East Lindsey Flood
Total Page:16
File Type:pdf, Size:1020Kb
Duty to Investigate Section 19 Investigations Lincolnshire County Council Section 19 Investigations - East Lindsey District Council Network Area - Area Highways Manager Russell Crockford (East) Risk Management Authorities S19 Report Number Of Investigation with Responsibilities and Estimated Timescales LCC / District Council EA Work IDB Work Water Company 3rd Party Date of Incident Town / Locality Street / Road Name Description of Flooding Proposed Action/Works Promoter Overall Works Status Works Completion Date File Properties Status whether they are exercising Recommendation Work Status Status Status Work Status Work Status Reference functions 2014 East Street - LN9 6AA LCC Overland and highway surface water flows collected at the low area of East Street and Task 1 - LCC & AW has submitted a bid for an overall surface water study for Horncastle with feasibility 28 June 2012 Horncastle 2 Residential Completed LCC - Yes & Completed Completed NA NA Completed NA Task 1 - 28 July 2017 S19-001 Stanhope Road causing internal flooding. and design programmed for 2014/15 of approved; works to be programmed 2015/16/17. Stanhope Road - LN9 5EL AW 2015 - 2017 2014 Task 1 - LCC has removed blockages within the drainage system and relocate the gas main . LCC - Yes 1 School Task 1 - 08/04/2014 28 June 2012 Horncastle West Street - LN9 5AD Surface water runoff to cause internal flooding. Completed Task 2 - LCC has submitted a bid for an overall surface water study, if approved works to be LCC & Completed Completed NA NA NA NA S19-002 3 Residential Task 2 - 28 July 2017 programmed 2015/1/17. Anglian Water - Yes 2015 - 2017 Task 1 - LCC is to check and repair their gullies and system. Task 2 - Anglian Water is to check their surface water systems and consider improvement works in Task 1 - 01/09/2017 South Street - LN9 6EF Anglian Water - Yes Surface water flows collected at the low area of the Bull Ring and South Street causing future asset management plans. Task 2 - TBC 28 June 2012 Horncastle 3 Residential Completed LCC 2018/19 On-going TBC TBC TBC TBC TBC S19-003 internal flooding. Task 3 - LCC has submitted a bid for an overall surface water study, if approved works to be Task 3 - 28 July 2017 Bull Ring - LN9 5HU LCC - Yes programmed 2015/1/17. Task 4 - TBC Task 4 - LCC is to include additional minor works in the future works programme. Task 1 - Highway drainage system repaired and functioning. LCC - Yes Task 2 - Anglian Water checked the surface water system and it is working acceptably. Initial works Task 1 - 05/07/2012 Overland flows from the adjacent hillside and agricultural land, which was not delivered. Task 2 - TBC 28 June 2012 Horncastle Langton Hill - LN9 5AH 4 Residential Completed Anglian Water - Yes LCC 2019/20 On-going TBC TBC TBC TBC TBC S19-004 contained by the interceptor ditch causing internal flooding. Task 3 - Consideration should be given to an overall surface water study for Horncastle. Task 3 - 28 July 2017 Task 4 - Witham 3rd Internal Drainage Board is ensuring that ditches are cleared by respective riparian Task 4 - TBC Witham 3rd IDB - Yes land owners. Mark Avenue - LN9 5BD Anglian Water - Yes LCC Task 1 - Riparian ditches cleaned out. Task 1 - TBC Significant overland flows from the adjacent hillside and agricultural land causing Task 2 - Anglian Water has fitted a new grill on its sewer and access points to deal with safety concerns 28 June 2012 Horncastle Accommodation Road - LN9 5AS 14 Residential Completed Witham 3rd IDB - Yes AW 2018/19 Completed Completed NA Completed Completed NA Task 2 - TBC S19-005 internal flooding. related to cleaning debris from watercourse. Task 3 - TBC Task 3 - An LCC capital scheme is included in the Medium Term Plan for works in 2020/21 Prospect Street - LN9 5BA ELDC - Yes Witham 3rd IDB 2014 Significant overland flows from the adjacent school field and Bowl Alley Lane. The Anglian Water - Yes LCC 28 June 2012 Horncastle Bowl Alley Lane - LN9 5EJ surface water collected at the lowest point causing flooding to the adjacent properties 3 Residential Completed Task 1 - Partnership scheme developed between LCC Highways, Education and AW. & Completed Completed NA NA Completed NA Task 1 - 2015 / 2016 S19-006 in Bowl Alley Lane. LCC - Yes AW 2015 - 2017 Main Road - LN9 6JE Task 1 - LCC removed dropped kerbs outside the post office and replaced them with full height kerbs. Task 1 - TBC 28 June 2012 New Bolingbroke Highway surface water flows collected in the low area causing internal flooding. 7 Residential Completed LCC - Yes LCC 2014 - 2016 On-going TBC NA NA NA NA S19-007 Task 2 - TBC Station Row - PE22 7LB Task 2 - LCC investigation found the drainage system to be damaged by buildings/trees and a new outfall is required. Solution being designed and costed. Trapped surface water on the south side of the trail caused internal flooding to one Horncastle Road - LN10 6YQ Task 1 - Temporary relief trench cut and boarded. Task 1 - Autum 2012 28 June 2012 Roughton Moor property. 1 Residential Completed LCC - Yes LCC Complete Autum 2012 Completed Completed NA NA NA NA S19-008 Task 2 - LCC designing a solution as Spa Trail upgrade has affected the natural overland flow path. Task 2 - Autum 2012 LCC - Yes Surface water flows bypassing kerb gullies and collecting in the low area of Task 1 - Capacity issues checked and found to be acceptable. Task 1 - Autum 2013 28 June 2012 Skegness Sunningdale Close - PE25 1BA Sunningdale Close, overland flows from the rear of the houses also contributed to the 4 Residential Completed Anglian Water - Yes ELDC Complete Autumn 2013 Completed NA NA Completed NA NA S19-009 Task 2 - ELDC installed new gullies. Task 2 - Autum 2013 internal flooding. ELDC - Yes Task 1 - LCC have completed a feasibility report. An outline business case for FDGiA is being prepared Witham 4th IDB - Yes Overland flows surcharged a number of watercourses in the area resulting in internal for delivery of a scheme after 2021. Possible works 28 June 2012 Toynton St Peter Ings Lane - PE23 5AU 1 Residential Completed LCC On-going TBC NA NA NA NA Task 1 - TBC S19-010 flooding to a low lying property in Ings Lane. 2021/22 LCC - Yes Works completed date - TBC. Task 1 - Witham 3rd Internal Drainage Board has instructed a developer to clear the ditches to the rear Witham 3rd IDB - Yes Surcharging of the highway drainage system (which flows into Tattershall Road) Task 1 -Summer 2014 28 June 2012 Woodhall Spa Albany Road - LN10 6TS 5 Residential Completed of Witham Road, and leading to the culvert crossing Albany Road. LCC Complete Summer 2014 Completed Completed NA NA NA NA S19-011 causing backflow into Albany Road causing internal flooding. Task 2 - Summer 2014 Task 2 - Culvert designed by LCC has been installed. LCC - Yes Task 1 - NM awaiting information from IDB regarding possible connection to water course. Surcharging from the highway drainage system due to blockages within the system Task 2 - LCC has investigated the highway drainage system and undertaken a CCTV survey which Task 1 - TBC 29 June 2012 Chapel St Leonards The Esplanade - PE24 5TB 2 Residential Completed LCC - Yes LCC April 2017 Completed Completed NA NA NA NA S19-012 caused internal flooding. indicates blockages and root infestation. Gullies and connections have been jetted. Further work is Task 2 - 07/01/2015 planned to clear roots and blockages within the system. Surcharging of Anglian Water surface water system due to displaced pipe work 28 June 2012 Chapel St Leonards Fairfield Avenue - PE24 5SB 1 Residential Completed Task 1 - AW to complete repair works to the displaced pipework. Anglian Water - Yes LCC Complete Winter 2013 Completed Completed NA NA NA NA Task 1 - 01/11/2013 S19-013 caused internal flooding. Task 1 - LCC has carried out works to trim and harden the verge to prevent future siltation and 28 June 2012 Saltfleet Main Road - LN11 7RZ Blockage to the adjacent gully caused internal flooding. 1 Residential Completed LCC - Yes LCC Complete Winter 2013 Completed Completed NA NA NA NA Task 1 - Winter 2013 S19-014 blockages of the channel and gully. Overland and highway surface water flows entering low lying property causing internal Task 1 - ELDC has investigated the surface water system and installed a new manhole enabling 28 June 2012 Saltfleet Pump Lane - LN11 7RL 1 Residential Completed ELDC - Yes ELDC Complete Winter 2013 Completed Completed NA NA NA NA Task 1 - 01/11/2013 S19-015 flooding. access, and will cleanse and repair the current system. This will include installing new gullies. Duty to Investigate Section 19 Investigations Lincolnshire County Council Section 19 Investigations - East Lindsey District Council Network Area - Area Highways Manager Russell Crockford (East) Risk Management Authorities S19 Report Number Of Investigation with Responsibilities and Estimated Timescales LCC / District Council EA Work IDB Work Water Company 3rd Party Date of Incident Town / Locality Street / Road Name Description of Flooding Proposed Action/Works Promoter Overall Works Status Works Completion Date File Properties Status whether they are exercising Recommendation Work Status Status Status Work Status Work Status Reference functions Task 1 - Since the summer ELDC have required the developer to complete the retaining wall, install the missing gullies, and clean out the surface water sewer system, which should mitigate the overland flows from the development. They commissioned a hydrological study in April 2013 which is now complete. The report makes a number of recommendations - the most significant being to install a much larger AW ELDC - Yes AW Overland flows from adjacent Riverhead development, and flows from the Terrace Completion due Summer Task 1 - TBC 28 June 2012 Louth Riverhead Terrace - LN11 0DD 9 Residential Completed pumping station.