STRICTLY RESTRICTED FOR COMPANY USE ONLY RESTRICTED The information given in this report is not to be communicated either directly or indirectly to the press or to any person not holding an official position in the CIL/ Government.

BHARAT COKING COAL LIMITED

MINING PLAN & MINE CLOSURE PLAN

FOR

KALYANESHWARI OC (Base – Salanpur-A)

(C.V AREA)

April – 2018

CENTRAL MINE PLANNING & DESIGN INSTITUTE LTD. REGIONAL INSTITUTE NO. - II DHANBAD Mine Plan for Kalyaneshwari OC CMPDI

MINING PLAN FOR KALYANESHWARI OC

LIST OF CONTENTS

CHAPTER PARTICULARS PAGE NO. List of Contents i List of Plates ii-iii List of Abbreviations iv List of Annexures v General Information GI-I Summarized Data SD-1 to SD-8 I Introduction 1 - 4 II Details of Earlier Approval of Mining Plan 5 III Locations, Topography & Communication 6 - 10

Exploration Geology Seam Sequence Coal IV 11 - 84 Quality & Reserves

V Mining 85 - 112 VI Manpower, Safety and Supervision 113 - 136 VII Coal handling, washing & mode of dispatch 137-155

Infrastructure Facilities Proposed and Their VIII 156 - 169 Location

X Land requirement 170 - 172 XI Environment management 173 - 193 XII Progressive and Final Mine Closure Plan 194 - 225

PLATES I - XXXII ANNEXURES I - VI

JOB NO. 200218001 i Mine Plan for Kalyaneshwari OC CMPDI

MINING PLAN FOR KALYANESHWARI OC

LIST OF PLATES

PLATES SUBJECT R.F. I Location Plan NTS II Surface Plan of Kalyaneshwari OC 1:4000 III Geological Plan of Kalyaneshwari OC 1:4000 IV Litholog 1:4000 V Geological Cross Section 1:4000 VI Floor Contour Plan of Laikdih Top 1:4000 VII Floor Contour Plan of Laikdih Middle 1:4000 VIII Floor Contour Plan of Laikdih Bottom 1:4000 IX Floor Contour Plan of Salanpur D 1:4000 X Floor Contour Plan of Salanpur C 1:4000 XI Floor Contour Plan of L6 1:4000 XII Floor Contour Plan of Salanpur B 1:4000 XIII Floor Contour Plan of Salanpur A 1:4000 XIV Seam Folio Plan of Laikdih Top 1:4000 XV Seam Folio Plan of Laikdih Middle 1:4000 XVI Seam Folio Plan of Laikdih Bottom 1:4000 XVII Seam Folio Plan of Salanpur D 1:4000 XVIII Seam Folio Plan of Salanpur C 1:4000 XIX Seam Folio Plan of L6 1:4000 XX Seam Folio Plan of Salanpur B 1:4000 XXI Seam Folio Plan of Salanpur A 1:4000 XXII Total In-situ Coal Thickness Plan 1:4000 XXIII Total In-situ OB Thickness Plan 1:4000 XIV Vertical Stripping Ratio Plan 1:4000

JOB NO. 200218001 ii Mine Plan for Kalyaneshwari OC CMPDI

PLATES SUBJECT R.F. XXV Initial Stage Quarry Plan 1:4000 XXVI Intermediate Stage Quarry Plan 1:4000 XXVII Final Stage Quarry Plan 1:4000 XXVIII Final Stage Dump Plan 1:4000 XXIX Element of Mining System 1:2000 XXX Ownership Status of Land 1:4000 Plan Showing Block Boundary vis-à-vis Mining XXXI 1:4000 Lease XXXII Proposed Plantation Plan 1:4000

JOB NO. 200218001 iii Mine Plan for Kalyaneshwari OC CMPDI

List of Abbreviations used in the Report

BCCL - Bharat Coking Coal Limited RF - Representative Factor MECL - Mineral Exploration Corporation Limited UVM - Unit Volatile Matter UHV - Useful Heat Value GCV - Gross Calorific Value BH - Bore Hole B&P - Bord and Pillar SDL - Side Discharge Loader DB - District Board SOP - Standing on Pillar OC - Open Cast OB - Over Burden HEMM - Heavy Earth Moving Machinery CMR - Coal Mines Regulations DGMS - Directorate General of Mines Safety UG - Underground/Ungraded GPM - Gallon Per Minute HT/LT - High/Low Tension HP - Horse Power DVC - Damodar Valley Corporation BOD - Biological Oxygen Demand MCP - Mine Closure Plan

JOB NO. 200218001 iv Mine Plan for Kalyaneshwari OC CMPDI

MINING PLAN FOR KALYANESHWARI OC

LIST OF ANNEXURES

Sl. No. Particulars Annexure No.

1 Result of Washablity Test I

2 Result of Physico-Mechanical Test II

3 Result of Ultimate Analysis & Coking Test III

4 Result of Petrography Study IV

Letter from GM (P&P) for preparing Mining Plan along with 5 Mine Closure Plan-Ref. No. BCCL/GM(P&P)/F-76/18/97(H) V Dated 27.03.2018

Letter of to the Joint Secretary to Govt. of , Ministry of Coal, Shastri Bhawan, New Delhi – 110001 for allocation of 6 VI East of Damagoria(Kalyaneshwari) Block and Block to BCCL. dated 19.02.2018 and 12.03.2018

JOB NO. 200218001 v

Mining Plan for Kalyaneshwari OC CMPDI

GENERAL INFORMATION

1. Name of the Coal Block area (Acre/Hectare/Sq. Km.) East of Damagoria (Kalyaneshwari) Block, 7.03 Sq. Km.

2. Name of the Coalfield and its location i.e. District and State Coalfield, West Burdwan District,

3. Name & Address of the Applicant : S. Chatterjee General Manager, C.V Area, Bharat Coking Coal Limited, Post- Dist. – Paschim Burdwan, Pin code – 713324 Phone No.0341-2523113 Mobile No.- 9470596605

4 Indication, if it is a Revised Mining Plan and if so, the Revision no. i.e. First Revision, Second Revision etc.

Not Applicable

5. Targetted capacity: 4.0 MTY + 30%

6. Date of preparation of Mining Plan- April, 2018

7. Indication, if the Mining Plan is re-submitted after incorporation the suggestions of Standing Committee

Not Applicable

JOB NO. 200218001 GI-1

Mining Plan for Kalyaneshwari OCP (4.0MTY) CMPDI

SUMMARISED DATA

1. General

Bharat Coking Coal Ltd., a) Name and Addresses of the applicant company Public Sector Undertaking Bharat Coking Coal Ltd., b) Name and address of the Block allottee Koyla Bhawan, Koylanagar, Dhanbad c) Relationship between the applicant and allottee company Not Applicable d) Status of the Applicant Company: Central / Public Sector Undertaking / State Government Undertaking / IV Central PSU Company/ Pvt Company / Public Co/ Others (Specify). East of Damagoria e) Name of the Coal Block together with name of Coalfield & State (Kalyaneshwari) Block, where located RCF, West Bengal i) Date of allotment By Nationalisation Basket linkage of washed g) End use of Coa/Lignitel as per approval by the competent authority coal h) ROM quantity proposed to be produced as per mining plan 4.0 MTPA I) Norms adopted for calculating ROM quantity requirement in case it Not Applicable differs from the quantity indicated in the allotment order. j) Beneficiation required – Yes/No Yes k) Requirement of Beneficiated coal & expected availability thereof. Detail in Chapter - I l) Period for which mining lease has been granted/ is to be renewed /is 39 Years to be applied for. m) Date of Expiry of earlier Mining Lease, if any Not Applicable n) RQP who has prepared the mining plan*

*Based on authenticated data, information and prepared plans furnished by Damagoria Colliery authority, CV Area, BCCL, this mining plan is prepared by CMPDI, RI-II in association with BCCL.

JOB NO. 200218001 SD - 1 Mining Plan for Kalyaneshwari OCP (4.0MTY) CMPDI

D. Information regarding earlier approved Mining Plans, if any a) Approval letter no. and date b) Lease Area c) Date of grant of Lease d) Date of Expiry of Lease e) Targeted Production f) Proposed year of start of Production g) Propose year of achieving the targeted production level h) Envisaged life of the mine (in years) i) Date of actual commencement of Mining Operations, if operations already started j) Likely date of Mining Operations, if operations not yet started & reasons for non-commencement of operations k) Planned production and actual levels achieved in last 3 years. NOT APPLICABLE l) Coal – U/G O/Cast OB m) Reasons for difference between the planned and actual production levels. n) Reason for revision of the Mining Plan o) Details of changes in the new mining plan compared to earlier approval (i) Lease Area (ii) Block boundary (iii) Production level (iv) Reserves (v) Mining technology / (Additional sheets to be used, if required) (vi) Land use pattern

JOB NO. 200218001 SD - 2 Mining Plan for Kalyaneshwari OCP (4.0MTY) CMPDI

E. LOCATION a) Location of the Block Mouza: Damagoria(part), Taluka / Village / Khasra / Plot / Block Range/ Etc. Jamaldih(part), Nakrajoria(part), District/State Salanpur(part), Digari, Sabanpur, Borira, Lalbazar(part) (part) Lachmanpur(part) and Chaptoria, of Raniganj Coalfield, Paschim Burdwan, West Bengal b) Name of the Coalfield / Coal belt Raniganj Coalfield c) Particulars of adjacent blocks: North, South, East, West North: Non-coal bearing area, South: Sitarampur Block, West: Ramnagar Block of SAIL, East: Dharma Block of ECL d) Area of the allotted block (hectares) i. Geological block area 703 ii. Mining block area 703 e) Reference no. of plan of block boundary issued by Not Applicable CMPDI/SCCL / NLC (a copy of the plan also to be annexed) f) Whether the lease boundary / required boundary is same as Yes demarcated by CMPDI/ SCCL/ NLC for delineating block / sub- block. g) Existing Mining Lease Area in case of existing mines, (hectares) 695.73 Ha – (as per mine officials)* h) Applied / Required Lease Area as per the Mining Plan under 703 consideration (hectares) i) Whether the applied lease area falls within the allotted block Yes j) Area (hectares) of lease which falls outside the block/ sub-block Not Applicable delineated by CMPDI/SCCL/NLC. k) Details of outside area: - Whether forms part of any other coal block Sitarampur Block - Whether it contains any coal/ lignite reserves Coal Reserve - Purpose for which it is required, e.g. roads/ OB dumps/service UG Mining & OB Dumping buildings/ colony safety zone / others (specify) l) Whether some part(s) of the allotted block has not been applied Not Applicable for mining lease. - Total area in Ha. Of such part(s) - Total reserves in such part(s) - Brief reasoning for leaving such part(s) m) Type of land involved in Hectares - Forest land Nil - Non Forest land o Tenancy land 414.17 o Road/Govt. land 9.59 o BCCL Land 706.52 o Railway Acquired Land Nil n) Broad land use pattern (Forest, Township, Industrial, Refer Chapter IX. Agricultural, Grazing, Barren etc.)

JOB NO. 200218001 SD - 3