Back Bay 1,800 SF - 4,300 SF LUXURY RETAIL OPPORTUNITY

Total Page:16

File Type:pdf, Size:1020Kb

Back Bay 1,800 SF - 4,300 SF LUXURY RETAIL OPPORTUNITY No. BOYLSTON308 STREET THE HERITAGE ON THE GARDEN Back Bay 1,800 SF - 4,300 SF LUXURY RETAIL OPPORTUNITY 617.274.4900 bosurban.com The Druker [email protected], Ltd. 617.274.4900 The// [email protected] Druker Company,// bosurban.com Ltd. BACK BAY THE HERITAGE ON THE GARDEN LUXURY RETAIL OPPORTUNITY // THE LOCATION Boston Urban Partners is pleased to offerup to 4,300 SF VIEW FROM THE PUBLIC GARDEN of luxury retail space at Boston’s preeminent mixed-use building: The Heritage On The Garden. The space offers: • Premier location: situated at the corner of Arlington & Boylston Streets • Excellent accessibility: adjacent to the Arlington T Station (8,519 daily passengers) • Luxury co-tenants: Hermes, Bottega Veneta, Anne Fontaine, Christofle, St. John, Exhale Spa, Bistro du Midi, Doretta Taverna & Raw Bar and 125,000 SF of first class office tenancy • Captive audience: 87 luxury residences above, and next door to both The Four Seasons (273 keys, 95 luxury condominiums) and The Boston Park Plaza (1,100 keys) • Visibility: 60 feet of retail frontage on Boylston Street THE BACK BAY NUMBERS. NEIGHBORING TENANTS 1.85 MIL $154,575 $1.83 BIL International Average Household Total Effective Visitors (EST.) to Income in Back Bay Spending in Back Bay Newbury Street in 2015 6,100 14 MIL SF 11,498 Hotel Rooms Office Space Daytime in Back Bay Population OF BOSTON 50% HOTELS are in the Back Bay The Druker Company, Ltd. 617.274.4900 // [email protected] // bosurban.com open THE HERITAGE ON THE GARDEN TOTAL SF FRONTAGE DELIVERY DATE // THE SPACE up to +/- 4,300SF +/- 60 FT Arranged Upon Lease Execution SPACE A SPACE A Street Level +/-2,500 SF Street Level +/- 36 FT SPACE B SPACE B Street Level +/- 1,800 SF Street Level +/- 24 SF STREET LEVEL SPACE A 36’ AVAILABLE TOTAL 2,500 SF +/- 4,300 SF 60’ BOYLSTON STREET BOYLSTON SPACE B AVAILABLE 1,800 SF 24’ The Druker Company, Ltd. 617.274.4900 // [email protected] // bosurban.com SOMERVILLESOMERVILLE Mystic River Fresh Pond 2 2 1/2 5 8 10 12 CHARLES STREET THE HERITAGECHARLES ON STREET THE GARDEN 200 1 1 // THE LOCATION 27 BACK BAY // PARK PLACE 140 25 382 273 KEYS 26 KEYS 1 200 CHARLESTOWNCHARLESTOWN 210 VACANT BOYLSTON STREET 63 28 27 VACANT 75 CHURCH STREET RETAIL 250 PARK PLAZA 26 272 27 THE PUBLIC GARDEN EASTEAST 280 2017 230 50 BOSTONBOSTON WATERTOWNWATERTOWN VACANT 50 292 37 PARK PLAZA VACANT BOSTON 1,100 308 KEYS 240 296 79 CAMBRIDGECAMBRIDGE 308 NORTHNORTH VACANT VACANT ENDEND 64 50 76 320 down 28 WESTWEST 100 108/110 r ENDEND ARLINGTON STREET ALLSTONALLSTON ARLINGTON STREET ARLINGTON ST. STATION 273 2 KEYS 8,519 1 1 AVG. WEEKDAY 6 Street & r VACANT T COMMUTERS 2nd 17 18 19 330 31 75 o. 75 101 5 8 VACANT N 3rd & 4th 338-342 BEACONBEACON 355 2nd 7- 9 2nd 10 HILLHILL DOWNTOWNDOWNTOWN street 308 10 street THE HERITAGE ON THE GARDEN 5th 4th 361 350 3rd 12 31 10 2nd 11 4th VACANT Charles River street 352 14 2 & 3 VACANT street 10 VACANT 2nd VACANT SOUTHWORTHS 31 street VACANT 356 MARKET Boylston St 15 16 street . EMANNUEL street 399 CHURCH street VACANT VACANT street street & 2nd 18 31 coming 29 soon 364 2nd 2nd 20 3rd 304 VACANT 31 31 419 2nd street 22 376 coming soon street BACK BAY VACANT BACK BAY BRIGHTONBRIGHTON 24 street VACANT 2nd 333 306 VACANT CAFE MED 31 FORTFORT POINT 33 28 425 380 COLUMBUS AVENUE Street BOYLSTON STREET NEWBURY STREET Boston Harbor 2nd 1&2 VACANT CHANNELCHANNEL 3rd 384 31 2nd 35 30 down street 431 316 392 moving out 32 VACANT 31 SEAPORTSEAPORT 162 2nd 37 Street 34 DISTRICTDISTRICT 39 36 406 38 2nd 410 FENWAYFENWAY COMMONWEALTH AVENUE COMMONWEALTH 45 437 44 414 VACANT 416 211 209 205X 161 617.274.4900// [email protected]// bosurban.com 47 46 VACANT 1&2 443 418-422 SOUTHSOUTH END BERKELEY STREET BERKELEY STREET 67 2nd 154 142 440 222 142 street 69 2nd 234 450 225 KEYS 71 Chestnutstreet Hill SOUTHSOUTH BOSTON Pleasure Reservoir 154 Bay STANHOPE STREET 2nd 480 up 73 down BROOKLINE VACANT 75 82 2nd 491 street 77 MUTUAL LIFE INSURANCE 370 27 79 84 2nd 1&2 497 81 STANHOPE STREET ST. JAMES STREET 29 HYNES 390 209 down 83 86 CONVENTION up CENTER down 85 BOYLSTON STREET BOYLSTON 2nd 33 up 91 STREET NEWBURY down coming soon 500 VACANT COMMONWEALTH AVENUE COMMONWEALTH COMMONWEALTH AVENUE COMMONWEALTH 88 93 - 95 VACANT 35 505 97 39 99 92 223 103 507 500500 500 131 131 3rd 100 406 2nd 105 CLARENDON STREET CLARENDON STREET 109 108 530 street street 111 up 1&2 535 236 2nd 110 down 234 up 220 309 downdown 115 coming soon up street The Druker upCompany & , Ltd. coming soon 545 140 down 117 112 down down street street up 65 KEYS 2nd VACANT street 617.274.4900 [email protected] bosurban.com 90 2nd // // down 119 551 up up 114 down 121 553 321 up TRINITY down TOWER down 123 2nd 2nd 557 CHURCH VACANT up up & down 125 116 STUART STREET VACANT down 426 563 COLUMBUS AVENUE up coming soon 2nd down 127 565 2nd 118 up up 129 down 569 down up up coming soon 126 down 131 575 up 441 down 329 up 128 down VACANT up down 133 130 down 579 430 2nd up 2nd 581 132 down 135 2nd up street BACK BAY 134 down COPLEY 138 432 street 136 STATION 587 SQUARE 441 18,100 139 AVG. WEEKDAY T COMMUTERS street 138 up & 434 down 540,770 140 AMTRAK ANNUAL street up RIDERSHIP 141 383 KEYS street r 142 down 601 2nd 143 street 187 441 street coming 145 145 131 131 113 111 283 soon 271 261 145 145 145 131 144 138 131 BACK BAY CLEANERS up up & 607 down 279 144B street DARTMOUTH STREET DARTMOUTH STREET up & COPLEY up & 154 down STATION down 159 14,021 up AVG. WEEKDAY r T COMMUTERS 2nd 156 down 130 130 up 161 down 158 1 up 163 up 647 down 160 down r 165 162 803 KEYS 2nd 651 up 164 up down HUNTINGTON AVENUE 167 up 166 down 657 down VACANT RESTAURANTS VACANT RETAILERS COPLEY PLACE 2nd 10 up 168 RETAILERS up 169 up 659 170 down STREET STUART 171 up 665 down 172 VACANT down HUNTINGTON AVENUE up 669 up 173 174 down down NEWBURY STREET THE HUNTINGTON VACANT 673 up 176 up & 143 KEYS pop-up 175 down down 47 VACANT 180 BOYLSTON STREET up 177 182 down 700 up 186 88 179 699 81 KEYS 90 51 181 190 EXETER STREET EXETER STREET up down 200 711 704 down 65 69 DINING 201 2nd up street 715 up & 2,3,4 VACANT 710 704 down 206 up 717 214 KEYS up & down 725 VACANT 205 208 VACANT 731 up & down 210 VACANT 207 up VACANT 209 up up 745 211 216 VACANT down down VACANT 53 up up 213 218 VACANT 760 down Paradise NAIL & SPA 2nd 780 up 755 coming soon VACANT 215 220 down down up up 222 down 761 RING ROAD down 217 VACANT up 2nd EDGE LUXURY 224 down 110 EYEWEAR up 219 772 down up 226 1,148 KEYS up 221 down DINING down up 777 VACANT up 228 down COMMONWEALTH AVENUE COMMONWEALTH COMMONWEALTH AVENUE COMMONWEALTH down 223 up 774 up 225 230 down COMING SOON down up up 775 VACANT 232 down 227 down VACANT up & up 776 down 229 234-236 COMING SOON up 231 up 793 776B 238 VACANT up 776 VACANT 233 116 up 240 799 COMING SOON down 237 116 FAIRFIELD STREET COMING SOON 148 KEYS COMING SOON up 239 coming soon 242 down 801 800 coming soon up up down 245 244 down THE SHOPS AT THE LEGEND up up & down 1&2 VACANT 811 246 PRUDENTIAL CENTER 247 up WEN ramen down up 248 down 1,2,3 down 249 up 815 up 250 down 251 up RETAILERS down 252 down up up up 253 VACANT down 254 down 827 down restaurant retail vacant up 255 up down Apartments 829 tenant down tenant space up 256 120 down 257 285 KEYS up down 259 up 261 262 120 up up COMING SOON BOYLSTON STREET NEWBURY STREET 264 down 263 down 841 HUNTINGTON AVENUE up & down Apartments 265 266 268 up COMING SOON r 267-269 up up 271 270 down up 855 hotel up HUNTINGTON AVENUE T stations 273 272 down BELVIDERE STREET VACANT 275 up 274 up down Town Nails & Skin Salon 867 up 277-279 278 150 Dwight Street Apartments down 282 883 GLOUCESTER STREET 150 NEIGHBORHOOD QUICK FACTS 284 279 VACANT 286 up 900 down 899 • 3,500 businesses and over 120,000 office up & down 283 2nd VACANT up 288 down 285 PRUDENTIAL employees in the Back Bay and Beacon Hill area. CENTER STATION down up 3,643 r 287 290 AVG. WEEKDAY 2nd T COMMUTERS up up down 291 292- down • Over 14,425,000 SF office space up 293 up 903 Apartments 296 down 295 VACANT up up • 6,311 hotel rooms in the Back Bay. 302 down 297 down up 907 up 304 down 299 up 911 HYNES CONVENTION • Hynes Convention Center hosts over 352,000 down 306 down CENTER 39 people each year. up up 921 301 314 down down 1 down • Over 53,230 people travel throughout the Back Bay up 148 KEYS 303 up MBTA stations each day. 316 up down 939 COMING SOON 211 KEYS 305 VACANT HEREFORD STREET 900 BACK BAY DEMOGRAPHICS (within 1 mile) 327 320 DALTON STREET 30 up VACANT 955 329 COMING SOON 324 down up 331 50 50 50 326 up 328 333 down $1.83 BIL $210,735 up 1.85 MIL coming 330 40 International soon 335 down Total Effective Average Household Visitors (EST.) to Spending in Back Bay Income in Back Bay down Newbury Street 332 BELVIDERE STREET 337 up in 2015 334 down 339 up 385 KEYS 336 down Town Nails & Skin Salon coming up SOMERVILLESOMERVILLE soon 341 Mystic River 338 down ST.
Recommended publications
  • Public Comments
    Arborway Parkways Improvement Project Public Comments Submitted via DCR Online Comment Portal deadline 11/6/2020 Time Comment First Last Address (City) State Zipcode 10/21/20 3:27 PM The 2 circles alternative is the one that I prefer (followed by the 1 circle, then no circle designs). Roundabouts are a safer intersection design compared to a signalized intersection and should be used to Domenic Privitera Boston MA 02120 improve the safety of the Arborway. 10/22/20 10:18 AM 1. The paths should not be shared use. With E‐bikes, micro mobility, cargo bikes, accessible conveyances, and pedestrians wearing ear buds and not able to hear an approaching bicyclist, there will be crashes if Anne Lusk Brookline MA 02445‐6756 it is shared use due to speed differentials and widths of cargo/Fun2Go/child carrier bikes. 2. Bicyclists should not be on a path beside the traffic while the pedestrians have paths with wide green spaces by the homes, trees, and lawns. Riding beside the sound, mobile source air pollution, and dust from fast moving vehicles is not pleasant or healthy, Also, on a two way path, bicyclists riding with approaching vehicular traffic on their right would not be comfortable. At night, the intense and direct‐beam LED bike lights would be confusing to drivers who would see a beam of light approaching on their right. 3. The bicyclists should be shaded by trees, especially with hot summers, and for 24 hour riding, have continuous lighting directly over the two way bike path. The lighting should not be from the tall cobra head for the road because tree limbs obstruct the light from reaching the bike path, creating light and dark sections on the pathway.
    [Show full text]
  • How to Find Us: by Car
    HOW TO FIND US: BY CAR Tufts Medical Center is easily accessible by car from the Massachusetts Turnpike (Route 90), the Central Artery and the Southeast Expressway (Route 93). The hospital is located in downtown Boston—in Chinatown and the Theater District—and within walking distance of the Boston Common, Downtown Crossing and many hotels and restaurants. The main entrance for patients and visitors at Tufts Medical Center is 800 Washington Street, Boston, MA 02111. Floating Hospital for Children is located at 755 Washington Street. Emergency services for adult as well as pediatric patients are located at the North Building, 830 Washington Street. Telephone driving directions are available by calling 617-636-5000, ext. 5 or visit www.tuftsmedicalcenter.org/directions. By cab and train: The hospital is a 15-to-20-minute cab ride from Logan Airport and within walking distance of South from from New Hampshire 93 95 New Hampshire Station. 128 and Maine 2 From the north (I-93 southbound): from 95 Western MA » 1 Take Exit 20 A (South Station) onto Purchase Street. Continue along Purchase Street (this becomes the Logan International TUFTS MEDICAL CENTER Airport Surface Artery). & FLOATING HOSPITAL from New York FOR CHILDREN » Turn right onto Kneeland Street. Go straight several blocks. » Turn left onto Tremont Street. The hospital’s garage is on 90 Boston Harbor your left, just past the Wang Theatre/Boch Center. 95 From the south (I-93 northbound): 93 128 » Take Exit 20 (Exit 20 is a two-lane ramp for I-90 East & from West, and South Station). 3 Cape Cod from Providence, RI » Stay left, following South Station/Chinatown signs.
    [Show full text]
  • Chapter 3—Existing Conditions: Bowker Overpass
    Massachusetts Turnpike Boston Ramps and Bowker Overpass Study December 2015 Chapter 3—Existing Conditions: Bowker Overpass 3.1 INTRODUCTION This chapter describes the analysis of the Bowker Overpass sub-area of the Massachusetts Turnpike — Boston Ramps Study. As in Chapter 2, which discusses the larger study area, this section summarizes existing transportation conditions during a typical workday, emphasizing the peak-commuting hour. This section also reviews crash data and land use conditions. The Transit Data and Environmental Conditions provided in Chapter 2 apply to the Bowker Overpass sub-area of the study. 3.2 TRAFFIC CONDITIONS Developing a base knowledge of current traffic conditions fosters an understanding of where congestion occurs now and where it likely would occur in the future. The first step in calculating traffic congestion requires using current or recent turning- movement and traffic counts. Traffic counts were obtained along the Massachusetts Turnpike between the Allston Tolls and Ted Williams Tunnel, and at specific intersections throughout the study area. The volumes used in this analysis are presented in Section 3.2.1. Section 3.2.2 summarizes system performance. 3.2.1 Existing (2010) Traffic Volumes The Bowker Overpass delineates the Back Bay and Fenway/Kenmore neighborhoods, and runs roughly along the Muddy Brook between the Emerald Necklace/Back Bay Fens and the Charles River Esplanade. It connects Boylston Street and Fenway with Storrow Drive over the Massachusetts Turnpike, Commonwealth Avenue, and Beacon Street (Figure 3-1). The Bowker is also known as the Charlesgate Overpass, as Charlesgate is the name of the roadway that the overpass carries.
    [Show full text]
  • 350 Boylston Street
    Project Notification Form 350 BOYLSTON STREET Submitted to: BOSTON REDEVELOPMENT AUTHORITY City Hall Square, 9th Floor Boston, MA 02201 Submitted by: THE DRUKER COMPANY, LTD. 50 Federal Street Boston, MA 02110 December 18, 2007 Project Notification Form 350 Boylston Street Submitted to: BOSTON REDEVELOPMENT AUTHORITY One City Hall Square Boston, MA 02201 Submitted by: THE DRUKER COMPANY, LTD. Prepared by: In Association with: EPSILON ASSOCIATES, INC. Pelli Clarke Pelli Architects 3 Clock Tower Place CBT Architects, Inc. Suite 250 Goulston & Storrs, P.C. Maynard, MA 01754 Vanasse Hangen Brustlin, Inc. Haley & Aldrich, Inc. Nitsch Engineering, Inc. Weidlinger Associates, Inc. Cosentini Associates, Inc. Moriarty & Associates December 18, 2007 TABLE OF CONTENTS PAGE 1.0 SUMMARY 1-1 1.1 Project Identification 1-1 1.2 Project Summary 1-3 1.2.1 Project Site 1-3 1.2.2 Proposed Development 1-3 1.2.3 Design Objectives 1-3 1.2.4 Public Review 1-7 1.2.5 Public Benefits 1-7 1.3 Consistency with Zoning 1-8 1.4 Legal Information 1-9 1.4.1 Legal Judgments Adverse to the Proposed Project 1-9 1.4.2 History of Tax Arrears on Property 1-9 1.4.3 Evidence of Site Control/Nature of Public Easements 1-9 1.5 Public Agencies 1-9 2.0 PROJECT DESCRIPTION 2-1 2.1 Existing Site 2-1 2.2 Proposed Development Program 2-1 2.2.1 Building Program 2-1 2.2.2 Approximate Dimensions 2-1 2.3 Determination of Alternative Considered / Project History 2-2 2.4 Schedule 2-2 3.0 ASSESSMENT OF DEVELOPMENT REVIEW COMPONENTS 3-1 3.1 Transportation 3-1 3.1.1 Introduction 3-1 3.2 Environmental Protection 3-4 3.2.1 Wind 3-4 3.2.2 Shadow 3-4 3.2.3 Daylight 3-5 3.2.4 Solar Glare 3-5 3.2.5 Air Quality 3-5 3.2.6 Stormwater/Water Quality 3-5 3.2.7 Flood Hazard Zones/Wetlands 3-6 3.2.8 Geotechnical/Groundwater 3-6 3.2.8.1 Existing Site Conditions 3-6 3.2.8.2 Subsurface Soil and Bedrock Conditions 3-6 3.2.8.3 Groundwater 3-7 3.2.8.4 Proposed Foundation Construction 3-8 2099/PNF/350 Boylston Street Page i Table of Contents Epsilon Associates, Inc.
    [Show full text]
  • G Vp How to Find Us: Public Transportation (Mbta)
    HOW TO FIND US: PUBLIC TRANSPORTATION (MBTA) STATE HOUSE PARK STREET BEACON STREET 93 SUMMER STREET RY TE DOWNTOWN CROSSING BOSTON CHARLES STREET T COMMON STREE TREMONT CENTRAL AR SOUTH WASHINGTON STREET STATION ESSEX STREET 90 BOYLSTON CHINATOWN PUBLIC GARDENS MASS TURNPIKE YLSTON STREET STREET CENTRAL AR BO KNEELAND HARRISON T STREET STUAR TREMONT STREET FLOATING HOSPITAL AVENUE TERY ARLINGTON STREET G TUFTS VP MEDICAL CENTER OAK STREET 93 90 MASS TURNPIKE The Tufts Medical Center Orange Line stop is located across from the main Tufts Medical Center entrance at 800 Washington Street. Other nearby MBTA stops are Downtown Crossing or South Station (Red Line) and Boylston (Green Line). We are also conveniently located within walking distance to bus lines 9, 11, 43, 55, and the Silver Line. By cab + train For transportation information online, Tufts Medical Center is a 15- to- 20-minute visit any of the following web sites: cab ride from Logan Airport and within • www.mbta.com : Complete listing of walking distance of South Station and the public transportation resources, including Back Bay train stations. Subway maps, bus schedules and maps or call Customer and commuter rail schedules are available Service at 617-222-3200. online at www.mbta.com. • www.smartraveler.com : Real-time traffic and transit information. 10714 012317 GETTING AROUND THE HOSPITAL CAMPUS CHINATOWN T T To South Station, Route 93 and Mass Pike Stuart Street T Kneeland Street To 75 Kneeland Street THEATRE DISTRICT Tufts 7th TUPPER 10th 35 KNEELAND University 15 KNEELAND et d e Dental R re eet Wilbur Theatre HNRC Av 711 WASHINGTON School St.
    [Show full text]
  • FENWAY Project Completion Report
    BOSTON PUBLIC LIBRARY Digitized by the Internet Archive in 2011 with funding from Boston Public Library http://www.archive.org/details/fenwayprojectcomOObost 1983 Survey & Planninsr Grant mperty Of bGblu^ MT A.nTunKifv PART I -FENWAY Project Completion Report submitted August 31, 1984 to Massachusetts Historical Commission Uteary Boston Landmarks Commission Boston Redevelopment Authority COVER PHOTO: Fenway, 1923 Courtesy of The Bostonian Society FENWAY PROJECT COMPLETION REPORT Prepared by Rosalind Pollan Carol Kennedy Edward Gordon for THE BOSTON LANDMARKS COMMISSION AUGUST 1984 PART ONE - PROJECT COMPLETION REPORT (contained in this volume) TABLE OF CONTENTS I. INTRODUCTION Brief history of The Fenway Review of Architectural Styles Notable Areas of Development and Sub Area Maps II. METHODOLOGY General Procedures Evaluation - Recording Research III. RECOMMENDATIONS A. Districts National Register of Historic Places Boston Landmark Districts Architectural Conservation Districts B. Individual Properties National Register Listing Boston Landmark Designation Further Study Areas Appendix I - Sample Inventory Forms Appendix II - Key to IOC Scale Inventory Maps Appendix III - Inventory Coding System Map I - Fenway Study Area Map II - Sub Areas Map III - District Recommendations Map IV - Individual Site Recommendations Map V - Sites for Further Study PART TWO - FENWAY INVENTORY FORMS (see separate volume) TABLE OF CONTENTS I. INTRODUCTION II. METHODOLOGY General Procedures Evaluation - Recording Research III. BUILDING INFORMATION FORMS '^^ n •— LLl < ^ LU :l < o > 2 Q Z) H- CO § o z yi LU 1 L^ 1 ■ o A i/K/K I. INTRODUCTION The Fenway Preservation Study, conducted from September 1983 to July 1984, was administered by the Boston Landmarks Commission, with the assistance of a matching grant-in-aid from the Department of the Interior, National Park Service, through the Massachusetts Historical Commission, Office of the Secretary of State, Michael J.
    [Show full text]
  • Map and Directions
    Map and Directions 800 Huntington Avenue • Boston, MA 02115 • 617-936-6100 • MassEyeAndEar.org/Longwood Boston Children’s Valet Parking Massachusetts Hospital Longwood Avenue Valet parking is available in our garage College of Art off Frawley Street. and Design Harvard Shattuck Street Medical Brigham & Women’s School Hospital Shapiro Harvard Cardiovascular School of Center Francis Street Directions to Parking Garage Public Longwood Health Medical Area From Huntington Avenue: Fenwood Road HuntingtonGreen Line “E” (Arborway) Avenue Driving West: Turn left on Frawley Street, then turn left into our garage. Driving East: Turn right on Frawley Turn down Frawley Huntington Avenue Street, then turn left into our garage. Street to access Mission parking garage Hill Brigham Mission Mass. Eye Circle Park and Ear, Fenwood Tremont Street Garage Parking Longwood Road All parking tickets must be processed at Huntington Avenue the reception desk before returning to X your vehicle. Do NOT leave your ticket in your car. Kevin W. Fitzgerald Park Frawley Street Mission Street Parker Hill Avenue 10/05/12 Parking Garage MBTA Stops Directions to Mass. Eye and Ear, Longwood Driving Directions Driving Directions Subway Directions From the North (via I-93 S) From the West (via I-90 E) (via MBTA) • Take Exit 26 (Storrow Drive West). • Take Exit 18 (Brighton/Cambridge) Stay in right Green Line • Take Kenmore Square/Fenway exit (on left ). lane aft er toll. D Line (Riverside) - Stop: Kenmore Station. • Bear left at fork and follow signs for Fenway. (Stay • Bear right towards Doubletree Guest Suites Hotel. Connect with bus service (65). in right lane on exit ramp.) • At traffi c light, take right toward Downtown E Line (Heath Street) - Stop: Fenwood Road • Bear right towards Boylston Street Outbound.
    [Show full text]
  • FRIENDS of the MUDDY RIVER No. 49 Fall 2020
    FRIENDS OF THE MUDDY RIVER No. 49 Fall 2020 A Muddy River Cruise down the Riverway 22. Bellevue Street Bridge 23 Chapel Street Bridge/Bridle Path 24. Round House We ended our Spring cruise down the Muddy River at the North end of Leverett Pond and now will be entering the Riverway section of the Emerald Necklace. Here, there is an extensive, tall granite headwall with a distinctive capstone topping that has a large arched opening. It carries the Muddy River underground for quite some distance and eventually under Boylston Street (Washington Street) where it immediately comes out at a much smaller curved granite headwall and into a 10’ wide cut stone water way. This section of the Muddy River is virtually hidden by a low 15“ wide patterned concrete wall that parallels River Road. On the other side of this small channel, a steep, heavily vegetated slope rises up to the overpass. This is the area of Brookline’s recently improved bike crossing park area. The narrow water course goes underground one more time to allow the on ramp from River Road to enter the outbound lane of the Jamaicaway. The Riverway ends and the Jamaicaway begins at the Curley Overpass. The final outlet is through an identical granite headwall where the Muddy River finally becomes a recognizable, natural flowing stream and parallels Brookline Avenue. Friends of the Muddy River Fall 2020 1 The area of the Curley Overpass is the narrowest point of the Riverway and one of the first significant alterations to accommodate the modern world of vehicular traffic.
    [Show full text]
  • Route 9 Corridor Study in Brookline
    Route 9 Corridor Study in Brookline Route 9 Corridor Study in Brookline Project Manager Chen-Yuan Wang Project Principal Mark Abbott Data Analysts Chen-Yuan Wang Benjamin Erban Graphics Kenneth Dumas Kate Parker-O'Toole Kim DeLauri Cover Design Jane Gillis The preparation of this document was supported by the Federal Highway Administration through MPO Planning Contract #105757 and MPO §5303 Contract #102694 and #106374. Central Transportation Planning Staff Directed by the Boston Region Metropolitan Planning Organization. The MPO is composed of state and regional agencies and authorities, and local governments. January 2020 (DRAFT) Route 9 Corridor Study in Brookline January 2020 To request additional copies of this document or copies in an accessible format, contact Central Transportation Planning Staff State Transportation Building Ten Park Plaza, Suite 2150 Boston, Massachusetts 02116 (857) 702-3700 (617) 570-9192 (fax) (617) 570-9193 (TTY) [email protected] ctps.org Page 2 of 92 Route 9 Corridor Study in Brookline January 2020 Abstract The Route 9 Corridor Study in Brookline is one in a series of studies supported by the Boston Region Metropolitan Planning Organization that address safety, mobility, and access on the Boston region’s roadways. This report identifies specific transportation issues and concerns in the Route 9 corridor in Brookline, Massachusetts; presents an in-depth analysis of multiple transportation-related factors, such as bicycle accommodation and safety at pedestrian crossings; proposes short- and long-term improvements to address the problems; and provides a vision for the corridor’s long-term development. Page 3 of 92 Route 9 Corridor Study in Brookline January 2020 TABLE OF CONTENTS PAGE Executive Summary .............................................................................
    [Show full text]
  • 7-4.10 Restrictions on Park Frontages. No Building Or Structure Or Any Part Thereof Hereafter Erected Or Altered on Land
    7-4.10 Restrictions on Park Frontages. No building or structure or any part thereof hereafter erected or altered on land which abuts on and has an entrance into and is within a distance of one hundred (100') feet from the following: The Fens (excepting Charlesgate East and Charlesgate West from a point one hundred (100') feet north from their intersection with Commonwealth Avenue to Charles River); Riverway, including Park Drive, from Brookline Avenue to Beacon Street; Commonwealth Avenue, from Arlington Street to a line drawn parallel to and one hundred thirty (130') feet west of Charlesgate West, and from a line parallel to and one hundred thirty-five (135') feet south of the southerly line of Mt. Hood Road, as extended across Commonwealth Avenue, to the Newton line; Jamaicaway; Olmsted Park; Arborway; Columbia Road on the southerly side from Sumner Street to Dorchester Avenue, and from Buttonwood Street to Marine Park, and on the northerly side from Boston Street to Dorchester Avenue, and from Buttonwood Street to Marine Park, South Boston; shall be used for a livery or public stable or public garage, or for any mechanical, mercantile or manufacturing purposes, nor, excepting churches and chapels, shall the extreme height of said buildings or structures exceed seventy (70') feet from the mean grade of the edgestone or sidewalk on the front facing said parkway, exclusive of such steeples, towers, domes, cornices, parapets, balustrades, sculptured ornaments, chimneys and roofs as the Parks and Recreation Commission shall approve; and
    [Show full text]
  • All Hynes Floor Plans
    Entrance to Prudential Center W Sheraton Boston Hotel H C C South Emergency Exit 900 Boylston Street | Boston, Massachusetts 02115 Lobby 877.393.3393 | 617.954.3326 | SignatureBoston.com M Hilton M M Boston Plaza Level W W Back Bay Business Center Show Oce Exhibit Hall B Flexible Exhibit Hall B Dalton Street Meeting Exhibit Hall A Space (38,770 sq ft) (36,900 sq ft) Main Lobby Roll-up Ramp Door Show Oce Exhibit Hall A Public Safety Oce Pre-function Hall A Pre-function Hall B M Down 107 108 109 110 111 M The Capital Exhibit Space Elevator Towne Grille Stove Service Corridor Meeting Rooms Freight & Ballroom Escalator Spirits 101 102 103 104 105 W Lobby & Pre-function Restrooms W Public Use Permanent Concessions Ring Road Charging Stations Boylston Hallway Non-Public Access Stairs Sidewalk (Lower Level) Loading Dock Pre-Feb Area & Loading Dock Covered Truck Access Drop-O (Lower Level) Food Services Boylston Street Boylston Street Entrance The Massachusetts Convention Center Authority owns and operates the Boston Convention & Exhibition Center, the John B. Hynes Veterans Memorial Convention Center, and The Lawn On D. W Sheraton Boston Hotel Connection H C C South Lobby 900 Boylston Street | Boston, Massachusetts 02115 (Below) 877.393.3393 | 617.954.3326 | SignatureBoston.com M Hilton W M M W Boston Second Level Back Bay Show Oce Exhibit Hall C Show Oce Exhibit Hall D Veterans Memorial Auditorium (25,760 sq ft) Exhibit Hall C Exhibit Hall D (37,750 sq ft) (37,300 sq ft) (4,000 Person Seating Capacity) Moveable AirwallMoveable Pre-function
    [Show full text]
  • Lights in the Necklace Transit and Parking Information
    Lights in the Necklace Transit and Parking Information Boylston St. Bridge Visit by MBTA: Take the Green Line (B, C or D) to Hynes Convention Center, walk south on Massachusetts Ave. to the Boylston Street intersection. Turn right on Boylston St. and continue for 0.2mi to the bridge. Visit by car: Free no-permit parking spots and metered spots are available on either Charlesgate E. St. or Ipswich St. Boylston St. Bridge has two viewing locations, one on Ipswich Street and one in the park on the southern side of Boylston Street. Walk down the stairs into the park for the best view. Liff Park Bridges Visit by MBTA: Take the Green Line D to the Fenway stop, walk up Park Dr. toward Brookline Ave. Justine Mee Liff Park will be across the street from the Landmark Center (401 Park Dr.). Visit by car: there is free no- permit parking with a 2-hour limit on various sections of Kilmarnock St. To walk to Liff Park bridges, go north on Kilmarnock St. until you reach Boylston St., take a left and continue to Park Dr. Use the crosswalk to cross Park Dr., turn right to cross again over Boylston St. and enter Liff Park. Both bridges on either end of this small park are illuminated. Chapel St. and Bridle Path Bridges AND Longwood Avenue Bridge Visit by MBTA: Take the Green Line D to the Longwood stop, turn left (to the North) and walk for 250ft to reach the Chapel Street Bridge and Bridle Path Bridge. Or, turn right and walk 375ft to the South to view the Longwood Avenue Bridge.
    [Show full text]