PATH TO THE PAD

William Hill Deputy Associate Administrator Deep Space Exploration Systems NASA Headquarters

1 NASA’s Deep Space Exploration System

The spacecraft and , launching from a modernized Kennedy spaceport is foundational to extending human presence deeper into the solar system. 3

Building to Exploration Mission-1 (EM-1)

European Service Module Critical Design Review LVSA Manufacturing Complete Core Stage Green Run Hot Fire Test

Crew Module Pressure Proof Test Mobile Launcher (ML) Umbilicals Installed Crew and Service Module Delivery to EGS

Booster Qualification Motor 2 Test VAC Welding Complete on Core Stage Ground Flight Application Software Complete

Crew Module Propellant Pressure Proof Test Launch Pad Flame Trench Construction Complete Stacking in VAB

VAB Verification & Validation Complete European Service Module Delivered to KSC Core Stage Arrival at KSC

RS-25 Flight Engines Complete All Parachute Tests Complete Core Stage Stacking with Boosters in VAB

ICPS Delivered to KSC Crew Module and Service Module Mate CM/SM Mating with Launch Abort System

Crew Module Initial Power On All Underway Recovery Tests Complete Orion Mating with SLS in VAB

VAB High Bay Construction Complete Core Stage Integration Wet Dress Rehearsal at Launch Pad

Multi-Payload Processing Facility Construction ML Ground Support Equipment Installation Complete Roll-out for Launch

Launch of EM-1

PathPath toto Lunarthe Lunar Surface Surface Deep Space Exploration Systems National Aeronautics and Space Administration Partners and Suppliers in America 9 Concept of Operations

Transfer Elements to VAB Integrated Operations LAS Launch Abort LAS/CM/SM System Facility

CT-2 Ogive CM/SM Transport to Pad Offline Spacecraft Processing Launch Crew Module ESM OSA Service Operations & ICPS Module Checkout Facility

OSA Multi-Payload Processing Facility VAB High Bay 3 & 4 ICPS Interim Cryogenic Propulsion ML Vehicle Integration & Test Stage Storage LC-39B Space Station Processing LVSA Facility Pad B LVSA Turn Basin Core Stage Core Stage Solid Rocket LCC Booster Processing VAB

Railcar to SRB Rotation Processing & Surge Facility Landing and Recovery Crew Jay-Jay Bridge RPSF Module Pacific Coast Recovery Recovery & Space Launch System Manufacturing Transport to KSC for Crew De-servicing Fwd Module Skirt Landing

Aft Skirt Hangar AF BFF Aft/Fwd Skirt, CSA Ring & Frustum Aft/Fwd Skirt, CSA Ring Buildup Refurb (SLS Production Activities) (SLS Production Activities) JSOG Activities Multi Payload Processing Facility (MPPF)

11 Mobile Launcher (ML)

12 Vehicle Assembly Building (VAB)

13 Launch Control Center (LCC)

14 Underway Recovery Test - 7 (URT)

15 Ascent Abort - 2 Test (AA-2)

16 Northrop Grumman – Solid Rocket Booster

Boosters for EM-1 are complete and in storage, awaiting shipment to .

17 18 Northrop Grumman – Solid Rocket Booster

Boosters for EM-2 are in process – just one more left to cast (fill with propellant). Have begun work on motors for FSB-1.

19 Northrop Grumman – Launch Abort and Attitude Control Motors

• The launch abort motor for EM-1 is scheduled to ship in April. • We have successfully conducted two static fire qualification motors. • AA-2 test this spring.

20 21 Engines of Choice for NASA’s Space Launch System (SLS) and Orion space craft

RS-25 Progress

Engines complete for EM-1; ✔ great progress made for EM-2

All flight controllers delivered; ✔ 14 of 17 completed green run Restart program: lowers engine cost ✔ and maintains SSME reliability

Strong test program continues, validating ✔ design, mfg. & affordability improvements

Meeting 33% cost reduction target; ✔ defining paths to even greater affordability & production rates

24 25 RL10 Progress

Completed engine integration with ✔ SLS upper stage ICPS for EM-1

RL10 engines for future flights are ✔ on cost and schedule

Manufacturing in progress for 9 out ✔ of 10 new RL10 engines.

New engines on track for delivery— ✔ the first 4 by 2019

26 RS-25 and RL10 Readiness

27