Contracts Awarded April 2010 Armenia Loan No. : 2363-ARM(SF) Water Supply and Sanitation Sector Project Name : Project State Comm. of Water Sys. of Ministry Executing Agency : of Territorial Admin. Name and Address : Sade CJSC Yerevan of Supplier : Armenia, Republic of Nature of Contract : Construction WSS Charentsavan Town, Salak/ Argel Contract Description : Vill Wastewater Amount of Contract : US$ 1,673,403.79 Date of Contract : 19 April 2010 Sector : Water Supply and Sanitation Loan No. : 2363-ARM(SF) Water Supply and Sanitation Sector Project Name : Project State Comm. of Water Sys. of Ministry Executing Agency : of Territorial Admin. Name and Address : SHMSH - 23 OJSC & Vayots DZOR OJCS Yerevan of Supplier : Armenia, Republic of Nature of Contract : Construction WSS Yeghegnadzor Town-Getap/ GOMK/ Malishka/ Noraznaberd & Shatin Contract Description : Villages Amount of Contract : US$ 1,740,886.88 Date of Contract : 19 April 2010 Sector : Water Supply and Sanitation Bangladesh Loan No. : 2266-BAN(SF) Secondary Education Sector Project Name : Development Project Executing Agency : Ministry of Education Name and Address : Various Various of Supplier : Bangladesh Nature of Contract : Others Procure Wireless Modem, Server & Network Accessories, Server, Soft Ware, Training Mat. E-Learning Contract Description : and Exam Reform Training, O&M-Wa 66 Amount of Contract : US$ 1,253,385.51 Date of Contract : 21 April 2010 Sector : Education Sector Development Loan No. : 2332-BAN Sustainable Power Sector Development Project Name : Project Bangladesh Power Development Board (BPDB); Power Grid Company of Executing Agency : Bangladesh, Ltd. (PGCB); Dhaka Power Distribution Company Ltd. (DPDC); Dhaka Electric Supply Company Ltd. (DESCO) Name and Address : M/S CCC-Etern Joint Venture No. 8 Langjiayuan, Jianguomenwai Chaoyang District of Supplier : China, People's Rep. of Nature of Contract : Turnkey Design Supply, Erection, Testing and Commissioning 132 Kv Aminbazar- Old Airport Transmission Lines on Contract Description : Turnkey Basis Amount of Contract : US$ 13,187,664.64 Date of Contract : 26 April 2010 Sector : Energy Sector Development Cambodia Loan No. : 2455-CAM(SF) Project Name : Emergency Food Assistance Project Executing Agency : Ministry of Economy and Finance Name and Address : Sayimex Co., Ltd. No. 177, Street 215, Skgt. Phsar Doeum Kor, Khan Tuol Kork, Phnom of Supplier : Penh, Cambodia Nature of Contract : Goods Supply and Delivery of Fertilizer of 3,126.9 Tons of Dap; and 1,686.2 Contract Description : of Urea for Wet Season 2010 Amount of Contract : US$ 2,607,159.60 Date of Contract : 22 April 2010 Agriculture and Rural Sector Sector : Development People's Republic of China Loan No. : 2219-PRC Hunan Road Development III (Jishou- Project Name : Huayuan) Hunan Provincial Department of Executing Agency : Transport (HPDOT) Golden Road Project Construction Name and Address : Group Corporation Ltd. No. 123, Jinggangshan Ave. Ji'an City, Jiangxi Province of Supplier : China, People's Rep. of Nature of Contract : Construction Civil Works for Huayuan-Fenghuang Contract Description : Section A3, Local Road Amount of Contract : US$ 1,351,610.10 Date of Contract : 08 April 2010 Sector : Road Transport Loan No. : 2219-PRC Hunan Road Development III (Jishou- Project Name : Huayuan) Hunan Provincial Department of Executing Agency : Transport (HPDOT) The Third Civil Engineering Company Name and Address : of Hunan Province No. 289, Jiefangnanlu, Yuhu District Xiangtan City, Hunan Province of Supplier : China, People's Rep. of Nature of Contract : Construction Civil Works of Huayuan-Fenghuang Contract Description : Section A4, Local Road Amount of Contract : US$ 1,360,269.27 Date of Contract : 08 April 2010 Sector : Road Transport Loan No. : 2244-PRC Project Name : Hunan Flood Management Sector Project Executing Agency : Hunan Provincial Government Hunan Provl. Water Conservancy & Name and Address : Hydropower Changsha, Hunan of Supplier : China, People's Rep. of Nature of Contract : Construction Flood Control Works for Shuidongjiang Protection Circle of Leiyang City; Hunan Provincial Water Conservancy and Hydropower Contract Description : Engg. Corp. Amount of Contract : US$ 1,352,531.14 Date of Contract : 28 April 2010 Water-Based Natural Resources Sector : Management Loan No. : 2244-PRC Project Name : Hunan Flood Management Sector Project Executing Agency : Hunan Provincial Government Hunan Provl. Water Conservancy & Name and Address : Hydropower Changsha, Hunan of Supplier : China, People's Rep. of Nature of Contract : Construction 2nd Flood Control Works for Taipingxi Zuoan Protection Circle of Huaihua City; Hunan Provincial Water Conservancy & Hydropower Contract Description : Engg. Corp. Amount of Contract : US$ 3,686,949.62 Date of Contract : 28 April 2010 Water-Based Natural Resources Sector : Management Loan No. : 2244-PRC Project Name : Hunan Flood Management Sector Project Executing Agency : Hunan Provincial Government Hunan Dayu Hydropower Construction Name and Address : Engg. Corp. Ltd. Changsha, Hunan of Supplier : China, People's Rep. of Nature of Contract : Construction Flood Control Works for Taipingxi Youan Protection Circle of Huaihua Contract Description : City Amount of Contract : US$ 2,691,501.48 Date of Contract : 28 April 2010 Water-Based Natural Resources Sector : Management Loan No. : 2244-PRC Project Name : Hunan Flood Management Sector Project Executing Agency : Hunan Provincial Government Hunan Province Yueyang City Water Name and Address : Conservancy Changsha, Hunan of Supplier : China, People's Rep. of Nature of Contract : Construction Flood Control Works for Cili Lingxi River Yongandu Protection Circle; Hunan Province Yueyang City Water Contract Description : Conservancy & Hydropower Engg. Co., Ltd. Amount of Contract : US$ 2,289,251.25 Date of Contract : 28 April 2010 Water-Based Natural Resources Sector : Management Loan No. : 2244-PRC Project Name : Hunan Flood Management Sector Project Executing Agency : Hunan Provincial Government Hunan Provl. Water Conservancy & Name and Address : Hydropower Changsha, Hunan of Supplier : China, People's Rep. of Nature of Contract : Construction Flood Control Works for Lengshuijiang Jiangbei Protection Circle; Hunan Provincial Water Conservancy and Contract Description : Hydropower Constn. Machinery Co. Amount of Contract : US$ 3,974,560.19 Date of Contract : 28 April 2010 Water-Based Natural Resources Sector : Management Loan No. : 2244-PRC Project Name : Hunan Flood Management Sector Project Executing Agency : Hunan Provincial Government Hunan Provl. Water Conservancy & Name and Address : Hydropower Changsha, Hunan of Supplier : China, People's Rep. of Nature of Contract : Construction Flood Control Works for Hengyang Xidu Protection Circle; Hunan Provl. Water Conservancy & Contract Description : Hydropower Constn. Machinery Co. Amount of Contract : US$ 1,615,124.04 Date of Contract : 28 April 2010 Water-Based Natural Resources Sector : Management Loan No. : 2244-PRC Project Name : Hunan Flood Management Sector Project Executing Agency : Hunan Provincial Government Hunan Dayu Hydropower Constn. Engg. Name and Address : Corp. Ltd. Changsha, Hunan of Supplier : China, People's Rep. of Nature of Contract : Construction Flood Control Works for Hengyang Main Urban Area; Hunan Dayu Hydropower Construction Engineering Contract Description : Corp. Ltd. Amount of Contract : US$ 2,786,653.41 Date of Contract : 28 April 2010 Water-Based Natural Resources Sector : Management Loan No. : 2244-PRC Project Name : Hunan Flood Management Sector Project Executing Agency : Hunan Provincial Government Hunan Provl. Water Conservancy & Name and Address : Hydropower Changsha, Hunan of Supplier : China, People's Rep. of Nature of Contract : Construction Flood Control Works for Lujiang Section of Zhuzhou County; Hunan Provincial Water Conservancy & Contract Description : Hydropower Engg. Corp. Amount of Contract : US$ 1,368,906.25 Date of Contract : 28 April 2010 Water-Based Natural Resources Sector : Management Loan No. : 2244-PRC Project Name : Hunan Flood Management Sector Project Executing Agency : Hunan Provincial Government Hunan Provl. Water Conservancy & Name and Address : Hydropower Changsha, Hunan of Supplier : China, People's Rep. of Nature of Contract : Construction Flood Control Works for Xiangjiang Section of Zhuzhou County; Hunan Provl. Water Conservancy & Contract Description : Hydropower Engg. Corp. Amount of Contract : US$ 1,778,091.76 Date of Contract : 28 April 2010 Water-Based Natural Resources Sector : Management Loan No. : 2244-PRC Project Name : Hunan Flood Management Sector Project Executing Agency : Hunan Provincial Government Hunan Provl. Water Conservancy & Name and Address : Hydropower Changsha, Hunan of Supplier : China, People's Rep. of Nature of Contract : Construction Flood Control Works for Shaodong County Hunan Provincial Water Conservancy & Hydropower Constn. Contract Description : Machinery Co. Amount of Contract : US$ 3,428,138.29 Date of Contract : 28 April 2010 Water-Based Natural Resources Sector : Management Loan No. : 2345-PRC Western Guangxi Roads Development Project Name : Project Guangxi Communications Department Executing Agency : (GCD) Guangxi Road & Bridge Engineering Name and Address : Corporation Nanning of Supplier : China, People's Rep. of Nature of Contract : Construction Contract Description : Pavement Works K68 K104 - 36.15km Amount of Contract : US$ 21,649,212.49 Date of Contract : 15 April 2010 Sector : Road Transport Loan No. : 2345-PRC Western Guangxi
Recommended publications
  • Medical Observation Pursuant to Articles 10 and 14 of Law No
    16 August 2021 MACAU SAR MEASURES FOR TRAVELLERS ENTERING MACAU SAR UNDER CURRENT CONTEXT OF COVID-19 Dear Customers, We would like to keep you informed of current measures for travelers into Macau International Airport (VMMC/MFM). As required by AACM in regards to the pandemic prevention for flights arriving from low/moderate/high risk areas, with immediate effect, please strictly follow the disinfection process and arrangement for your aircraft as shown in this video. For your easy reference, kindly find below link for the video review. 預防新冠病毒經航空運輸接觸傳播的措施 https://www.youtube.com/watch?v=WC30n_v4_FI Medical observation Pursuant to articles 10 and 14 of Law no. 2/2004 – “Law on the Prevention, Control and Treatment of Infectious Diseases”: All individuals (including those intending to enter or already admitted to Macao) who have been to the following areas during the specified time and have left there for less than 14 days must, at the discretion of the health authorities, undergo medical observation at designated venue until 14 days after their departure from the concerned area(s), but for a minimum period of 7 days: Announcement Effective since Countries/ areas no. 19:00 of 2 August 2021 Jingzhou Railway Station in Hubei Province (visited between 13:00 119/A/SS/2021 and 16:00 on 27 July) 02:00 of 1 August 2021 Yangzhou City of Jiangsu Province or the Sixth People’s Hospital in 116/A/SS/2020 Zhengzhou City of Henan Province All arrivals who have been to the following areas during the specified time and have left there for less than 14 days must, at the discretion of the health authorities, undergo medical observation at designated venue until 14 days after their departure from the concerned area(s), but for a minimum period of 7 days: Announcement Effective since Countries/ areas no.
    [Show full text]
  • Panva Gas Holdings Limited
    IMPORTANT If you are in any doubt about this prospectus, you should consult your stockbroker, bank manager, solicitor, professional accountant or other professional adviser. PANVA GAS HOLDINGS LIMITED !"#$%&'* (incorporated in the Cayman Islands with limited liability) LISTING ON THE GROWTH ENTERPRISE MARKET OF THE STOCK EXCHANGE OF HONG KONG LIMITED PLACING Number of Placing Shares : 95,000,000 (subject to Over-allotment Option) Issue Price : $0.57 per Share Nominal value : $0.10 each Stock code : 8132 Sponsor TAI FOOK CAPITAL LIMITED Joint Lead Managers TAI FOOK SECURITIES COMPANY LIMITED CU SECURITIES LIMITED Co-Managers Luen Fat Securities Company Limited Peace Town Securities Limited Young Champion Securities Limited The Stock Exchange of Hong Kong Limited and Hong Kong Securities Clearing Company Limited take no responsibility for the contents of this prospectus, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this prospectus. A copy of this prospectus, having attached thereto the documents specified in the paragraph headed “Documents delivered to the Registrar of Companies” in Appendix VI to this prospectus, has been registered by the Registrar of Companies in Hong Kong as required by section 342C of the Companies Ordinance, Chapter 32 of the Laws of Hong Kong. The Securities and Futures Commission and the Registrar of Companies in Hong Kong take no responsibility for the contents of this prospectus or any of the other documents referred to above. * For identification only 10th April, 2001 CHARACTERISTICS OF THE GROWTH ENTERPRISE MARKET (“GEM”) OF THE STOCK EXCHANGE OF HONG KONG LIMITED (THE “STOCK EXCHANGE”) GEM has been established as a market designed to accommodate companies to which a high investment risk may be attached.
    [Show full text]
  • Hunan Flood Management Sector Project: Xiangtan City Resettlement
    Resettlement Plan December 2014 PRC: Hunan Flood Management Sector Project Resettlement Plan and Due Diligence Report for Xiangtan City (Non-Core Subproject) Prepared by Hunan Hydro and Power Design Institute for the Hunan Provincial Project Management Office (PMO) of Urban Flood Control Project in Hilly Region Utilizing ADB Loans, Xiangtan City PMO of Urban Flood Control Project Utilizing ADB Loans, and the Asian Development Bank. GSDS Certificate Grade A No.180105-sj GSDK Certificate Grade A No.180105-kj GZ Certificate Grade A No. 1032523001 SBZ Certificate Grade A No. 027 Hunan Province Xiangtan City Urban Flood Control Project Utilizing ADB Loans Resettlement Plan and Due Diligence Report (Final version) Hunan Provincial PMO of Urban Flood Control Project in Hilly Region Utilizing ADB Loans Xiangtan City PMO of Urban Flood Control Project Utilizing ADB Loans Hunan Hydro and Power Design Institute December, 2014 i Approved by : Xiao Wenhui Ratified by: Zhang Kejian Examined by: Xie Dahu Checked by: Tan Lu Compiled by: Liu Hongyan Main Designers: Ouyang Xiongbiao Guan Yaohui Zhao Gengqiang Tan Lu Liu Hongyan Teng Yan Zhou Kai Jin Hongli Huang Bichen ii Contents Updated Info……………………………………………………………………………………………………………i Objectives of Resettlement Plan & Definition of Resettlement Vocabulary……………………………….1 Executive Summary .....................................................................................................................................3 A. STATUS OF RESETTLEMENT PLAN ....................................................................................................................................
    [Show full text]
  • Table of Codes for Each Court of Each Level
    Table of Codes for Each Court of Each Level Corresponding Type Chinese Court Region Court Name Administrative Name Code Code Area Supreme People’s Court 最高人民法院 最高法 Higher People's Court of 北京市高级人民 Beijing 京 110000 1 Beijing Municipality 法院 Municipality No. 1 Intermediate People's 北京市第一中级 京 01 2 Court of Beijing Municipality 人民法院 Shijingshan Shijingshan District People’s 北京市石景山区 京 0107 110107 District of Beijing 1 Court of Beijing Municipality 人民法院 Municipality Haidian District of Haidian District People’s 北京市海淀区人 京 0108 110108 Beijing 1 Court of Beijing Municipality 民法院 Municipality Mentougou Mentougou District People’s 北京市门头沟区 京 0109 110109 District of Beijing 1 Court of Beijing Municipality 人民法院 Municipality Changping Changping District People’s 北京市昌平区人 京 0114 110114 District of Beijing 1 Court of Beijing Municipality 民法院 Municipality Yanqing County People’s 延庆县人民法院 京 0229 110229 Yanqing County 1 Court No. 2 Intermediate People's 北京市第二中级 京 02 2 Court of Beijing Municipality 人民法院 Dongcheng Dongcheng District People’s 北京市东城区人 京 0101 110101 District of Beijing 1 Court of Beijing Municipality 民法院 Municipality Xicheng District Xicheng District People’s 北京市西城区人 京 0102 110102 of Beijing 1 Court of Beijing Municipality 民法院 Municipality Fengtai District of Fengtai District People’s 北京市丰台区人 京 0106 110106 Beijing 1 Court of Beijing Municipality 民法院 Municipality 1 Fangshan District Fangshan District People’s 北京市房山区人 京 0111 110111 of Beijing 1 Court of Beijing Municipality 民法院 Municipality Daxing District of Daxing District People’s 北京市大兴区人 京 0115
    [Show full text]
  • Through the Armenian Switzerland to the Wild Caucasus (M-ID: 2647)
    +49 (0)40 468 992 48 Mo-Fr. 10:00h to 19.00h Through the Armenian Switzerland to the wild Caucasus (M-ID: 2647) https://www.motourismo.com/en/listings/2647-through-the-armenian-switzerland-to-the-wild-caucasus from €2,590.00 Dates and duration (days) On request 11 days On the Enduro trip Through Armenian Switzerland to the wild Caucasus you will experience, partly on gravel roads, the touristically still quite unknown Armenia with its ancient culture, sights and world heritage sites. From the Trchkan waterfall in the north, the most water-rich 160km asphalt | Sanahin and Haghpat, both impressive in Armenia, over the Armenian Switzerland, along Lake monasteries, situated high above the Debed Gorge and Sevan, to the wild southern Caucasus, the tour leads us. UNESCO World Heritage Site Ijevan, city of caravanserais. Along the route, old monasteries and churches bear witness to the first Christian country, prehistoric menhirs Day 5: Ijevan / Navur / Lake Parz / Dilijan and burial sites to the ancient history. In the very south, 150km asphalt, 75km gravelroad | Via gravel road to Navur with its high mountain ranges and deep gorges, through and into the mountains to Lake Parz. Lake Parz is a clear whose lonely forests bears and leopards still roam, where mountain lake in the nature park of Dilijan, climatic health gold and copper are mined, the route takes us over winding resort Dilijan in the nature park of the same name with pass roads to near the border with Iran. summer houses of Dimitri Shostakovich and Benjamin Britten. Discover Armenia on the tour Through Armenian Switzerland to the wild Caucasus, which has only appeared Day 6: Dilijan / Semyonovka / Lake Sevan / Noraduz / on tourist maps again since its independence 30 years ago, Vardenyants Pass / Yeghegnadzor has just recently managed a velvet revolution and is 175km asphalt uncharted territory for Western European travellers.
    [Show full text]
  • U.S. Geological Survey Bulletin 2177 ______
    The Nor Arevik Coal Deposit, Southern Armenia By Brenda S. Pierce, Gourgen Malkhasian, and Artur Martirosyan U.S. Geological Survey Bulletin 2177 _______________________________________ All data relating to the Nor Arevik coal deposit — stratigraphic, coal quality, and resource information — are contained in this one comprehensive, interpretive report U.S. DEPARTMENT OF THE INTERIOR BRUCE BABBITT, Secretary U.S. GEOLOGICAL SURVEY CHARLES G. GROAT, Director UNITED STATES GOVERNMENT PRINTING OFFICE, WASHINGTON: 2000 Published in the Eastern Region, Reston, Va. Manuscript approved for publication on October 4, 2000 Any use of trade, product, or firm names in this publication is for descriptive purposes only and does not imply endorsement by the U.S. Government. This report is being released online only. It is available on the World Wide Web at: http://pubs.usgs.gov/bulletin/b2177/ Contents Introduction . 1 Source of data . 1 Previous work . 2 Age . 2 Stratigraphic data . 3 Coal quality of the Nor Arevik deposit . 5 Coal quality analyses . 5 Petrographic descriptions . 6 Other analyses . 7 Coal resource calculations of the Nor Arevik deposit . 8 Resource terminology . 8 Archival resource estimates . 9 Recalculation of resource estimates . 10 Conclusions . 10 References cited . 10 Figures 1. Location map of Armenia’s coal, carbonaceous shale, and oil shale deposits . 11 2. Geologic map of the Nor Arevik coal and carbonaceous shale deposit . 12 Tables 1. Borehole, adit, and trench data from exploration done by Tarayan (1942) and Drobotova and Saponjian (1996) on the Nor Arevik coal deposit . 13 2. Proximate analyses of samples from the Nor Arevik coal deposit . 41 3. Chemical analyses of combustible shales from Drobotova and Saponjian (1996) .
    [Show full text]
  • Page 1 Establishment of Computer Labs in 50 Schools of Vayots Dzor
    Establishment of Computer Labs in 50 schools of Vayots Dzor Region, RA List of beneficiary schools Number of Number of Current Numbers of computers Number of students in Number of School Director Tel. number of printers to to be students middle and teachers computers be donated donated high school Yeghegnadzor subregion Hovhannisyan 1 Agarakadzor sch. 093-642-031 10 1 121 79 27 Naira 2 Aghavnadzor sch. Manukyan Nahapet 091-726-908 2 10 1 230 130 32 Yedigaryan 3 Aghnjadzor sch. 093-832-130 0 5 1 46 26 16 Hrachya 4 Areni sch. Hayrapetyan Avet 093-933-780 0 10 1 221 130 29 5 Artabuynq sch. Babayan Mesrop 096-339-704 2 10 1 157 100 24 6 Arpi sch. Hovsepyan Ara 093-763-173 0 10 1 165 120 22 7 Getap sch. Qocharyan Taguhi 093-539-488 10 10 1 203 126 35 8 Gladzor sch. Hayrapetyan Arus 093-885-120 0 10 1 243 110 32 9 Goghtanik sch. Asatryan Anahit 094-305-857 0 1 1 15 5 8 10 Yelpin sch. Gevorgyan Jora 093-224-336 4 6 1 186 100 27 11 Yeghegis sch. Tadevosyan Levon 077-119-399 0 7 1 59 47 23 Yeghegnadzor N1 12 Grigoryan Anush 077-724-982 10 10 1 385 201 48 sch. Yeghegnadzor N2 13 Sargsyan Anahit 099-622-362 15 10 1 366 41 sch. Khachatryan 14 Taratumb sch. 093-327-403 0 7 1 59 47 17 Zohrab 15 Khachik sch. Tadevosyan Surik 093-780-399 0 8 1 106 55 22 16 Hermon sch.
    [Show full text]
  • World Bank Document
    Document of The World Bank FOR OFFICIAL USE ONLY Public Disclosure Authorized Report No: PAD1424 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT PROJECT APPRAISAL DOCUMENT ON A Public Disclosure Authorized PROPOSED LOAN IN THE AMOUNT OF US$55 MILLION TO THE REPUBLIC OF ARMENIA FOR A LOCAL ECONOMY AND INFRASTRUCTURE DEVELOPMENT PROJECT Public Disclosure Authorized December 1, 2015 Social, Urban, Rural and Resilience Global Practice EUROPE AND CENTRAL ASIA This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without Public Disclosure Authorized World Bank authorization. CURRENCY EQUIVALENTS (Exchange Rate Effective November 23, 2015) Currency Unit = AMD ADM 475 = US$1 FISCAL YEAR January 1 – December 31 ABBREVIATIONS AND ACRONYMS ADB Asian Development Bank M&E Monitoring and Evaluation ADS Armenia Development Strategy MIS Management Information System ASA Air Service Agreements MNA Middle East and North Africa ASIF Armenia Social Investment Fund MoC Ministry of Culture ATDF Armenian Territorial Development Fund MoE Ministry of Economy B&B Bread and Breakfast MoNP Ministry of Nature Protection Ministry of Territorial Administration BP Bank Policy MoTA&ES and Emergency Situations MOUD Ministry of Urban Development CBA Cost Benefit Analysis NCB National Competitive Bidding National Competitiveness Foundation CER Contingent Emergency Response NCFA of Armenia CIS Commonwealth of Independent States CNF Caucasus Nature Fund
    [Show full text]
  • Effectiveness of Live Poultry Market Interventions on Human Infection with Avian Influenza A(H7N9) Virus, China Wei Wang,1 Jean Artois,1 Xiling Wang, Adam J
    RESEARCH Effectiveness of Live Poultry Market Interventions on Human Infection with Avian Influenza A(H7N9) Virus, China Wei Wang,1 Jean Artois,1 Xiling Wang, Adam J. Kucharski, Yao Pei, Xin Tong, Victor Virlogeux, Peng Wu, Benjamin J. Cowling, Marius Gilbert,2 Hongjie Yu2 September 2017) as of March 2, 2018 (2). Compared Various interventions for live poultry markets (LPMs) have with the previous 4 epidemic waves, the 2016–17 fifth emerged to control outbreaks of avian influenza A(H7N9) virus in mainland China since March 2013. We assessed wave raised global concerns because of several char- the effectiveness of various LPM interventions in reduc- acteristics. First, a surge in laboratory-confirmed cas- ing transmission of H7N9 virus across 5 annual waves es of H7N9 virus infection was observed in wave 5, during 2013–2018, especially in the final wave. With along with some clusters of limited human-to-human the exception of waves 1 and 4, various LPM interven- transmission (3,4). Second, a highly pathogenic avi- tions reduced daily incidence rates significantly across an influenza H7N9 virus infection was confirmed in waves. Four LPM interventions led to a mean reduction Guangdong Province and has caused further human of 34%–98% in the daily number of infections in wave 5. infections in 3 provinces (5,6). The genetic divergence Of these, permanent closure provided the most effective of H7N9 virus, its geographic spread (7), and a much reduction in human infection with H7N9 virus, followed longer epidemic duration raised concerns about an by long-period, short-period, and recursive closures in enhanced potential pandemic threat in 2016–17.
    [Show full text]
  • "Let's Shape Our Future Ourselves"
    Training and Networking project "Let's Shape Our Future Ourselves" INFOPACK Print and take with you!!! ARMENIA, 25-30 April, 2013 1 | P a g e Project summary, objectives & main activities Summary "Let's Shape Our Future Ourselves" TC aims at providing rural youth workers and youth leader with competences to build the capacities of young people as leaders and encourages civic activism in their communities. Training course will take part in Hermon village, Vayots Dzor region, Armenia from the 25th until 30th of April, 2014. We invite our partner countries from Europe and neighbor partner countries (4 participants from each country from 18 to 30 years old). Specific objectives are: Reflect upon the role of young people as community leaders; explore the ways of reveling and developing leadership potential of rural youth; Encourage active participation of young people, by means of providing them tools for participation, project creation and management, creativity and community changes; Provide participants with space to exchange best practices; Equip participants with knowledge and tools for getting involved in international youth work and encourage cooperation while implementing such projects within and beyond Youth Programme; Promote solidarity and tolerance of project participants by creating a platform to acquire alternative and positive information about youth from different countries 2 | P a g e Team of Organizers Training course is organized by Syunik NGO, Armenia together with project partner organizations: Regional Network of Peace and Reintegration – Georgia, National Youth Council of Switzerland, Center for European Initiatives – Ukraine, Citizens of Europe – Germany, ASOCIACIÓN CAZALLA INTERCULTURAL –Spain. The training will be delivered by two experienced trainers: Life is a great If you want to go opportunity for fast, go alone.
    [Show full text]
  • Second Report Submitted by Armenia Pursuant to Article 25, Paragraph 1 of the Framework Convention for the Protection of National Minorities
    ACFC/SR/II(2004)010 SECOND REPORT SUBMITTED BY ARMENIA PURSUANT TO ARTICLE 25, PARAGRAPH 1 OF THE FRAMEWORK CONVENTION FOR THE PROTECTION OF NATIONAL MINORITIES (Received on 24 November 2004) ACFC/SR/II(2004)010 Table of contents: Introduction SECTION 1: Practical arrangements made at national level for following up the results of the first monitoring cycle of the implementation of the Framework Convention 1. Prior to the creation of a state structure on national minorities issues 2. After creation of a state structure for national minorities issues SECTION 2: Measures taken to improve implementation of the Framework Convention in response to the resolution adopted by the Committee of Ministers in respect of Armenia 1. General Provisions 2. Demographic Landscape of the Republic of Armenia 3. Implemented measures Article by Article Article 1 Article 2 Article 3 Article 4 Article 5 Article 6 Article 7 Article 8 Article 9 Article 10 Article 11 Article 12 Article 13 Article 14 Article 15 Article 16 Article 17 Article 18 Article 19 Part 3. Answers to the Questionnaire Compiled by the Advisory Committee Concerning the Report Presented by Armenia During the Second Phase of Framework Convention Implementation Monitoring Table 1 Table 2 Table 3 Table 4 Table 5 Table 6 Table 7 Table 8 Table 9 Table 10 2 ACFC/SR/II(2004)010 Introduction 1. Pursuant to paragraph 1 of Article 25 of the Framework Convention for Protection of National Minorities, the Republic of Armenia is submitting its second report on the implementation of the Convention and progress of legislative and other measures taken to give effect to the principles set out in the framework Convention.
    [Show full text]
  • English Were Elaborated and Submitted on a Regular Basis to the World Bank Team
    Public Disclosure Authorized CONNECTING THE DOTS: TRANSPORT, POVERTY, AND SOCIAL Public Disclosure Authorized INCLUSION - EVIDENCE FROM ARMENIA December 2017 Transport and ICT Global Pracce EUROPE Public Disclosure Authorized Public Disclosure Authorized Connecting the Dots: Transport, Poverty, and Social Inclusion - Evidence from Armenia December 2017 Transport and ICT Global Practice EUROPE CURRENCY EQUIVALENTS (Exchange Rate Effective November 1, 2017) Currency Unit = Armenian Dram (AMD) AMD 486,671 = US$1 US$ 0,00021 = AR$ 1 FISCAL YEAR January 1 - December 31 Regional Vice President: Regional Vice President:Cyril Muller Country Director: Country Director:Mercy Miyang Tembon Senior Global Practice Director: Senior Global Practice Director:Jose Luis Irigoyen Practice Manager: Practice Manager:Juan Gaviria Task Team Leader(s): Task Team Leader(s):Steven Farji Weiss Standard Disclaimer: This volume is a product of the staff of the International Bank for Reconstruction and Development/ The World Bank. The findings, interpretations, and conclusions expressed in this paper do not necessarily reflect the views of the Executive Directors of The World Bank or the governments they represent. The World Bank does not guarantee the accuracy of the data included in this work. The boundaries, colors, denominations, and other information shown on any map in this work do not imply any judgment on the part of The World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries. Copyright Statement: The material in this publication is copyrighted. Copying and/or transmitting portions or all of this work without permission may be a violation of applicable law. The International Bank for Reconstruction and Development/ The World Bank encourages dissemination of its work and will normally grant permission to reproduce portions of the work promptly.