Form 1 of Group Housing & Staff Quarters” at UPSRTC Campus,Vikas Nagar, Kanpur”

Form 1 of Group Housing & Staff Quarters” at UPSRTC Campus,Vikas Nagar, Kanpur”

“Form 1 of Group Housing & staff quarters” at UPSRTC campus,Vikas nagar, Kanpur” FORM 1 (I) Basic Information S. No Item Details 1 Name of the Project /s Construction of Proposed Group Housing and Staff Quarters at UPSRTC Campus, Vikas Nagar, Kanpur, Uttar Pradesh state. 2 Sl. No in the Schedule 8 (a) 3 Proposed capacity / area / length / Plot Area - 47682.72 sq.m(housing and staff tonnage to be handled /command area / quarters) (11.78 acres), lease area / number of wells to be drilled Basement Area- 34333 sq.m Stilt Area- 118089 sq.m Total Built-up Area - 135813.01 sq.m No. of Flats - 1208 (with 1,2 & 3 BHK) No. of towers - 26 nos. Total Open Area-35589.69 sq.m (road area + green area) Project Layout Plan is shown in Annexure I 4 New / Expansion / Modernization New 5 Existing Capacity / Area etc. Not Applicable 6 Category of Project i.e. ‘A’ or ‘B’ Item 8(a), category-B 7 Does it attract the general conditions? If No yes, please specify 8 Does it attract the Specific conditions? If No yes, please specify 9 Location Latitude: 26° 30' 15.78"N Longitude: 80° 17' 55.47"E Plot / Survey / Khasra No At UPSRTC campus Village Vikas Nagar, Purana Kanpur, Kanpur nagar. Tehsil Kanpur District Kanpur Nagar State Uttar Pradesh 10 Nearest railway station / airport along Kanpur Central Railway Station –7 km. (SE) with distance in kms Chaudhary Charan Singh International Airport – 65 km. (NE) 11 Nearest town, city, district headquarters Kanpur (7 km from core city) along with distance in kms 12 Village Panchayats, Zilla Parishad, Kanpur Municipal Corporation(KMC) Municipal Corporation, Local body Moti Jheel, Harsh Nagar, Kanpur (U.P) - 208002 (complete postal addresses with telephone nos, to be given) 13 Name of the applicant Kanpur Development Authority (KDA) 14 Registered Address Kanpur Development Authority, Moti Jheel campus, Kanpur (U.P) Tel: 0512-2556292 & 93; Fax: 0512-2551880; email: [email protected] 15 Address for Correspondence Name Shri.V.K Goyal Designation (Owner/Partner/CEO) Chief Engineer Address Office of Kanpur Development Authority, Moti Jheel campus, Kanpur (U.P) Ramky Enviro Services Pvt. Ltd,Hyderabad 1 “Form 1 of Group Housing & staff quarters” at UPSRTC campus,Vikas nagar, Kanpur” S. No Item Details Pin Code 208002 E-mail [email protected], [email protected] Telephone no Fax no 16 Details of Alternate Sites examined, if No alternate sites considered. Topomap showing any. Location of these sites should be project site is shown in Annexure-2 shown on a topo sheet 17 Interlinked Projects Not Applicable 18 Whether separate application of Not Applicable interlinked project has been submitted 19 If yes, date of submission Not Applicable 20 If no, reason 21 Whether the proposal involves approval No / clearance under: if yes, details of the same and their status to be given (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z. Notification, 1991? 22 Whether there is any Government Order No / Policy relevant / relating to the site 23 Forest Land involved (hectares) No Forest land involved in the project 24 Whether there is any litigation pending No against the project and / or land in which the project is proposed to set up? (a) Name of the Court (b) Case No (c) Orders / directions of the court, if any and its relevance with the proposed project. II. Activity: Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.,) Details thereof (with approximate quantities Information/Checklist S. No Yes/No /rates, wherever possible) with source of confirmation information data 1.1 Permanent or temporary No Proposed project envisages the development of change in land use, land Group Housing & staff quarters on vacant plot cover or topography of land (of UPSRTC) earmarked for residential including increase in land use. Hence proposed project do not intensity of land use (with anticipate any permanent or temporary change in respect to local land use land use, land cover or topography of the area. plan) 1.2 Clearance of existing land, No Vacant open land. Require clearing of site prior to vegetation and buildings? construction. However, there will not be significant tree felling or disturbance in vegetation due to the construction of residential houses. Ramky Enviro Services Pvt. Ltd,Hyderabad 2 “Form 1 of Group Housing & staff quarters” at UPSRTC campus,Vikas nagar, Kanpur” Details thereof (with approximate quantities Information/Checklist S. No Yes/No /rates, wherever possible) with source of confirmation information data 1.3 Creation of new land uses? No Proposed site is vacant plot of land, mostly scrub land with very few small trees 1.4 Pre-construction Yes Soil testing will be done before beginning of investigations e.g. bore construction activity houses, soil testing? 1.5 Construction works? Yes Project consists of construction of residential flats for group housing & staff quarters. All construction activities will be confined within only, no physical changes outside the site and the activities will be performed as per norms/bylaws 1.6 Demolition works? No No demolitions works 1.7 Temporary sites used for No Most workers will be hired from nearby areas. construction works or Temporary sheds, store-rooms etc., will be housing of construction provided for security persons, outside labourers workers? and raw material storage which are stored in the project site only. 1.8 Above ground buildings, Yes Activity development of group housing and structures or earthworks creating common infrastructure like roads, sewer including linear structures, system, water pipelines, sewage network, cut and fill or excavations underground water storage tanks and pilelines, power transformers/sub-stations, etc. Hence, no major earth works, cut and fill or excavations are envisaged. Any excavated soil will be used for back-filling in the site. 1.9 Underground works No No underground or mining work will be carried including mining or out. Excavation of earth material will be carried tunneling? out for laying foundation of the proposed buildings. 1.10 Reclamation works? No No reclamation work required 1.11 Dredging? No No dredging required 1.12 Offshore structures? No No off shore structures required 1.13 Production and No No production/manufacturing process is involved manufacturing processes? 1.14 Facilities for storage of goods Yes Construction Phase: or materials? Minimum bulk material for construction will be purchased as per requirement and stored on site with appropriate arrangement. Separate storage arrangements will be made for storage of bulk raw material. Cement will be stored under cover in bales and sand will be stacked neatly under tarpaulin cover. Bricks and steel will be laid in open. Operation Phase: Not required except for common cleaning and maintenance equipment and material. Ramky Enviro Services Pvt. Ltd,Hyderabad 3 “Form 1 of Group Housing & staff quarters” at UPSRTC campus,Vikas nagar, Kanpur” Details thereof (with approximate quantities Information/Checklist S. No Yes/No /rates, wherever possible) with source of confirmation information data 1.15 Facilities for treatment or Yes Construction Phase: disposal of solid waste or Waste debris, plaster falls, stone mixture, sand liquid effluents? leftovers, empty cement bags, cartons, etc., some are reused or sold to recyclers. Operation Phase: Waste from domestic, horticultural, e-waste is collected and into bio and non-bio degradable is stored and disposed off periodically without causing any concern to residents and surroundings. Non-biodegradable waste is disposed off to authorized recyclers 1.16 Facilities for long term Yes Will be provided housing of operational workers? 1.17 New road, rail or sea traffic Yes Constructed main road for outside connectivity in during construction or the project site and internal roads for within site operation? for accessibility will be constructed for residents in operation phase 1.18 New road, rail, air No No new transport infrastructure outside for waterborne or other project site transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of No No closure or diversion of existing transports existing transport routes or routes. infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission No No new or diversion of existing transmission lines lines or pipelines? or pipelines 1.21 Impoundment, damming, No No impoundment, damming, converting, culverting, realignment or realignment or other changes to the hydrology of other changes to the water courses or aquifers is envisaged. Local hydrology of water courses hydrology will be taken into consideration while or aquifers? designing storm water drains. 1.22 Stream crossings? No No stream crossings are planned 1.23 Abstraction or transfers of No No groundwater abstraction or abstraction during water form ground or construction or operational phase. Domestic surface waters? water requirement during occupation and construction shall be sourced from private water tankers, for preferably treated water is used and for regular domestic use like drinking and washing, water is sourced from Jal kal Vibhag,(Water Supply & Sewerage Board) Nagar Nigam, Kanpur. Ramky Enviro Services Pvt. Ltd,Hyderabad 4 “Form 1 of Group Housing & staff quarters” at UPSRTC campus,Vikas nagar, Kanpur” Details thereof (with approximate quantities Information/Checklist S. No Yes/No /rates, wherever possible) with source of confirmation information data 1.24 Changes in water bodies or Yes Yes, since this is for construction for group the land surface affecting housing purpose, the land surface will be changed. drainage or run-off? Paved area will increase thereby increasing the runoff during rains. There will be no alteration of natural drainage system. Provisions as per EMP shall be kept to capture this runoff and harvest the rain water from the project area.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    16 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us