Federal Railroad Administration, DOT § 235.7

Total Page:16

File Type:pdf, Size:1020Kb

Federal Railroad Administration, DOT § 235.7 Federal Railroad Administration, DOT § 235.7 track which is part of the general rail- (b) When the resultant arrangement road system of transportation. will comply with part 236 of this title, (b) This part does not apply to rail it is not necessary to file for approval rapid transit operations conducted over to decrease the limits of a system as track that is used exclusively for that follows: purpose and that is not part of the gen- (1) Decrease of the limits of an inter- eral system of railroad transportation. locking when interlocked switches, de- rails, or movable-point frogs are not in- § 235.5 Changes requiring filing of ap- volved; plication. (2) Removal of electric or mechanical (a) Except as provided in § 235.7, ap- lock from hand-operated switch in plications shall be filed to cover the automatic block signal or traffic con- following: trol territory where train speed over (1) The discontinuance of a block sig- switch does not excess 20 miles per nal system, interlocking, traffic con- hour; or trol system, automatic train stop, (3) Removal of electric or mechanical train control, or cab signal system or lock from hand-operated switch in other similar appliance or device; automatic block signal or traffic con- (2) The decrease of the limits of a trol territory where trains are not per- block signal system, interlocking, traf- mitted to clear the main track at such fic control system, automatic train switch. stop, train control, or cab signal sys- (c) When the resultant arrangement tem; or will comply with part 236 of this title, (3) The modification of a block signal it is not necessary to file an applica- system, interlocking, traffic control tion for approval of the following modi- system, automatic train stop, train fications: control, or cab signal system. (1) A modification that is required to (b) [Reserved] comply with an order of the Federal Railroad Administration or any section (Approved by the Office of Management and of part 236 of this title; Budget under control number 2130–0042) (2) The installation of an automatic block signal or a traffic control system § 235.7 Changes not requiring filing of to replace manual block or non-sig- application. naled territory; (a) It is not necessary to file an appli- (3) The installation of a traffic con- cation for approval of the following trol system to replace a roadway auto- discontinuances: matic block signal system (discontinu- (1) Removal of block signal system, ance of an automatic train stop, train interlocking, traffic control system, control, or cab signal system is not automatic train stop, train control, or permitted without FRA approval); cab signal system from track approved (4) The installation of an automatic for abandonment by formal proceeding; train stop, train control, or cab signal (2) Removal of devices and associated system in an existing automatic block signals used to provide protection or traffic control system; against unusual contingencies such as (5) The installation of a continuous landslide, burned bridge, high water, inductive automatic train stop system high and wide load, or tunnel protec- to replace an existing intermittent in- tion when the unusual contingency no ductive automatic train stop system; longer exists; (6) The installation of a continuous (3) Removal of an interlocking where inductive automatic train stop system a drawbridge has been permanently to supplement an existing automatic closed by the formal approval of an- cab signal system; other government agency; or (7) The installation of an automatic (4) Removal from service not to ex- train control system to replace an ex- ceed six months of block signal system, isting automatic train stop system or interlocking, or traffic control system to supplement an existing automatic necessitated by catastrophic occur- cab signal system; rence such as derailment, flood, fire, or (8) The installation of an inter- hurricane. locking to replace existing stop signs, 661 VerDate Nov<24>2008 13:41 Dec 07, 2009 Jkt 217215 PO 00000 Frm 00671 Fmt 8010 Sfmt 8010 Y:\SGML\217215.XXX 217215 wwoods2 on DSK1DXX6B1PROD with CFR § 235.8 49 CFR Ch. II (10–1–09 Edition) gates, or pipe-connected derails pro- (i) The installation of new track; tecting a railroad crossing at grade; (ii) The elimination of existing track (9) The installation of all relay type other than a second main track; locking to replace existing mechanical (iii) The extension or shortening of a or electromechanical locking of an passing siding; interlocking; (iv) Elimination of second main (10) The installation of an additional track where signal system mn retained controlled point in existing traffic con- main track is arranged to provide both trol system; opposing and following protection for (11) The installation of an inter- train movements provided second main locking in an existing block signal sys- track is physically removed; or tem; (v) A line relocation; or (12) The conversion of a hand-oper- (vi) The conversion of pole line cir- ated switch, a hand-operated switch cuits to electronic (coded) track cir- locked either electrically or mechani- cuits provided that the railroad gives cally, or a spring switch to a power-op- notice and a profile plan of the change erated switch; to the FRA regional office having juris- (13) The conversion of a spring switch diction over that territory at least 60 to a hand-operated switch, or to a days in advance of the change. The hand-operated switch locked either railroad must also at the same time electrically or mechanically; provide a copy of the notice and profile (14) The removal or relocation of sig- plan to representatives of employees nals associated with a spring switch responsible for maintenance, inspec- converted to hand operation; tion and testing of the signal system (15) The installation, relocation, or under 49 CFR part 236. The signal sys- removal of signals to specifically pro- tem modification will be deemed ac- vide adequate stopping distance; ceptable, unless within 60 days, the Re- (16) The change of aspects; gional Adminstrator stays action by (17) The relocation of a signal to im- written notice to the railroad and re- prove preview of signal aspect visi- fers the issue to the Railroad Safety bility; Board for decision. (18) To replace a signal with a signal (25) The temporary or permanent ar- of another type; rangement of existing systems neces- (19) To change an approach signal to sitated by highway rail separation con- operative or inoperative signal, or re- struction. Temporary arrangements move an approach signal not required shall be removed within six months fol- by § 236.310 of this title; lowing completion of construction. (20) The change in location of a ma- chine from which an interlocking or [49 FR 3380, Jan. 26, 1984, as amended at 61 FR 33873, July 1, 1996] traffic control system is controlled; (21) The closing of a manual block § 235.8 Relief from the requirements of station or the change in hours during part 236 of this title. which a manual block station is at- Relief from the requirements of the tended; rules, standards and instructions con- (22) The change in hours during tained in part 236 of this title will be which a manual interlocking is at- granted upon an adequate showing by tended provided the interlocking oper- an individual carrier. Relief heretofore ates for all routes over which train granted to any carrier shall constitute movements are permitted; relief to the same extent as relief (23) The installation of devices used granted under the requirements of this to provide protection against unusual part. contingencies such as landslide, burned bridges, high water, high and wide (Approved by the Office of Management and loads, or dragging equipment; Budget under control number 2130–0043) (24) The installation, relocation, or removal of signals, interlocked switch- § 235.9 Civil penalty. es, derails, movable-point frogs, or Any person (an entity of any type electric locks in an existing system di- covered under 1 U.S.C. 1, including but rectly associated with: not limited to the following: a railroad; 662 VerDate Nov<24>2008 13:41 Dec 07, 2009 Jkt 217215 PO 00000 Frm 00672 Fmt 8010 Sfmt 8010 Y:\SGML\217215.XXX 217215 wwoods2 on DSK1DXX6B1PROD with CFR.
Recommended publications
  • NSG 604 Indicators and Signs
    This is an uncontrolled copy. Before use, make sure that this is the current version by visiting www.railsafe.org.au/nsg NSG 604 signals and signs Indicators and signs General To describe the types of indicators and signs used in the Network. ............................................................................................... NOTE The Figures in this Rule show examples of the indicators and signs used in the Network. White or lunar white lights are shown in blue . ............................................................................................... Clearance posts Clearance posts may be located between two converging lines to show the clearance limit. Some clearance posts have: • a reflective background, or • a white light that must be illuminated at night or in conditions of low visibility. White reflective post forms Illuminated post form FIGURE 1: Examples of clearance posts ............................................................................................... NETWORK RULES MARCH 2019 V10.0 © SYDNEY TRAINS 2019 PAGE 1 OF 38 This is an uncontrolled copy. Before use, make sure that this is the current version by visiting www.railsafe.org.au/nsg NSG 604 signals and signs Indicators and signs Dead end lights Dead end lights are small red lights to indicate the end of dead end sidings. The lights display STOP indications only. If it is possible for a dead end light to be mistaken as a running signal at STOP, a white light above the red light is used to distinguish it from a running signal. FIGURE 2: Examples of dead end lights ............................................................................................... NETWORK RULES MARCH 2019 V10.0 © SYDNEY TRAINS 2019 PAGE 2 OF 38 This is an uncontrolled copy. Before use, make sure that this is the current version by visiting www.railsafe.org.au/nsg NSG 604 signals and signs Indicators and signs Guard’s indicator If it is possible for the signal at the exit-end of a platform to be obscured from a Guard’s view, a Guard’s indicator is placed over the platform.
    [Show full text]
  • RAIB Report: Freight Train Derailment at Angerstein Junction on 3 June 2015
    Oliver Stewart Senior Executive, RAIB Relationship and Recommendation Handling Telephone 020 7282 3864 E-mail [email protected] 4 June 2020 Mr Andrew Hall Deputy Chief Inspector of Rail Accidents Cullen House Berkshire Copse Rd Aldershot Hampshire GU11 2HP Dear Andrew, RAIB Report: Freight train derailment at Angerstein Junction on 3 June 2015 I write to provide an update1 on the action taken in respect of recommendation 3 addressed to ORR in the above report, published on 1 June 2016. The annex to this letter provides details of the action taken regarding the recommendation. The status of recommendation 3 is ‘Implemented’. We do not propose to take any further action in respect of the recommendation, unless we become aware that any of the information provided has become inaccurate, in which case I will write to you again. We will publish this response on the ORR website on 5 June 2020. Yours sincerely, Oliver Stewart 1 In accordance with Regulation 12(2)(b) of the Railways (Accident Investigation and Reporting) Regulations 2005 Annex A Recommendation 3 The intent of this recommendation is to ensure that the derailment risk at Angerstein Junction is adequately controlled. Network Rail should review and, if appropriate, alter the infrastructure configuration on the line between Angerstein Junction and Angerstein Wharf sidings to reduce its contribution to the derailment risk in the immediate vicinity of the 851A trap points. This review should include, but not be limited to, consideration of: • the wagon types and loads normally using the line; • the layout of the check rail; • the speed and braking profiles of trains using the line; • the locations and operation of signalling equipment; and • the location of the trap points, or the provision of alternative risk mitigation measures ORR decision 1.
    [Show full text]
  • Federal Railroad Administration Office of Safety Headquarters Assigned Accident Investigation Report HQ-2006-24 CSX Transportati
    Federal Railroad Administration Office of Safety Headquarters Assigned Accident Investigation Report HQ-2006-24 CSX Transportation (CSX) Richmond, Virginia April 22, 2006 Note that 49 U.S.C. §20903 provides that no part of an accident or incident report made by the Secretary of Transportation/Federal Railroad Administration under 49 U.S.C. §20902 may be used in a civil action for damages resulting from a matter mentioned in the report. DEPARTMENT OF TRANSPORTATION FRA FACTUAL RAILROAD ACCIDENT REPORT FRA File # HQ-2006-24 FEDERAL RAILROAD ADMINISTRATION 1.Name of Railroad Operating Train #1 1a. Alphabetic Code 1b. Railroad Accident/Incident No. CSX Transportation [CSX ] CSX R000022015 2.Name of Railroad Operating Train #2 2a. Alphabetic Code 2b. Railroad Accident/Incident N/A N/A N/A 3.Name of Railroad Responsible for Track Maintenance: 3a. Alphabetic Code 3b. Railroad Accident/Incident No. CSX Transportation [CSX ] CSX N/A 4. U.S. DOT_AAR Grade Crossing Identification Number 5. Date of Accident/Incident 6. Time of Accident/Incident Month Day Year 04 22 2006 05:19:00 AM PM 7. Type of Accident/Indicent 1. Derailment 4. Side collision 7. Hwy-rail crossing 10. Explosion-detonation 13. Other (single entry in code box) 2. Head on collision 5. Raking collision 8. RR grade crossing 11. Fire/violent rupture (describe in narrative) 3. Rear end collision 6. Broken Train collision 9. Obstruction 12. Other impacts 01 8. Cars Carrying 9. HAZMAT Cars 10. Cars Releasing 11. People 12. Division HAZMAT Damaged/Derailed HAZMAT Evacuated 0 0 0 0 FLORENCE 13. Nearest City/Town 14.
    [Show full text]
  • [(Central] [Central, 6 E -1 4
    /NEWYORK^ Fnewyork^ [(Central] [Central, 6 e -1 4 Reference Marks NEW YORK CENTRAL LC.L Between POPULAR ALL-COACH DAYLINER Dally. II Meal station. Sunday only. • Thla train does not carry baggage SERVICE ADVANTAGES Chicago, Pittsburgh & Boston Daily except Sunday- Ex. Sun.—Runs dally except Sunday. Daily except Monday. E.T.—Eastern Standard Time. Daily except Saturday. C.T.—Central Standard Time. In addition to the train service shown, buses of the United Traction Company run at frequent intervals between Albany and Troy. | I i^i ichedulot . pcart'd to 5 Packing and handling research Stops on signal to receive passengers for stations beyond Albuny. traffic requirement! for most ... they assure the security ol Stops to receive or discbarge passengers for or from Astatabula and beyond. Stops except Saturdays and Sundays. rX|M*llitioilH .1. Ii\ i-r n--. the shipped merchandise. bb Stops at 6.25 a. m. to discharge passengers from Rochester and beyond or to 2 Free pick up and delivery ser• receive passengers for Chicago. Smooth operation . easy 4 Stops on signal to receive passengers for beyond Troy. vice . direct from Hliippcr's grades... superlative roadbed. Stops on signal to discharge or receive passengers. to roiisipiirrV door. No baggage handled for or from this station; *y Constant supervision and pro• Stops regularly, but only to receive passengers. * f Optional trucking allowance to tection in transit.. still mon Stops only to discbarge passengers. nhi|»|MTH jiiul roiittignrcR ... a security for shipped merchan Runs Saturdays only. mi I • i i ii i ii I tavina to both. dise.
    [Show full text]
  • Rtd Light Rail Design Criteria
    RTD LIGHT RAIL DESIGN CRITERIA Regional Transportation District November 2005 Prepared by the Engineering Division of the Regional Transportation District Regional Transportation District 1600 Blake Street Denver, Colorado 80202-1399 303.628.9000 RTD-Denver.com November 28, 2005 The RTD Light Rail Design Criteria Manual has been developed as a set of general guidelines as well as providing specific criteria to be employed in the preparation and implementation of the planning, design and construction of new light rail corridors and the extension of existing corridors. This 2005 issue of the RTD Light Rail Design Criteria Manual was developed to remain in compliance with accepted practices with regard to safety and compatibility with RTD's existing system and the intended future systems that will be constructed by RTD. The manual reflects the most current accepted practices and applicable codes in use by the industry. The intent of this manual is to establish general criteria to be used in the planning and design process. However, deviations from these accepted criteria may be required in specific instances. Any such deviations from these accepted criteria must be approved by the RTD's Executive Safety & Security Committee. Coordination with local agencies and jurisdictions is still required for the determination and approval for fire protection, life safety, and security measures that will be implemented as part of the planning and design of the light rail system. Conflicting information or directives between the criteria set forth in this manual shall be brought to the attention of RTD and will be addressed and resolved between RTD and the local agencies andlor jurisdictions.
    [Show full text]
  • Federal Railroad Administration, DOT § 235.7
    Federal Railroad Administration, DOT § 235.7 railroads that operate on standard gage (5) Removal of an intermittent auto- track which is part of the general rail- matic train stop system in conjunction road system of transportation. with the implementation of a positive (b) This part does not apply to rail train control system approved by FRA rapid transit operations conducted over under subpart I of part 236 of this chap- track that is used exclusively for that ter. purpose and that is not part of the gen- (b) When the resultant arrangement eral system of railroad transportation. will comply with part 236 of this title, it is not necessary to file for approval § 235.5 Changes requiring filing of ap- to decrease the limits of a system as plication. follows: (a) Except as provided in § 235.7, ap- (1) Decrease of the limits of an inter- plications shall be filed to cover the locking when interlocked switches, de- following: rails, or movable-point frogs are not in- (1) The discontinuance of a block sig- volved; nal system, interlocking, traffic con- (2) Removal of electric or mechanical trol system, automatic train stop, lock, or signal used in lieu thereof, train control, or cab signal system or from hand-operated switch in auto- other similar appliance or device; matic block signal or traffic control (2) The decrease of the limits of a territory where train speed over the block signal system, interlocking, traf- switch does not exceed 20 miles per fic control system, automatic train hour; or stop, train control, or cab signal sys- (3) Removal of electric or mechanical tem; or lock, or signal used in lieu thereof, (3) The modification of a block signal from hand-operated switch in auto- system, interlocking, traffic control matic block signal or traffic control system, automatic train stop, train territory where trains are not per- control, or cab signal system.
    [Show full text]
  • Developing Standards for New Technology Signal Systems for Rail Transit Applications
    Transactions on the Built Environment vol 34, © 1998 WIT Press, www.witpress.com, ISSN 1743-3509 Developing standards for new technology signal systems for rail transit applications A. F. Rumsey Parsons Transportation, New York, U.S.A. Abstract Radio communications-based train control (CBTC) systems, also referred to as transmission-based signalling (TBS) systems, permit more effective utilization of rail transit infrastructure by allowing trains to operate safety at much closer headways, by permitting greater flexibility and greater precision in train control, and by providing continuous safe train separation assurance and overspeed protection. One of the challenges facing transit agencies who are considering the introduction of CBTC systems, however, is the lack of industry standards for this emerging technology, and the current inability of trains equipped with CBTC equipment from one supplier to operate on track equipped with CBTC equipment from a second supplier. This paper reports on the status of two separate initiatives being taken in North America to develop standards for CBTC systems for rail transit applications; one based on a voluntary consensus development approach, and the second based on a competitive procurement approach. 1 Background Conventional signalling and train control systems rely almost exclusively on track circuits to detect the presence of trains. Information on the status of the track ahead is provided to train operators either through wayside signals or trainborne cab signals. Ensuring compliance with the signals is achieved either through strict observance of operating procedures, or through automatic train protection features such as wayside electro-mechanical train stops, or trainborne supervisory equipment linked to the train's braking system.
    [Show full text]
  • Low-Cost Highway-Rail Intersection Active Warning System Field
    Low•Cost Highway•Rail Intersection Active Warning System Field Operational Test Evaluation Report Prepared for: December 2005 Low•Cost Highway•Rail Intersection Active Warning System Field Operational Test Evaluation Report Prepared for: Minnesota Department of Transportation Office of Traffic, Security and Operations Prepared by: URS Corporation and TranSmart Technologies, Inc. December 2005 Table of Contents EXECUTIVE SUMMARY .......................................................................................................... v 1. INTRODUCTION................................................................................................................. 1 1.1 ROJECTP PURPOSE............................................................................................................ 2 1.2 ARTICIPANTSP .................................................................................................................. 3 2. PROJECT BACKGROUND................................................................................................ 4 2.1 YSTEMS DEVELOPMENT, TESTING, AND FIELD OPERATIONAL TEST................................ 4 2.2 HUMAN FACTORS EVALUATION....................................................................................... 6 3. REVIEW OF EMERGING HRI TECHNOLOGY ........................................................... 7 3.1 OVERVIEW OF ACTIVE WARNING TECHNOLOGY ............................................................. 7 3.2 MERGINGE HRI TECHNOLOGY........................................................................................
    [Show full text]
  • LNW Route Specification 2017
    Delivering a better railway for a better Britain Route Specifications 2017 London North Western London North Western July 2017 Network Rail – Route Specifications: London North Western 02 SRS H.44 Roses Line and Branches (including Preston 85 Route H: Cross-Pennine, Yorkshire & Humber and - Ormskirk and Blackburn - Hellifield North West (North West section) SRS H.45 Chester/Ellesmere Port - Warrington Bank Quay 89 SRS H.05 North Transpennine: Leeds - Guide Bridge 4 SRS H.46 Blackpool South Branch 92 SRS H.10 Manchester Victoria - Mirfield (via Rochdale)/ 8 SRS H.98/H.99 Freight Trunk/Other Freight Routes 95 SRS N.07 Weaver Junction to Liverpool South Parkway 196 Stalybridge Route M: West Midlands and Chilterns SRS N.08 Norton Bridge/Colwich Junction to Cheadle 199 SRS H.17 South Transpennine: Dore - Hazel Grove 12 Hulme Route Map 106 SRS H.22 Manchester Piccadilly - Crewe 16 SRS N.09 Crewe to Kidsgrove 204 M1 and M12 London Marylebone to Birmingham Snow Hill 107 SRS H.23 Manchester Piccadilly - Deansgate 19 SRS N.10 Watford Junction to St Albans Abbey 207 M2, M3 and M4 Aylesbury lines 111 SRS H.24 Deansgate - Liverpool South Parkway 22 SRS N.11 Euston to Watford Junction (DC Lines) 210 M5 Rugby to Birmingham New Street 115 SRS H.25 Liverpool Lime Street - Liverpool South Parkway 25 SRS N.12 Bletchley to Bedford 214 M6 and M7 Stafford and Wolverhampton 119 SRS H.26 North Transpennine: Manchester Piccadilly - 28 SRS N.13 Crewe to Chester 218 M8, M9, M19 and M21 Cross City Souh lines 123 Guide Bridge SRS N.99 Freight lines 221 M10 ad M22
    [Show full text]
  • Intelligent Transportation Systems at Highway-Rail Intersections a Cross-Cutting Study
    Intelligent Transportation Systems at Highway-Rail Intersections A Cross-Cutting Study Improving Safety and Mobility at Highway-Rail Grade Crossings December 2001 Intelligent Transportation Systems at Highway-Rail Intersections: A Cross-Cutting Study i Executive Summary In 1997, the ITS Joint Program Office (JPO) at the Federal Highway Administration commissioned a study to identify projects being conducted in the U.S. that used Intelligent Transportation Systems (ITS) at highway-rail grade crossings, including not only those projects that were Federally-sponsored, but state and locally-sponsored ones, as well. The study identified seven projects that tested five functions: in-vehicle warning, second train warning, use of crossing blockage information for traveler information and traffic management, four quadrant gates with automatic train stop, and a comprehensive set of technologies called the Intelligent Grade Crossing. The following year, the JPO commissioned a cross-cutting study to examine the commonalities and differences among the seven projects. This report documents the findings of that cross-cutting study: · Several railroads were reluctant to fully participate in the projects due to liability, safety and operational concerns. Although there were exceptions, passenger railroads – and, in particular, light rail transit – tended to be more involved in these projects than freight railroads. · In all but one of the seven projects examined in this study, the largest share of funding came from the Federal level, through either direct Federal grants or Congressional designations. In the one project that was the exception to this rule, the largest share of funding came from a private sector technology vendor who made in-kind contributions, using the opportunity of the test to refine its prototype system.
    [Show full text]
  • UPRR - General Code of Operating Rules
    Union Pacific Rules UPRR - General Code of Operating Rules Seventh Edition Effective April 1, 2020 Includes Updates as of September 28, 2021 PB-20280 1.0: GENERAL RESPONSIBILITIES 2.0: RAILROAD RADIO AND COMMUNICATION RULES 3.0: Section Reserved 4.0: TIMETABLES 5.0: SIGNALS AND THEIR USE 6.0: MOVEMENT OF TRAINS AND ENGINES 7.0: SWITCHING 8.0: SWITCHES 9.0: BLOCK SYSTEM RULES 10.0: RULES APPLICABLE ONLY IN CENTRALIZED TRAFFIC CONTROL (CTC) 11.0: RULES APPLICABLE IN ACS, ATC AND ATS TERRITORIES 12.0: RULES APPLICABLE ONLY IN AUTOMATIC TRAIN STOP SYSTEM (ATS) TERRITORY 13.0: RULES APPLICABLE ONLY IN AUTOMATIC CAB SIGNAL SYSTEM (ACS) TERRITORY 14.0: RULES APPLICABLE ONLY WITHIN TRACK WARRANT CONTROL (TWC) LIMITS 15.0: TRACK BULLETIN RULES 16.0: RULES APPLICABLE ONLY IN DIRECT TRAFFIC CONTROL (DTC) LIMITS 17.0: RULES APPLICABLE ONLY IN AUTOMATIC TRAIN CONTROL (ATC) TERRITORY 18.0: RULES APPLICABLE ONLY IN POSITIVE TRAIN CONTROL (PTC) TERRITORY GLOSSARY: Glossary For business purposes only. Unauthorized access, use, distribution, or modification of Union Pacific computer systems or their content is prohibited by law. Union Pacific Rules UPRR - General Code of Operating Rules 1.0: GENERAL RESPONSIBILITIES 1.1: Safety 1.1.1: Maintaining a Safe Course 1.1.2: Alert and Attentive 1.1.3: Accidents, Injuries, and Defects 1.1.4: Condition of Equipment and Tools 1.2: Personal Injuries and Accidents 1.2.1: Care for Injured 1.2.2: Witnesses 1.2.3: Equipment Inspection 1.2.4: Mechanical Inspection 1.2.5: Reporting 1.2.6: Statements 1.2.7: Furnishing Information
    [Show full text]
  • Development of Integrated Automatic Train Stop with Patterns (ATS-P) On-Board System
    Computers in Railways VII, C.A. Brebbia J.Allan, R.J. Hill, G. Sciutto & S. Sone (Editors) © 2000 WIT Press, www.witpress.com, ISBN 1-85312-826-0 Development of integrated automatic train stop with patterns (ATS-P) on-board system M. Miyachi', H. Ikeda*, H. Tokuhashi* ' Safety Research Laboratory, * Hachioji Branch office East Japan Railway Company, Japan * Kyosan Electric MFG. Company, Japan Abstract The East Japan Railway Company (JR-East) has been introducing aggressively the ATS-P system, which has a high safety record in train operations in preventing serious train accidents since 1989. As the existing ATS-P on-board system has been used for 10 years, a number of problems for the on-board system are recently increasing. Investigation into the causes of these problems are difficult with to the existing system, which has not got appropriate recording devices. In order to improve the cost-effectiveness, the reliability and the maintenance of the system, the ATS-P on-board system should be completely re-designed. The authors have developed the integrated ATS-P on-board system. As a result, the system has the benefit of both the reduction in costs and the improvement in the reliability and also a reduction in the number of devices constituting the on-board system. The existing ATS-P on-board system is composed of several devices, but the integrated ATS-P on-board system is composed of only one main device, a smaller relay block and so on. This system shows results with about 70% of the cost and almost 133% of the reliability of the existing newest on-board system.
    [Show full text]