Victoria Cycling Group Bike Rides in 2019 for People 50+

Total Page:16

File Type:pdf, Size:1020Kb

Victoria Cycling Group Bike Rides in 2019 for People 50+ COTA (Council on the Aging) Victoria cycling group Bike rides in 2019 for people 50+ PLEASE READ We ride every Wednesday of each month except January. The 1st and 3rd Wednesday rides are short (20- 30km) to encourage less experienced riders to join us and the route is mostly chosen on the day. The 2nd and 4th Wednesday rides are longer (50- 60km), more challenging and for experienced riders. Rides on the 5th Wednesday are generally longer. We generally meet at 10am at the ‘Place to meet’ (see below). A coffee stop is found midmorning and we take our own lunch and picnic together on longer rides. Riders are welcome to join the ride along the way or cut the ride short at any point. If the temperature is 30°C or above on the day, the long rides will be cut short. If a ride is to be altered from the published program, including cancelling the ride, you will be notified by e-mail before 8pm the night before. Please check your e-mail on Tuesday evening after 8pm. All riders are required to register with COTA and accept the group riding conditions—go to: http://cotavic.org.au/programs-events/physical-education/cota-cycling/. We also recommend that riders consider joining Bicycle Victoria for the insurance and service they offer. Please contact Richard Hawkey by e-mail [email protected] or on 0428 329 450 to discuss details. Date Place to Description Grade meet July 3rd Southbank Short ride footbridge July 10th Southbank Scotchmans Creek to Ringwood and Medium footbridge Blackburn Start at Southbank, up Yarra and Gardiners Creek, coffee at Ferndale. South along the Alamein line to East Malvern, up Scotchmans Creek trail, lunch at Jells Park. Up Dandenong Creek to the railway near Heatherdale, then along the railway path to Blackburn Station. Distance about 60 km, some gravel north of Jells Park. Peter and Joan to lead July 17th Southbank Short ride footbridge July 24th 10:03 Carrum-Warburton Trail Hard Lilydale Ride the relatively new section of bike path station between Lilydale & Bayswater, part of what is now being called the Carrum-Warburton Trail. Ride around Lilydale Lake and get onto the 'new' trail. Morning tea at the Lower Deck Café in Croydon . Ride Croydon to Bayswater with possible bailout from Bayswater station. 17 Km Lilydale to Bayswater, 25 Km Bayswater to Ashburton Station. Mike Sheidlinger to lead July 31st Extra ride. To be advised Aug 7th Southbank Short ride footbridge Aug 14th Jacana Down the Maribyrnong Medium Station. Tra From Jacana west along the Ring Road to in leaves FS Brimbank Park Café for coffee, and about 10 at 9:32, km down the Maribyrnong on gravel, to lunch arriving at at Canning Reserve (Cordite Road). Jacana at 10:03. After lunch, continue down the Maribyrnong to Footscray Road and east, via Docklands to Southbank. Total distance about 50 km. Peter and Joan to lead Aug 21st Southbank Short ride footbridge Aug 28th Lilydale Warburton Rail Trail Medium Station Janet and David to lead Sept 4th Southbank Short ride footbridge Sept 11th Mordialloc Peninsula Link Trail. Easy Station Coffee at Mordialloc station southside then ( Frankston ride the Long Beach trail to Patterson River. Line). Train Then the Peninsula Link trail to Robinson’s leaves F.S at Park for lunch. (BYO) Return along Peninsula 9.12, arr Link trail to Frankston trail to Frankston station Mordi 9.55 ~ 50km. Tricia to lead. Sept 18th Southbank Short ride footbridge Sept 25th Ferry to Port Arlington Don to lead Port Arlington Oct 2nd Southbank Short ride footbridge Oct 9th Moreland Woodlands Historic Park Medium, Station on Follow the Upfield path, then backstreets to about the Upfield the Moonee Ponds Creek trail, follow it north 16K of Line to Westmeadows village for coffee, then on gravel, Train from into Woodlands Park for lunch. We’ll return to total 50K Flinders St the city via the Moonee Ponds creek trail. at 9.44 Possible end points at Pascoe Vale station or arrives at Strathmore station. Not suitable for road Moreland bikes. Cathy Mead to lead at 10.04. Oct 16th Southbank Short ride footbridge Oct 23rd Rosanna Mernda. Medium station. Paths & streets N via Bundoora Park, Stables Train dep FS SC (coffee), Sth Morang, Mill Park Lakes to 9.20, arr Mernda Village (lunch). To rail trail and S to Sth 9.59 Morang station. Plenty Rd and Ring Rd paths to Greensborough station. 48 km. Can extend down Plenty River trail to eg Heidelberg (10 km). (Short section on Plenty Rd—good bike lane) Les to lead Oct 30th Cranbourne Cranbourne Station Ride to Cranbourne Australian garden for coffee and walk around. Please bring a lock. From there head up to Berwick and lunch then back to station. Will be around 50 km Yvonne to lead Nov 6th Southbank Short ride footbridge Nov 13th Southbank State Rose Garden Medium footbridge Ride the Bay Trail west to Williamstown for Flat all coffee. Then lunch at the State Rose Garden in the way Werribee. Ride to Hoppers Crossing for train back to city. ~50kms. Richard to lead Southbank Short ride footbridge Nov 27th Keilor Plains Westward Ho. Easy station. Streets N to Taylors Ck trail and service rd to apart Train dep FS Keilor (coffee). Climb to top of Brimbank Pk from one 9.39, arr climb and Ring Rd. S then Forrest Rd path to 10.10 Sunshine and rail trail to West Footscray, Seddon and back to city. ~43 km Les to lead Dec 4th Southbank Short ride footbridge Dec 11th Bayswater Bayswater to Seaford Easy Station North to Dandenong Creek, then west and Express south along Eastlink, to coffee at Chesterfield leaves FS Farm. 9:26, arr Bayswater Follow Dandenong Creek to Dandenong for 10:07. If lunch. starting at Continue downstream to Peninsula Freeway, other then south along freeway and Seaford stations wetlands to Seaford Station change at Laburnum Distance about 55 km. Peter and Joan to lead Dec 18th Southbank Short ride and Xmas Lunch .
Recommended publications
  • Bicycle Plan 2007-2011
    The City of Melbourne Bicycle Plan 2007 – 2011 2 THE CITY OF MELBOURNE BICYCLE PLAN 2007 – 2011 THE CITY OF MELBOURNE BICYCLE PLAN 2007 – 2011 3 CONTENTS Foreword - A message from the Lord Mayor ___________________________________________________________________________________4 Introduction ________________________________________________________________________________________________________________________________________________________________________5 Mission _____________________________________________________________________________________________________________________________________________________________________________________6 Targets _______________________________________________________________________________________________________________________________________________________________________________________6 Background __________________________________________________________________________________________________________________________________________________________________________ 7 The cycling network – In general ______________________________________________________________________________________________________________ 10 The cycling network – The CBD __________________________________________________________________________________________________________________ 20 Cycling safely ___________________________________________________________________________________________________________________________________________________________________23 Facilities ________________________________________________________________________________________________________________________________________________________________________________28
    [Show full text]
  • City of Melbourne Bicycle Plan 2016-2020
    BICYCLE PLAN 2016–2020 A CONNECTED CITY We manage movement in and around our growing city to help people trade, meet, participate and move about safely and easily, enabling our community to access all the services and opportunities the municipality offers. melbourne.vic.gov.au/bicycleplan CONTENTS Foreword 1 2. Aconnectedbicyclenetwork 13 Executivesummary 2 SmartRoadsandsettingpriorities 13 Acyclingcity 3 Riderchoices 13 Introduction 3 Gapsinthenetwork 13 Aconnectedcity 4 Planninganddesigningforpeopletoridebikes 14 Vision 5 Streetsforcycling(levelofservice) 15 Goals 5 Cyclingcorridors 15 Targets 5 Arterialroads 21 Totaltripsto,within&fromtheCityofMelbourne 6 Othermajorprojects 21 Summaryofachievements 6 Routesinlocalareas 21 Whyandwherepeoplecycle 7 Localroads 26 Thecyclingcommunity 8 Off-roadroutes 27 Benefitsofcycling 9 Gardensandparks 28 1. Planningforpeopletoridebikes 10 Sharedzonesandspaces 28 Cyclingnetworks 10 Actions 29 Growthareasandprojectedgrowth 10 3. Facilitiesforbicycles 30 Structureplansforlocalareas 12 On-streetbicyclefacilities 30 ThePlanningScheme 12 Bicyclehubs 31 Actions 12 End-of-tripfacilities 32 Bicyclesecurity 32 Signage,signalsandothersupportforcyclists 32 MelbourneBikeShare 35 Actions 35 To find out how you can participate in the decision-making process for City of Melbourne’s current and future initiatives, visit melbourne.vic.gov.au/participate 4. Asaferenvironmenttoridebikes 36 6. Measuringoursuccess 50 Crashstatistics 36 BicycleAccount 50 Intersections 39 Countsandmonitoring
    [Show full text]
  • Draft 10 Year Bicycle and Pedestrian Projects
    Project Type Description Effect on Network Beneficiary Project Current 2019_20 2020_21 2021_22 2022_23 2023_24 2024_25 2025_26 2026_27 2027_28 2028_29 2029_30 manager Status Deliverable Deliverable Deliverable Deliverable Deliverable Deliverable Deliverable Deliverable Deliverable Deliverable Deliverable Responsible for Delivery Annual DDA Upgrades/Improvements Footpath Upgrade of the pedestrian network to Improve access for people with mobility issues or Pedestrians Moreland Proposed Design and Design and Design and Design and Design and Design and Design and Design and Design and Design and Design and Upgrade meet DDA standards requirements Council Construct Construct Construct Construct Construct Construct Construct Construct Construct Construct Construct Annual Pedestrian Threshold Intersection Install threshold treatments to improve Pedestrians Moreland Proposed Design and Design and Design and Design and Design and Design and Design and Design and Design and Design and Design and Treatments upgrade prestrian access and slow traffic Council Construct Construct Construct Construct Construct Construct Construct Construct Construct Construct Construct Annual Bus Stop Improvements Public Upgrade of bus stops to improve access Pedestrians Moreland Proposed Design and Design and Design and Design and Design and Design and Design and Design and Design and Design and Design and Transport Council Construct Construct Construct Construct Construct Construct Construct Construct Construct Construct Construct Annual Bicycle Parking Bicycle Provide
    [Show full text]
  • COTA (Council on the Aging) Cycling Group Seniors Bike Rides in 2020
    COTA (Council on the Aging) cycling group Seniors Bike rides in 2020 PLEASE READ We ride every Wednesday of each month except January. The 1st and 3rd Wednesday rides are short (20- 30km) to encourage less experienced riders to join us and the route is mostly chosen on the day. The 2nd and 4th Wednesday rides are longer (50-60km), more challenging and for experienced riders. Rides on the 5th Wednesday are generally longer. We generally meet at 10am at the ‘Place to meet’ (see below). A coffee stop is found midmorning and we take our own lunch and picnic together on longer rides. Riders are welcome to join the ride along the way or cut the ride short at any point. If the temperature is 30°C or above on the day, the long rides will be cut short. If a ride is to be altered from the published program, including cancelling the ride, you will be notified by e-mail before 8pm the night before. Please check your e-mail on Tuesday evening after 8pm. All riders are required to register with COTA and accept the group riding conditions—go to: http://cotavic.org.au/programs-events/physical-education/cota-cycling/. We also recommend that riders consider joining Bicycle Victoria for the insurance and service they offer. Please contact Richard Hawkey by e-mail [email protected] or on 0428 329 450 to discuss details. Date Place to meet Description Grade Feb 5th Southbank Short ride footbridge Feb 12th Lilydale Station Warburton Rail Trail Medium David and Janet to lead Feb 19th Southbank Short ride footbridge Feb 26th Don Gorrie to lead.
    [Show full text]
  • Newsletter September 2010
    Newsletter September 2010 Boroondara BUG meetings are normally held on the 2nd Thursday of each month except January. Our next meeting is on Thursday 9th September. It will be held in the function room at the Elgin Inn, cnr Burwood Rd and Elgin St, Hawthorn (Melway 45 B10). Optional dinner at 6.30pm, meeting starts at 7.30pm. The Boroondara BUG is a voluntary group working to promote the adoption of a safe and practical environment for utility and recreational cyclists in the City of Boroondara. We have close links with the City of Boroondara, Bicycle Victoria, and other local Bicycle Users Groups. Two of the positions on the Boroondara Bicycle Advisory Committee, which meets quarterly, are assigned to Boroondara BUG members. Boroondara BUG has a website at http://www.boroondarabug.org that contains interesting material related to cycling, links to other cycle groups, recent Boroondara BUG Newsletters and breaking news. Our email address for communications to the BUG is [email protected] We also have a Yahoo Group: Send a blank email to: [email protected] to receive notification when the latest monthly newsletter and rides supplement have been placed on the web site and very occasional important messages. All articles in this newsletter are the views and opinions of the authors and do not necessarily represent the views of any other members of Boroondara BUG. All rides publicised in the Rides Supplement are embarked upon at your own risk. Features Highlights of Holland Day 0: Friday 30th April Arriving at 5.40am at Amsterdam’s Schlipol Airport we eventually obtained good advice and trained to Zeeburg YHA hostel.
    [Show full text]
  • Moonee Ponds Creek Strategic Opportunities Plan
    MOONEE PONDS CREEK STRATEGIC OPPORTUNITIES PLAN City of Melbourne Project Client: City of Melbourne Project Name: Moonee Ponds Strategic Opportunities Plan Project Number: 0650MEL Revision: Status: Date: by: Checked: A Draft 04.12.2017 MW CB B Draft 02.02.2018 MW CB C Draft 26.02.2018 MW CB D Draft WIP 02.05.2018 MW CB E Draft WIP 20.06.2018 MW CB F Draft WIP 22.06.2018 MW CB G Final 02.08.2018 MW CB H Final revision 1 10.09.2018 MW CB I Final revision 2 13.09.2018 MW CB J Final revision 3 14.09.2018 MW CB Studio: Melbourne Report Contact: Christian Borchert Consultants: Wave Consulting AUSTRALIA UNITED KINGDOM Melbourne Bristol Phone: +61 [0]3 9088 6500 Phone: +44 [0]7496 282281 Email: [email protected] Email: [email protected] Address: Level 4, 125 Flinders Lane, Melbourne Address: 77 Stokes Croft, Bristol VIC 3000, Australia. BS1 3RD, United Kingdom. Sydney CHINA Phone: +61 [0]2 9188 7500 Shenzhen Email: [email protected] Phone: +86 136 0260 5947 Address: 21c Whistler Street, Manly, Email: [email protected] NSW 2095, Australia. Address: 9D, 9th Floor, Shenzhen Zimao www.mcgregorcoxall.com Centre, 111 Taizi Road, Nanshan District, Shenzen 518000, China. 深圳市南山区太子路111号深圳自贸中心9楼9D, 518000 In collaboration with: DISCLAIMER This Study is for the confidential use only of the party to whom it is addressed (the client) for the specific purposes to which it refers. We disclaim any responsibility to any third party acting upon or using the whole or part of its contents or reference thereto that may be published in any document, statement or circular or in any communication with third parties without prior written approval of the form and content in which it will appear.
    [Show full text]
  • Cycling Into the Future 2013–23
    DECEMBER 2012 CYCLING INTO THE FUTURE 2013–23 VICTORIA’s cyCLING STRATEGY Published by the Victorian Government, Melbourne, December 2012. © State of Victoria 2012 This publication is copyright. No part may be reproduced in any process except in accordance with the provisions of the Copyright Act 1968. Authorised by the Victorian Government Melbourne Printing managed by Finsbury Green For more information contact 03 9655 6096 PAGE III CYCLING INTO THE FUTURe 2013–23 VICTORIA’s CYCLING STRATEGY CONTENTS Minister’s foreword v Executive summary vi 1 Cycling in Victoria 1 2 Growing cycling in Victoria 5 Current cycling patterns 5 Potential growth 5 3 Benefits of cycling 8 Healthier Victorians 8 Better places to live 9 Stronger economy 9 Healthier environment 10 4 Strategic framework 11 Direction 1: Build evidence 12 Direction 2: Enhance governance and streamline processes 14 Direction 3: Reduce safety risks 16 Direction 4: Encourage cycling 20 Direction 5: Grow the cycling economy 22 Direction 6: Plan networks and prioritise investment 24 5 Implementation, monitoring and evaluation 29 Appendix 1: Cycling networks, paths and infrastructure 30 PAGE IV CYCLING INTO THE FUTURe 2013–23 VICTORIA’s CYCLING STRATEGY Some of our work in metropolitan Melbourne includes: > a new bridge on the Capital City Trail at Abbotsford > bike lanes along Chapel Street > extensions and improvements to the Federation Trail, Gardiner’s Creek Trail and Bay Trail on Beach Road > Jim Stynes Bridge for walking and cycling between Docklands and the CBD along the Yarra River > Heatherton Road off-road bike path from Power Road to the Dandenong Creek Trail > a bridge over the Maroondah Highway at Lilydale > bike connections to Box Hill and Ringwood > Parkiteer bike cages and bike hoops at 16 railway stations > Westgate Punt weekday services > bike paths along the Dingley Bypass, Stud Road, Clyde Road and Narre Warren – Cranbourne Road > bike infrastructure as part of the Regional Rail Link project > a new trail in association with the Peninsula Link.
    [Show full text]
  • Recreational Activity Surveys During COVID-19 and Comparison with Pre-Lockdown Activity Levels
    More people out on bicycles: Recreational activity surveys during COVID-19 and comparison with pre-lockdown activity levels May 2020 Measuring recreational activity in unprecedented times Lockdown in Victoria On 30 March 2020, the Minister for Health and Medical Research signed an Order for stage 3 lockdown measures to be put in place across Australian states, following a national outbreak of the novel coronavirus. The Order, which in Victoria falls under section 200 of the Public Health and Wellbeing Act (2008)1, 2, places legally enforceable restrictions on all non-essential gatherings, as a means of minimising the spread of the deadly virus. During the stage 3 restrictions, there are only four reasons for Victorian residents to be outside: • purchasing food and essential supplies; • medical, care or compassionate needs; • exercise; and • work and study if they cannot be undertaken remotely2. How has this affected our recreational activities? An arising question is how these restrictions have affected the recreational needs of residents in Victoria and elsewhere. A recent survey by Bicycle Network3 found that, in response to stage 3 restrictions across Australian states: • 73 per cent [of respondents] are planning to use a bicycle to access essential services (shops, healthcare, work and education) in the coming weeks and months; • 84 per cent of healthcare workers said they would ride bicycles more or the same amount; and • Most respondents (39 per cent) said that they will be riding a bicycle outdoors to get their daily exercise. In addition, emerging data suggests an increase in bicycle purchases during lockdown restrictions4. These findings suggest that, given these increased needs for bicycle-related transport, exercise and recreation; Australian roads and shared paths may be exhibiting major deviations from normal bicycle traffic volumes.
    [Show full text]
  • John Kiriakidis– Curriculum Vitae B: Matters Raised by PPV Guide to Expert Evidence C: West Gate Tunnel Active Transport
    1. West Gate Tunnel Project 2. Traffic and Transport Review Expert Evidence Statement Expert Witness: 3. John TrafficKiriakidis and Transport Review Client: Western Distributor Authority Instructed by: Clayton Utz Lawyers Reference: V131660 Hearing Date: 14/08/2017 Report Date: 02/08/17 West Gate Tunnel Project Expert Evidence Statement Traffic and Transport Review Issue: 02/08/17 Client: Western Distributor Authority Reference: V131660 GTA Consultants Office: VIC ) © GTA Consultants (GTA Consultants (VIC) Pty Ltd) 2017 The information contained in this document is confidential and intended solely for the use of the client for the purpose for which it has 150630 v2.6 150630 ( been prepared and no representation is made or is to be implied as being made to any third party. Use or copying of this document in Melbourne | Sydney | Brisbane whole or in part without the written permission of GTA Consultants Canberra | Adelaide | Perth constitutes an infringement of copyright. The intellectual property VCAT Evidence VCAT Gold Coast | Townsville contained in this document remains the property of GTA Consultants. Table of Contents 1. Introduction 1 1.1 Background 1 1.2 Qualifications and Experience 1 1.3 Report Scope 1 1.4 References 2 1.5 Assessment Methodology Context 3 1.6 Statement on Findings 3 1.6.1 Overview 3 1.6.2 Strategic Alignment with Policy / Strategy 3 1.6.3 Project Position 5 1.7 Tests, Experiments & Assistance 5 2. Project Background & Review Context 6 2.1 Project Proposal 6 3. Legislation and Policy Framework 9 3.1 Preamble 9 3.1.1 Social and Economic Inclusion 10 3.1.2 Economic Prosperity 10 3.1.3 Environmental Sustainability 11 3.1.4 Integration of Transport and Land Use 12 3.1.5 Efficiency, Coordination and Reliability 12 3.1.6 Safety, Health and Wellbeing 12 3.1.7 Summary of Objectives 13 3.2 State Planning Policy Framework 13 3.3 Other Strategies and Policies 14 4.
    [Show full text]
  • West Gate Tunnel Project
    Western Distributor Authority 09-May-2017 West Gate Tunnel Project Technical report K Land use planning 09-May-2017 Prepared for – Western Distributor Authority – ABN: 69981208782 AECOM West Gate Tunnel Project West Gate Tunnel Project Land Use Planning Assessment Client: Western Distributor Authority ABN: 69981208782 Prepared by AECOM Australia Pty Ltd Level 10, Tower Two, 727 Collins Street, Melbourne VIC 3008, Australia T +61 3 9653 1234 F +61 3 9654 7117 www.aecom.com ABN 20 093 846 925 09-May-2017 Job No.: 60338862 AECOM in Australia and New Zealand is certified to ISO9001, ISO14001 AS/NZS4801 and OHSAS18001. 09-May-2017 Prepared for – Western Distributor Authority – ABN: 69981208782 AECOM West Gate Tunnel Project Quality Information Document 60338862 Date 09-May-2017 Prepared by Brian Gibbs, Kaity Munro, Jimmy Chan Reviewed by Kristina Butler Authorised Rev Revision Date Details Name/Position Signature F 09-May-2017 Final Report Kristina Butler Principal Planner 09-May-2017 Prepared for – Western Distributor Authority – ABN: 69981208782 AECOM West Gate Tunnel Project i Executive Summary This technical report is an attachment to the West Gate Tunnel Project Environmental Effects Statement (EES). It provides an assessment of potential land use impacts associated with the project, and defines the Environmental Performance Requirements (EPRs) necessary to meet the EES objectives. Overview This Land Use Planning Impact Assessment Report has been prepared by AECOM to provide an assessment of the land use planning related impacts associated with the construction and operation of the West Gate Tunnel Project. These include potential impacts of the project’s construction and operation on land use, built form and strategic policy within the study area.
    [Show full text]
  • Rides Supplement
    Rides Supplement Camberwell Downhill Gourmet Bike Riders February Ride: Southern Suburbs Date : Sunday 17 th February Meet : Ashburton Station, west side at 9.30am The Ride : We’ll follow the Anniversary Trail south, cross to East Malvern Station then ride via the Urban Forest to Hughesdale Station and pick up the Rosstown Rail Trail. We’ll leave this at Gardenvale and from there follow the Elster and Elwood canals to the Bay. Here we’ll turn north and head up to Beaconsfield Pde. We’ll turn at Pickles St to head for the Gasworks Arts Park and thence to Albert Park where we’ll take a turn around the lake. From there we’ll head up to St Kilda Rd and move onto the tan. This will take us to the Yarra trail and we’ll follow this and the Gardiners Creek Trail back to Ashburton. Refreshments : We’ll stop for a morning coffee at Gardenvale; bring a picnic lunch to have in one of the parks along the way Distance : ~45; Bail outs at Gardenvale and Richmond Contingency plans : If the forecast max is over 30 the ride will be cancelled. For further information contact : Julia Blunden, email: [email protected] . Phone: 9853 5095; Mobile: 0408 501 082 Other Rides for 2008 March 16 th: David & Geraldine - Southbank to Ricketts Point; April 20 th ?; May 18 th , Graeme; June 15 th, David & Geraldine; July 20 th ?; August 17 th ?; September 21 st Val; October 19 th Jack Simpson; November 16 th David & Geraldine Dinners July 11 th ; November 21st Hawthorn Cycle Tours Hawthorn Cycle Tours (run by the Hawthorn Aquatic and Leisure Centre) has 10 bikes (and helmets) available.
    [Show full text]
  • COTA (Council on the Aging) Cycling Group Seniors Bike Rides in 2021
    COTA (Council on the Aging) cycling group Seniors Bike rides in 2021 PLEASE READ We ride every Wednesday of each month except January. • The 1st and 3rd Wednesday rides are short (20- 30km) to encourage less experienced riders to join us and the route is mostly chosen on the day. The 2nd and 4th Wednesday rides are longer (50-60km), more challenging and for experienced riders. Rides on the 5th Wednesday are generally longer. • We generally meet at 10am at the ‘Place to meet’ (see below). A coffee stop is found midmorning and we take our own lunch and picnic together on longer rides. Riders are welcome to join the ride along the way or cut the ride short at any point. • If the temperature is 30°C or above on the day, the long rides will be cut short. • If a ride is to be altered from the published program, including cancelling the ride, you will be notified by e-mail before 8pm the night before. Please check your e-mail on Tuesday evening after 8pm. All riders are required to register with COTA and accept the group riding conditions—go to: http://cotavic.org.au/programs-events/physical-education/cota-cycling/. We also recommend that riders consider joining Bicycle Victoria for the insurance and service they offer. Please contact Cathy Mead by email [email protected] or on 0412 688 930 to discuss details. Date Place to meet Description Grade Feb 3rd Southbank Short ride footbridge Feb 10th Lilydale Station Warburton Rail Trail Medium David and Janet to lead Feb 17th Southbank Short ride footbridge Feb 24th Craigieburn Station Craigieburn to the city via the Glada Tamboore Trail and Merri Creek trail.
    [Show full text]