Appraisal of Zonal Safety MCDOs for the month of September 2013 S.No. Rly. Main Highlights of Safety MCDO Safety Performance Comments of Safety Dte. • Consequential Accident Derailment of 2 BCN loaded wagons and the brakevan of Up Dankuni (DKAE) Goods (Commodity Sugar) at Dhalgaon station limit of Solapur division at 04.25 hrs on 15.09.2013 • Indicative Train Accident (1) 98315 Dn EMU (Local, BR13) passed down home signal No. S-10 of Chembur station in Harbour line at ‘ON’ position in CSTM - Panvel BG section on Mumbai division at 09.33 hrs 14.09.2013. (2) Train No. 12071 passed the down starter signal No. S-44 at ‘ON’ position at Igatpuri station of Mumbai Division at 16.33 hrs on 21.09.2013. • Any Unusal ------NIL ------• Level Crossing Gates closed 0 1 • Unmanned Level Crossings Manned 5 CR • Safety Seminars conducted Conducted on various aspects of Safety. • Inter Railway Safety Audit (Six Monthly) Conducted at Pune Division on 11th and 12th Sept.2013 by SAG team of WR. • Internal Railway Safety Audit (Bi-Monthly) Conducted in CSTM, BSL, NGP, SUR, PA divisions. • Inspections conducted by Safety Branch 1164 • Inspections conducted by other departments 9665 • Safety category Staff overdue for PME 163 • Safety category Staff overdue for Refresher course 556 • Safety category staff vacancies 7189 • Completion of trip within 10 hours 'sign on ' to 'sign off' 85.55 • Consequential Train Accident On 12.09.2013, train no. 12339 Up hauled by Engine No.30327 WAP7/HWH started with proper signal for diversion from UP L-1 to UP L-2, while in course of diversion, its front two coaches including one SLR got derailed over nose of crossing of Point No.57B in no road condition at km 217/19A-27A near west Cabin Barachak of Division at about 20.50 Hrs. • Indicative Train Accident ------NIL ------• Any Unusal ------NIL ------• Level Crossing Gates closed 5 • Unmanned Level Crossings Manned 0 2 • Safety Seminars conducted 16 Places. ER • Inter Railway Safety Audit (Six Monthly) Conducted at Bilaspur Station of South East Central Railway on 04.09.2013 by SAG team of ER. • Internal Railway Safety Audit (Bi-Monthly) Details not given. • Inspections conducted by Safety Branch 932 • Inspections conducted by other departments 7419 • Safety category Staff overdue for PME 149 • Safety category Staff overdue for Refresher course 1723 • Safety category staff vacancies 9395 • Completion of trip within 10 hours 'sign on ' to 'sign off' 67.8 • Consequential Train Accident On 23/09/2013 While the train No. 12402 DN (NDLS - IPR Magadh Exp.) was on run in between GMR - CSA stations, B Cabin of DANAPUR Division its 1st AC Coach No. NR/WGFAC/10002 (5th from train engine) caught fire. • Indicative Train Accident ------NIL ------• Any Unusal ------NIL ------• Level Crossing Gates closed 2 • Unmanned Level Crossings Manned 3 • Safety Seminars conducted 17 Places. 3 • Inter Railway Safety Audit (Six Monthly) Details not given.

ECR • Internal Railway Safety Audit (Bi-Monthly) Conducted at NRPA yard of SEE division on 25.09.13. • Inspections conducted by Safety Branch 1118 • Inspections conducted by other departments 5336 • Safety category Staff overdue for PME 131 • Safety category Staff overdue for Refresher course 513 • Safety category staff vacancies 8192 • Completion of trip within 10 hours 'sign on ' to 'sign off' 84.98 • Consequential Train Accident On 03/09/2013 08:40 hours While the train was on run between KKLU-KMSD of Waltair division wagon No. SWR 12150310069 N Box load ( 14th from engine) got derailed at Km 353/17-18 of Waltair division. • Indicative Train Accident ------NIL ------• Any Unusal ------NIL ------• Level Crossing Gates closed 2 • Unmanned Level Crossings Manned 2 • Safety Seminars conducted 41 Places. 4 • Inter Railway Safety Audit (Six Monthly) Details not given.

• Internal Railway Safety Audit (Bi-Monthly) Conducted at KUR & SBP Divisions. ECOR • Inspections conducted by Safety Branch 423 • Inspections conducted by other departments 6065 • Safety category Staff overdue for PME 58 • Safety category Staff overdue for Refresher course 415 • Safety category staff vacancies 7689 • Completion of trip within 10 hours 'sign on ' to 'sign off' 49.09 • Consequential Train Accident (1) On 11/09/2013 12:10 hours Car struck against T/E at UMLC no. C - 43 between NAKODAR-MALSIANKOT stations of FIROZPUR Division. (2) On 28/09/2013 12:35 hours Derailment of 1 bogie of 1 AJL/64551 at Amritsar station of FIROZPUR Division on 28/9/2013. • Indicative Train Accident ------NIL ------• Any Unusal ------NIL ------• Level Crossing Gates closed 6 • Unmanned Level Crossings Manned 1 5 • Safety Seminars conducted 4 Places. NR • Inter Railway Safety Audit (Six Monthly) Details not given. • Internal Railway Safety Audit (Bi-Monthly) Details not given. • Inspections conducted by Safety Branch 1240 • Inspections conducted by other departments 12944 • Safety category Staff overdue for PME 27 • Safety category Staff overdue for Refresher course 987 • Safety category staff vacancies 13076 • Completion of trip within 10 hours 'sign on ' to 'sign off' 80.3 • Consequential Train Accident ------NIL ------• Indicative Train Accident ------NIL ------• Any Unusal ------NIL ------• Level Crossing Gates closed 0 • Unmanned Level Crossings Manned 0 • Safety Seminars conducted Conducted in ALD division. • Inter Railway Safety Audit (Six Monthly) Details not given. 6 • Internal Railway Safety Audit (Bi-Monthly) Details not given. NCR • Inspections conducted by Safety Branch 644 • Inspections conducted by other departments 6148 • Safety category Staff overdue for PME 52 • Safety category Staff overdue for Refresher course 205 • Safety category staff vacancies 7229 • Completion of trip within 10 hours 'sign on ' to 'sign off' 66.23 • Consequential Train Accident ------NIL ------• Indicative Train Accident On 01/09/2013 at 08:00 Loco Pilot 52249 UP failed to observe ON aspect of Home signal at Dliganj station of Lucknow division and entered on same line where 15310 Dn express train was waiting for crossing with UP train Loco Pilot of 52249 Up stopped at a distance of 107.85 meter. • Any Unusal ------NIL ------• Level Crossing Gates closed 1 • Unmanned Level Crossings Manned 6 • Safety Seminars conducted 331 Places. 7 • Inter Railway Safety Audit (Six Monthly) Details not given.

NER • Internal Railway Safety Audit (Bi-Monthly) Details not given. • Inspections conducted by Safety Branch 943 • Inspections conducted by other departments 2840 • Safety category Staff overdue for PME 273 • Safety category Staff overdue for Refresher course 298 • Safety category staff vacancies 2506 • Completion of trip within 10 hours 'sign on ' to 'sign off' 91.96 • Consequential Train Accident ------NIL ------• Indicative Train Accident ------NIL ------• Any Unusal ------NIL ------• Level Crossing Gates closed 0 • Unmanned Level Crossings Manned 4 • Safety Seminars conducted 49 Places. • Inter Railway Safety Audit (Six Monthly) Details not given. 8 • Internal Railway Safety Audit (Bi-Monthly) Details not given. NFR • Inspections conducted by Safety Branch 1191 • Inspections conducted by other departments 5300 • Safety category Staff overdue for PME 94 • Safety category Staff overdue for Refresher course 78 • Safety category staff vacancies 4108 • Completion of trip within 10 hours 'sign on ' to 'sign off' 86 • Consequential Train Accident ------NIL ------• Indicative Train Accident ------NIL ------• Any Unusal ------NIL ------• Level Crossing Gates closed 6 • Unmanned Level Crossings Manned 0 • Safety Seminars conducted 29 Places. • Inter Railway Safety Audit (Six Monthly) Details not given. 9 • Internal Railway Safety Audit (Bi-Monthly) Details not given.

NWR • Inspections conducted by Safety Branch 690 • Inspections conducted by other departments 5494 • Safety category Staff overdue for PME 7 • Safety category Staff overdue for Refresher course 20 • Safety category staff vacancies 3858 • Completion of trip within 10 hours 'sign on ' to 'sign off' 85.81 • Consequential Train Accident ------NIL ------• Indicative Train Accident ------NIL ------• Any Unusal ------NIL ------• Level Crossing Gates closed 11 • Unmanned Level Crossings Manned 2 • Safety Seminars conducted 31 Places • Inter Railway Safety Audit (Six Monthly) Details not given. 10 • Internal Railway Safety Audit (Bi-Monthly)

SR Details not given. • Inspections conducted by Safety Branch 1934 • Inspections conducted by other departments 12536 • Safety category Staff overdue for PME 261 • Safety category Staff overdue for Refresher course 983 • Safety category staff vacancies 7773 • Completion of trip within 10 hours 'sign on ' to 'sign off' 94.59 • Consequential Train Accident At about 02.40 hrs on 22.9.13 while No.12666 Exp. was on run, between Srivenkateshwarapalem and Kavali Stations on Gudur – Vijayawada, BG, electrified double line controlled section of Vijayawada Division, one coach next to engine derailed due to cattle run over. • Indicative Train Accident ------NIL ------• Any Unusal ------NIL ------• Level Crossing Gates closed 0 • Unmanned Level Crossings Manned 0 11 • Safety Seminars conducted 13 Places,

• Inter Railway Safety Audit (Six Monthly) Details not given. SCR • Internal Railway Safety Audit (Bi-Monthly) Details not given. • Inspections conducted by Safety Branch 1202 • Inspections conducted by other departments 16244 • Safety category Staff overdue for PME 0 • Safety category Staff overdue for Refresher course 0 • Safety category staff vacancies 9913 • Completion of trip within 10 hours 'sign on ' to 'sign off' 79.40 • Consequential Train Accident ------NIL ------• Indicative Train Accident ------NIL ------• Any Unusal ------NIL ------• Level Crossing Gates closed 4 • Unmanned Level Crossings Manned 2 • Safety Seminars conducted Conducted at CKP, ADA, RNC and KGP Divisions. • 12 Inter Railway Safety Audit (Six Monthly) Details not given. • Internal Railway Safety Audit (Bi-Monthly) Details not given. SER • Inspections conducted by Safety Branch 884 • Inspections conducted by other departments 9736 • Safety category Staff overdue for PME 146 • Safety category Staff overdue for Refresher course 906 • Safety category staff vacancies 8121 • Completion of trip within 10 hours 'sign on ' to 'sign off' 68.32 • Consequential Train Accident ------NIL ------• Indicative Train Accident ------NIL ------• Any Unusal ------NIL ------• Level Crossing Gates closed 2 • Unmanned Level Crossings Manned 0 • Safety Seminars conducted Conducted at BSP, NGP and R Divisions. • Inter Railway Safety Audit (Six Monthly) Conducted at Bilaspur Station of South East Central Railway on 04.09.2013 by SAG team of ER. 13 • Internal Railway Safety Audit (Bi-Monthly) Conducted in Bilaspur division on 26.09.13

SECR • Inspections conducted by Safety Branch 495 • Inspections conducted by other departments 5873 • Safety category Staff overdue for PME 66 • Safety category Staff overdue for Refresher course 203 • Safety category staff vacancies 6483 • Completion of trip within 10 hours 'sign on ' to 'sign off' 82.38 • Consequential Train Accident ------NIL ------• Indicative Train Accident ------NIL ------• Any Unusal ------NIL ------• Level Crossing Gates closed 1 • Unmanned Level Crossings Manned 0 • Safety Seminars conducted Conducted in SBC and UBL Divisions • Inter Railway Safety Audit (Six Monthly) 14 Details not given. • Internal Railway Safety Audit (Bi-Monthly) Details not given. SWR • Inspections conducted by Safety Branch 508 • Inspections conducted by other departments 3507 • Safety category Staff overdue for PME 156 • Safety category Staff overdue for Refresher course 258 • Safety category staff vacancies 2169 • Completion of trip within 10 hours 'sign on ' to 'sign off' 0 • Consequential Train Accident On 7.9.13 at about 19.25 hrs. one Truck at 4147 dashed with Diesel Power No. 14092 WDM3 RTM of train NO. 19119 (ADI- SMNH Exp.) at UMLC No. 123/C at Km.176/9-177/0 between ADE-VRL in RJT-SMNH section of BHAVNAGAR Division.

• Indicative Train Accident ------NIL ------• Any Unusal ------NIL ------• Level Crossing Gates closed 7 • Unmanned Level Crossings Manned 0 • Safety Seminars conducted 109 Places. 15 • Inter Railway Safety Audit (Six Monthly) Details not given. WR • Internal Railway Safety Audit (Bi-Monthly) Details not given. • Inspections conducted by Safety Branch 1681 • Inspections conducted by other departments 12118 • Safety category Staff overdue for PME 93 • Safety category Staff overdue for Refresher course 174 • Safety category staff vacancies 10016 • Completion of trip within 10 hours 'sign on ' to 'sign off' 85.42 • Consequential Train Accident ------NIL ------• Indicative Train Accident ------NIL ------• Any Unusal ------NIL ------• Level Crossing Gates closed 2 • Unmanned Level Crossings Manned 0 • Safety Seminars conducted 12 Places. • Inter Railway Safety Audit (Six Monthly) Conducted at Pune Division on 11th and 12th Sept.2013 by SAG team of WR. 16 • Internal Railway Safety Audit (Bi-Monthly) Conducted at BPL Division on 26.9.13

WCR • Inspections conducted by Safety Branch 903 • Inspections conducted by other departments 7656 • Safety category Staff overdue for PME 14 • Safety category Staff overdue for Refresher course 109 • Safety category staff vacancies 4894 • Completion of trip within 10 hours 'sign on ' to 'sign off' 78.68 *Based on the Safety MCDO of Zonal Railways.