CIRCLE AND HAMMERSMITH & CITY LINES TIMETABLE ALTERATIONS DUE TO ENGINEERING WORK MONDAY TO WEDNESDAY NIGHTS AND TUESDAY TO THURSDAY MORNINGS, COMMENCING 16th MAY 2016 AND UNTIL FURTHER NOTICE In connection with Metropolitan Line track and drainage renewal work between Baker Street and Finchley Road on Monday to Wednesday nights and Tuesday to Thursday mornings, commencing 16th May, the arrangements shown in this Timetable Notice will apply. The Metropolitan Line train service will be suspended between Park and Aldgate from approximately 21.55 (southbound from Wembley Park) and 22.50 (northbound from Baker Street) on Monday to Wednesday nights until approximately 05.30 (southbound at Wembley Park) and 05.55 (northbound at Baker Street) on Tuesday to Thursday mornings. In consequence, the two late evening Circle and Hammersmith & City Line trains which stable at Neasden Depot/Wembley Park Sidings will be diverted to stable at Hammersmith Depot. To balance the rolling stock, two S7 trains will transfer empty from Hammersmith Depot to Neasden Depot/Wembley Park Sidings before the Metropolitan Line closure begins.

Circle and Hammersmith & City Line trains will be amended as follows:-

Monday to Wednesday nights

Train H706, will start from Hammersmith Depot at 21.13 and run (additional empty throughout) as follows:- Hammersmith (24 road) arrive 21.16, form 21.24, Goldhawk Road 21/25½, Latimer Road 21/30, Paddington (Suburban) 21/36½, Praed Street Junction 21/39, Edgware Road (platform 1) 21/40½, Baker Street 21a43½, King’s Cross 21/49, Farringdon 21/52½, Moorgate (platform 3) arrive 21.57½, form 22.10½, Farringdon 22/13½, King’s Cross 22/17, Baker Street (platform 2) 22a23½, Finchley Road 22/29, Neasden 22/33½, Wembley Park (platform 1) 22/35½, FL, -on-the-Hill (platform 4) 22.41½, reverse via siding, form 22.51½ via Harrow-on-the-Hill (platform 5), FL, Wembley Park (platform 6) 23m02, Neasden Depot (N) arrive 23.11 and stable.

Train H275, 20.12 ex Barking Sidings, on arrival Hammersmith (platform 3) at 21.14, will be revised to form 21.26½, then run ½ minute later than booked to Edgware Road depart 21a43, Baker Street depart 21a46, then run as booked. Train H707, will start from Hammersmith Depot at 21.33 and run (additional empty throughout) as follows:- Hammersmith (24 road) arrive 21.36, form 21.44½, Goldhawk Road 21/46, Latimer Road 21/50½, Paddington (Suburban) 21/57, Praed Street Junction 21/59, Edgware Road (platform 1) 22/00½, Baker Street 22a03½, King’s Cross 22/09, Farringdon 22/12½, Moorgate (platform 3) arrive 22.17½, form 22.30½, Farringdon 22/33½, King’s Cross 22/37, Baker Street (platform 2) 22a43½, Finchley Road 22/49, Neasden 22/53½, Wembley Park (platform 1) 22/55½, FL, Harrow-on-the-Hill (platform 4) 23.00, reverse via siding, form 23.08 via Harrow-on-the-Hill (platform 5), FL, Wembley Park (platform 6) arrive 23.18½, form 23.24, Wembley Park Sidings arrive 23.26 and stable.

Train H171, 20.32½ ex Barking Sidings, on arrival Hammersmith (platform 2) at 21.34, will be revised to form 21.47, then run 1 minute later than booked to Baker Street depart 22a06, then run as booked. Train H714, (RR, Empty) 20.34 ex Upminster Depot, will (if running) be revised on arrival Wembley Park (platform 1) at 22.00 to form 22.16, Neasden Depot (F) arrive 22.24 and stable.

Train H170, (RR, Empty) will (if running) be revised to depart Edgware Road (26 siding) at 22.26 and then run 80 minutes later than booked to Hammersmith (24 road) arrive 22.41½, form 22.51, Hammersmith Depot arrive 22.53 and stable. Cancelled 21.06 (RR, empty) Edgware Road to Hammersmith and 21.30 (RR, empty) Hammersmith to Hammersmith Depot. Train H264, 21.12 ex Barking Sidings, will be revised to arrive Hammersmith (platform 3) at 22.15, then run as booked.

Train H174, 22.25 (empty) ex Hammersmith Depot, on arrival Hammersmith (24 road) at 22.28, will be revised to form 22.35½ (empty), Goldhawk Road depart 22a37½ (passenger), then run as booked. Train H215, 21.55 ex Aldgate (I.R), on arrival Hammersmith (platform 3) at 22.29, will be revised to form 22.42 then run 1 minute later than booked to Baker Street depart 23b01, then run as booked.

Train H216, 22.05 ex Aldgate (I.R), will be revised to arrive Hammersmith (platform 1) at 22.39, then run as booked. Train H267, 21.42 ex Barking Sidings, will be revised to arrive Hammersmith (platform 3) at 22.45, then run as booked. Timetable Notice No. 51/16 Page 2 of 2

Train H177, 23.42 ex Hammersmith Depot, will be revised to depart 23.40 (empty), Hammersmith (24 Road) arrive 23.43, form 23.50½ (empty) to Goldhawk Road depart 23.52 (passenger), then run as booked. Cancelled 23.50½ (passenger) Hammersmith to Goldhawk Road.

Train H275, 22.42 ex Barking Sidings, will be diverted to Baker Street (platform 6), depart 23a25½ (additional passenger) then run as follows:- Edgware Road (platform 4) 23a28½, Praed Street Junction 23/29½, Paddington (Suburban) 23.30½, Latimer Road 23.37, Goldhawk Road 23.41½, Hammersmith (platform 3) arrive 23.44, form 23.53 (additional empty) Hammersmith Depot arrive 23.55 and stable. Cancelled running via Baker Street platform 2, 23b26½ (empty) Baker Street to Harrow-on-the-Hill and 00.04½ (empty) Harrow- on-the-Hill to Neasden Depot. Train H277, 23.12 ex Barking Sidings, will be diverted to Baker Street (platform 6), depart 23a55½ (additional passenger) then run as follows:- Edgware Road (platform 4) 23a58½, Praed Street Junction 23/59½, Paddington (Suburban) 00.00½, Latimer Road 00.07, Goldhawk Road 00.11½, Hammersmith (platform 1) arrive 00.14, form 00.20 (additional empty) Hammersmith Depot arrive 00.22 and stable. Cancelled running via Baker Street platform 2, 23f59½ (empty) Baker Street to Harrow-on-the-Hill and 00.28 (empty) Harrow-on- the-Hill to Wembley Park and 00.38 (empty) Wembley Park to Wembley Park Sidings.

Tuesday to Thursday mornings Train H271 will be revised to depart Neasden Depot (S) at 05.17 (empty) and then run 3 minutes later than booked to Baker Street depart 05m39 (passenger), then run as booked.

All the timetable alterations contained in this notice are included on Signal Control Data. Advice to Passengers After approximately 22.00 (eastbound) and 22.30 (westbound) on Monday to Wednesday nights passengers travelling between Aldgate and Baker Street must be advised to use Hammersmith & City or Circle Line train services. Late night passengers travelling from stations Aldgate to Great Portland Street must be advised to commence their journeys 20 minutes earlier than normal in order to maintain last train connections. Last train connections to all Metropolitan Line destinations have been provided, but passengers must be at Baker Street (northbound Jubilee Line platform) at normal last train times. Bank Holiday Mondays The early closure of the Metropolitan Line will not apply on Bank Holiday Mondays. The normal Saturday service shown in Working Timetable No. 34 will operate (unless amended for other engineering work). This means that on Tuesdays following a Bank Holiday Monday a normal start of service will operate together with an early close of traffic on the Metropolitan Line. Evening Wembley Stadium Events If a Wembley Stadium event is scheduled on a Monday, Tuesday or Wednesday evening, the early closure will not apply and the following morning will have a normal start of traffic, as shown in Working Timetable No.34.

For full details of the revised Metropolitan Line train service see Timetable Notice No. 50/16. For full details of the revised Jubilee Line train service see Timetable Notice No. 52/16.

Nigel Cobbe Scheduling Services Planning and Performance Underground Limited 55 Broadway, London SW1H 0BD 13 April, 2016 SCHEDULES MANAGER (TIMETABLES)