company profile Company profile Experience and reliability to support innovation and quality

ith almost 40 years of experience on the market, Bulfaro S.p.A. is an impor- W tant I talian general contractor specialising in major infrastructures for public and private customers, civil and residential building projects, environmental enginee- ring and renewable energy sources. Incorporated as a joint stock company in 2009, today Bulfaro has over 100 employees and can count on a network of collaborators and partners with time-tested competence and technical know-how who are precious assets for the company as it expands and innovates. Preparation, competence and reliability, accompanied by strict application of quality standards, have distinguished the Bulfaro way of doing business over the years and have enabled the company to acquire a solid reputation on the market while continuing to grow from the moment of its founding to the present. The company is a point of reference and key advisor for the public administration and major market players who, over the years, have appreciated the transparency, social responsibility, environmental commitment and readiness of the company to meet the needs for infrastructure, creating value added for local communities.

Headquarters - History From its founding to the present day

The company resolved to Construction of the diversify and extend its strategic (province of ) plant began. The Bulfaro Antonio company was The company activities by acquiring the Midi Designed to complement the born as a one-man enterprise and consolidated and 2009 2011 Hotel, an important hotel with a activities of the Lagonero concrete 1975 began activity as a subcontractor 2001 reinforced its position restaurant and meeting rooms plant (), for public works. The first on the market for situated just 100 metres from at completion it will have two important job for the company production of concrete the Salerno-Reggio Calabria concrete batching, aggregate was earth transport on behalf Bulfaro Antonio, the and asphalt with the motorway junction for . crushing and grading plants and of the Lodigiani company during one-man company, acquisition of Sinnica In addition, Bulfaro Costruzioni integrate Lagonegro production construction of the Monte Cotugno 1995 became Bulfaro Strade S.r.l. which had S.r.l. completed the merger with deliveries for construction of the reservoir for the largest earth dam Costruzioni S.r.l., been a market leader the Sinnica Strade S.r.l. and Salerno-Reggio Calabria motorway. in Europe. In 1978 the company a limited liability for decades. S.M.I.M.A. S.r.l. companies. obtained its first registration on company. the national roll of builders.

The Bulfaro Antonio company Just one year after the Bulfaro Costruzioni S.r.l. acquired The growth achieved by began to grow: having expanded constitution of Bulfaro Costruzioni S.M.I.M.A S.r.l., a concrete acquisitions and mergers, together 1994 operations to the whole of southern 1996 S.r.l., the company expanded its 2006 batching company that also had 2010 with the new industrial plan, led , it built its first aggregate operations again and opened its own quarry for extraction to the transformation of Bulfaro quarry and concrete production worksites for the municipality of and preparation of aggregates, Costruzioni S.r.l. into Bulfaro S.p.A. plant (the Serrapotamo plant Courmayeur (province of Aosta) in order to gain control of the In addition, acquisition of the in Castronuovo di Sant’Andrea, and the Po River Authority, whole production cycle. With this Sinnica Beton S.r.l. company branch province of Potenza). launching a period of growth that operation, Bulfaro Costruzioni S.r.l. that included the Lagonegro plant transformed it into an important became the leading supplier of contributed to a significant increase player at the national level. concrete, asphalt and aggregates in concrete production output. in its area of reference. Mission, strategy and values Innovation, Quality and Efficient processes

Company Figures

he company mission is to provide accurate and competent solutions to customers and create value for 1.500 3.000 15.000 100 T all the stakeholders, while guaranteeing quality standards of excellence, environmental sustainability, safety and respect for local requirements. SHARE CAPITAL SHARE REVENUES NO. STAFF FULLY PAID IN €/000 HOLDERS’ EQUITY €/000 The values that inspire our strategies and daily decisions are based on quality, reliability and innovation. €/000

Offices, plants and production QUALITY RELIABILITY INNOVATION The highest quality standards are Bulfaro has always been committed Innovation is the key concept guiding guaranteed in all phases of the to guaranteeing the greatest possible company strategies and investments. It also 2 9 1.050mq 5.700mq 300.000mq production cycle because the key steps transparency and reliability of execution, strict characterises company methods from project start OPERATIONAL production OFFICES WAREHOUSES TOTAL PRODUCTION / of all phases are internal operations: respect of contractual terms, good practice, to finish, in an unending effort to develop OFFICES plants AND SHEDS QUARRYING AREA the design phase, procurement, safety measures and social responsibility integrated management tools and systems transformation of raw materials and during all phases of the productive cycle and that will continue to optimise company handover of the finished work. in relations with partners and customers. processes and produce leading edge results. tot.470mc/h tot.9.570 q.li tot.720mc 3.320mc TOTAL CONCRETE TOTAL CEMENT TOTAL AGGREGATES TOTAL QUARRYING PRODUCTION STOCKING CAPACITY STOCKING CAPACITY VOLUME SECTORS OF ACTIVITY PER HOUR

Bulfaro SpA Vehicles 47 15 14 2 Public industrial EARTH MOVING SURFACING SPECIAL VEHICLES Renewable vehicles MACHINES MACHINES and private Asphalt Concrete Aggregates Horeca construction energy projects sources Worksites Infrastructures

INDUSTRIAL PARK NEW LINK ROAD VIADUCT NATIONAL PARK INTERNAL ROADS RESURFACING OF 9 KM STATE ROUTE HIGHWAY COMPLETION OF THE NEW LINK ROAD Colleferro (Rome) Upland Authority for the High Valley ANAS Calabria Terranova (Potenza) ANAS of Potenza Province of Potenza Basic infrastructure of the Production (Potenza) Completion of state route 106, Jonica: Pollino National Park: construction Maintenance of state route 106, Jonica: Completion of the Serrapotina highway between Site Plan area at Valle Settedue and Construction of the Serrapotina highway with construction of a viaduct over an of internal roads to high altitude scarification and repair of deteriorated the junction with provincial route 4 to Contrada construction of the reinforced concrete hydraulic engineering works and construction archaeological site to bypass the villages mountain shelters, road repairs and paving, Km 419+700 to Km 420+400 Rotalupo di Senise: construction of fills and a water tower of a bridge across the Vallone torrent of Bova Marina and Palizzi stormwater drainage and Km 421+000 to Km 428+820 bridge across the Serrapotamo torrent

INDUSTRIAL PARK EXPANSION 5 KM OF FOUR LANE HIGHWAY UPGRADE OF 2 KM STATE ROUTE HIGHWAY WIDENING OF 3.5 KM STATE ROUTE HIGHWAY NEW MUNICIPAL ROAD IMPROVEMENTS TO STATE ROUTE HIGHWAY Senise (Potenza) Pontedera (Pisa) Province of Pisa Province of Pisa San Mauro Forte (Potenza) ANAS Puglia Expansion of the Senise Industrial Construction of the link to the Upgrade, widening and improvements Upgrade, widening and repairs to State Route Construction of the road linking Salice – Hydraulic engineering works to eliminate Park and integration of existing Florence-Pisa-Leghorn trunk road to State Route 439 Sarzanese-Valdera 439 Sarzanese-Valdera in the stretch between Salandrella – Cavonica: construction of new flooding of the cut-and-cover tunnel in infrastructures by means of lime-stabilized fills, in the stretch between La Rosa di Terricciola La Rosa di Terricciola and Montecatini Val di layout, reinforced concrete embankments, Modugno (Bari) and adjacent areas: reinforced underpasses and a reinforced and the municipality of Pomarance Cecina; upgrade of the junction with provincial surfacing and road markings concrete works and stormwater drainage concrete tunnel: lots 1 and 2 (Km 76+660 to Km 78+900) route 26, S. Pietro Belvedere Worksites Aqueducts and sewers

63 KM CHANNEL SEWER NETWORK 25 KM SEWER LINE BOX SECTION SEWERS 18 KM SEWER NETWORK 45 KM IRRIGATION NETWORK Irrigation Authority (Bari) Province of Pisa Province of Potenza Milan South Environmental Protection Consortium Nuove Acque S.p.A. (Arezzo) Piave Reclamation Consortium Water supply system for the municipalities Collectors and sewer networks connected Wastewater collection in the municipalities Collector of the consortium in the Construction of 18 km of wastewater collectors Renewal of the flow and surface irrigation in the area of the Monte Cotugno to the municipal sewer of S. Maria a Monte of and to preserve municipality of San Giuliano Milanese: and 12 lift stations in the areas of Arezzo and system: construction of 45 km of irrigation reservoir: headrace channel construction, and subsequent repair of the roads the reservoir: construction of construction of reinforced concrete Valdichiana for the municipalities of Arezzo, network with branches and pumping stations in total length 63 km disrupted by works 25 km sewer line and two lift stations box section sewers and channels Monte San Savino and Marciano della Chiana municipalities of the province of Treviso

47 KM WASTEWATER COLLECTORS SEWER NETWORK COMPLETION INDUSTRIAL SEWER SANITARY SEWER STORMWATER NETWORK SEWER NETWORK COMPLETION Upland Authority for the High Sinni Valley (Potenza) Wastewater Purification Consortium Isola Consortium (Bergamo) Carovigno (Brindisi) Grottaglie (Taranto) Taranto Rural wastewater collection in the municipalities Connection of the municipality of Baveno Construction of wastewater and industrial Construction of a sanitary sewer Construction of a stormwater Completion of the sanitary sewer of the Upland Authority and connection to the (province of Verbano Cusio Ossola) to the sewer sewer network in the municipalities of Terno network in the municipality network in the 167 north area network for the villages of S.Vito, system of the Senise- water purification network of the consortium and finishing works d’Isola and Chignolo d’Isola of Carovigno Lama and Carelli consortium: construction of the sewer network and wastewater lines for a total of 47 km Worksites Environment

AGGREGATES LANDFILL SITE RIVER BANK PROTECTION WATER PURIFICATION PLANT ARTIFICIAL LAKE COLLECTOR PURIFICATION PLANT Highway Junction Valle d’Aosta Interregional Agency for the Po River Ovada (Alessandria) Noepoli (Potenza) Waters Association of Lodi Cassano Irpino (Avellino) Construction of landfill with debris from Hydraulic engineering works, protection of the Construction of the water Tourism investment: hydraulic engineering Construction of the wastewater collector Construction of the purification plant tunnel boring along the highway route, banks of the Belbo torrent and the villages of purification plant of the consortium, works regulating the water regime and the and purification plant for the for the residential and Production mitigation of environmental impact and Incisa-Scapaccino (Asti): construction of rein- connection to the sewer network Acquabona ditch, construction of the artificial municipalities of Borgo San Giovanni - Site Plan areas including collector, reclamation of the area concerned forced concrete structures and components and reclamation of polluted areas lake and access roads Cornegliano Laudense and Pieve Fissiraga degritting, denitrification, oxidation, etc.

COMPLETION OF THE A.T.E.N.A. WATER WOODEN CHANNELS ENVIRONMENTAL RECLAMATION NATURE RESERVE RECLAMATION AND PATHS PURIFICATION PLANT PURIFICATION PLANT Consortium for Reclamation of the Leghorn Hills Province of Prato Campi Bisenzio (Firenze) Senise (Potenza) Atena Lucana (Potenza) Completion of the water purification plant in Repairs to banks of the main collectors Construction of a flood control reservoir on Hydraulic reclamation subsequent to highway Environmental upgrade of the eastern Construction of a collector and Vercelli of the gravity reclamation sewer network the right bank of the Filimortula ditch in the construction and expansion of the built-up promontory of the built-up area: reclamation, purification plant at Maglianello at La Mazzanta in the municipality of Vada. municipality of Prato and reclamation works area of the municipality of Campi Bisenzio; construction of footpaths, stormwater drainage Construction of hydraulic channels of special including drainage and construction of foot expansion of the Focognano nature reserve and slope stabilisation works Dutch wood instead of reinforced concrete and cycle paths Worksites Stabilisation works

BUILT-UP AREA CHECK DAMS FOR CHANNEL BANK PROTECTION MEDICI VILLA STABILISATION WALLS MITIGATION OF HYDRO-GEOLOGI- LAVELONA CASTLE Region Upland Authority for the High Sinni Valley Cerreto Guidi (Florence) (Potenza) CAL RISK Montalcino (Siena) Stabilisation of the built-up area of Castronuovo di (Potenza) Stabilisation of a landslide to protect Construction of bulkheads with San Martino d’Agri (Potenza) Expansion of Lavelona castle: slope Sant’Andrea (province of Potenza): construction of a Soil stabilisation of runoff water channels the Medici villa in the town centre prestressed micro piles and Stabilisation works for mitigation stabilisation by means of bulkheads, reinforced concrete grid, tie rod anchored bulkhead, in the municipalities connected to by constructing a bulkhead of piles reinforced concrete structures of hydro-geological risk in the tie rods and reinforced concrete retaining stormwater drainage and slope stabilisation the Senise-Noepoli purification plant and other retaining works (retaining walls and urban design) Carbonara and San Giovanni zones walls; constructed wetland plant

LOWERING THE PO RIVER TORRENT BANKS BUILT-UP AREAS OLD TOWN CENTRE BIOENGINEERING TORRENT BED Interregional Agency for the Po River Province of Imperia (Potenza) Senise (Potenza) Fratte (Salerno) Province of Potenza Stabilisation of the river banks in the Completion of works on the right bank Stabilisation of the central and adjacent Works to correct hydro-geological Stabilisation for reasons of safety Completion of the Serrapotina road, stretch municipality of Alzano Scrivia (Alessandria), of Armea torrent in the municipality built-up areas: drainage improvement to instability in the old town centre: of a slope above the built-up area: between the junction with provincial road lowering the water level by dredging one of Sanremo, in the stretch above the the promontory slides, construction of a bulkheads of large-diameter piles, slope stabilisation, stormwater drainage 4 and C.da Rotalupo in Senise: stabilisation million cubic metres of sediment, rock covered flower market bulkhead and connecting beams, construction micro piles, tie rods and reinforced and bioengineering works of the Serrapotamo torrent bed prior to pitching along the banks of a reinforced earth retaining wall concrete retaining walls building the bridge completing the road Worksites Business sustainability Civil and industrial building Quality, environment and safety

CASTLE EXPANSION LOGISTICS BUILDING OFFICE BUILDING Montalcino (Siena) Waters Association of Lodi Senise (Potenza) CERTIFICATIONS Expansion of the accommodation Construction of a service building and an Construction of BULFARO head offices, structure of Lavelona Castle: office building for the purification plant of surrounding yard with The trends for innovation, quality objectives, re- tegrated with great attention to the themes of construction of new wings, the municipalities of Borgo San Giovanni, Betonella paving blocks, gardens roof gardens and finishing works Cornegliano Laudense and Pieve Fissiraga and exterior lighting spect for the environment and dedication to the safety and environmental protection. This has safety of workers constitute the guiding values enabled us to certify the conformity of the pro- along the path of business sustainability that ducts we sell: aggregates, concrete and asphalt. Bulfaro has been following for many years. Today the process of excellence has been With this in mind, in 2001 our registration on completed by implementation of the Code of the national roll of builders was transformed Ethics and the Code of Conduct and certifica- into a Society of Actuaries certificate. In 2002 tion according to ISO 14001 and ISO 18001 we achieved ISO 9001 certification and envi- standards. Our policy based on quality, envi- ronmental certification in 2004. ronment and safety is promoted in all sectors As the company has grown the management where the company operates and at all levels systems have always been configured and in- of the organisation.

                               

             

ISO 9001 Society of Actuaries ISO 14001 ISO 18001 Code of Ethics Code of Conduct RESIDENTIAL COMPLEX MULTI-PURPOSE CENTRE EQUIPMENT STORAGE BUILDING Senise (Potenza) Chiaromonte (Potenza) Piave Reclamation Consortium (Treviso) Construction of nine apartment Construction of a covered market Construction of an industrial building buildings for a total of 40 flats at Servino, in the built-up area for storage of equipment and housing infrastructures and roads electromechanical devices; construction of an eco-sustainable office building Production The plants

ISO 9001 Moliterno CE Aggregates CE asphalt FPC concrete ISO 9001 Chiaromonte Moliterno Chiaromonte Chiaromonte QUARRY AND AGGREGATE ASPHALT PRODUCTION PRODUCTION SITE AND CONCRETE BATCHING Moliterno (Potenza) CHIAROMONTE (Potenza) C.da Carpineta C.da Isca Production 230 m3/h Marini MAP 120/160 asphalt production – 10 aggregate grades plant – built year 2000 Nominal capacity 120 t/h Carbonate aggregates Bitumen emulsion production plant quarry Office No. 2 Concrete batching plants Shed No. 5 Cement storage silos for a total of 400 Vehicle shed tonnes Workshop No. 10 Aggregate storage bins for a total of 80 tonne scales 450 m3 Total production 160 m3/h Projeko Roller system Recycling of materials and mix water 50 tonne scales 80 tonne scales Aggregate crushing and grading plant Sand production plant Vehicle sheds approx. 600 m2 Garage sheds approx. 250 m2 No. 2 Offices 250 m2 Production The plants

SOA Bulfaro S.p.A. ISO 9001 General FPC Concrete ISO 9001 Lagonegro Lagonegro READY MIX CONCRETE BATCHING AND PROJEKO ROLLER CONCRETE BATCHING SENISE (Potenza) LAGONEGRO (Potenza), Zona industriale C.da Carconi Ready mix concrete batching plant No. 1 Concrete batching plant Cement storage silos 252 tonnes No. 2 Cement storage silos Aggregates storage 210 m3 for a total of 200 tonnes Production 90 m3/h Aggregates storage for a Projeko Roller system total of 300 m3 Total production 80 m3/h Weigh-bridge 80 tonnes Concrete laboratory Production The plants

ISO 9001 Lauria FPC Concrete Lauria 1 FPC Concrete Lauria 2 CE Aggregates ISO 9001 Castronuovo S.A. Castronuovo S.A. AGGREGATE GRADING CONCRETE BATCHING AND CONCRETE BATCHING LAURIA (Potenza) Castronuovo di Sant’Andrea (Potenza) C.da Galdo C.da Serrapotamo No. 2 Concrete batching plants Vehicle sheds approx. 700 m2 No. 6 Cement storage silos for a total of 550 tonnes Offices 250 m2 Aggregates storage bins for a total of 500 m3 Aggregate grading plant Total production 150 m3/h Aggregate crushing plant Water and aggregates recycling system Concrete batching plant 90 tonne scales Production The vehicles

ulfaro S.p.A. has a fleet of vehicles and equipment that is adequately dimensioned to Bsupport all of the company’s activities so there is no recourse to plant hire to carry out our commissions. In addition to cars and lorries for transportation, we have excavators, scrapers and loaders for earth moving, dumper lorries and mixers for delivery of aggregates, concrete and asphalt, all types of surfacing equipment and portable concrete batching plants.

No. 10 concrete mixer trucks 3-4 axles with 10-12 m3 drums No. 4 concrete pumps 24-42 mt

No. 14 excavators from 1.5 to 70 tonnes No. 2 scrapers No. 4 road tractors with dry bulk and flatbed trailers No. 14 dumper lorries

No. 2 mini wheel loaders with accessories No. 5 wheel loaders No. 2 crane lorries No. 9 7-seater crew-cab tipper Production The vehicles

No. 2 scarifying cutters width from 1000 to 2000 mm No. 2 sprayers

No. 4 vibro pavers width from 500 to 5700 mm No. 4 compactors from 1.5 to 12 tonnes

Bulfaro S.P.A. Zona Industriale 85038 Senise (PZ) Telefono: +39 0973.584141 Fax:+39 0973.585919 e-mail:[email protected] www.bulfaro.com

No. 3 mobile cranes Demolition tools www.bulfaro.com