Paschim Bardhaman
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
NTPC – SAIL Power Company Limited (NSPCL) Is a 50:50 Joint Venture of Two Maharatna Psus I.E
SALIENT FEATURES OF KULTI SOLAR PV POWER PROJECT (25 MWp) 1.0 INTRODUCTION NTPC – SAIL Power Company Limited (NSPCL) is a 50:50 joint venture of two Maharatna PSUs i.e. NTPC LTD, an integrated power major and SAIL, one of the largest steel producing companies of India. It has an installed capacity of coal based 814 MW at different SAIL locations i.e Bhilai, Rourkela & Durgapur. Out of 814 MW of installed capacity 564 MW capacity is for captive use of SAIL plant at respective locations. It is also undertaking the development of Coal based units of 1X250 MW at SAIL, Rourkela (RSP) & 2X20 MW at SAIL, Durgapur (DSP), which are under construction phase by BHEL & ISGEC Ltd respectively. NSPCL is intending to set up a 25 MWp Solar PV plant at Kulti Steel Plant of SAIL in West Bengal. The 25 MWp Solar PV power project shall be implemented in a single EPC package under domestic competitive bidding using Non DCR (open category) manufactured PV modules and cells. Further this EPC package is proposed to be awarded to single bidder in single block of 25 MWp with suitable award criteria intimated separately in the bidding documents. “Salient Technical Features of the equipment/ systems/ services covered in the IFB No.CC/C&M/C-496 are mentioned below. These Salient Technical Features are mentioned only to facilitate the prospective bidders to prima-facie understand the requirements under the tender and shall not in any way limit or alter the scope of work and technical features/ specification of equipment/ systems/ services covered in the Bidding Documents. -
Sanctoria, P.O. Dishergarh 713333 ” Within 10 Days from the Date of Publication of This Advertisement
Ref.no. HoD_IAD/NS_StoreAudit/EOI/2019/55 Dated 11.03.2019 INVITATION OF EXPRESSION OF INTEREST FOR APPOINTMENT OF STORE AUDITORS Eastern Coalfields Limited invites Expression of Interest [EOI] for empanelment of 4 nos. of practicing firms of Chartered Accountants /Cost Accountants for conducting “Physical verification of store and spares and Reconciliation of Store ledgers with Financial ledgers on annual basis” of all of its 24 nos. of Stores of Areas/Units/workshops and HQ located in the states of Jharkhand and West Bengal for the FY 2018-19. Eligible firms may send their EOI in prescribed format in a SEALED COVER through Hand delivery /Speed post or Courier services, so as to reach the office of “The HOD, Internal Audit Department, Eastern Coalfields Ltd., CMD Office, Technical Building, IInd Floor, Sanctoria, P.O. Dishergarh 713333 ” within 10 days from the date of publication of this advertisement. The prescribed format of EOI containing detailed terms & conditions can be downloaded from the website: www.easterncoal.nic.in . Date of Closing – 21/03/2019 (4.00 PM) Date of Opening EOI – 25/03/2019 (11.00 AM) Eastern Coalfields Ltd. Sanctoria EOI Document for Store Audit [1] EASTERN COALFIELDS LIMITED A. PROFILE OF THE AUDIT FIRM 1 (i) Name / Title of the Firm : (ii) Year of Establishment : (iii) Status of Firm (Proprietor/Partnership) : (iv) Details of Partners/Proprietor : 2 Registration no. of the Firm (Please enclose the copy of certificate of Registration issued by the institute of Chartered Accountants of India/Institute of Cost Accountants of India in evidence of informations at Sl.no 1&2.) 3 Name of Qualified Assistants with Membership No. -
West Bengal State Colonies S.No Name of Colony Address District 1 Kalyanpur Colony, Gouripur, Gouripur, Bankura – Dt
Association of People Affected by Leprosy List of West Bengal State Colonies S.No Name of Colony Address District 1 Kalyanpur Colony, Gouripur, Gouripur, Bankura – Dt. 2 Nabajibanpur Junbedia, Junbedia, Bankura – Dt. 3 Bishnupur colony, Bishnupur, Bishnupur, Bankura – Dt. 4 Peardoba Aftercare colony, Peardoba, Peardoba, Bankura – Dt. 5 Nimpura Colony, Rakhajangal, Rakhajangal, Bankura – Dt. 6 Garbeta Colony, Garbeta – Post, Garbeta – Post, Bankura – Dt. 7 Saltola Colony, Midnapur Post, Midnapur Post, Bankura – Dt. 8 Manikpara Colony, Manikpara – Post, Manikpara – Post, Bankura – Dt. 9 Bachhurdoba Colony, Jharagram – Post, Jharagram – Post, Bankura – Dt. 10 Tantigeria Colony, Midnapur – Post, Midnapur – Post, Bankura – Dt. 11 Gidhni Colony, Gidhni - Post, Gidhni - Post, Bankura – Dt. 12 Rahamatdanga colony, Burnpur – Post, Burnpur – Post, Burdwan – Dt. 13 Kankardanga Colony, Burnpur – Post, Burnpur – Post, Burdwan – Dt. 14 Chanda Colony, Chanda – Post, Chanda – Post, Burdwan – Dt. 15 Jamuria Colony, Jamuria – Post, Jamuria – Post, Burdwan – Dt. 16 Mohan Das Karamchand Kustha Pally, Durgapur, Durgapur, Burdwan – Dt. 17 Ukhra Colony, Ukhra, Ukhra, Burdwan – Dt. 18 Kajora Colony, Kajora, Kajora, Burdwan – Dt. 19 Pandaveswar colony, Pandaveswar, Pandaveswar, Burdwan – Dt. 20 Bohula colony, Bohula – Post, Bohula – Post, Burdwan – Dt. 21 Chakdola Colony, Chakdola – Post, Chakdola – Post, Burdwan – Dt. 22 J.K. Nagar colony, J.K. Nagar, J.K. Nagar, Burdwan – Dt. 23 Barakar Leprosy colony, Barakar, Barakar, Burdwan – Dt. 24 Lachhipur Mahatma Gandhi Kustha pally Sitarampur, Sitarampur, Burdwan – Dt. 25 Sahebganj Colony, Ranigunge, Ranigunge, Burdwan – Dt. 26 Manipur Colony, Adra – Post, Adra – Post, Purulia Dt. 27 Simonpur colony, Baligara, Baligara, Purulia Dt 28 Jamunabandh Colony, Purulia Purulia Purulia – Dt. 29 Matigora Colony, Siliguri -Post, Siliguri -Post, Jalpaiguri. -
Office of the Commissioner of Police Asansol – Durgapur
OFFICE OF THE COMMISSIONER OF POLICE ASANSOL – DURGAPUR C.P. Order No. 20 /18 Dated : 13 / 04 /18 In exercise of power conferred upon me u/s 112(2)/115/116/117 of motor vehicles Act.1988 vide notification no. 2827(A)-WT/3M-80/2002 dated 01.09.11 of Transport Department, I, Shri Laxmi Narayan Meena, IPS, Commissioner of Police, Asansol-Durgapur do hereby issue the restrictive orders on the roads under Asansol-Durgapur Police Commissionerate as hereunder, in the interest of public safety and also to prevent danger, obstruction, inconvenience to public in general, to impose speed limit restrictions for regulating the movement of vehicles at different parts of Asansol-Durgapur Police Commissionerate. Sl. Name of Speed (Extent Reason for Speed Name of the place Name of the road No. the TG Limit of road) Limit Barakar Hanuman Charai 1 30 km/hr. G.T. Road 1.5 KM Congested area to Barakar Check-post Barakar Hanuman Charai Populated area and 2 40 km/hr. G.T. Road 3.9 KM to Kulti College Road School Kulti Collage Road to Populatedarea and 3 50 km/hr. G.T. Road 2.2 KM IISCO Road School Congested area and Neamatpur New Road to 4 30 km/hr. G.T. Road 1.4 KM School, Bankand Neamatpur Ghari Masjid Bazar Neamapur Ghari Masjid to 5 40 km/hr G.T. Road 1.5 KM Populated area Bangabasi Hotel Neamatpur New Road to Niyamatpur – 6 50 km/hr. 4 KM Populated area Chowranghee More Runarayanpur Road Chowranghee More to Niyamatpur – 7 Kulti TG 50 km/hr. -
W.B.C.S.(Exe.) Officers of West Bengal Cadre
W.B.C.S.(EXE.) OFFICERS OF WEST BENGAL CADRE Sl Name/Idcode Batch Present Posting Posting Address Mobile/Email No. 1 ARUN KUMAR 1985 COMPULSORY WAITING NABANNA ,SARAT CHATTERJEE 9432877230 SINGH PERSONNEL AND ROAD ,SHIBPUR, (CS1985028 ) ADMINISTRATIVE REFORMS & HOWRAH-711102 Dob- 14-01-1962 E-GOVERNANCE DEPTT. 2 SUVENDU GHOSH 1990 ADDITIONAL DIRECTOR B 18/204, A-B CONNECTOR, +918902267252 (CS1990027 ) B.R.A.I.P.R.D. (TRAINING) KALYANI ,NADIA, WEST suvendughoshsiprd Dob- 21-06-1960 BENGAL 741251 ,PHONE:033 2582 @gmail.com 8161 3 NAMITA ROY 1990 JT. SECY & EX. OFFICIO NABANNA ,14TH FLOOR, 325, +919433746563 MALLICK DIRECTOR SARAT CHATTERJEE (CS1990036 ) INFORMATION & CULTURAL ROAD,HOWRAH-711102 Dob- 28-09-1961 AFFAIRS DEPTT. ,PHONE:2214- 5555,2214-3101 4 MD. ABDUL GANI 1991 SPECIAL SECRETARY MAYUKH BHAVAN, 4TH FLOOR, +919836041082 (CS1991051 ) SUNDARBAN AFFAIRS DEPTT. BIDHANNAGAR, mdabdulgani61@gm Dob- 08-02-1961 KOLKATA-700091 ,PHONE: ail.com 033-2337-3544 5 PARTHA SARATHI 1991 ASSISTANT COMMISSIONER COURT BUILDING, MATHER 9434212636 BANERJEE BURDWAN DIVISION DHAR, GHATAKPARA, (CS1991054 ) CHINSURAH TALUK, HOOGHLY, Dob- 12-01-1964 ,WEST BENGAL 712101 ,PHONE: 033 2680 2170 6 ABHIJIT 1991 EXECUTIVE DIRECTOR SHILPA BHAWAN,28,3, PODDAR 9874047447 MUKHOPADHYAY WBSIDC COURT, TIRETTI, KOLKATA, ontaranga.abhijit@g (CS1991058 ) WEST BENGAL 700012 mail.com Dob- 24-12-1963 7 SUJAY SARKAR 1991 DIRECTOR (HR) BIDYUT UNNAYAN BHAVAN 9434961715 (CS1991059 ) WBSEDCL ,3/C BLOCK -LA SECTOR III sujay_piyal@rediff Dob- 22-12-1968 ,SALT LAKE CITY KOL-98, PH- mail.com 23591917 8 LALITA 1991 SECRETARY KHADYA BHAWAN COMPLEX 9433273656 AGARWALA WEST BENGAL INFORMATION ,11A, MIRZA GHALIB ST. agarwalalalita@gma (CS1991060 ) COMMISSION JANBAZAR, TALTALA, il.com Dob- 10-10-1967 KOLKATA-700135 9 MD. -
Date Wise Details of Covid Vaccination Session Plan
Date wise details of Covid Vaccination session plan Name of the District: Darjeeling Dr Sanyukta Liu Name & Mobile no of the District Nodal Officer: Contact No of District Control Room: 8250237835 7001866136 Sl. Mobile No of CVC Adress of CVC site(name of hospital/ Type of vaccine to be used( Name of CVC Site Name of CVC Manager Remarks No Manager health centre, block/ ward/ village etc) Covishield/ Covaxine) 1 Darjeeling DH 1 Dr. Kumar Sariswal 9851937730 Darjeeling DH COVAXIN 2 Darjeeling DH 2 Dr. Kumar Sariswal 9851937730 Darjeeling DH COVISHIELD 3 Darjeeling UPCH Ghoom Dr. Kumar Sariswal 9851937730 Darjeeling UPCH Ghoom COVISHIELD 4 Kurseong SDH 1 Bijay Sinchury 7063071718 Kurseong SDH COVAXIN 5 Kurseong SDH 2 Bijay Sinchury 7063071718 Kurseong SDH COVISHIELD 6 Siliguri DH1 Koushik Roy 9851235672 Siliguri DH COVAXIN 7 SiliguriDH 2 Koushik Roy 9851235672 SiliguriDH COVISHIELD 8 NBMCH 1 (PSM) Goutam Das 9679230501 NBMCH COVAXIN 9 NBCMCH 2 Goutam Das 9679230501 NBCMCH COVISHIELD 10 Matigara BPHC 1 DR. Sohom Sen 9435389025 Matigara BPHC COVAXIN 11 Matigara BPHC 2 DR. Sohom Sen 9435389025 Matigara BPHC COVISHIELD 12 Kharibari RH 1 Dr. Alam 9804370580 Kharibari RH COVAXIN 13 Kharibari RH 2 Dr. Alam 9804370580 Kharibari RH COVISHIELD 14 Naxalbari RH 1 Dr.Kuntal Ghosh 9832159414 Naxalbari RH COVAXIN 15 Naxalbari RH 2 Dr.Kuntal Ghosh 9832159414 Naxalbari RH COVISHIELD 16 Phansidewa RH 1 Dr. Arunabha Das 7908844346 Phansidewa RH COVAXIN 17 Phansidewa RH 2 Dr. Arunabha Das 7908844346 Phansidewa RH COVISHIELD 18 Matri Sadan Dr. Sanjib Majumder 9434328017 Matri Sadan COVISHIELD 19 SMC UPHC7 1 Dr. Sanjib Majumder 9434328017 SMC UPHC7 COVAXIN 20 SMC UPHC7 2 Dr. -
World Bank Document
/-i 7/ IIV-> F117 PRD APPENDIX 4 L-172- RESTRICTED Public Disclosure Authorized i his report is restricted to use within the Bank. INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Public Disclosure Authorized FILECOPY TECHNICAL REPORT ON THE IISCO-SCOB IRON AND STEEL PROJECT IN Public Disclosure Authorized INDIA December 4, 1952 Public Disclosure Authorized Loan Department Rate of Exchange of Indian Currency 1 Indian rupee a US $0.21 1 US dollar * Rs. 4.762 1 lakh of ruJees . US $21,000 (Rs. 100,000) 1 crore of rupees . US $2,100,000 (Rs. 10,000,000) TECHNICALREPORT ON IISCO-SCOB IRON AND STEEL PROJECT I N D I A Page I. Purpose and Scope of Report 1 II. India's Iron and Steel Program 1 III. The Borrower 2 IV. Description of the Project 3 V. Raw Materials 5 VI. Transport 6 VII. Power 7 VIII. Market 7 IX. Estimated Cost of Construction 9 X. Estimates of Cost of Production 9 XI. Schedule of Constructionand Disbursement1R XII. MHethod of Financing 11 XIII, Justificationof the Project 19 XIV. Conclusions 20 TECHNICALREPORT ON IISCO-SCOB IRON AND STEEL PROJECT I N D I A I. Purpose and Scope of Report 1. In June, 1952, the Bank sent a llissionto India to examine the problems connectedwith the proposed expansion of the steel industry and to report on the specific projects as the basis for a possible loan. The llissionstudied: (a) the need for expansion of Indiats iron and steel industry; (b) the best methods of ac'omplishingthis expansion; and (c) the extent to which Bank financingmight be required. -
Statistical Handbook West Bengal 2015
State Statistical Handbook 2015 STATISTICAL HANDBOOK WEST BENGAL 2015 Bureau of Applied Economics & Statistics Department of Statistics & Programme Implementation Government of West Bengal CONTENTS Table No. Page I. Area and Population 1.0 Administrative Divisions of the State of West Bengal (as on 31.12.2015) 1 1.1 Villages, Towns and Households in West Bengal, (As per Census 2011) 2 1.2 Districtwise Population by Sex in West Bengal, (As per Census 2011) 3 1.3 Density of Population, Sex Ratio and Percentage Share of Urban Population in West Bengal by District (As per Census 2011) 4 1.4 Population, Literacy rate by Sex and Density, Decennial Growth rate in West Bengal by District (As per Census 2011) 6 1.5 Number of Workers and Non-workers in West Bengal, (As per Census 2011) 7 1.5(a) Work Participation Rate (main + marginal) in West Bengal (As per Census 2001) 8 1.5(b) Ranking of Districts on the basis of percentage of main workers to total population in West Bengal, (As per Census 2001 & 2011) 9 1.6 Population of CD Blocks in West Bengal by District (As Per Census 2011) 10-24 1.7 Population of Cities, Towns and Urban Outgrowths in West Bengal by District (As per Census 2011) 25-62 1.8 Annual Estimates of Population of West Bengal 63 1.9 Distribution of Population by Religious communities in West Bengal 64 1.10 Districtwise Educational Facilities in West Bengal (As per Census 2011) 65 1.11 Districtwise Medical Facilities in West Bengal (As per Census 2011) 66 II. -
Coalmine Methane Under Indian Mining Scenario
Coalmine Methane Under Indian Mining Scenario CMM under Indian Mining Scenario • In India coal is a reliable energy resource due to limited availability of petroleum and natural gas. • Coal based non-conventional energy is poised to play a major role in India as : 9 It would bridge the gap between demand and availability of conventional energy source 9 International trading scenario in energy sector has been stormy 9 Environmental concerns has given impetus to clean coal technologies. • Under the scenario, Coalbed Methane (CBM) and its subsets like Coal Mine Methane (CMM) and Abandoned Mine Methane (AMM) may find important place in Indian Energy scenario in coming years. CMM under Indian Mining Scenario Development of CBM in India • Out of different sub-sets of Coalbed Methane (CBM), CBM from the deep lying coal deposits (VCBM) has been pursued. • So far 16 Coalbed Methane (VCBM) blocks have been allotted under CBM policy of GoI covering an area of 7807 sq. km and prognosticated CBM resource of 825 BCM. • 10 more blocks have been opened for global bidding. • Several core wells/pilot wells have been drilled in the allotted blocks and are giving encouraging results. • Few operators are planning commercial production from 2007- 08. • The total production potentiality in the allotted blocks is 23 MMSCMD, which is about 10% of the existing Natural Gas demand. CMM under Indian Mining Scenario Coal Mine Methane and Abandoned Mine Methane • Coal Mine Methane (CMM)/ Abandoned Mine Methane (AMM) also subset of CBM is related to mining activities and as per MOU between MoC and MoP&NG, coal producing companies have right of CBM exploitation in their working mines including pre and post mining operations. -
JAI BALAJI INDUSTRIES LIMITED (Unit - I)
JAI BALAJI INDUSTRIES LIMITED (Unit - I) FORM 1 for Proposed expansion of existing Steel Plant by installation of Sponge Iron Plant with 1x350 TPD + 1x500 TPD DRI Kilns, 4x25 T Induction Furnaces, 0.6 MTPA Iron Ore Beneficiation & 0.6 MTPA Palletization Plant & 40 MW capacity Captive Power Plant along with the product mix change of existing 2x7 MVA Submerged Arc furnaces at G-1, Mangalpur Industrial Complex, P.O.-Baktarnagar, District – Paschim Burdwan, West Bengal July– 2019 Proposed Expansion of existing Steel Plant by installation of Sponge Iron Plant, M/s Jai Balaji Induction Furnaces, I/O Beneficiation & Palletization Plant & Captive Power Plant FORM 1 Industries Ltd. at G-1, Mangalpur Industrial Complex, P.O.-Baktarnagar, P.S. Raniganj, District – Paschim Burdwan, West Bengal FORM-1 (I) Basic Information: Sl.No Item Details 1 Name of the project/s: Proposed expansion of existing Steel Plant by installation of Sponge Iron Plant with 1x350 TPD + 1X500 TPD DRI Kilns, 4x25 T Induction Furnaces, 0.6 MTPA Iron Ore Beneficiation & 0.6 MTPA Palletization Plant & 40 MW capacity Captive Power Plant along with the product mix change of existing 2x7 MVA Submerged Arc furnaces. 2 S. No. in the schedule Item 3(a) & 1(d), Category A of the Schedule of the EIA Notification 2006. 3. Proposed capacity / area The company has an operating steel iron plant at Mangalpur /length / tonnage to be Industrial Complex, P.O.- Baktarnagar, Raniganj, District – handled / command area Paschim Bardhaman of West Bengal. Now, the company has / lease area / number of decided for further expansion of its existing plant along with the Wells to be drilled. -
Eastern Coalfields Limited (A Subsidiary of Coal India Ltd.)
HALF YEARLY ENVIRONMENT CLEARANCE COMPLIANCE REPORT OF CLUSTER 11 J-11015/245/2011-IA.II(M) FOR THE PERIOD OF OCTOBER 2018 TO MARCH 2019 Eastern Coalfields Limited (A subsidiary of Coal India Ltd.) Half Yearly EC Compliance report in respect of mines Area (Cluster 11), ECL Period:- October 2018 to March 2019 Specific Conditions Condition no.(i) The Maximum production from the mine at any given time shall not exceed the limit as prescribed in the EC. Compliance Kenda - Complied S.No Name of Mines Peak EC Production from(Oct ’18 to Capacity March ’19) (MTPA) (MT) 1 Krishnanagar 0.05 Temporarily closed. (U/G) 2 Haripur Group 2.30 0.565458 of Mines A Haripur(U/G + 0.75 Haripur UG is Temporarily OC ) closed & OCP Not yet started. B CBI(U/G) 0.10 0.029889 C Chora 7,9 & 10 0.15 0.07793 pit(U/G) D Bonbahal OC 0.5 0.102754 Patch(OCP) E Shankarpur/CL 0.8 0.354885 Jambad OC Patch/Mine(52 Ha) 3 New Kenda 2.00 0.119282 Group of Mines A New Kenda (UG) 0.05 0.015802 B West Kenda OC 0.75 Not yet started. Patch/Mines C New Kenda OC 1.2 0.10348 mine(240 Ha) 4 Bahula Group of 0.45 0.146471 Mines A Lower 0.15 0.035949 Kenda(U/G) B Bahula (U/G) 0.25 0.085078 C CL Jambad 0.05 0.025444 (U/G) 5 Siduli(U/G +OC) 1.2 0.054887, OCP not yet started. -
Government of West Bengal Office of the District Magistrate, Burdwan
Government of West Bengal Office of the District Magistrate, Burdwan (Food Section) ORDER Out of balance amount of Rs.79,84,642=00 (Rupees Seventy Nine lakh Eighty Four thousand Six hundred and Forty Two only) sanctioned vide G.O.No.707(Sanc)/ES(CMDMP)/GENL-32/2011 dt.14/12/2011 & 293(Sanc)ES(CMDMP)/Genl-32/2011 dt.14/06/2012, a sum of Rs.15,24,391=00 (Rupees Fifteen lakh Twenty Four thousand Three hundred and Ninety One only) is hereby sub-allotted to the all Block Development Officers of Burdwan district for their respective blocks and to all Sub-Division Officers of Burdwan district for the Municipalities and/or Municipal Corporations under their jurisdiction to meet up the cost of Transportation for carrying of food grains in connection with Mid-day-Meal Programme for Upper Primary Stage for the period July 2012 to August 2012 as per statement enclosed through Bank Advice System. All S.D.O.s and B.D.O.s are requested to pay the amount on the basis of the Govt. order No.633/ES/PLNG/O/MDM-21/2010 dt.01/11/11 of School Education Department, Kolkata-91. Previous Unspent fund including this allotment, if any, can be utilized for the following months for the same purpose. Income Tax should be deducted as per rule and deposited under proper head of A/c. at the time of passing bill. They are requested to submit Utilization Certificate in respect of the fund sanctioned here in should invariably be sent to this end in proper format proforma along with statement of expenditure by the last working day of the following month.