www.relayservice.com.au. This document is also available on the internet at www.delwp.vic.gov.au. Office for Suburban Development Aboriginal acknowledgement The Victorian Government proudly acknowledges Victoria’s Aboriginal community and their rich culture and pays respect to their Elders past and present.
    [Show full text]
  • Northern Regional Trails Strategy 2016
    Northern Regional Trails Strategy 2016 Councils of Banyule, Darebin, Hume, Moreland, Nillumbik and Whittlesea Councils of Banyule, Darebin, Hume, Moreland, Nillumbik, Whittlesea and Yarra Northern Regional Trails Strategy Final Report Final | 6 June 2016 Councils of Banyule, Darebin, Hume, Moreland, Nillumbik, Whittlesea and Yarra Northern Regional Trails Strategy Final Report Final | 6 June 2016 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility is undertaken to any third party. Job number 237101-00 Arup Arup Pty Ltd ABN 18 000 966 165 Arup Level 17 1 Nicholson Street Melbourne VIC 3000 Australia www.arup.com This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility is undertaken to any third party. Job number 237101-00 Arup Arup Pty Ltd ABN 18 000 966 165 Arup Level 17 1 Nicholson Street Melbourne VIC 3000 Australia www.arup.com Councils of Banyule, Darebin, Hume, Moreland, Nillumbik, Whittlesea Northern Regional Trails Strategy and Yarra Contents Page Executive Summary 2 1 Introduction 7 2 Value of recreation trail networks 10 2.1 Social value 10 2.2 Transport value 11 2.3 Economic value 12 2.4 Environmental value 13 2.5 Network scale benefits 14 3 Approach 16 3.1 GIS database compilation 16 3.2 Design guidelines 17 3.3 Verification of existing trails 20 4 Multi-criteria analysis
    [Show full text]
  • The Middle Yarra Concept Plan
    THE MIDDLE YARRA CONCEPT PLAN BURKE ROAD TO WATSONS CREEK STATE GOVERNMENT OF VICTORIA JULY 1991 The Middle Yarra Concept Plan (Stage 2) Burke Road to Watsons Creek July 1991 ■_117. State Government of Victoria Foreword The vision of a green network of linear parks lining Conservation and Environment's Warrandyte State Park. Melbourne's waterways from the Bay to the Ranges is The Board of Works, through "Open Space 2000", is becoming a reality. The Middle Yarra Concept Plan now preparing'A management plan for the Yarra Valley (Burke Road to Watsons Creek) completes the series of Metropolitan Park, which will further develop these concept plans for the Yarra Valley and provides a broad concepts into a detailed plan for this major park co-ordinated approach to the enhancement, protection consistent with the concept plan. and management of these priceless assets. The full implementation of these plans will take many The Middle Yarra River is a place of enormous contrasts. years, both for the completion of the land acquisition The valley changes from an almost pristine bushland program and development of the parks to their optimum environment in Kangaroo Ground and Warrandyte to a relatively urbanised setting in Templestowe and Heidelberg. Even the Heidelberg parklands, however, The planning controls associated with this concept plan retain some of the natural charm and landscape aim to discourage inappropriate urban development and character made famous by the Heidelberg School of will ensure that the special character of the Middle Yarra painters. Valley is not compromised: The middle section of the river (between Fitzsimons Much of the initiative for this concept plan stemmed Lane and Pound Bend) is largely inaccessible and from the late Mr Alan Bunbury, former chairman of the unknown to the public at this stage, but provides a Middle Yarra Advisory Committee.
    [Show full text]
  • ``Banyule Bicycle User Group—Rides Program
    ``BANYULE BICYCLE USER GROUP—RIDES PROGRAM Rides start 9am from Heidelberg Park (Melway ref 32 B4) except where indicated. A reasonable level of riding fitness is assumed. Visitors are welcome to ride with us. December 2004 Sun 5Sandridge Beach. 50 km. Yarra Trail, Collingwood, Southbank to beach. Return via Lorimer St, Docklands, Royal Park (H1). Tue 7Strathewen Meet at train station(s). Depart 9.00 am train from Heidelberg (9.03 Rosanna) for Hurstbridge. Ride via Arthur's Creek to Strathewen for break (no shops or facilities). 36 km out and back to H'bridge. Undulating, with 1 x H2. Train or ride (28 km) home. Sun 12 Warburton Trail. 8 am start and a self-catering ride. Ride to Box Hill station (10 km) and catch 9.09 am train to Lilydale. Ride the Rail Trail to Warburton (37 km) and return. Some riders may opt for a shorter ride and turn back at an intermediate point. At the latest, catch the 4.17 pm train from Lilydale and, finally, ride home from Box Hill or other station. Tue 14 Westmeadows ~65 km. 9.30 am start. Capital City and Moonee Ponds Creek Trails to Westmeadows Tavern for lunch. Any drinks break en route will be self-catering. Sun 19 Ceres 45 km. To Fairfield by Yarra Trail, then Merri Creek Trail to Ceres for break. Continue on Merri Creek Trail to Broadhurst Av exit and Reservoir streets to Darebin Trail. Tue 21 Riders' Choice January 2005 Riders' Choice rides will operate on Tuesdays and Sundays through January, commencing Tues.
    [Show full text]
  • Yarra Valley Parklands Management Plan, Parks
    For more information contact the Parks Victoria Information Centre on 13 1963, or visit www.parkweb.vic.gov.au Yarra Valley Parklands Management Plan November 2008 YARRA VALLEY PARKLANDS MANAGEMENT PLAN A Victorian Government Publication. This publication is copyright. No part may be reproduced by any process except in accordance with the provisions of the Copyright Act 1968. Published in November 2008 by Parks Victoria Level 10, 535 Bourke Street, Melbourne, Victoria 3000 National Library of Australia Cataloguing-in-Publication entry Parks Victoria Yarra Valley Parklands Management Plan ISBN 978 0 7311 8379 1 1. National parks and reserves --Victoria --Yarra Valley --Management. 2. Yarra Valley Park (Vic.) --Management. 333.783099452 Acknowledgements Acknowledgement of Country: In their rich culture, Indigenous Australians are intrinsically connected to the continent — including the area now known as Victoria. Parks Victoria recognises that the parklands are part of Country of the Traditional Owners. Disclaimers This plan is prepared without prejudice to any negotiated or litigated outcome of any native title determination applications covering land or waters within the plan’s area. It is acknowledged that any future outcomes of native title determination applications may necessitate amendment of this plan; and the implementation of this plan may require further notifications under the procedures in Division 3 of Part 2 of the Native Title Act 1993 (Cwlth). The plan is also prepared without prejudice to any future negotiated outcomes between the Government/s and Victorian Aboriginal communities. It is acknowledged that such negotiated outcomes may necessitate amendment of this plan. Every effort has been made to ensure that the information in this plan is accurate.
    [Show full text]
  • IN the MATTER of North East Link - Environmental Effect Statement Independent Assessment Committee – Panel Hearing
    IN THE MATTER OF North East Link - Environmental Effect Statement Independent Assessment Committee – Panel Hearing STATEMENT BY NATALIE MACDONALD VICE-PRESIDENT (STRATEGY & DEVELOPMENT) LA TROBE UNIVERSITY INTRODUCTION 1. Since its establishment in 1967, La Trobe’s Melbourne Campus has played a crucial role in shaping the city’s north. 2. The relationship between our campus and the surrounding areas is extremely important. It forms the heart of our vision for the future, and these valuable connections will be vital in the next chapter of our story. 3. The role of La Trobe University has been recognised in successive Metropolitan Strategies including Melbourne 2030, Shaping Melbourne’s Future, and Plan Melbourne. 4. Globally, La Trobe University is ranked in the top 1.2% of universities. We offer a diverse range of educational options and we are leaders of global research across a number of fields. Our economic contribution is unmatched in Melbourne’s North. 5. La Trobe University has been long recognised as a key regional focus for the education and research sectors with a focus on health, sports, information technology and innovation. 6. Other institutions and companies are located within the campus including Agriculture Victoria, Victoria Police Forensic Services Centre, Rio Tinto, WEHI and City Football Group. 7. Most recently, La Trobe University has been recognised as a key part of the La Trobe National Employment and Innovation Cluster (NEIC), one of Melbourne’s seven recognised NEICs. 8. The La Trobe NEIC contains over 28,000 jobs (with over 7,000 of these at La Trobe University) and includes Heidelberg Activity Centre, the Austin and Heidelberg Repat Hospital, the Northland Urban Renewal Precinct and the West Heidelberg Industrial Precinct.
    [Show full text]
  • Linking People and Spaces Is Available at Parks Victoria’S Website Preparing This Final Version
    LINKING A strategy for Melbourne’s open space PEOPLE network, prepared by Parks Victoria in 2002 + SPACES LINKING Parks Victoria released Linking People and Spaces as a draft in August 2001. Over a three month consultation period we received more than 100 written submissions. We considered all submissions when we were preparing this final version. Linking People and Spaces is available at Parks Victoria’s website www.parkweb.vic.gov.au The website will be periodically updated to reflect the actions completed across the network. PEOPLE SPACES + and Spaces Linking People This publication might be of assistance to you and Parks Victoria has made every effort to ensure that the information in the report is accurate. Parks Victoria does not guarantee that the report is without flaw of any kind or is wholly appropriate for your specific purposes and therefore disclaims all liability for any error, loss or other consequences that might arise from you relying on any information in this publication. ISBN 0 7311 8325 8 2002. MINISTER’S FOREWORD Melbourne’s world-class network of parks, trails and waterways has been planned, fought for and created over the last 140 years. This precious legacy has many recreational, cultural, ecological and economic benefits that are essential to the city’s healthy functioning and liveability. In December 2001, the Bracks Government finalised the transfer of more than 4000 hectares of metropolitan parkland from freehold title to Crown Land status. For many years these parks have been vulnerable to ad hoc decisions of previous governments. Without adequate protection through legislation, and without a sound strategy, this land could have been sold off without any opportunity for public debate.
    [Show full text]