Godrej Upavan Location Docket
Total Page:16
File Type:pdf, Size:1020Kb
GODREJ UPAVAN THANE EXTENSION Thane Extensionwelcomes you to the future. Stock image for representation purpose only. Stock image for representation The project is registered as Godrej Upavan under MahaRERA No. P51700027436 available at http://maharera.mahaonline.gov.in. The project is being developed by “Prakhhyat Dwellings LLP” in which Godrej Properties Limited is a partner. The sale is subject to terms of the Application Form and the Agreement, including specication. All specications of the unit shall be as per the nal agreement between the Parties. Recipients are advised to apprise themselves of the necessary and relevant information of the project / offer prior to making any purchase decisions. The ofcial website of Godrej Properties Ltd. is www.godrejproperties.com. Please do not rely on the information provided on any other website. The upcoming infrastructure facilities mentioned in this document are proposed to be developed by the Government and other authorities and we cannot predict the timing or the actual provisioning of the facilities, as the same is beyond our control. We shall not be responsible or liable for any delay or non-provisioning of the same. Mumbai plans its future at Thane Extension purpose only. Stock image for representation Welcome to Godrej Upavan, a home located at Thane Extension that is only a 20-minute** drive time from the Majiwada Circle. You will nd 20-minute yourself at a location where Mumbai drive time** from Thane Majiwada is planning its future. It ticks all the Circle. boxes of a good real estate hub-accessibility, infrastructure and quality of life. Thane Extension offers easy connectivity to major business centres and the ease of access to various major cities and towns.* It is slowly becoming one of the biggest attractions for home-buyers. The central location of Thane-Kalyan-Ambivali now opens its arms to Godrej Upavan, a home that gives you more. *https://www.hindustantimes.com/mumbai-news/thane-real-estateamong-top-20-in-the-world-where-rich-want-to-inv est-survey/story-efXxd1kGc0gjgV0hcL6iPI.html **Drive time refers to the time taken to travel by a car basis normal trafc conditions during non-peak hour as per Google maps. Your own Garden of More In the Heart of a Growing Residential Hub You will be living at a location that has been seeing a great growth in terms of new residential investments happening over the recent years, much more than most areas of the Mumbai Metropolitan Region. Source: Liases Foras Stock image for representation purpose only. The growth story of Thane Extension The location has consistently maintained a Compounded Annual Growth Rate (CAGR) of greater than 20% in the last 5 years. 8000 7000 6000 5000 4000 3000 2000 1000 0 FY 12-13 FY 13-14 FY 14-15 FY 15-16 FY 16-17 FY 17-18 FY 18-19 FY 19-20 THANE THANE EXTENSION 148% growth in the number of apartments bought in Thane in the last 5 years, but for Thane Extension it has been 254% Stock image for representation purpose only. Stock image for representation Source: Liases Foras The gardenthat’s at the centre of life Thane Extension stands right at the centre of a thriving locality. Everything you need for a comfortable life is only a few minutes away. TOWARDS NASHIK PRESIDENCY SCHOOL BHIWANDI GODREJ UPAVAN NKT INTERNATIONAL PROPOSED SCHOOL A METRO STATION* KALYAN GHODBUNDER ROAD TREE HOUSE INTERNATIONAL PODAR SCHOOL KALYAN - BHIWANDI ROAD INTERNATIONAL SCHOOL PVR CINEMA VED HSOPITAL BIRLA THANE - BHIWANDI ROAD SCHOOL & COLLEGE HOLY CROSS HOSPITAL FORTIS HOSPITAL CARNIVAL SM5 R MALL SHREEDEVI HOSPITAL VASANT VIHAR SCHOOL INOX CINEMA MUMBAI - NASHIK EXPRESSWAY METRO JUNCTION MALL CINEMAX JUPITER HOSPITAL VIVIANA MALL SULOCHANA DEVI SINGHANIA SCHOOL CINÉPOLIS KORUM MALL INOX DOMBIVLI MUMBAI THANE KALYAN - SHILPHATA ROAD NATIONAL HIGHWAY MUMBAI ROAD TOWARDS PROPOSED METRO LINE TOWARDS TOWARDS SHILPHATA MUMBAI PANVEL LANDMARK METRO STAION HOSPITAL SCHOOL & COLLEGE MALL CINEMA HALLS MAP NOT TO SCALE. SOURCE: GOOGLE MAPS. *Source: https://mmrda.maharashtra.gov.in/metro-line-5# Thecentre of convenience and connectivity INOX 20 Mins Kalyan Station 15 Mins Fortis Hospital Podar International 15 Mins School Airport Kalyan - Shilphata Road 15 Mins 20 Mins** 30 Mins Mumbai - Nashik Expressway 1 Min Shreedevi Hospital 15 Mins Thane 20 Mins Holy Cross Hospital Tree House 15 Mins International School 15 Mins Korum Mall Upcoming 25 Mins THANE Metro Station* Bhiwandi Station 1 Min 6 Mins EXTENSION Jupiter Hospital 25 Mins Cinepolis 15 Mins Birla School & College 15 Mins Ved Hospital PVR Cinemas 15 Mins 10 Mins Presidency School Metro Junction Mall 15 Mins Vasant Vihar International School 15 Mins Viviana Mall 30 Mins 25 Mins Sulochana Devi Singhania School 25 Mins EASY ACCESSIBILITY TO Pune, Nashik, Goa and Ahmedabad Thane Extension Mumbai Pune Mumbai-Ahmedabad Highway (NH 4) Highway (NH 8) Mumbai-Nashik Thane Highway (NH 3) Ghodbunder Road Bhiwandi-Kalyan Stock image for representation purpose only. Stock image for representation Shilphata Road Source: The above time shown are drive times. Drive time refers to the time taken to travel by a car basis normal trafc conditions during non-peak hour as per Google Maps. *https://www.hindustantimes.com/mumbai-news/metro-lines-4-and-5-to-be-linked-at-station-in-thane/storyExLA0iR u8QWQnm16T5v0QJ.html **https://economictimes.indiatimes.com/news/politics-and-nation/pm-narendra-modi-lays-foundation-stone-of- navi-mumbai-international-airport/articleshow/62970239.cms Liveat the address of tomorrow, today REASONS TO LIVE AT THANE EXTENSION Upcoming Mumbai Metro Line 51 The work for Phase 1 of Metro Line 5 is underway and so far 4-5% of the overall metro work has been completed. Basis the update in Oct 2020, 33 pier work has been completed and 457 piers are yet to be built. About 3 per cent of station work and 5.2 per cent of viaduct work has been attained, according to the MMRDA. The upcoming metro station is just a 2 minute walk from Godrej Upavan. Stock image for representation purpose only. Stock image for representation 1.https://www.hindustantimes.com/mumbai-news/metro-lines-4-and-5-to-be-linked-at-station-in-thane/story-ExLA0i Ru8QWQnm16T5v0QJ.html https://www.freepressjournal.in/mumbai/metro-line-5-phase-1-deadline-revised-to-2024#:~:text=The%20Mumbai%2 0Metropolitan%20Region%20Development,the%20Phase%201%2C%20was%202022.&text=The%20entire%2024.5 %20km%20Metro,to%20cost%20Rs%208%2C416%20crore. Stock image for representation purpose only. Stock image for representation Connectivityto Thane like never before The announcement also stated that the upcoming Metro Line 5 will be connected with Metro Line 4 and Metro Line 12* Godrej Kalyan Upavan Dombivli MIDC Taloja Kasarwadavli Kapurbawadi Wadala Mumbai Metro Line *https: //www.moneylife.in/ar ticle/maharashtra-clears-three-new-metro-routes-worth-rs24000-crore-for-mumbai /57748.html Athat location has it all 8 LANE 126 KM LONG VIRAR ALIBAUG CORRIDOR2 MMRDA has planned a 126 km long, 8 lane corridor, from Virar to Alibaug which will connect important towns such as Virar, Panvel, Bhiwandi, Kalyan, Pen, Uran and Alibaug. For increased connectivity and reach to each and every area nearby, over 330 hectares of land have been earmarked for this project. TheKalyan Business District3 The South Korean government is partnering with the Maharashtra government and this ambitious project is all slated to be completed by 2028 with an investment of `56,676-crore. Stock image for representation purpose only. Stock image for representation 2. https://www.hindustantimes.com/mumbai-news/virar-alibaug-corridor-in-fast-lane-maharashtra-gov t-seeks-14-000-cr-loan-from-world-bank /story-EcYUuVdMKR4Kl9R8Ok9ZoM.html 3. https://epaper.timesgroup.com/Olive/ODN/TimesOfIndia/shared/ShowArticle.aspx?doc=TOIM%2F2018%2F04%2 F07&entity=Ar05503&sk=E73935FF&mode=text# Thane- Dombivlibridge The proposed 980-metre-long-bridge4 will reduce travel time from Mankoli to Dombivli. The land acquisition process in Suryagoan and Saranggoan towards Mankoli side is on and the Collector is expected to hand over the land to Mumbai Metropolitan Region Development Authority (MMRDA) by December 2020 end. The Mothagaon-Mankoli bridge connecting Dombivli (W) and Bhiwandi over the Ulhas River is targeted to be completed by June 2022. Stock image for representation purpose only. Stock image for representation https://frontierindia.com/mothagaon-mankoli-bridge-work-on-ulhas-creek-to-be-ready-by-june-2022/#:~:text=Mahar ashtra-,Mothagaon%2DMankoli%20bridge%20work%20on%20Ulhas%20creek,be%20ready%20by%20June%20202 2&text=The%20Mothagaon%2DMankoli%20bridge%20connecting,be%20completed%20by%20June%202022. 4.https://www.hindustantimes.com/mumbai-news/state-gives-nod-to-grant-1-44-acre-of-mangrove-land-for-thane-d ombivli-bridge/stor y-LPYx xsMOf3eup1qCf4OrsN.html https: //maharashtratimes.indiatimes.com/maharashtra / thane-kokan-news/ thane/new-contractor-for-mankoli-bridge/articleshow/66940395.cms Connectivity like no other Samruddhi Mahamarg The 701 km long expressway will connect Thane to Nagpur and will reduce the travel time to 8 hrs from current travel time of 14 to 15 hours (Mumbai to Aurangabad in 4 hrs and Aurangabad to Nagpur in 4 hrs). The Mumbai-Nagpur super communication expressway will pass through 10 districts. Not only will the super expressway connect Nagpur to Mumbai, but it will also provide direct connectivity to country’s largest container port – JNPT. Current Status 40% work on the ambitious project has been completed and the 623-km Igatpuri-Nagpur stretch will be fully operational by December 2021. The remaining 78-km stretch in Thane district Stock image for representation purpose only. Stock image for representation https://www.nancialexpress.com/infrastructure/roadways/mumbai-nagpur-super-communication-expressway-route- length-maharashtra-samruddhi-mahamarg/1444512/ https://indianexpress.com/article/india/40-pc-work-on-samruddhi-corridor-completed-623-km-stretch-to-be-operati onal-by-dec-2021-6529858/ : SALES LOUNGE : Godrej Upavan, Sales Lounge, E-10, Bhumi World - Industrial Park, Mumbai-Nashik Highway, Thane, 421 302, Maharashtra.