“Form 1 of Group Housing & staff quarters” at UPSRTC campus,Vikas nagar,

FORM 1

(I) Basic Information S. No Item Details 1 Name of the Project /s Construction of Proposed Group Housing and Staff Quarters at UPSRTC Campus, Vikas Nagar, Kanpur, state. 2 Sl. No in the Schedule 8 (a) 3 Proposed capacity / area / length / Plot Area - 47682.72 sq.m(housing and staff tonnage to be handled /command area / quarters) (11.78 acres), lease area / number of wells to be drilled Basement Area- 34333 sq.m Stilt Area- 118089 sq.m Total Built-up Area - 135813.01 sq.m No. of Flats - 1208 (with 1,2 & 3 BHK) No. of towers - 26 nos. Total Open Area-35589.69 sq.m (road area + green area) Project Layout Plan is shown in Annexure I 4 New / Expansion / Modernization New 5 Existing Capacity / Area etc. Not Applicable 6 Category of Project i.e. ‘A’ or ‘B’ Item 8(a), category-B 7 Does it attract the general conditions? If No yes, please specify 8 Does it attract the Specific conditions? If No yes, please specify 9 Location Latitude: 26° 30' 15.78"N Longitude: 80° 17' 55.47"E Plot / Survey / Khasra No At UPSRTC campus Village Vikas Nagar, Purana Kanpur, Kanpur nagar. Tehsil Kanpur District Kanpur Nagar State Uttar Pradesh 10 Nearest railway station / airport along Kanpur Central Railway Station –7 km. (SE) with distance in kms Chaudhary Charan Singh International Airport – 65 km. (NE) 11 Nearest town, city, district headquarters Kanpur (7 km from core city) along with distance in kms 12 Village Panchayats, Zilla Parishad, Kanpur Municipal Corporation(KMC) Municipal Corporation, Local body , Harsh Nagar, Kanpur (U.P) - 208002 (complete postal addresses with telephone nos, to be given) 13 Name of the applicant Kanpur Development Authority (KDA) 14 Registered Address Kanpur Development Authority, Moti Jheel campus, Kanpur (U.P) Tel: 0512-2556292 & 93; Fax: 0512-2551880; email: [email protected] 15 Address for Correspondence Name Shri.V.K Goyal Designation (Owner/Partner/CEO) Chief Engineer Address Office of Kanpur Development Authority, Moti Jheel campus, Kanpur (U.P)

Ramky Enviro Services Pvt. Ltd,Hyderabad 1

“Form 1 of Group Housing & staff quarters” at UPSRTC campus,Vikas nagar, Kanpur”

S. No Item Details

Pin Code 208002 E-mail [email protected], [email protected] Telephone no Fax no 16 Details of Alternate Sites examined, if No alternate sites considered. Topomap showing any. Location of these sites should be project site is shown in Annexure-2 shown on a topo sheet 17 Interlinked Projects Not Applicable 18 Whether separate application of Not Applicable interlinked project has been submitted 19 If yes, date of submission Not Applicable 20 If no, reason 21 Whether the proposal involves approval No / clearance under: if yes, details of the same and their status to be given (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z. Notification, 1991? 22 Whether there is any Government Order No / Policy relevant / relating to the site 23 Forest Land involved (hectares) No Forest land involved in the project 24 Whether there is any litigation pending No against the project and / or land in which the project is proposed to set up? (a) Name of the Court (b) Case No (c) Orders / directions of the court, if any and its relevance with the proposed project.

II. Activity: Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.,)

Details thereof (with approximate quantities Information/Checklist S. No Yes/No /rates, wherever possible) with source of confirmation information data 1.1 Permanent or temporary No Proposed project envisages the development of change in land use, land Group Housing & staff quarters on vacant plot cover or topography of land (of UPSRTC) earmarked for residential including increase in land use. Hence proposed project do not intensity of land use (with anticipate any permanent or temporary change in respect to local land use land use, land cover or topography of the area. plan) 1.2 Clearance of existing land, No Vacant open land. Require clearing of site prior to vegetation and buildings? construction. However, there will not be significant tree felling or disturbance in vegetation due to the construction of residential houses.

Ramky Enviro Services Pvt. Ltd,Hyderabad 2

“Form 1 of Group Housing & staff quarters” at UPSRTC campus,Vikas nagar, Kanpur”

Details thereof (with approximate quantities Information/Checklist S. No Yes/No /rates, wherever possible) with source of confirmation information data 1.3 Creation of new land uses? No Proposed site is vacant plot of land, mostly scrub land with very few small trees 1.4 Pre-construction Yes Soil testing will be done before beginning of investigations e.g. bore construction activity houses, soil testing? 1.5 Construction works? Yes Project consists of construction of residential flats for group housing & staff quarters. All construction activities will be confined within only, no physical changes outside the site and the activities will be performed as per norms/bylaws 1.6 Demolition works? No No demolitions works 1.7 Temporary sites used for No Most workers will be hired from nearby areas. construction works or Temporary sheds, store-rooms etc., will be housing of construction provided for security persons, outside labourers workers? and raw material storage which are stored in the project site only. 1.8 Above ground buildings, Yes Activity development of group housing and structures or earthworks creating common infrastructure like roads, sewer including linear structures, system, water pipelines, sewage network, cut and fill or excavations underground water storage tanks and pilelines, power transformers/sub-stations, etc. Hence, no major earth works, cut and fill or excavations are envisaged. Any excavated soil will be used for back-filling in the site. 1.9 Underground works No No underground or mining work will be carried including mining or out. Excavation of earth material will be carried tunneling? out for laying foundation of the proposed buildings. 1.10 Reclamation works? No No reclamation work required

1.11 Dredging? No No dredging required

1.12 Offshore structures? No No off shore structures required

1.13 Production and No No production/manufacturing process is involved manufacturing processes?

1.14 Facilities for storage of goods Yes Construction Phase: or materials? Minimum bulk material for construction will be purchased as per requirement and stored on site with appropriate arrangement. Separate storage arrangements will be made for storage of bulk raw material. Cement will be stored under cover in bales and sand will be stacked neatly under tarpaulin cover. Bricks and steel will be laid in open. Operation Phase: Not required except for common cleaning and maintenance equipment and material.

Ramky Enviro Services Pvt. Ltd,Hyderabad 3

“Form 1 of Group Housing & staff quarters” at UPSRTC campus,Vikas nagar, Kanpur”

Details thereof (with approximate quantities Information/Checklist S. No Yes/No /rates, wherever possible) with source of confirmation information data 1.15 Facilities for treatment or Yes Construction Phase: disposal of solid waste or Waste debris, plaster falls, stone mixture, sand liquid effluents? leftovers, empty cement bags, cartons, etc., some are reused or sold to recyclers.

Operation Phase: Waste from domestic, horticultural, e-waste is collected and into bio and non-bio degradable is stored and disposed off periodically without causing any concern to residents and surroundings. Non-biodegradable waste is disposed off to authorized recyclers 1.16 Facilities for long term Yes Will be provided housing of operational workers? 1.17 New road, rail or sea traffic Yes Constructed main road for outside connectivity in during construction or the project site and internal roads for within site operation? for accessibility will be constructed for residents in operation phase 1.18 New road, rail, air No No new transport infrastructure outside for waterborne or other project site transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of No No closure or diversion of existing transports existing transport routes or routes. infrastructure leading to changes in traffic movements?

1.20 New or diverted transmission No No new or diversion of existing transmission lines lines or pipelines? or pipelines

1.21 Impoundment, damming, No No impoundment, damming, converting, culverting, realignment or realignment or other changes to the hydrology of other changes to the water courses or aquifers is envisaged. Local hydrology of water courses hydrology will be taken into consideration while or aquifers? designing storm water drains. 1.22 Stream crossings? No No stream crossings are planned 1.23 Abstraction or transfers of No No groundwater abstraction or abstraction during water form ground or construction or operational phase. Domestic surface waters? water requirement during occupation and construction shall be sourced from private water tankers, for preferably treated water is used and for regular domestic use like drinking and washing, water is sourced from Jal kal Vibhag,(Water Supply & Sewerage Board) Nagar Nigam, Kanpur.

Ramky Enviro Services Pvt. Ltd,Hyderabad 4

“Form 1 of Group Housing & staff quarters” at UPSRTC campus,Vikas nagar, Kanpur”

Details thereof (with approximate quantities Information/Checklist S. No Yes/No /rates, wherever possible) with source of confirmation information data 1.24 Changes in water bodies or Yes Yes, since this is for construction for group the land surface affecting housing purpose, the land surface will be changed. drainage or run-off? Paved area will increase thereby increasing the runoff during rains. There will be no alteration of natural drainage system. Provisions as per EMP shall be kept to capture this runoff and harvest the rain water from the project area. Well planned storm water drainage system has been designed for internal storm water drainage 1.25 Transport of personnel or Yes During construction, transport of materials, materials for construction, machinery and persons are there and they will be operation or preferably sourced locally. And, during operation decommissioning? phase, there will be regular movement of persons and materials of residents. 1.26 Long-term dismantling or No Not applicable decommissioning or restoration works? 1.27 Ongoing activity during No No such activities, so no impacts. decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in Yes During construction phase, majority of labors will either temporarily or be locally and temporarily hired hence there will permanently? not be major influx of people anticipated during construction phase of project whereas during the operational phase permanent residential population will come to reside for which all amenities and supporting infrastructure is proposed to accommodate this influx of personnel. 1.29 Introduction of alien species? No No alien species are introduced in the project site. All floras are local available varieties only. 1.30 Loss of native species or No No loss of native species or genetic diversity due genetic diversity? to project activity.

1.31 Any other actions? No No significant action will have impact on environment.

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Details thereof (with approximate quantities Information/checklist S. No Yes/No /rates, wherever possible) with source of confirmation information data 2.1 Land especially No Project site is a vacant piece of land and now it undeveloped or agricultural is proposed to convert for residential housing land (ha) purpose. 2.2 Water (expected source & Yes Source of Water: competing users) unit: KLD Construction Phase: Water Tankers from private

Ramky Enviro Services Pvt. Ltd,Hyderabad 5

“Form 1 of Group Housing & staff quarters” at UPSRTC campus,Vikas nagar, Kanpur”

Details thereof (with approximate quantities Information/checklist S. No Yes/No /rates, wherever possible) with source of confirmation information data suppliers for drinking & other uses. Operational Phase: sourced from Jal kal Vibhag, (Water Supply & Sewerage Board) Nagar Nigam, Kanpur. Water Requirement – 834 KLD Water/Waste Water Details: (in KLD) Domestic (Non-flushing) 544 Domestic (Flushing) 272 Horticulture 18 (Landscaping/Plantation) Total Required 834

2.3 Minerals (MT) No Not Applicable 2.4 Construction material – Yes Raw materials (main) for construction like steel, stone, aggregates, sand / cement, stone aggregates, sand, bricks, flooring soil (expected source – MT) material, fly ash products will be sourced preferably from the local traders/suppliers. Approx. 1.7 lakh metric tonnes of main materials are required. Qty Quantity Material MT/cu.m) (in MT) Cement 0.16 21730 Steel 0.06 8149 Sand 0.41 55683 Aggregate 0.62 84204 Estimated Material 169766 Quantity:

2.5 Forests and timber (source Yes Locally available timber for doors and windows – MT) and no regular timber is used 2.6 Energy including electricity Yes Minimal electricity for construction activities and fuels (source, and fuel for earth moving and transporting competing users) Unit: fuel vehicles shall be required. (MT), energy (MW) Power required is 6000KVA and will be taken from U.P State Electricity Board. DG sets are utilized during power failure. 2.7 Any other natural resources No No other significant natural resources are (use appropriate standard required. units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

Details thereof (with approximate S. No Information/Checklist confirmation Yes/No quantities/rates, wherever possible) with source of information data 3.1 Use of substances or materials, which No No hazardous substances or materials are are hazardous (as per MSIHC rules) to used. Materials like paints for coloring,

Ramky Enviro Services Pvt. Ltd,Hyderabad 6

“Form 1 of Group Housing & staff quarters” at UPSRTC campus,Vikas nagar, Kanpur”

Details thereof (with approximate S. No Information/Checklist confirmation Yes/No quantities/rates, wherever possible) with source of information data human health or the environment diesel for running DG set, tar for roads are (flora, fauna, and used water supplies) No storage of hazardous chemicals (as per MSIHC rules) will be used, except HSD (low sulphur variety) required to run DG sets LPG/PNG will be used for cooking in kitchen by residents. During construction, paints, solvents, thinner, oil and lubricants will be stored for use which is hazardous to health. Suitable management practices will be adopted in this regard. 3.2 Changes in occurrence of disease or No None envisaged. affect disease vectors (e.g. insect or Suitable drainage and waste management water borne diseases) measures will be adopted which restricts water stagnation and waste accumulation and this controls disease vectors. 3.3 Affect the welfare of people e.g. by Yes No harmful effects to the people and the changing living conditions? surroundings due to project. Socio- economic standards will improve and creates more interactive living environment 3.4 Vulnerable groups of people who No Project is for development of residential could be affected by the project e.g. group housing, so no adverse impact to hospital patients, children, the elderly the vulnerable people by the project etc., 3.5 Any other causes No No significant causes of concern

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

Details thereof (with approximate S. No Information/Checklist confirmation Yes/No quantities/rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes No Earth material will be excavated during initial construction phase for foundations and basement. Minimal cutting, filling and reclamation will be done. Excavated soil will be temporarily stored in earmarked areas and will be used for filling, landscaping and road construction; and surplus soil (if any) will be transported to designated disposal site as per norms. Precautions will be taken to block soil which may damage storm water drain system during rains during construction

Ramky Enviro Services Pvt. Ltd,Hyderabad 7

“Form 1 of Group Housing & staff quarters” at UPSRTC campus,Vikas nagar, Kanpur”

Details thereof (with approximate S. No Information/Checklist confirmation Yes/No quantities/rates, wherever possible) with source of information data 4.2 Municipal waste (domestic and or Yes Solid wastes generated during operation commercial wastes) phase such as waste vegetables, foods etc and inorganic waste like papers, cartons, thermocool, glass plastics, polythene bags, etc. Solid wastes will be segregated into bio- and non-biodegradable and is collected in separate bins. Non-biodegradable wastes will be sold to recyclers and biodegradable wastes will be collected and disposed off through the local Municipal Authority/hired agency at designated location. Waste generated is about 2420 kg/day 4.3 Hazardous wastes No No major hazardous wastes are produced. (as per Hazardous Waste The only hazardous waste in the project Management Rules) will be used/spent oil from standby DG sets, which is classified as hazardous waste category 5.1 as per Hazardous Wastes (Management & Handling) Amendments Rules, 2003. Spent oil and leftover paints, solvents and other material will be stored in HDPE drums under isolated storage and periodically sold to authorized recyclers. As per PCB norms, all precautions will be taken in handling the waste. 4.4 Other industrial process wastes No Not Applicable. 4.5 Surplus product No Not Applicable. 4.6 Sewage sludge or other sludge from No Not Applicable. effluent treatment 4.7 Construction or demolition wastes Yes Earth material excavated during initial construction phase will be used for road construction, landscaping and back-filling; and the excess if any will be transported to the designated disposal site 4.8 Redundant machinery or equipment No No redundant machinery or equipment for disposal 4.9 Contaminated soils or other materials No Proper care will be taken to avoid contamination of soil and oil. If any, oil spills are found, they will be scrapped off and stored at earmarked places and sent to designated disposal sites. 4.10 Agricultural wastes No No agricultural waste will be generated, except horticultural/landscape waste like dry leaves, grasses, trimmings etc., which will be there during operation phase which will be disposed off to municipal

Ramky Enviro Services Pvt. Ltd,Hyderabad 8

“Form 1 of Group Housing & staff quarters” at UPSRTC campus,Vikas nagar, Kanpur”

Details thereof (with approximate S. No Information/Checklist confirmation Yes/No quantities/rates, wherever possible) with source of information data collection facility. 4.11 Other solid wastes No Not applicable

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) Details thereof (with approximate Information/Checklist S. No Yes/No quantities/rates, wherever possible) with source confirmation of information data 5.1 Emissions from combustion Yes Main emissions are from vehicles running at site of fossil fuels from during construction and operation period and also stationary or mobile sources from the DG sets used for power-backup source (during power failures, only for short duration). High Speed Diesel (HSD) will be used for DG sets.

Main emissions will be SO2 and NOx, DG set will be acoustically enclosed to meet PCB norms. Proper PCB norms will be followed to control and mitigate emissions and ensure proper dispersion of pollutants. 5.2 Emissions from production No Not applicable, as this is a housing construction processes project 5.3 Emissions from materials Yes Main emissions are dust arising from material handling including storage handling and transport vehicles, which are during or transport vehicle idling, loading and unloading activates. Proper control measures and mitigations will be adopted as per PCB norms. 5.4 Emissions from construction Yes Gaseous emission from construction activities

activities including plant such as SO2, NOx, CO, PM are known pollutants to and equipment occur from construction equipments and other vehicles used at construction site which are temporary in nature. Dust emissions (such as – during haul-road movements, construction and material handling) are controlled with suitable measures. 5.5 Dust or odours from Yes During construction phase, the dust from handling handling of materials materials such as soil, sand, cement, fossil fuels including construction and bitumen are anticipated. materials, sewage and Odour will be generated due to solid waste and waste sewage generated and they are controlled with proper control measures, they are stored in earmarked places, and separated into biodegradable and degradable and accordingly will be disposed off to municipal collection bins/authorized recyclers. As such no significant odors will be generated. 5.6 Emissions from incineration No Not applicable of waste 5.7 Emissions from burning of No Open Burning of waste shall not be permitted. waste in open air (e.g. slash

Ramky Enviro Services Pvt. Ltd,Hyderabad 9

“Form 1 of Group Housing & staff quarters” at UPSRTC campus,Vikas nagar, Kanpur”

Details thereof (with approximate Information/Checklist S. No Yes/No quantities/rates, wherever possible) with source confirmation of information data materials, construction debris) 5.8 Emissions from any other No Not applicable sources

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

Details thereof (with approximate quantities/rates,

S. No Information/Checklist wherever possible) with source of information data Yes/No confirmation with source of information data

6.1 From operation of Yes Noise level of > 75 dB (A) are anticipated during equipment e.g. engines, activities such as drilling, concrete mixing and ventilation plant, crushers crushing by loaders, cranes, trucks, power generators etc., and are temporary in nature (during construction phase) and will be minimized by adopting proper maintenance such as greasing oiling and insulations (enclosures) for noise abatement. Measures will be taken to minimize the noise from such sources. No vibration effects, no light and heat emissions are not envisaged 6.2 From industrial or similar No Not applicable processes 6.3 From construction or Yes Construction activities such as excavation, mixing, demolition dumping and other activities shall lead to generation of noise and vibrations which the activities are temporary. Measures will be taken to minimize high noise generating construction activities and carried out only during daytime; installation, use and maintenance of mufflers on equipment; ear muffs/earplugs will be provided to workers who are working near high noise areas 6.4 From blasting or piling No No blasting and pilling will be done.

6.5 From construction or Yes Noise will be generated from construction activities operational traffic and vehicle movements. Proper control measures will be taken to reduce noise levels like-proper vehicle traffic control, minimizing construction activities during day-time, tree cover around boundary to minimize noise and dust, etc., 6.6 From lighting or cooling Yes There will be change in the light pollution level of systems project area. Use of focused lights to the active areas is envisaged. Further, there will be no sky- lighting during the construction as well as post- construction phase. Cooling towers are not proposed so there will be no noise generation from them. During power failure, operation of DG sets will generate noise. However,

Ramky Enviro Services Pvt. Ltd,Hyderabad 10

“Form 1 of Group Housing & staff quarters” at UPSRTC campus,Vikas nagar, Kanpur”

Details thereof (with approximate quantities/rates,

S. No Information/Checklist wherever possible) with source of information data Yes/No confirmation with source of information data

these shall be housed in acoustically enclosed chambers 6.7 From any other sources No No effects from other sources are envisaged

7. Risks of contamination of land or water from release of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

Details thereof (with approximate Information/Checklist S. No Yes/No quantities/rates, wherever possible) with source confirmation of information data 7.1 From handling, storage, No No major risks. use or spillage of All materials like HSD oil is properly utilized and hazardous materials handled carefully and suitable good practices with proper precautions will be taken while storage and use. Used HSD will be stored in leak proof barrels/drums are properly handled and disposed off to authorized re-processors/dealers. 7.2 From discharge of sewage Yes Sewage will be discharged into sewer lines of or other effluents to water Kanpur nagar nigam. Acceptance letter from Jalkal or the land (expected Vibhag is obtained for water supply & sewerage mode and place of disposal. discharge) 7.3 By deposition of pollutants No Dust generated during construction phase from emitted to air into the land earthworks and vehicle movements will be or into water controlled by suitable measures like water sprinkling, tarpaulin covering of trucks etc. and are as per PCB norms. To minimize pollution deposition the greenbelt will be developed along the boundary and roads. DG stack height will be maintained as per PCB norms. 7.4 From any other sources No None are envisaged 7.5 Is there a risk of long term No No long term risks are envisaged by the build up of build up of pollutants in pollutants in environment from handling, storage, the environment from use or spillage of hazardous materials, discharge of these sources? sewage or other effluents to water or the land and by deposition of pollutants emitted into air or land or water bodies.

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment

Details thereof (with approximate Information/Checklist S. No Yes/No quantities/rates, wherever possible) with source confirmation of information data

Ramky Enviro Services Pvt. Ltd,Hyderabad 11

“Form 1 of Group Housing & staff quarters” at UPSRTC campus,Vikas nagar, Kanpur”

Details thereof (with approximate Information/Checklist S. No Yes/No quantities/rates, wherever possible) with source confirmation of information data 8.1 From explosions, spillages, No None envisaged. All construction workers will be fires etc from storage, provided with suitable protective equipment as per handling, use or production health and safety norms. Suitable fire fighting of hazardous substances measures will be provisioned. Training and awareness about safety norms will be given to construction site workers and supervisors. 8.2 From any other causes No Not applicable 8.3 Could the project be No Project area falls in Zone III (Moderate intensity) of affected by natural Seismic Zoning Map of India. The seismic factors disasters causing have been appropriately incorporated in the civil environmental damage designs for the proposed development of (e.g. floods, earthquakes, residential plots. landslides, cloudburst etc)?

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality

Details thereof (with approximate S. No Information/Checklist confirmation Yes/No quantities/rates, wherever possible) with source of information data 9.1 Lead to development of supporting. Yes Due to proposed project there will be Utilities, ancillary development or some impact on the existing roads, due development stimulated by the project to influx of people the housing demand which could have impact on the will increase in nearby area, existing environment e.g.: shops, hotels etc., will have higher • Supporting infrastructure (roads, business. power supply, waste or waste water treatment, etc.) • housing development • extractive industries • supply industries • other 9.2 Lead to after-use of the site, which could No None envisaged have an impact on the environment 9.3 Set a precedent for later developments Yes Similar new projects may develop in nearby areas in future 9.4 Have cumulative effects due to proximity Yes Cumulative effects like similar projects to other existing or planned projects with may come up nearby. Tree plantation, similar effects sewerage and storm water systems will be more developed which could lead to better environment

(III) Environmental Sensitivity Name / Aerial distance (within 15 km.) S. No Areas Identity Proposed project location boundary 1 Areas protected under No None

Ramky Enviro Services Pvt. Ltd,Hyderabad 12

“Form 1 of Group Housing & staff quarters” at UPSRTC campus,Vikas nagar, Kanpur”

international conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or Yes Zoological Park – adjacent to site sensitive for ecological reasons - Ganga river- 2 km (E) Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests

3 Areas used by protected, No None in the study area important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration

4 Inland, coastal, marine or No None in the study area underground waters

5 State, National boundaries No None in study area 6 Routes or facilities used by the No None public for access to recreation or other tourist, pilgrim areas 7 Defence installations Yes – 9 km (SE), Indian Air Force Station – 16 km(SE), Hindustan Aeronautics Limited - 15 km(SE) 8 Densely populated or built-up Yes Site is located within the Kanpur city area. area 9 Areas occupied by sensitive man- Yes Religious Places: J K Temple – 3.5 km(SES), made land uses (hospitals, Pandunagar Gurudwara – 3.5 km(SWS), schools, places of worship, Ahmadiya Masjid – 3.1 km (SWS), CNI community facilities) Church – 4.5 km (SE) Schools/Hospitals: Regency – 2.7 km (S), – 3.2 km (SE), Gastro Liver Hospital – 2.8 km (SES), Jugal Devi School – 1.2 km (NW), HTBI – 1 km (SE). Also, there are several hospitals, schools, places of worship and community facilities within 15 km of the project site.

10 Areas containing important, high Yes Ganga river – 2 km (E) quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to No Not applicable pollution or environmental damage. (those where existing legal environmental standards

Ramky Enviro Services Pvt. Ltd,Hyderabad 13

“Form 1 of Group Housing & staff quarters” at UPSRTC campus,Vikas nagar, Kanpur”

are exceeded) 12 Areas susceptible to natural No Project site is not susceptible for these hazard which could cause the natural disasters. Not prone to landslide, project to present environmental erosion and flooding. The proposed site problems falls in Seismic Zone – III (Moderate (earthquakes, subsidence, intensity). landslides, erosion, flooding or extreme or adverse climatic conditions)

(IV) Proposed Terms of Reference for EIA studies

Not Applicable

Ramky Enviro Services Pvt. Ltd,Hyderabad 14

“Form 1 of Group Housing & staff quarters” at UPSRTC campus,Vikas nagar, Kanpur”

Annexure 1: Project Layout plan

Ramky Enviro Services Pvt. Ltd,Hyderabad 15

“Form 1 of Group Housing & staff quarters” at UPSRTC campus,Vikas nagar, Kanpur”

Annexure 2: Topo map showing project site

Ramky Enviro Services Pvt. Ltd,Hyderabad 16