Issance Survey/Prospecting & Exploration, Mine Planning
Total Page:16
File Type:pdf, Size:1020Kb
Reconnaissance Survey/Prospecting & Exploration, Mine Planning ISO 9001:2008 Certified SIDDHARTH GEOCONSULTANTS & An ISO 9001:2008 Certified Company SIDDHARTH GEO CONSULTANTS (I) PVT.LTD. 621/3 FIRST FLOOR, RAMKUND, SAMTA COLONY, BEHIND LIFE WORTH HOSPITAL, RAIPUR, CHHATTISGARH, INDIA Phone-0771-4070731 Fax- 0771 - 4281072, E –mail: [email protected]& [email protected] Website: www.mininggeology-sgc.com 1. RECONNAISSANCE SURVEY We have a team of experienced experts to deal with all type of Technical and Legal procedures needed to perform Reconnaissance. The process includes not only the field work but also various Government procedures as under: Application for Reconnaissance Permit (R.P.). Preparation and submission of Scheme. Geo-physical survey. Detailed Geological Mapping. Sampling & Analysis. Data interpretation. Mineral & Area selection for Prospecting License (P.L.). R.P. Projects RP over an Area of 907 Sq Km for Gold, Diamond, Base Metal, and Precious & Semi-Precious Gem Stone, Rare Earth Minerals etc. in Sidhi District of MP State for Rag Mines Pvt. Limited Raipur. RP over an Area of 1354 Sq. Km. for Diamond, Gold, Base Metal, & Semi-precious Gem Stone in Bijapur District. RP sanctioned to Major Anil Singh (Partner of Siddharth Geo Consultants), Raipur. RP over an Area of 522 Sq Km for Gold, Diamond, Base Metal, and Precious & Semi-Precious Gem Stone, Rare Earth Minerals etc. in Sidhi District of MP State for Rag Mines Pvt. Limited Raipur. 2. PROSPECTING AND EXPLORATION Preparation and Submission of P.L. application. Preparation of Prospecting Scheme as per UNFC guidelines. Topographical and DGPS Survey. Detail Geological Mapping. Geophysical Survey. Detail Exploration by Pitting, Trenching, & Core Drilling. Chemical analysis and 3D Modeling. Map Preparation and Reserve estimation. Geological report preparation as per UNFC guidelines. We follow the latest technology in Equipment’s like, DGPS, GPS, DRILLING MACHINE, TOTAL STATION (LICA) and GIS software’s like, MAP INFO, DIVA GIS, IDRISI ,TAIGA, for that we have a well trained and experienced team. We are also empanelled with INDIAN BUREU OF MINES (IBM) as an Exploration agency. And we have completed more than 100 PL & exploration in different minerals i.e. Gold, Iron, Bauxite, Dolomite, Lime stone, Porcellenite, Quartz, Quartzite, Gem stone, Tin, REE pegmatite etc. Some of Our Prospecting Projects 1. M/s. JSPL, Dolomite/Limestone deposite,total area 54.958 hect. 2. M/s. Agrasen Mines & Minerals, Dolomite deposit – 4.592 Hect. 3. M/s. Gurushri Minerals, Dolomite deposit – 6.07 Hect. 4. M/s. Satguru Sai Minerals, Dolomite deposit – 4.404 Hect. 5. M/s. Ganesh Minerals, Dolomite deposit – 4.654 Hect. 6. M/s. Siddhbaba Minerals, Dolomite deposit – 4.208 Hect. 7. Prospecting of the Gold in Tapkara, teh.-Kunkuri, district- Jashpur in 2008 total area is 25 sq km & 45 sq km. 8. Prospecting of Iron ore Deposit in village- Chhitpuri, Khara Forest Range of Kawardha District for Rashmi Sponge-Iron & Power Industries Ltd. over an area 457.00 hect. 9. Prospecting of Iron Ore Deposit over an area 235.03 hect. in Village- Bachhrukonadistt- Kawardha for Real Spat Pvt. Ltd. Total area is 10. Prospecting of Iron Ore deposit in Dallirajhara, Distt- Durg (C.G.), for Mahendra Sponge & Power Ltd. Total area is 376.00 hect. 11. Prospecting of Iron ore deposit over an area 40.00 hect. in village- Lohattar, Distt- Kanker, for Trimula Sponge Iron Pvt. Ltd. 12. Prospecting of Iron ore deposit in Koilibeda, district Kanker in 2009 13. Prospecting of Porcellainite (Natural Calcine) deposit over an area 4.712 hect. In Phuthamuda, district Raigarh, (C.G.) of Ravindra Agrawal. 14. Prospecting of Dolomite deposit in Katangpali, district Raigarh, (C.G.) 15. Prospecting of Bhainso Limestone deposit of Pamgarh tehsil, district Janjgir-Champa, (C.G.) 16. Prospecting of Dolomite deposit over an area 6.07hect. in Chhitapadariya, District -Janjgir-Champa for Guru Shri Minerals, Raigarh. 17. Prospecting of Quartz Deposit over an area 4.08 Hect in Basna, District Mahasamund. 18. Prospecting of Dolomite Deposit over an area 4.182 Hect. Of Shyam Sunder Agrawal, Barawdar, District Janjgir- Champa, (C.G.). 19. Prospecting of Dolomite Deposit over an area 4.047 Hect. of Shushil Agrawal, Akalsara, District - Janjgir-Champa,(C.G.) 20. Prospecting of Dolomite Deposit over an area 4.160 Hect. of Girwar Agrawal, Akalsara, District- Janjgir-Champa (C.G.). 21. Prospecting of Dolomite Deposit over an area 4.35 Hect. of Sanjay Kedia, Dumarpara, District - Janjgir-Champa, (C.G.). 22. Prospecting of Quartz Deposit over an area 4.314 Hect. ofNatwar Gopal Agrawal, Balakpodi (Pathalgaon), District -Raigarh, (C.G.). 23. Prospecting of Quartz Deposit over an area 7.058 Hect. ofShailendraChaurasiya, Sakti, District Janjgir-Champa, (C.G.). 24. Prospecting of Iron Ore deposit over an area 787 Hect. In Chhatarpur, District Sagar (MP) for Rashmi Cement. Ltd. Kolkata. 25. Prospecting of Medesara Limestone Deposit over an area 4.04 hect of Sanjay Shrivastava, Dist – Durg, (C.G.). 26. Prospecting of Limestone Deposit over an area 7.47 hect of YogitaChandrakar, Dhamdhadist – Durg, (C.G.). 27. Prospecting of Limestone Deposit over an area 4.04 hect of Sanjay Agrawal Vill-MedesaraDist – Durg, (C.G.). 28. Prospecting of Dolomite Deposit over an area 4.297 Hect. of Sailendra Pandey, vill-Chhitapadriya, Distt- Janjgir-Champa (C.G.) 29. Prospecting of Dolomite Deposit over an area 4.047 Hect. ofShaswat Infrastructure Development company, vill- Bhainso, Distt- Janjgir-Champa. 30. Prospecting of Kumurkatta Iron ore deposit, over an area 39.39 Hect. Of Salasar Steel & Power Ltd. 31. Prospecting of Boriya Tibbu Iron ore Deposit, over an area 231.63 Hect. Of Hari Minerals. 32. Prospecting of Kalwar Iron ore Deposit over an area of 23.72 Hect. of Maa Vindhyvasni Minerals and Steel Pvt. Ltd. Distt- Bhanupratappur. C.G. 33. Prospecting of Basnajhar Limestone deposit distt- Raigarh over an area 48.120 Hect. of M/S Calcar Products Pvt. Ltd. PROSPCTING 3. MINING LEASE& PLANS The process is followed after the PROSPECTING is completed MINING LEASE application. Pre-Feasibility&Feasibility report preparation. Preparation of MINING PLAN/MINING SCHEME along with PMCP/FMCP Environment and Forest clearance. Mining Plan/Scheme The purpose of a mining plan is to plan for scientific, sustainable, environmentally sound mining, which also includes leaving the area in a safe, nonpolluting condition, after the mining is completed and for that reclamation of the land is planned to regain the original land profile, which includes Planning and Proposals of: Mining Operation. Economical assessment of Mining Venture. Assessment of Mines. Scientific mining operation. Mineral use and Processing. Waste Management. Base line data for environment impact assessment. Land Reclamation. Mine Closure Plan (PMCP & FMCP). Our Honorary advisor Mr. Arvind Singh is certified RQP from IBM for more than 13 years, for preparation of MINING PLAN & SCHEMES; along with experienced team of geologists& mining engineers. ONE OF THE PLATES INCLUDED IN MINING PLAN SHOWING YEARLY PRODUCTION/BENCHES/SECTIONS ETC. Approved Mining Plans We have more than 100 Approved Mining Plans of both mechanized and semi-mechanized mines, including Modified Mining Plans, PMCP, FMCP, major among them are: LIST OF APPROVED MP/MS S. No PREPARED MINING PLAN, PMCP STATUS Approved by Mining plan of CHHOTE KADMA, Bastar Dist. Over an area of IBM16.04.2002 1. 2.80 hect. Lime stone deposit.Rekh chand Jain,Jadalpur. 1 Lakh T/y Mining plan of CHHOTE KADMA, Bastar Dist. Over an area of Approved by 2.43 hect. Lime stone deposit.Rafik Khan, Jagdalpur. IBM03.06.2002 2. 1 Lakh T/y Mining plan of Bade Bacheli Tin deposit, Bastar, Over an area of Approved by 5.314 hect. For Chhattisgarh Mineral Development corporation Ltd. IBM10.10.2002 3. 2LakhT/yTin Pegmatite Mining plan of Bade Bacheli Tin deposit, Bastar, Over an area of Approved by 17.087 hect. For Chhattisgarh Mineral Development corporation Ltd. IBM10.10.2002 4. 10 Lakh T/y Tin Pegmatite Mining plan of Bade Bacheli Tin deposit, Bastar, Over an area of Approved by 36.067 hect. for Chhattisgarh Mineral Development corporation Ltd. IBM06.12.2002 5. 20 LakhT/y Tin Pegmatite Mining plan of Matia Lime stone deposite, of Raipur Dist. Over an Approved by area of 10.469 hect. For M/s F.R.Enterprises, Raipur. IBM17.01.2003 6. 2 LakhT/y Mining plan of Kodiya Dolomite deposit, of Bilaspur Dist. Over an Approved by area of 6.17 hect. For O.P.Singh. IBM06.01.2006 7. 1.5 LakhT/y Mining plan of Kumakoleng, Tin deposit, Bastar, Over an area of Approved by IBM 30.259 hect. for Chhattisgarh Mineral Development corporation Ltd. 18.01.06 8. Mining plan of Kesara, Bauxite deposit, Surguja, Over an area of Approved by 9. 20.34 hect. for Chhattisgarh Mineral Development corpo. Ltd. IBM22.02.2006 1 LakhT/y Mining plan of Kesara, Bauxite deposit, Surguja, Over an area of Approved by 10. 9.000 hect. for Chhattisgarh Mineral Development corporation Ltd. IBM22.02.2006,75000T/y Mining plan of Kesara, Bauxite deposit, Surguja, Over an area of Approved by IBM 13.13 hect. for Chhattisgarh Mineral Development corporation Ltd. 22.02.2006 11. 75000 T/y Mining plan of Kesara, Bauxite deposit, Surguja, Over an area of Approved by IBM 12. 4.90 hect. for Chhattisgarh Mineral Development corporation Ltd. 22.02.2006, 50000hT/y Progressive Mine closure Plan of Lime stone deposit of Chhote Approved by IBM 13. Kadma, over an area of 2.43 hect. In Bastar Dist.For Rafik Khan. 13.07.2005 Progressive Mine closure Plan of Lime stone deposit of Chhote Approved by IBM 14. Kadma, over an area of 2.80 hect. In Bastar Dist.For Rekh Chand 13.07.2005 Jain. Progressive Mine closure Plan of Tin deposit of Bade Bacheli, over Approved by IBM 15.