Examination of Estimates of Expenditure 2021-22 Reply Serial No. HAB172 CONTROLLING OFFICER's REPLY (Question Serial No. 2374)
Total Page:16
File Type:pdf, Size:1020Kb
Examination of Estimates of Expenditure 2021-22 Reply Serial No. HAB172 CONTROLLING OFFICER’S REPLY (Question Serial No. 2374) Head: (95) Leisure and Cultural Services Department Subhead (No. & title): (-) Not Specified Programme: (1) Recreation and Sports, (4) Performing Arts Controlling Officer: Director of Leisure and Cultural Services (Vincent LIU) Director of Bureau: Secretary for Home Affairs Question: (a) Please list in a table the details and expenditures of minor works projects costing not less than $1 million for renovation, improvement and upgrading of recreation and sports facilities under the Leisure and Cultural Services Department in 2020-21 and 2021-22. (b) Please list in a table the details and expenditures of minor works projects costing not less than $1 million for renovation, improvement and upgrading of performing arts facilities under the Leisure and Cultural Services Department in 2020-21 and 2021-22. Asked by: Hon MA Fung-kwok (LegCo internal reference no.: 45) Reply: The Leisure and Cultural Services Department (LCSD) keeps constant review of the provision and conditions of recreation, sports and performing arts venues under its purview. It also undertakes works projects to provide new facilities or renovate/improve existing facilities to meet the changing needs of the public. There are minor works projects primarily for the improvement and upgrading of existing recreation and sports facilities. The details and estimated expenditure of minor works projects not less than $1 million in 2020-21 and 2021-22 are at Annexes I and II respectively. As regards the performing arts facilities, details and estimated expenditure of those minor works projects not less than $1 million in 2020-21 and 2021-22 are at Annexes III and IV respectively. Annex I to Reply Serial No. HAB172 LCSD’s Minor Works Projects for Existing Sports and Recreation Facilities (2020-21) Works Expenditure Brief description of renovation, Venue commencement in 2020-21 improvement and upgrading works date ($ million)(1) 1. Hong Kong Stadium Slope (11SW-D/DT17) upgrading works Jul 2018 2.478 2. Fa Hui Park Refurbishment of lighting system in the park Nov 2018 1.170 3. Jordan Valley Swimming Pool Refurbishment of leisure pools and water play equipment Nov 2018 2.806 4. Sun Yat Sen Memorial Park Refurbishment of metal roofing and floor Dec 2018 2.728 Sports Centre 5. Quarry Bay Sports Centre Refurbishment of sports centre including arena, toilets, squash courts, Jan 2019 5.397 dance room and table tennis rooms 6. Tai Po Sports Ground Replacement of wooden fencing and flagstaff Feb 2019 2.911 7. Urban Council Centenary Garden Refurbishment (Phase III): replacing floor blocks, lamp posts, seating Mar 2019 1.953 benches and manhole covers 8. Tsing Tin Playground Refurbishment of lighting system and external paving Mar 2019 1.801 9. Hang Ming Street Sitting-out Provision of a sitting-out area at Hang Ming Street, Ma On Shan Apr 2019 5.998 Area (Area 90 in Ma On Shan) 10. Victoria Park Refurbishment of lighting system in the park May 2019 2.623 11. Cheung Chau Sports Ground Refurbishment of soccer pitch, athletic field, paving adjacent to May 2019 2.051 basketball court, railings and storage cabinets in changing rooms 12. Sai Tso Wan Recreation Ground Refurbishment of the office and toilets May 2019 2.073 13. Mong Kok Stadium Improvement of closed-circuit television (CCTV) Jun 2019 1.304 14. Morse Park Swimming Pool Refurbishment of pools Jun 2019 6.023 15. Tung Chung North Park Refurbishment of external finishes, barrier-free access facilities, Jul 2019 5.345 spectator stand and lighting system 16. Siu Sai Wan Sports Ground Construction of new foot path and new wave breaking boundary wall Jul 2019 1.131 and reinstatement Works Expenditure Brief description of renovation, Venue commencement in 2020-21 improvement and upgrading works date ($ million)(1) 17. Morrison Hill Swimming Pool Improvement of the sand filtration tank system and calorifier Aug 2019 1.000 (Training pool) 18. Cheung Chau Park Refurbishment of park facilities, toilet and roof of service building Aug 2019 2.402 19. Cheung Chau Sports Centre Refurbishment of fitness room, activity room and external wall Aug 2019 1.032 20. Tsuen King Circuit Playground Refurbishment of tennis courts, basketball courts, playground and Aug 2019 2.347 facilities 21. North District Sports Ground Improvement of lighting system at tennis courts, soccer pitch, Sep 2019 1.055 children’s playground, spectator stand and toilets 22. Pao Yue Kong Swimming Pool Improvement of lighting system and refurbishment of water play Sep 2019 1.566 equipment 23. Blake Gardens Slope upgrading works Sep 2019 2.358 24. Yuet Wah Street Playground Refurbishment of benches, arbours and toilets Sep 2019 2.302 25. Lam Tin South Sports Centre Refurbishment of arena Sep 2019 1.017 26. Cafeteria Old Beach Refurbishment of toilets Sep 2019 2.964 27. Quarry Bay Park Refurbishment of toilets and changing rooms, replacement of lighting Sep 2019 1.267 system 28. Shing Mun Valley Swimming Improvement of plant, stair and outdoor pool lighting system Oct 2019 1.567 Pool 29. Chai Wan Swimming Pool Replacement of signages, lighting system and emergency lighting Oct 2019 2.146 30. Tsuen King Circuit Recreation Refurbishment of toilet block and pavement surface Oct 2019 1.332 Ground and Rest Garden 31. Wu Shan Tennis Courts Refurbishment of surface of tennis courts, pavilion, railings, benches Oct 2019 3.614 and external paving 32. Tai Po Waterfront Park Refurbishment of jogging track and footpath from Pavilion no. 5 to 7 Oct 2019 1.817 33. Ho Man Tin Swimming Pool Refurbishment of outdoor leisure pool (no.4) Nov 2019 2.453 34. Hammer Hill Park Replacement of CCTV and irrigation system Nov 2019 1.639 35. Morrison Hill Swimming Pool Improvement of the ceiling of men’s and ladies’ changing rooms Nov 2019 4.100 36. Tuen Mun Swimming Pool Refurbishment of main pool Nov 2019 2.190 Works Expenditure Brief description of renovation, Venue commencement in 2020-21 improvement and upgrading works date ($ million)(1) 37. Aldrich Bay Promenade Refurbishment of toilets Nov 2019 3.285 38. King's Park Recreation Ground Refurbishment of pavilion and benches, resurfacing of floor blocks Nov 2019 1.368 39. The Jockey Club Yan Oi Tong Refurbishment of water slide Nov 2019 2.553 Swimming Pool 40. Vacant government land Conversion of land near 11SE-A/R56 and 11SE-A/R57 at Dragon Road Dec 2019 12.000 into a rest garden 41. Morse Park Swimming Pool Electronic improvement of men’s and ladies’ changing rooms and Dec 2019 1.007 toilets 42. Luen Wo Hui Playground Replacement of fencing of soccer pitch and basketball court Dec 2019 1.089 43. Tai Tau Leng Sitting-out Area Improvement of venue facilities Dec 2019 1.583 44. Junction Road Park Installation of walkway cover Dec 2019 1.600 45. Chuk Yuen Sports Centre Refurbishment of flooring and acoustic panel of arena Jan 2020 2.546 46. Po Kong Village Road Sports Refurbishment of flooring and acoustic panel of arena Jan 2020 2.546 Centre 47. Aberdeen Tennis and Squash Refurbishment of tennis courts Jan 2020 2.200 Centre 48. Kau Pui Lung Road Playground Replacement of pavilion Feb 2020 1.538 49. Shek Kip Mei Park Sports Centre Improvement to the air-conditioning system Feb 2020 1.520 50. Yuen Wo Playground Refurbishment of 4 tennis courts and 2 7-a-side hard surface soccer Feb 2020 2.581 pitches 51. Shek Kip Mei Park Sports Centre Refurbishment of men’s and ladies’ changing rooms and toilets on G/F Feb 2020 1.731 52. Pak Wo Road Playground Refurbishment of external pavings of bicycle practicing area and Feb 2020 1.119 replacement of park benches and manhole covers 53. Yau Oi Sports Centre Refurbishment of sports centre including flooring, safety padding, Feb 2020 5.970 acoustic panel of arena and corridor railings on 1/F 54. Lai Chi Kok Park Swimming Conversion of light refreshment restaurant into ancillary facilities Mar 2020 3.089 Pool Works Expenditure Brief description of renovation, Venue commencement in 2020-21 improvement and upgrading works date ($ million)(1) 55. Lei Yue Mun Waterfront Sitting- Refurbishment of arch Mar 2020 3.854 out Area 56. Wah Lam Path Sitting-out Area Provision of play equipment Mar 2020 3.065 57. Shau Kei Wan Service Reservoir Installation of lighting system for jogging tracks Mar 2020 1.870 Playground 58. Tsing Yi Promenade Improvement of lighting Mar 2020 1.029 59. Portland Street Rest Garden Building a new pergola, installation of CCTV system, provision of Mar 2020 4.500 drinking fountain and vertical green walls, resurfacing floor blocks and provision of movable tables and chairs 60. Chai Wan Park Refurbishment of toilets Mar 2020 3.196 61. San Wai Tsai Children's Refurbishment of walls, pavement, pavilion and benches Mar 2020 1.109 Playground 62. San Hui Playground Refurbishment of basketball courts Mar 2020 2.503 63. Hong Kong Park Refurbishment and improvement of Tai Chi Garden Apr 2020 1.889 64. Wong Chuk Hang Sports Centre Replacement of flooring, acoustic panel of arena, and repainting of Apr 2020 2.384 walls 65. Fanling Recreation Ground Replacement of boundary fence and gate Apr 2020 4.439 66. Ma Wan Tung Wan Beach Re-construction of 2 lookout towers Apr 2020 1.060 67. Shek O Headland Picnic Area Reinstatement of bridge (the Blue Bridge) and peripheral walkway Apr 2020 14.980 68. Pak Fuk Tin Sum Playground Refurbishment of jogging path and arbour Apr 2020 2.328 69. Middle Bay Beach Refurbishment of surface Apr 2020 1.417 70. Hammer Hill Road Swimming Refurbishment of indoor pool (including replacement of floor blocks, Apr 2020 12.000 Pool acoustic panels and roof painting) and water play equipment 71.