Kathryn Tyson, AIA 1615 Pond View Court Middleton, 53562

(608) 831 – 7763 land (608) 515 – 3547 cell [email protected]

Ms. Tyson has 25+ years of experience in architectural planning and project management from the early stages of facility strategic planning, benchmarking, building analysis and issue identification, through design and construction. Clients are pleased with her focus on their needs and the interactive approach to programming, planning and design. She specializes in resolving complex planning issues.

Education University of Detroit, School of Architecture, Detroit, MI. Bachelor of Architecture. May 1973. University of Detroit, School of Architecture, Detroit, MI. Master of Architecture. May 1975. University of Michigan, Ross School of Business, Ann Arbor, MI. MBA. December 1982.

Registrations, Accreditations Registered Architect American Institute of Architects National Council of Architectural Registration Board (50091, May 1998) LEED Accredited Professional, Building Design & Construction

Project Experience At LPD (August 2011 to Present) • University of Wisconsin, Meat Sciences Laboratory, Madison, WI. 55,700 GSF – Lab planner • SAFC, Scale-up and Stability Lab Renovations, Verona, WI. 17,000 GSF – Lab planner

At HOK (August 2008 – August 2013) • University of Wisconsin, Wisconsin Energy Institute, Madison, WI 107,000 GSF – Lead lab planner for new interdisciplinary, alternative energy research institute. • University of Wyoming, Wyoming Energy Resource Center, Laramie, WY 55,460 GSF – Lead lab planner for the planning and design of the new energy resource center. • KAUST, Saudi Arabia. 48,800 GSF – Lab Planner for lab areas within the highly interdisciplinary research lab complex.

At Flad Architects, Madison, WI (August 1991 – August 2008) • US Army Medical Institute for Chemical Defense (USAMRICD), Aberdeen Proving Ground, MD 383,000 GSF - Lab planner for the planning, and schematic design of the chemical agent research facility. • US Army Center, Health Promotion & Preventative Medicine (USACHPPM), Aberdeen Proving Ground, MD 300,000 GSF - Lab planner for programming and schematic design of this office, lab, and vivarium facility. • Wyeth R&D Strategic Planning, Various Locations, US and Italy.

Resume of Kathryn Tyson Page 1

2,000,000 GSF - Project manager and lab planner for multiple strategic planning studies for business units in Wyeth Research space in the US and Italy over a six-year period. • Wyeth Research Expansion and Renovation, Chazy, NY 47,500 GSF - Project manager and lab planner for the office and central utility plant expansion and formulations lab renovation through construction. • Blood Center of Southeastern Wisconsin, Milwaukee, WI 46,000 GSF - Project manager / lab planner for the blood testing and research laboratory renovation project through construction. • Wisconsin State Hygiene Lab, Madison, WI 72,000 GSF - Lab planner for the chemistry division of the State Lab of Hygiene during the programming phase. • Michigan Department of Agriculture, Geagley Lab, East Lansing, MI 45,000 GSF - Project manager for programming and design of the lab renovation through construction. • Biosciences/Engineering Center, Lafayette, IN 54,000 GSF - Lab planner and programmer for the multidisciplinary science building through the SD phase. • /Immunex Helix Buildings ABCD, , WA 551,000 GSF - Project manager for the biotechnology/ biopharmaceutical research center through CD phase. • Building 87, , IN 275,000 GSF - Lab planner for a discovery chemistry laboratory on the Lilly campus through schematic design. • Eli Lilly Sphinx Pharmaceuticals, RTP, NC 160,000 GSF - Project manager / lead lab planner for the high throughput screening laboratory through SD’s. • Bayer B36, West Haven, CT. 15,000 GSF - Project manager and lead lab planner of the expansion and renovation project for the high throughput screening lab through construction. • PPD Pharmaceuticals, Middleton, WI. 5,000 GSF – Project manager and lab planner for the renovation of an analytical lab through construction.

At CRSS Architects, Inc., Irvine, CA (1988 – July 1991) • Lockheed. Hazardous Materials and Waste Warehouse, Palmdale, CA 32,000 GSF – Project manager and lead lab planner for the design of the new hazardous materials storage facility through construction documents.

Tools Microsoft Word, Excel, Microsoft Project, Revit, various specialized and commercial databases (E.G., Affinity).

Awards R&D Magazine, Renovated Lab of the Year 2001, Bayer B36 High Throughput Screening Lab.

Publications • “Meeting sustainability goals in an energy-charged world,” Laboratory Design News, October 2014. http://www.labdesignnews.com/articles/2014/10/meeting-sustainability-goals-energy-charged-world • “Wisconsin Energy Institute Lab Casework Design,” Laboratory Design News, September 2014. http://www.labdesignnews.com/articles/2014/09/wisconsin-energy-institute-lab-casework-design. • “Sizing Lab Modules for Flexibility and Energy Efficiency”, Laboratory Design News, Oct. 15 and Nov. 17, 2010. • “Facility Design: Forecasting Space Requirements,” Lab Animal News, June 1999. • “Flexibility: Getting the Type You Need,” Laboratory Design News, March 1999.

Resume of Kathryn Tyson Page 2