20150424-5254 FERC PDF (Unofficial) 4/24/2015 1:24:11 PM UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION 8point3 Energy Partners LP ) Docket No. EC15-___-000 Solar Star California XIII, LLC ) APPLICATION FOR AUTHORIZATION UNDER SECTION 203 OF THE FEDERAL POWER ACT AND REQUEST FOR EXPEDITED ACTION William B. Conway Jr. SKADDEN, ARPS, SLATE, MEAGHER & FLOM LLP 1440 New York Avenue, N.W. Washington, DC 20005 Tel: (202) 371-7135 Fax: (202) 661-0535
[email protected] Counsel for 8point3 Energy Partners LP and Solar Star California XIII, LLC April 24, 2015 20150424-5254 FERC PDF (Unofficial) 4/24/2015 1:24:11 PM UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION 8point3 Energy Partners LP ) Docket No. EC15-___-000 Solar Star California XIII, LLC ) APPLICATION FOR AUTHORIZATION UNDER SECTION 203 OF THE FEDERAL POWER ACT AND REQUEST FOR EXPEDITED ACTION Pursuant to section 203(a)(1) and 203(a)(2) of the Federal Power Act (“FPA”)1 and Part 33 of the regulations of the Federal Energy Regulatory Commission (“FERC” or “Commission”),2 Solar Star California XIII, LLC (“Solar Star XIII”) and 8point3 Energy Partners LP3 (“8point3 Partners” and together with Solar Star XIII the “Applicants”) hereby submit this application (“Application”) requesting authorization for: 1. The contribution to 8point3 Operating Company, LLC (“OpCo”) by SunPower Corporation (“SunPower”) of SunPower’s indirect ownership interest in Solar Star XIII and the contribution to OpCo by SunPower and First Solar, Inc. (“First Solar”) of other indirect ownership interests in certain other solar electric generation companies (such interests collectively with SunPower’s interest in Solar Star XIII the “Contributed Interests”); 2.