Corrigendum After Pre-Bid Meeting

Total Page:16

File Type:pdf, Size:1020Kb

Corrigendum After Pre-Bid Meeting INSTITUTE OF NANO SCIENCE AND TECHNOLOGY, MOHALI (An autonomous Research Institute of Department of Science and Technology, Government of India) Knowledge City, Sector 81, Mohali – 140306, PUNJAB Phone No: 0172 – 2297000 Website: www.inst.ac.in _____________________________________________________________________ Ref No. INST/12(337)/2020-Pur Date: 09/04/2021 CORRIGENDUM AFTER PRE-BID MEETING Reference to NIT no. INST/12(337)/2020-Pur, CPPP tender ID 2021_MST_596530_1 and published in national newspapers for Construction of (i) one synthetic tennis court with lighting, fencing, nets and posts and (ii) synthetic artificial turn cricket pitch. Below mentioned technical & commercial points may be read and corrected as per following:- Present Tender Specifications Modified T&C and Specifications after pre-bid meeting Point No. 8 of 2nd page: The agency The agency should have solvency limit should have solvency limit more than equivalent to 40% of the estimated cost. Rs. 15.00 lacs Point No. 9 (a) Three (03) similar (a) Having completed one similar work of area 10000 Sq. Ft. in completed works costing not less last three years than the amount equal to 75% of the Or estimated cost; Having completed two similar Or work of area not less than 6000 Sq. Ft. each in last three years. Two (02) similar completed work (b) Copy of GST certificate should costing not less than the amount be provided along with technical equal to 80% of the estimated bid. cost.(Please attached certificates in (c) Copy of PAN card should be this regard) provided along with technical bid. (d) Valid documents for Average annual turnover should not be less than 50% value of estimated work and not have incurred any loss during the last three years. Page No. 17 (h) The approved make of materials The approved make of materials has to be from Deco turf/ has to be from Deco turf/ Rebound ace. Bidders are to Rebound ace/Altius. Bidders are note that in-order to avoid any to note that in-order to avoid any poor quality materials and poor quality materials and tampering, materials quality will tampering, materials quality will be checked prior to the start of be checked prior to the start of work and if any discrepancy or work and if any discrepancy or malpractice is found, the malpractice is found, the executing agency shall be executing agency shall be debarred / blacklisted from any debarred / blacklisted from any further execution / future bidding further execution / future bidding in Indian Audit & Accounts in Indian Audit & Accounts Department. Department. (i) All the work will be carried (i) This point is removed from out through experienced the T&C. agency/ contractor those who are empaneled with AITA. (ii) The agency should have completed Twelve or more (ii) Having completed one similar work of area 10000 Nos. of courts of the similar Sq. Ft. in last three years nature i.e. Synthetic court Or with asphalt base during Having completed two last three calendar years similar work of area not less and than 6000 Sq. Ft. each in (iii) Should have completed at- last three years. least three or more (iii) This point is removed from the T&C. synthetic courts with asphalt base during the period from 01.01.2018 to 31.12.2020 (please enclose complete details, including satisfactory services from purchaser organization along with their contact details). (vi) Bidders are to note that (vi) Bidders are to note that since any since any Synthetic Synthetic surfaces require regular surfaces require regular maintenance, interested parties are to maintenance, interested ensure that a minimum of 5 years parties are to ensure that a warranty is to be provided by them minimum of 3 years of after the completion of the project periodic maintenance is to failing which the security amount be provided by them after deducted from each running bill is the completion of the liable to be forfeited. project failing which the security amount deducted from each running bill is liable to be forfeited. (viii) The Bidder should be a profitable company for the (viii) The Bidder should be a last financial year and must profitable company for the last three have an annual turnover of financial years and must have an at least Rs. 1.0 crore for annual turnover of at least 50% of the financial year ending 31st estimated cost for financial year ending March 2020.(please 31st March 2020.(please attached attached certificate). certificate). (xiii) Warranty: A warranty for a Warranty: A warranty for a period of period of 3 years for any 5years for any product/manufacturing product/manufacturing defect defect shall be provided by the firm submitting the quotations and will be shall be provided by the firm effective from the date of completion of submitting the quotations and will work in Toto. be effective from the date of completion of work in Toto. Point No. 15 of on page no. 24 of section A : Construction of one synthetic tennis court with lighting, fencing, nets and posts: Note- The bidder must provide a Note- The bidder must provide a documentary proof for the same alongwith documentary proof for the same. Bidder their technical bid. Bidder not furbishing not furbishing this document will be this document will be disqualified. Bidder disqualified. Bidder should give a warranty should give a warranty of 5 years. of 5 years. Point No. 22 of Section A: Earthing with G.I. earth pipe 4.5 Earthing with G.I. earth pipe 4.5 metre long, 40 mm dia including metre long, 40 mm dia including accessories, and providing masonry accessories, and providing masonry enclosure with cover plate having enclosure with cover plate having locking arrangement and watering locking arrangement and watering pipe etc. pipe etc. with charcoal/ coke and salt as with charcoal/ coke and salt as required (Qty: 01 nos.) required (Qty: 02 nos.) Point No. 25 of Section A: Providing & Laying of four MS Providing & Laying of four MS Tennis pole 33 ft height from Tennis pole 23ft - 33 ft height from ground. ground to achieve lux level of 300 along with foundation work. Additional items Sr.n. Description of Item Qty Unit Rate Amount Supplying, installation, testing & commissioning of feeder panel of size 2'x2' made out of 2 mm thick MS sheet to accommodate the below mentioned items at Sr no 2, duly powder coated in approved colour , 1 locking arrangement, including connections, interconnections, earthing (earthing to be paid NS seperately) etc complete as required. Nos 4200 Providing and fixing following rating and breaking capacity and pole MCCB with thermomagnetic release and terminal 2.2 spreaders in existing cubicle panel board including drilling holes in cubicle panel, making connections, etc. as required. 2.2.1 100 A, 16 KA,TPMCCB 1 Nos 3726 Providing and fixing 4 core - 80 sqmm copper cable (Make- Havells/ Polycab/ LS/ KEI/ Finolex) by Qty to me excavating the ground and refilling of same with measured by INST coushining of sand all complete as per direction of from main panel mtr 2800 Engineer in Chargeincluding thimbeling, connection, upto the tennis etc from main panel to feeder panel including court NS thimbeling, connection, etc 100 (qty are Providing and fixing 3 core - 6 sqmm copper cable tentative and may (Make- Havells/ Polycab/ LS/ KEI/ Finolex) by increase or excavating the ground and refilling of same with decrease as per mtr 880 coushining of sand all complete as per direction of the positioning of Engineer in Charge from feeder panel to electrical electrical pole and pole including thimbeling, connection, etc NS feeder panel) Note: The deviation limit is 30% in tender as per CPWD rules. The last date for receipt of tender has been extended upto 19/04/2021 till 2:00PM which will be opened on the same date at 3:00PM at INST, Mohali. The other details of the tender shall remain unchanged. Sd/- CFAO .
Recommended publications
  • THE PERFECT COMBINATION of CUSHIONED COMFORT and PLAYABILITY California Sports Surfaces (CSS) Is a Team of the Most Prestigious Sports Surfacing Brands
    THE PERFECT COMBINATION OF CUSHIONED COMFORT AND PLAYABILITY California Sports Surfaces (CSS) is a team of the most prestigious sports surfacing brands. Rebound Ace is a CSS brand with a long, decorated history and renowned world leader in cushioned acrylic surface systems. With strikingly vivid and long lasting colour finishes, the Rebound Ace range has options to suit all your sport surfacing requirements. From the durable, colour fast Synpave over asphalt or concrete, through to Rebound Ace GS8 for 8mm of pure cushioned comfort, Rebound Ace products provide high quality, low maintenance solutions for all indoor and outdoor sports. A HISTORY OF QUALITY AND RELIABILITY SYNPAVE REBOUND ACE GS8 1979 First production of Rebound Ace The long lasting premium acrylic coating over concrete or asphalt with Rebound Ace GS8 is the ultimate in cushioned sporting surfaces. With a sport surfaces excellent slip resistance and UV stability. shock absorbency rating of >23%, the GS8 is perfectly suited to players who prefer maximum comfort and reduced stress on the body. 1988 Official Surface of the Australian Open • Perfect ball bounce every time, no matter whether your game is 2000 Official Olympic Games tennis professional, club or social. • 7mm custom rubber shock pad for the highest level of player comfort surface – Sydney, Australia • Ideally suited to tennis, netball, basketball, futsal and general • Reinforced with fiberglass for added stability playground or multisport areas • Suitable for all individual or multisport courts 2010 Official Commonwealth Games tennis • An affordable surface with extremely low maintenance requirements surface – Delhi, India • Available in a portable court solution 2011 First professional tennis tournament (ATP) played on Rebound Ace Portable 2014 Official Asia Games tennis surface - Incheon, PRO CUSHION REBOUND ACE AIR CUSHION South Korea A liquid cushion surface system incorporating multiple layers of Designed for application over old and deteriorating surfaces, while rubber-filled acrylic beneath our high quality top coats.
    [Show full text]
  • KRC Tennis Renovations Meeting March 2017
    March 2017 Kiwanis Tennis Complex • Original 1975 buildings, lighting (42 30-foot poles), and 15 asphalt courts • 1995 and 2008 – Replaced cushioned playing surface • 40,000 – 50,000 user contacts annually • Popular for lessons, competitive leagues, organized drop in play, and general play • ~40% of use is lessons, with growth in youth under 10 lessons Existing Lighting • Light fixtures are no longer manufactured • One light pole was damaged by wind storm in 2012 Existing Lighting • Current lighting levels are below minimum USTA recommendations • Existing fixtures create glare and light spillage Evolution of Lighting Technology Lighting Improvements • Replace existing lighting system with new foundations, poles, LED fixtures, conduit, conductors, and SES (Service Entrance Section) • 50 feet = 17 new poles • ~$1.45M • 30 feet = 39 new poles • ~$2.00M View to West from S. College Ave. Homes Existing Courts Cushioned surface 1.5 ” Asphalt surface 4” Base Subgrade • Asphalt base is raveling • Failure in the upper court surface • Cracks will continue to widen • Hazardous to players • On-going maintenance Tennis Court Improvements Cushioned surface • Post-tensioned concrete with ½” Cable 4” cushioned playing surface Post tensioned concrete slab • Resistance to cracking and settling 2” Structural fill • Better drainage • Elimination of control joints • More uniform playing surface • Lower maintenance costs and longer service life (30+ years) Next Steps Next Mar-17 Funding and Funding and Outreach 4 months Apr-17 Public May-17 Jun-17 Jul-17 Aug-17 Design Design and Permitting Sep-17 Oct-17 9 months Nov-17 Dec-17 Jan-18 Feb-18 Mar-18 Apr-18 May-18 Construction 6 Jun-18 months Jul-18 Aug-18 Sep-18 Oct-18 Open Kiwanis Recreation Center Tennis Complex Restoration Project Survey Results Overview A public meeting was held on March 29 to get feedback on the proposed new lighting and court renovations.
    [Show full text]
  • Measurements of the Horizontal Coefficient of Restitution for a Superball and a Tennis Ball
    Measurements of the horizontal coefficient of restitution for a superball and a tennis ball Rod Crossa) Physics Department, University of Sydney, Sydney, NSW 2006 Australia ͑Received 9 July 2001; accepted 20 December 2001͒ When a ball is incident obliquely on a flat surface, the rebound spin, speed, and angle generally differ from the corresponding incident values. Measurements of all three quantities were made using a digital video camera to film the bounce of a tennis ball incident with zero spin at various angles on several different surfaces. The maximum spin rate of a spherical ball is determined by the condition that the ball commences to roll at the end of the impact. Under some conditions, the ball was found to spin faster than this limit. This result can be explained if the ball or the surface stores energy elastically due to deformation in a direction parallel to the surface. The latter effect was investigated by comparing the bounce of a tennis ball with that of a superball. Ideally, the coefficient of restitution ͑COR͒ of a superball is 1.0 in both the vertical and horizontal directions. The COR for the superball studied was found to be 0.76 in the horizontal direction, and the corresponding COR for a tennis ball was found to vary from Ϫ0.51 to ϩ0.24 depending on the incident angle and the coefficient of sliding friction. © 2002 American Association of Physics Teachers. ͓DOI: 10.1119/1.1450571͔ I. INTRODUCTION scribed as fast, while a surface such as clay, with a high coefficient of friction, is described as slow.
    [Show full text]
  • Products Summary
    PRODUCTS SUMMARY Rebound Ace Sports Pty. Ltd. is an Australian owned company manufacturing the World ’ s most renowned sports surfaces. Recognised as the leader in sports sur- faces with the most technologically advanced systems designed for player develop- ment and performance for all ball sports. Rebound Ace Sports has a range of sur- faces for indoor and outdoor tennis, netball, basketball, concrete and asphalt-based multi-sport and playground areas, and indoor sports surfaces such as gymnasiums, multi-purpose halls, volleyball, badminton, futsal and many others. Uncoated concrete and asphalt courts will oxidize over time due to ultra violet expo- sure and weathering, stones loosen, and the surface becomes abrasive and danger- ous, physically demanding on limbs and bones, and becomes stained, pitted, cracked and unsightly after very little use. All of the Rebound Ace Sports outdoor surfaces are slip resistant even in damp conditions, ITF classified, and long-lasting even with constant use. Rebound Ace Sports ’ IMPACT indoor surface is suitable for both sports and non-sporting activities, and has become the superior choice to unforgiving hardwood and shiny lacquered parquetry floors. SURFACE LAYER DIAGRAMS Incorporating Your local Rebound Ace Approved Applicator is: TEB CONSTRUCTIONS 47 Conservatory Circuit, OAKDEN 5086 SA. Email: [email protected] Rebound Ace Sports Pty.Ltd. Christina & Tom Burgess (08) 83958198 WWW.REBOUNDACESPORTS.COM.AU 19 Argon Street, Carole Park (M) 0419832282 (E) [email protected] Queensland Australia 4300 Ph: +61 7 37238800 Fx: + 61 7 32714659 PHONE: 1800 786617 Email : [email protected] Printed June 2012 Rebound Ace GS 8 Suitable for outdoor or indoor; asphalt or concrete Suitable for outdoor or indoor; asphalt or concrete Rebound SYNPAVE bases base.
    [Show full text]
  • Court Resurfacing Project for Chabot Canyon Racquet Club Informational Meeting Presentation
    Court Resurfacing Project for Chabot Canyon Racquet Club Informational Meeting Presentation Presented by: Capital Improvement Committee Updated December 7, 2018 Agenda • Make-up of the Capital Improvement Committee (CIC) • Why court resurfacing now? • Our court resurfacing recommendation • Why Plexicushion 2000 compared to other cushioned surfaces? • Why Install a Slipsheet? • Why use Vintage Contractors? • Quick review of the All Member Survey results and conclusions • Quick review of Harbor Point Survey results and conclusions • Important Considerations • Financial Plan for Plexicushion 2000 w/ slipsheet as developed by consultant, Joan Martin, Deal Matters • Quotes to Remember Appendix 1: Estimated 2019 Costs for Court Resurfacing by Vintage Contractors Appendix 2: Vintage Contractor’s Website Information: Plexicushion 2000 and Plexipave Appendix 3: Financial Plan for Plexipave w/ slipsheet as developed by consultant, Joan Martin, Deal Matters 2 Members of the Capital Improvement Committee Originally formed in October 2016 to address long-term capital improvements with particular focus on court resurfacing, court lights, and clubhouse remodeling projects • David Steinberg (chairperson) • Peter Franzese • Phil Mitchell • Julie Simon • Kathleen Maynard • Steve Squire Note: Carl Gardeman resigned from committee mid-2017 and was replaced by Peter Franzese. Sue Andrews resigned from the committee mid-2018. Julie and Kathleen replaced her. Also, Ted Frey was our original board liaison and was replaced in that role by Melissa Kennedy in May
    [Show full text]
  • Womens & Mens Fantasy Tour: Season 1 Schedule
    Womens & Mens Fantasy Tour: Season 1 Schedule # Women's Tournament Men's Tournament Surface Level 1 Medibank Internationl- Sydney, AUS Qatar ExxonMobil Open- Doha, QAT R Tier I 2 ASB Classic- Auckland, NZL Next Generation Adelaide International- Adelaide, AUS R Tier III 3 Mondial Australian Women's Hardcourts- Gold Coast, AUS Medibank International- Sydney, AUS R Tier II 4 Moorilla Hobart International- Hobart, AUS Heineken Open- Auckland, NZL R Tier IV 5 Australian Open- Melbourne, AUS Australian Open- Melbourne, AUS RGS 6 Bausch & Lomb Championships- Amelia Island, USA Open SEAT- Barcelona, ESP C Tier II 7 Estoril Open- Estoril, POR US Men's Claycourt Championships- Houston, USA C Tier IV 8 Internazionali BNL d'Italia- Rome, ITA Monte Carlo Open- Monte Carlo, MON C Tier I 9 Internationaux de Strasbourg- Strasbourg, FRA Estoril Open- Estoril, POR C Tier III 10 Roland Garros- Paris, FRA Roland Garros- Paris, FRA CGS 11 Team Championships- Beijing, CHN Team Championships- Beijing, CHN * Tier IIB** 12 DFS Classic- Birmingham, GBR Gerry Weber Open- Halle, GER G Tier II 13 Ordina Open- 's-Hertogenbosch, NED Ordina Open- 's-Hertogenbosch, NED G Tier III 14 Campbell's Hall of Fame Tennis Champs- Newport, USA Red Letter Days Open- Nottingham, GBR G Tier IV 15 International Women's Open- Eastbourne, GBR The Artois Championships- London, GBR G Tier I 16 The Championships, Wimbledon- London, GBR The Championships, Wimbledon- London, GBR GGS 17 Bank of the West Classic- Stanford, USA RCA Championships- Indianapolis, USA H Tier IV 18 East West Bank
    [Show full text]
  • Guerrero Bares Reelection Plan by Rafael H
    UNIVERSITY OF }..U~W.i.W USf-?ARY arianas %riet~~ Micronesia~s Leading Newspaper Since 1972 b&) evvs Guerrero bares reelection plan By Rafael H. Arroyo Duringthe ribbon-cutting cer­ said his decision to seek reelec­ emonies for a water project in tion would be anchored on how GOVERNORLorenzofGuerrero MarpilastweekCommonwealth thepeoplehaveseenhiscommit­ announced yesterday he would Utilities Corporation Executive menttoprovidethebestqualityof seek reelection.in November. Director Ramon S. Guerrerode­ life to citizens of the Common­ "I have consulted my family clared the candidacyof the gov­ wealth. andhavereachedadecision.Yes, ernor and Lieutenant Governor Theyear1993 isthelastyearof I amseeking reelection," Guerrero BenjaminT.Manglona, askedfor Guerrero's initialfour yearterm. saidin a press. conference. comment at that time Guerrero UndertheConstitution, Guerrero The governor's disclosureyes­ said nothingwas definite yet and is allowed a reelection bid for terday came 19 days earlier than that Ray Guerrero's statements anotherfour-year term. promised. Hesaidearlierhewould wereonlyindicativeofthelatter's "Looking back at what we officially declarehisplansonJan. supportthe governor. promised during our campaign 25, his birthday. The CUC executive director trailsin 1989, Imust say wehave "Okay,sinceyoumediaarevery was the governor's campaign delivered,"Guerrerosaid. insistenton knowing if 1am run­ managerduring the 1989 guber­ He mentionedhis accomplish­ ning or not, yes 1 am. But you natorialrace which h~ won over ments in utilities infrastructure,
    [Show full text]
  • EUROPEAN TENNIS BASE SALZBURG the “European Tennis Base” Location SALZBURG / RIF
    EUROPEAN TENNIS BASE SALZBURG The “European Tennis Base” Location SALZBURG / RIF The European Tennis Base (ETB) established its tennis training center The German and Austrian as well as the Swiss tennis federation have The ULSZ Rif sports center offers the following The perfect facilities of the ULSZ Rif sports center and Olympic at the ULSZ Rif/Salzburg on September 1st, 2011. entrusted them with their most promising young players who they state-of-the-art sport facilities: training base, its central geographic position and cooperation with Gerald Mild and Ulf Fischer founded the ETB in order to coach and accompanied up to the ATP’s top 35 (several Grand Slam quarter professional local partners were crucial for it to be chosen as a loca- develop highly talented tennis players. Due to high demand there finals). Gerald Mild and Ulf Fischer are considered as accomplished • indoor tennis courts (rebound ace) tion. The city’s historic center is included in the UNESCO list of World exists a need for an intensive and professional instruction for trai- and diligent coaches who have a keen sense of talented tennis play- • outdoor clay courts Heritage Sites. nees who intend to become professional tennis players and want to ers. Furthermore they have made their mark as competent teachers • outdoor hard courts (as at the US Open, Australian Open) achieve world-class success. Gerald Mild and Ulf Fischer have overall over the years. They have gained insights and experiences at impor- • track-and-field facilities (indoor, outdoor) The airport Salzburg (15 min.) is located in the city area and directly responsibility for the ETB.
    [Show full text]
  • Court Surface Options Summary
    COURT SURFACE OPTIONS SUMMARY HARD COURTS CLAY COURTS Plexi-Pave Clay Tech Plexi-Cushion Prestige Premier Court Rebound Ace Har-Tru Clay (existing courts 4-9) (existing courts 1-3) Surface Type Acrylic based (hard court) Acrylic based (hard court) Acrylic based (hard court) Acrylic based (hard court) Har-Tru Har-Tru 25 mm Har-Tru 92 mm granular Surface Depth 0 mm 3 mm 5 mm 8 mm 12 mm Har-Tru base Soft court, ability to slide and Soft court, ability to slide and The Plexi base is a blend of latex, improves shock absorption improves shock absorption Most common hard-court surface rubber and plastic particles, reducing stress on joints. reducing stress on joints. in Western Canada designed to absorb body shock and reduce muscle fatigue. Easy on ankles, knees, hips and Easy on ankles, knees, hips and Used for most public courts. back. back. Softer feel but still considered a Very good experience by Clubs Softer feel but still considered a Formulated to accommodate all hard court. using this surface outdoors (i.e. hard court. Must be well maintained in terms Must be well maintained in terms levels of play from novice to Oakridge). of watering and sweeping clay of watering, rolling, and professional. Considered to reduce impact of Considered to reduce impact of from edges to court. sweeping. fatigue on players knees, ankles Best value for money for fatigue on players knees, ankles and feet. cushioned hard-court surfaces and feet. Not properly watering make court Expert knowledge and skill Description and Other Factors based on Tomko (i.e.
    [Show full text]
  • NICK KYRGIOS Zwischen Genie Und Wahnsinn Schweiz Der Tennis-Magazin
    CHF 8.90 Offizielles Verbandsmagazin: 1-2/2017 Jan./Febr. 2017 | Ausgabe Nr. 1/2 Partner von ANDERER WEG Als Doppel-Spezialisten zu Ruhm, Ehre und Geld NICK KYRGIOS Zwischen Genie und Wahnsinn Schweiz der Tennis-Magazin Das RATGEBER Wie Sie überflüssige Pfunde loswerden 01 Das macht Lust! Roger Federer und Belinda Bencic waren am Hopman Cup die Attraktion und überzeugten 9 771424 925002 WARM-UP Attraktives Doppel Liebe Leserin, lieber Leser Als ich kurz nach dem Jahreswechsel das Privileg genoss, mit einer Kaffeegenuss – Legende des Welttennis auf der selben Seite des Netzes zu stehen, wurde mir wieder bewusst, wie schön und facettenreich das Doppelspiel doch ist. Man bespricht sich, man bejubelt einen Punktgewinn und wenn das Racket frisch gemahlen, einmal, unfreiwillig natürlich, die Hand verlässt, hat man sogar jemanden, der es einem wieder bringt. Geteiltes Leid ist halbes Leid, geteilte Freude nicht gekapselt. doppelte Freude und regelmässiges Abklatschen einfach gut für die Psycho- hygiene. Zudem kann man Doppel nicht wie Einzel bis ins biblische Alter spielen. Sehr schade, dass es auf Profilevel oft als Tennis zweiter Klasse bezeichnet wird und etliche Entscheidungsträger damit nur einen Kostenfaktor in Verbindung bringen. Doppel ist dynamisch, abwechslungsreich und seit den Regeländerungen mit dem No-Ad-System und dem Champions Tiebreak auch rasant. Für viele Spieler, denen es im Einzel nicht ganz reicht, ist es auch die einzige Möglichkeit, doch noch den Sprung in die Nationalmann- schaft oder an die Olympischen Spiele und in die Weltspitze zu schaffen. Auch die Verdienstmöglichkeiten für die Topstars sind nicht zu verachten: Allein im Männercircuit war 2016 bei mehr als einem Dutzend Spieler das Preisgeld höher als das Bruttosalär eines Bundesrats.
    [Show full text]
  • 2014 Champions of Tennis
    Customization Pioneer Youth Tennis STRING SELECTOR: The wit and Hit a winner Find the right string and warmth of with COACH for your customers VIC BRADEN YOUTH TENNIS JANUARY 2015 / VOLUME 43/ NUMBER 1 / $5.00 2014 Champions of Tennis CONGRATULATIONS TO: BAHRAM AKRADI ARMY NAVY COUNTRY CLUB Our annual awards honor DAVID YAMANE TRANS TEXAS TENNIS those who continue to make ALLAN IVERSON YOUR SERVE TENNIS this sport a winner. JOE & SHIMA GROVER ELLEN MILLER SIMON GALE INNERCITY TENNIS FOUNDATION INDIAN WELLS TENNIS GARDEN JACK NEWMAN MERCER COUNTY PARK T.C. LAURIE MARTIN WASH. DC DEPT. OF PARKS & REC PAUL WALKER SIGNATURE TENNIS THE TENNIS CONGRESS NIGEL PUGH RANDY MATTINGLEY USTA INTERMOUNTAIN pg. 45 Incorporating USPTA Te nnisIndustry www.tennisindustrymag.com JANUARY 2015 DEPARTMENTS 4 Our Serve 7 Industry News 15 TIA news 20 Youth Tennis: Coach Youth Tennis 22 Pioneers: Vic Braden 40 Ask the Experts 42 String Playtest: Babolat Origin 17 44 Your Serve, by Mark Rearden INDUSTRY NEWS 7 Asics debuts BZ100 Performance Racquet 7 World TeamTennis celebrates 40 years 7 Gerflor buys Connor Sport Court 8 MRT John Gugel honored by IART Symposium 8 NYJTL honored by Bronx Chamber of Commerce p.23 8 Tecnifibre partners with ProWorld Tennis FEATURES 8 Head introduces new Graphene XT Speed line 23 2014 Champions of Tennis 9 UST A’s Gordon Smith honored by University of Georgia Our annual awards honor the people, 9 UST A honors grassroots businesses and organizations that are making a tennis at Atlanta TDW 11 Mason promoted to president difference in the tennis industry.
    [Show full text]
  • Rebound Ace® Sports Surfaces Have the Ideal Surface to Fi T Both Sport and Budget Requirements for a Wide Range of Applications
    Follow in the footsteps of champions www.reboundace.com.au The ball’s in our court From Grand Slam tennis venues to school netball and tennis courts, Rebound Ace® Sports Surfaces have the ideal surface to fi t both sport and budget requirements for a wide range of applications. Rebound Ace® Grand Slam Recognised by elite players the world over, Rebound Ace® Grand Slam is the ultimate cushioned hard court system. As an offi cial Grand Slam surface, Rebound Ace® Grand Slam delivers the right combination of bounce, ball response and player comfort. Because the special surface texture and unique layered cushioning benefi ts all styles of play, Tennis Australia also recommend it as an ideal surface to promote good stroke and tactical skills development for junior players. The surface never loses resilience from age or hard wear. Rebound Ace® Air Cushion Rebound Ace® Air Cushion provides a unique system for both indoor and outdoor applications. It retains all of the benefi ts of Rebound Ace® Grand Slam with the extra advantage that it is more economical to install and can also be laid over most old or deteriorating surfaces whether it be indoor carpet, synthetic grass, concrete or asphalt surfaces. The optional Dynamic Cushion Base allows Rebound Ace® Air Cushion to also cover clay courts or provide an economical base construction for new courts. Rebound Ace® Pro Rebound Ace® Pro use a liquid rubber cushion system offering the same cushioning benefi ts of Rebound Ace® but uses a thinner section (thickness) of rubber. Installed with a highly effi cient application system, Rebound Ace® Pro delivers a high performance, affordable, cushioned surface that is generally used for netball and smaller tennis centres.
    [Show full text]