¼F'ko Izdk'k½ V/Kh{K.K Vfhk;Ark ¼Leuo;½ Izfrfyfi Layxud Ds Lkfk 1

Total Page:16

File Type:pdf, Size:1020Kb

¼F'ko Izdk'k½ V/Kh{K.K Vfhk;Ark ¼Leuo;½ Izfrfyfi Layxud Ds Lkfk 1 Minutes of 28th Co-ordination Meeting of UGBO 1 GOVERNMENT OF INDIA CENTRAL WATER COMMISSION UPPER GANGA BASIN ORGANISATION Phone : 0522-2715832, ” /Janhavi Sadan Fax : 0522-2719834 /Indira Nagar E-Mail : [email protected] /Lucknow-226016 : 30 03 Minutes of the 28th Co-ordination Meeting of UGBO dated: 28th March, 2017. The 28th Co-ordination Meeting of UGBO, CWC was held under the Chairmanship of Shri S.K.Sibal, Chief Engineer, UGBO, CWC, Lucknow on 28.03.2017 in the Conference Room of UGBO, CWC, “Janhavi Sadan”, Lucknow to discuss the issues concerning UGBO, CWC. A copy of the Minutes of Meeting is enclosed for information and further necessary action. This issues with the approval of Chief Engineer, UGBO, CWC, Lucknow. layXud&;FkksDr A ¼f'ko izdk'k½ v/kh{k.k vfHk;ark ¼leUo;½ izfrfyfi layXud ds lkFk 1. lnL;] unh izcU/ku] dsUnzh; ty vk;ksx] ubZ fnYyh A 2. lfPko] dsUæzzzh; ty vk;ksx] 313 ¼nf{k.k½] lsok Hkou] jked`".kiqje&1] ubZ fnYyhA 3. funs'kd] unh izca/ku leUo; funs’kky;] dsUnzh; ty vk;ksx,lsok Hkou] ubZ fnYyhA 4. funs'kd] ck< iwokZuqeku ,ao izca/ku funs’kky;] dsUnzh; ty vk;ksx ,lsok Hkou] ubZ fnYyhA 5. funs'kd] unh vkadMs funs'kky;] dsUnzh; ty vk;ksx] osLV Cykd&1] ubZ fnYyhA 6. funs'kd] ih0&Mh0funs’kky;] dsUnzh; ty vk;ksx,lsok Hkou] ubZ fnYyhA v/kh{k.k vfHk;ark] ty foKkuh; izs{k.k ifjeaMy] dsUnzh; ty vk;ksx] okjk.klh @nsgjknwu A vf/k'kklh vfHk;ark e/; xaxk e.My&I y[kuÅ @ e/; xaxk e.My&II y[kuÅ @e/; xaxk e.My&III okjk.klh@ fgeky; xaxk eaMy] nsgjknwu A mie.Myh; vfHk;Urk] dsUnzh; ty vk;ksx] y[kuÅ@ dkuiqj@ cjsyh@ eqjknkckn @ xksaMk@ xksj[kiqj@ gfj}kj @ fVgjh@ bykgkckn@ okjk.klh@ gY}kuh@jhaok@Jhuxj A A 1 Minutes of 28th Co-ordination Meeting of UGBO Government of India Central Water Commission Upper Ganga Basin Organisation Minutes of 28th Co-ordination Meeting of UGBO dated: 28-03-2017 The 28th Co-ordination Meeting of UGBO, CWC was held on 28-03-2017 under the Chairmanship of Shri S.K.Sibal, Chief Engineer, UGBO, CWC, Lucknow in the Conference Room of UGBO, CWC, Lucknow to discuss the various issues concerning UGBO, CWC. The list of participants present is enclosed as Annexure-I. At the outset, Shri S. K. Sibal, Chief Engineer, UGBO, CWC, Lucknow welcomed all the participants and requested Shri Shiva Prakash, SE (C) to take up the agenda for the meeting. The gist of the discussions held on various agenda items is as under:- 1. Rationalisation of Manpower at Site, Sub-division, Division and Circle in respect of Work Charged Staff as per the observation of Member(RM): Chief Engineer, UGBO, CWC, Lucknow stated that Member(RM) vide his note 4/MCRM/General/2017/43 dated 22.03.2017 has asked to optimise posting of staff on all existing sites, sub-division, Division and new sites to be opened so as to be ready for oncoming flood season from 1st June, 2017. In this regard, it was intimated that as per data available with this office, out of 472 W/C staff (except OB Engine, MV Driver, Carpenter, Mechanic, Electrician) under UGBO, 141 nos. are posted at Regional Office, Circle Office, Division and Sub-divisions. Details are enclosed at Annexure-II. SE’s of both the Circle intimated that because of shortage of Regular Establishment, work at Circle, Division, Sub-division is being managed by the W/C Staff. CE, UGBO desired that the utility of each W/C staff posted in place of Regular Establishment alongwith the Work being done by them may be intimated. Further, out of these which work can be managed by alternative way may also be suggested. 10 nos. of new Level & Inflow Forecast stations has been added in this season for which forecast will be issued by the CWC (HQ). Hourly data at these new FF stations and their base stations will be needed from 1st June, 2017. A workable arrangement may be suggested by both the SE,s. The exercise may be completed by both the Circle and detailed action taken note as discussed may by intimated by 15th April,2017. (SE, HOC, VNS/DDN) 2 Minutes of 28th Co-ordination Meeting of UGBO 2. Inspection of Sites and submission of Inspection Report in RD-16 Inspection of sites is being carried out by the SDE/EE/SEs. As per norms joint inspection is to be carried out by EE/SDE and Inspection Report is to be submitted. However it is seen that the joint inspection is not being carried out, which is affecting the quality of checking of data. It was desired by the CE, UGBO that w.e.f. 1st April, 2017 EEs/SDEs may conduct Joint Inspection failing which their Inspection will be treated as null and void and ATP may not be approved by the controlling officers. Random checking of data collected at site may also be carried out by the Inspecting Officers. If the staff posted at site is not carrying out properly all the measurements viz hydrological, sediment, water quality, suitable disciplinary action may be taken, so that the staff posted at site become sensitive to their duties and erring staff can be punished. Further, as discussed earlier and circulated by the SE, H.O.Circle, CWC, Varanasi, inspection of the telemetry system is also to be carried out. Presently the same is not being carried out by most of the SDEs/EEs. From 1st April, 2017, all the Inspecting officer shall attach Joint Inspection Report alongwith the Inspection Report of Telemetry System. Sample copy of Inspection Report Telemetry system is attached as Annexure-III. (SE, HOC, VNS/DDN, EE, MGD-I/MGD-II/MGD-III/HGD) 3. Status of restoration of existing Telemetry System Detailed discussion was held on the issue of restoration of existing telemetry system. Site wise status is attached as Annexure-IV. It was desired by the CE, UGBO that all the stations shall be made operational by 30th May, 2017. Sites (Birdghat, Kakardhari, Shardanagar, Dabri, Bareilly) where tower has been planned, its construction may be taken up of on priority and completed by 15th May, 2017. It was decided that the drawing for Tower as shown in new Telemetry station tender document may be adopted as a Model drawing for estimate and tender purpose. It was also clarified that this work is of continuing nature of 11th Plan. It was informed that the telemetry system of Srinagar, Rudraprayag, Nandkeshari which had been washed out in flood of 2013 have been included in the Tender for new telemetry system. As such, the number of existing stations, henceforth shall be reckoned as 42 instead of 45. At Elgin Bridge site, the installation Level may be provided to the Firm without waiting for further lowering of water level, so that the PTB can be constructed by the Firm by 15th May, 2017. At Bansi site, EE, MGD-I may make the necessary payment to PWD for cutting of Road, so that the Orifice Tube, HDPE Pipe can be laid out and connected to PTB by 15th May, 2017. At Rishikesh site, EE, HGD may take immediate necessary action for the carrying out Civil Works for the Telemetry system and complete it by 15th May, 2017 so that the HDPE/Orifice 3 Minutes of 28th Co-ordination Meeting of UGBO Tube can be laid out that has got disturbed/damaged due to Ghat renovation work undertaken by Uttarakhand Govt. EE, MGD-II may shift the bubbler of Narora on the concrete wall towards pondage area of barrage, so that the problem of siltation may be avoided and water level system could become functional. Further after discussing the matter with the State Govt. of UP, I&WRD may be intimated that CWC is installing the bubbler on the concrete diaphragm wall at Lucknow pursuant to these discussions, if no approval is forthcoming from their end. This may be informed to them during discussions. It was also decided that the proportionate payment of Maintenance charges to the Firm may be released by the respective Divisions for the sites that have been made operational. The charges may be worked out from the date of their operationalization. SE’s of respective Circle may ensure that the works to done from CWC end are completed by 15th May, 2017 positively, so that the sites are operational by 31st May, 2017 otherwise the responsibility may be fixed. It was also desired that the site wise booklet for each site may be prepared showing therein the geographical location viz latitude & longitude, layout plan, inventory, photograph etc. for future reference. (SE, HOC, VNS/DDN, EE, MGD-I/MGD-II/MGD-III/HGD) 4. Publication of Year Books The following status of publication of Year Books under UGBO was intimated during the meeting: Sl. Published Present Status Year Book Nos. River No. by 1 Ganga (main stem) HOC, VNS Published 1 Ghaghara HOC, VNS Published Water Year Book 1 Sone HOC, VNS Published 1 for 2015-16 1 Small Tributaries HOC, VNS Published 1 Ramganga HOC, DDN Published 1 Gomti HOC, DDN Published Total 6 1 Ganga (main stem) HOC, VNS Published 1 Ghaghara HOC, VNS Published Water Quality Year 1 Sone HOC, VNS Published 2 Books for 2015-16 1 Small Tributaries HOC, VNS Published 1 Ramganga HOC, DDN Published 1 Gomti HOC, DDN Published Total 6 1 Ganga (main stem) HOC, VNS Published 1 Ghaghara HOC, VNS Published Sediment Year 3 1 Sone HOC, VNS Published Books for 2015-16 1 Ramganga HOC, DDN Published 1 Gomti HOC, DDN Published Total 5 4 Minutes of 28th Co-ordination Meeting of UGBO 1 H.O.Circle, Varanasi HOC, VNS Published Meteorological HOC, DDN Yet to be 4 Year Books for 1 H.O.Circle, Dehradun published since 2015-16 2013-14 Total 2 CE, UGBO stated that in an earlier meeting, deadline of 31st October was fixed for publication of Year Books.
Recommended publications
  • System Map 2017 A1 Final.Cdr
    T To Jind To Panipat o Nazibabad MEERUT Jn. To Kashipur 31-03-2017 rd la'kksf/kr AS ON 31-03-2017 T T o Hisar T ROHTAK Jn. o Jammutawi o Saharanpur UTTARAKHAND N o Lalkuan T N.Rly. T . o Lalkuan NH 1 o Saharanpur o Muazzampur BHIWANI Jn. T T -Narain N.E.Rly N.Rly MURADABAD Jn. gfj;k.kk . N.Rly. GAJRAULA Jn. NH24 N.Rly. GHAZIABAD BUZURG Jn. (CPYZ)((GZB) 1428.99 1432.35 RAMPUR Jn. HARYANA DELHI 1540.80 AYANA HAPUR Jn. N.Rly CHIP 1428.50 (N.C.Rly. Limit) NEW DELHI 1537.66 . MARIPAT (MIU) 1422.44 N.E.Rly H.NIZAMUDDIN 1530.41 DADRI (DER) 1415.69 BORAKI HALT (BRKY) 1411.35 N.Rly AJAIBPUR (AJR) 1406.46 . To Pilibhit DANKAUR (DKDE) 1398.02 . WAIR (WAIR) 1389.55 N.E.Rly . CHANDAUSI Jn. To Loharu FARIDABAD 1509.61 CHOLA (CHL) 1384.55 GANGRAUL HALT (GNRN) 1380.18 BHOJIPURA Jn REWARI Jn. N.Rly N.Rly SIKANDARPUR (SKQ) 1375.39 1370.47 (N.C.Rly. Limit) . IJJAT NAGAR Jn Y . AMUNA KHURJA Jn. (KRJ) 1369.82 N.Rly BAREILI Jn NH 2 KAMALPUR HALT (KAMP) 1363.87 . 153.60 GANGA RAMGANGA Jn DANWAR (DAR) 1358.83 EXPRESS PALWAL (PWL) 1480.46 T CHANETHI Jn o Palwal N W .Rly 1479.40 (N.C.Rly. Limit) AJHAI (AJH) 1417.87 (SOM) 1348.54 VAN Rd. (VRBD)1406.83 1.48 SOMNA GANJ (HGJ) VRINDA RUNDHI (RDE) 1471.14 Y VAN (BDV) 1 AMUNA VRINDA Division wise Route / Running track / Total track length .
    [Show full text]
  • List of Candidates for Refund 2020-21
    List of Candidates for Refund ( Round of I, II, III & Additional) Online Counselling 2020-21 S. Roll No Name Bank Name Branch Name IFSC Account No Name of Account Holder Refundable NO. Amount 1 200310043131 NALIN VERMA HDFC bank Lakhimpur kheri HDFC0001914 50100368464565 NALIN VERMA 15000 2 200310053526 RAUNAK KUMAR Union Bank Of India Lucknow main UBIN0530221 302202010704968 RAJENDER PRASAD 7000 3 200310062010 ADITYA JAIN BANK OF INDIA Indira nagar, lucknow BKID0006852 685210110000863 ADITYA JAIN 15000 4 200310070835 SANYA SENGAR STATE BANK OF INDIA Azad nagar, kalyanpur SBIN0001962 30091238739 SANYA SENGAR 15000 5 200310076008 NAMAN SINGH Kotak mahindra bank Civil lines bareilly KKBK0005294 619010016953 KEYERROR 7000 6 200310139507 MAYANK GARG Union Bank Shamli UBIN0541125 411202010991520 KEYERROR 15000 7 200310141073 SHUBHNEET TIWARI STATE BANK OF INDIA Manik chowk SBIN0003759 38563010993 NAVNEET TIWARI 15000 8 200310164372 DIVYANSH BAJPAI State Bank of India Karrhi SBIN0015624 32978606681 DIVYANSH BAJPAI 15000 9 200310169615 GEETIKA SINGH BANK OF INDIA Lohatia BKID0006915 691510100007669 KEYERROR 15000 10 200310181526 SAKSHAM GAUTAM Prathama U.P. Gramin Bank Kachaharii road bulandshahr PUNB0SUPGB5 91681500003267 SAKSHAM GAUTAM 15000 11 200310185397 MAYANK GUPTA STATE BANK OF INDIA Ashok nagar kanpur SBIN0006218 10417761378 AMBARISH GUPTA 15000 12 200310208513 PUNIT KUMAR PUNJAB NATIONAL BANK Afzalgarh PUNB0051500 0515000105712115 PUNIT KUMAR 7000 13 200310212525 ANKITA SINGH STATE BANK OF INDIA Jankipuram, lucknow SBIN0051291 30057228891 KEYERROR 15000 14 200310363207 SHIVANSH GUPTA BANK OF BARODA K-block kidwai nagar kanpur BARB0KIDKAN 19640100024438 SHIVANSH GUPTA 15000 SANTOSH KUMAR 15 200310395766 MANISH SRIVASTAVA State Bank Of India Industrial estate SBIN0000219 10890252471 15000 SRIVASTAVA 16 200310571706 ANURAG MISHRA Canara Bank Shyamnagar, kanpur CNRB0004964 4964101000209 PRIYANKA MISHRA 15000 17 200310620392 APARNA DUBEY State Bank of India Sbi-kannauj sarai miran p.o.
    [Show full text]
  • State City Hospital Name Address Pin Code Phone K.M
    STATE CITY HOSPITAL NAME ADDRESS PIN CODE PHONE K.M. Memorial Hospital And Research Center, Bye Pass Jharkhand ​Bokaro NEPHROPLUS DIALYSIS CENTER - BOKARO 827013 9234342627 Road, Bokaro, National Highway23, Chas D.No.29-14-45, Sri Guru Residency, Prakasam Road, Andhra Pradesh Achanta AMARAVATI EYE HOSPITAL 520002 0866-2437111 Suryaraopet, Pushpa Hotel Centre, Vijayawada Telangana Adilabad SRI SAI MATERNITY & GENERAL HOSPITAL Near Railway Gate, Gunj Road, Bhoktapur 504002 08732-230777 Uttar Pradesh Agra AMIT JAGGI MEMORIAL HOSPITAL Sector-1, Vibhav Nagar 282001 0562-2330600 Uttar Pradesh Agra UPADHYAY HOSPITAL Shaheed Nagar Crossing 282001 0562-2230344 Uttar Pradesh Agra RAVI HOSPITAL No.1/55, Delhi Gate 282002 0562-2521511 Uttar Pradesh Agra PUSHPANJALI HOSPTIAL & RESEARCH CENTRE Pushpanjali Palace, Delhi Gate 282002 0562-2527566 Uttar Pradesh Agra VOHRA NURSING HOME #4, Laxman Nagar, Kheria Road 282001 0562-2303221 Ashoka Plaza, 1St & 2Nd Floor, Jawahar Nagar, Nh – 2, Uttar Pradesh Agra CENTRE FOR SIGHT (AGRA) 282002 011-26513723 Bypass Road, Near Omax Srk Mall Uttar Pradesh Agra IIMT HOSPITAL & RESEARCH CENTRE Ganesh Nagar Lawyers Colony, Bye Pass Road 282005 9927818000 Uttar Pradesh Agra JEEVAN JYOTHI HOSPITAL & RESEARCH CENTER Sector-1, Awas Vikas, Bodla 282007 0562-2275030 Uttar Pradesh Agra DR.KAMLESH TANDON HOSPITALS & TEST TUBE BABY CENTRE 4/48, Lajpat Kunj, Agra 282002 0562-2525369 Uttar Pradesh Agra JAVITRI DEVI MEMORIAL HOSPITAL 51/10-J /19, West Arjun Nagar 282001 0562-2400069 Pushpanjali Hospital, 2Nd Floor, Pushpanjali Palace,
    [Show full text]
  • Chapter – 15 ENVIRONMENT and SOCIAL IMPACT ASSESSMENT
    Chapter – 15 ENVIRONMENT AND SOCIAL IMPACT ASSESSMENT Detailed Project Report for Rail Based Mass Transit System in Kanpur FINAL REPORT Chapter 15: Environmental and Social Impact Assessment 15. ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT 15.1 EXISTING SCENARIO 15.1.1 Environmental Baseline Data on land environment has been collected and compiled from various sources and during field surveys. Information about geology, hydrology, prevailing natural hazards like earthquakes etc have been collected from literature reviews and authenticated information made available by government departments. Water quality, soil quality, ambient air and noise environment in the surrounding areas were assessed primarily through field studies, and by undertaking monitoring and analysis of samples collected from field. Meteorological data was collected from Indian Meteorological Department (IMD). A scoping matrix was formulated to identify the attributes likely to be affected due to the development of proposed project and is presented in Table 15.1. The general environmental attributes pertaining to the proposed metro project along with parameters to be collected and its frequency are presented in Table 15.2. TABLE 15.1: SCOPING MATRIX ASPECT OF ENVIRONMENT LIKELY IMPACTS A. Land Environment Increased soil erosion Construction Phase Pollution by construction spoils Solid waste from worker colonies, construction sites B. Water Resources & Water Quality Water quality impacts due to disposal of wastewater from worker camps Construction Phase and construction sites,
    [Show full text]
  • Lucknow Dealers Of
    Dealers of Lucknow Sl.No TIN NO. UPTTNO FIRM - NAME FIRM-ADDRESS 1 09150000006 LK0022901 EVEREADY INDUSTRIES INDIA LTD 6/A,SAPRU MARG LUCKNOW 2 09150000011 LK0019308 SHAKTI SPORTS COMPANY NEW MARKET HAZRAT GANJ LKO. 3 09150000025 LK0034158 FOOD CORPORATION OF INIDIA TC-3V VIBHUTI KHAND,GOMATI NAGAR,LUCKNOW 4 09150000030 LK0090548 BUTTON HOUSE-B B,HALWASIYA MARKET LKO. 5 09150000039 LK0099188 SHYAM LAL PARCHUNIYA NARHI HAZRAT GANJ LKO. 6 09150000044 LK0108090 RAM LAL & BROTHERS HAZRAT GANJ LUCKNOW. 7 09150000058 LK0084428 RAJ PAL JAIN(F.P.S.) NARHI BAZAR HAZRATGANJ LUCKNOW. 8 09150000063 LK0150065 LUCHYA PHARMA N.K.ROAD LUCKNOW. 9 09150000077 LK0178817 SURI WEATHER MAKERS HAZRAT GANJ LUCKNOW. 10 09150000082 LK0185031 RADLA MACHINERY EXPERTS ASHOK MARG LUCKNOW. 11 09150000096 LK0197396 UNITED ATOMOTIVES R.P.MARG LUCKNOW. 12 09150000105 LK0203133 PANNA LAL KAPOOR&CO. HALWASIA MARKET LUCKNOW. 13 09150000110 LK0209886 GUJRAT NARMADA VELLY FURTILISERS C-2 TILAK MARG LUCKNOW CO.LTD 14 09150000119 LK0208650 MAHINDRA AND MAHINDRA LTD. 7 B LANE LUCKNOW 15 09150000124 LK0214591 BRADMA OF INDIA PVT LTD. 40/4 WAZEER HASAN ROAD LUCKNOW 16 09150000138 LK0220861 TRIVENI MOTORS CO. N.K.ROAD, LUCKNOW 17 09150000143 LK0226255 RAVI AUTO SUPPLIERS ASHOK MARG LKO. 18 09150000157 LK0238867 MAN CHOW RESTORENT M.G.ROAD LKO. 19 09150000162 LK0236005 SAHNI SONS JANPATH MARKET LUCKNOW. 20 09150000176 LK0237986 ROHIT KRISHI UDYOG 1-NAVAL KISHORE ROAD LUCKNOW 21 09150000181 LK0242907 DELIGHT STORE HALWASIA MARKET LUCKNOW 22 09150000195 LK0236394 SALIG RAM KHATRY AND COMPANY HAZRAT GANJ LKO. 23 09150000204 LK0232676 RAJ KUMAR AGARWAL RANA PRATAP MARG LUCKNOW. 24 09150000218 LK0330787 SADANA ELE. JANPATH MARKET HAZRAT GANJ LKO.
    [Show full text]
  • Town Wise Revised Action Plan for Polluted River Stretches in the State of Bihar Original Application No: 200/2014 (Matter : M.C
    INDEX Town wise Revised Action Plan for polluted River Stretches in the State of Bihar Original application No: 200/2014 (Matter : M.C. Mehta Vs Union of India & Orgs) S.No. Particulars Page No 1 Synopsis 1-7 Maps showing ongoing /Proposed Sewerage Scheme in 2 8 Towns under Polluted Stretch & Tributaries Map showing Patna town division into zones for Sewerage 3 9 Schemes Compliance report in terms of progress in Quarter related to 4 10-15 STPs in the state of Bihar Report related to Polluted Stretches and Lying of sewage 5 network, collection and disposal of sewage, interception and 16-33 diversion of drains carrying sewage to STP. 6 Ganga River Tributary Towns 34-35 7 SWM Status & Action Plan for Ganga & its Tributaries 36-38 8 ODF Status & Action Plan of Ganga & its tributaries 39 9 Status of Plastic Waste Management 40 10 Annexures Status of Ongoing / Tendered / Tender to be floated of Schemes under Namami Gange Program i. and 41-48 Status of Screening with Sewerage Schemes : Annexure- i Solid Waste Management Status Report in Ganga Towns and ii. Status of different Components of SWM and allied Works at 49-52 Ghats: Annexure- ii Report of Plastic Carry Bags Since coming into effect of iii. Plastic Waste Management Byelaws till date: 53-56 Annexure- iii Toilet Status of Ganga Town ULBs and Status of ODF ULBs iv. Certified by QCI: 57-59 Annexure- iv 60-68 and 69 11 Status on Utilization of treated sewage (Column- 1) 12 Flood Plain regulation 69 (Column-2) 13 E Flow in river Ganga & tributaries 70 (Column-4) 14 Assessment of E Flow 70 (Column-5) 70 (Column- 3) 15 Adopting good irrigation practices to Conserve water and 71-76 16 Details of Inundated area along Ganga river with Maps 77-90 17 Rain water harvesting system in river Ganga & tributaries 91-96 18 Letter related to regulation of Ground water 97 Compliance report to the prohibit dumping of bio-medical 19 98-99 waste Securing compliance to ensuring that water quality at every 20 100 (Column- 5) point meets the standards.
    [Show full text]
  • Center Information Not Updated by DIOS 13102017.Xlsx
    Page 1 Madhyamik Shiksha Parishad, Uttar Pradesh, Allahabad Schools whose Basic Centre Informations are not submitted by DIOS upto 13-10-2017 Sl Dist Sch sch_name Geo-Location status uploaded by schools 1 01 1352 S NEKRAM NETRA PAL H S SCH KITHAM AGRA not uploaded till date 2 01 1620 SHILA HSS BAGIA AGRA not uploaded till date 3 01 1001 BENI S VEDIC VIDYAVATI I C BALUGANJ AGRA uploaded 4 01 1002 BHAGAT KANWAR RAM H S SCHOOL G M KHAN AGRA uploaded 5 01 1003 BAPTIST H S SCHOOL AGRA uploaded 6 01 1004 CHITRA GUPTA H S SCHOOL SHAHGANJ AGRA uploaded 7 01 1005 SHRI C P PUBLIC INTER COLLEGE AGRA uploaded 8 01 1006 SHRI D J INT COLL DHULIA GANJ AGRA uploaded 9 01 1007 D B S S KHALSA INT COLL PRATAPPURA AGRA uploaded 10 01 1008 HOLMAN INSTITUTE H S SCHOOL AGRA uploaded 11 01 1009 SHRI K R B R H S SCHOOL MOTI GANJ AGRA uploaded 12 01 1037 NAGAR NIGAM GIRLS HS SCH TAJGANJ AGRA uploaded 13 01 1052 GOVERMENT INTER COLLEGE SHAHGANJ PNACHKUIYA AGRA uploaded 14 01 1066 S M A O INT COLL AGRA uploaded 15 01 1071 A P INT COLL SHAMSHADBAD AGRA uploaded 16 01 1122 SHRI RAM SAHAY VERMA INT COLL BASAUNI BAH AGRA uploaded 17 01 1123 LAKHAN SINGH INT COLL CHANGOLI BAH AGRA uploaded 18 01 1124 RADHA BALLABH INT COLL SHAHGANJ AGRA uploaded 19 01 1125 FAIZ A AM I C NAGLA MEWATI AGRA uploaded 20 01 1126 S G R I C KURRA CHITTARPUR AGRA uploaded 21 01 1127 S S V INT COLL KARKAULI AGRA uploaded 22 01 1128 G V INT COLL BRITHLA AGRA uploaded 23 01 1129 S R K GIRLS I C KHANDARI AGRA uploaded 24 01 1130 KEVAL SINGH M INT COLL SUTHARI BAH AGRA uploaded 25 01 1131 ANAND INTER
    [Show full text]
  • Preparatory Survey on Ganga Rejuvenation Project in the State of Uttar Pradesh, India
    THE STATE GOVERNMENT OF UTTAR PRADESH THE REPUBLIC OF INDIA PREPARATORY SURVEY ON GANGA REJUVENATION PROJECT IN THE STATE OF UTTAR PRADESH, INDIA DRAFT FINAL REPORT June 2017 JAPAN INTERNATIONAL COOPERATION AGENCY (JICA) 4R NJS CONSULTANTS CO., LTD. CR(3) NIPPON KOEI CO., LTD. 17 - 033 1 USD = 116.0 Yen 1 INR = 1.71 Yen (As of December 2016) TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES LIST OF PHOTOS LIST OF APPENDICES SUMMARY MAIN REPORT APPENDICES TABLE OF CONTENTS CHAPTER 1 Introduction ................................................................................................ 1-1 1.1 Background ............................................................................................................................ 1-1 1.2 Objective of the Preparatory Survey ................................................................................... 1-2 1.3 Basic Information on the Survey Area ................................................................................ 1-4 1.4 Basic information on the survey area .................................................................................. 1-8 1.4.1 Ganga River ....................................................................................................................... 1-8 1.4.2 Varanasi ............................................................................................................................ 1-11 1.4.3 Mirzapur ........................................................................................................................... 1-14 1.4.4
    [Show full text]
  • AFCONS Infra Wins Rs 676 Crore Civil Contract for Kanpur Metro
    9/16/2019 AFCONS Infra wins Rs 676 crore Civil Contract For Kanpur Metro - Metro Rail News AFCONS Infra wins Rs 676 crore Civil Contract For Kanpur Metro The technical bid for the project was also opened earlier last month (August 2019), and work will be contracted out for an estimated Rs 105.00 crore. By Narendra Shah - 07/09/2019 KANPUR (Metro Rail News): The civil works tender for building nine metro stations of the Kanpur Metro Rail project wins AFCONS Infrastructure limited as It emerg the lowest bidder among other competitors Larsen & Toubro Limited, KEC-CCECC JV and NCC. AFCONS Infrastructure will be responsible for constructing the nine metro stations in Kanpur and elevated viaduct structures for the same. 9 Metro Stations are:- The nine stations are IIT Kanpur Station, Kalyanpur Railway Station, Motijheel Station, Gurudev Chauraha Station, Geeta Nagar Station, Rawatpur Railway Station, Kanpur University Station, SPM Hospital Station and Lala Lajpat Rai Hospital Station. Cost of the tender The civil contract is worth Rs 676 crore while the whole project will cost an estimated Rs 11,076.48 crore. The technical bid for the project was also opened earlier last month (August 2019), and work will be contracted out for an estimated Rs 105.00 crore. A number of cities in Uttar Pradesh are set to get their own metro rail systems in the coming years, with Agra and Kanpur metros already having received approval from the Centre, while metros for Meerut, Gorakhpur and Varanasi in various stages of planning. https://www.metrorailnews.in/afcons-infra-wins-rs-676-crore-civil-contract-for-kanpur-metro/ 1/2 9/16/2019 AFCONS Infra wins Rs 676 crore Civil Contract For Kanpur Metro - Metro Rail News The first phase of its construction will connect IIT to Moti Jheel and the second one from Harsh Nagar to Naubasta, making for a total of 33km.
    [Show full text]
  • Form 1 of Group Housing & Staff Quarters” at UPSRTC Campus,Vikas Nagar, Kanpur”
    “Form 1 of Group Housing & staff quarters” at UPSRTC campus,Vikas nagar, Kanpur” FORM 1 (I) Basic Information S. No Item Details 1 Name of the Project /s Construction of Proposed Group Housing and Staff Quarters at UPSRTC Campus, Vikas Nagar, Kanpur, Uttar Pradesh state. 2 Sl. No in the Schedule 8 (a) 3 Proposed capacity / area / length / Plot Area - 47682.72 sq.m(housing and staff tonnage to be handled /command area / quarters) (11.78 acres), lease area / number of wells to be drilled Basement Area- 34333 sq.m Stilt Area- 118089 sq.m Total Built-up Area - 135813.01 sq.m No. of Flats - 1208 (with 1,2 & 3 BHK) No. of towers - 26 nos. Total Open Area-35589.69 sq.m (road area + green area) Project Layout Plan is shown in Annexure I 4 New / Expansion / Modernization New 5 Existing Capacity / Area etc. Not Applicable 6 Category of Project i.e. ‘A’ or ‘B’ Item 8(a), category-B 7 Does it attract the general conditions? If No yes, please specify 8 Does it attract the Specific conditions? If No yes, please specify 9 Location Latitude: 26° 30' 15.78"N Longitude: 80° 17' 55.47"E Plot / Survey / Khasra No At UPSRTC campus Village Vikas Nagar, Purana Kanpur, Kanpur nagar. Tehsil Kanpur District Kanpur Nagar State Uttar Pradesh 10 Nearest railway station / airport along Kanpur Central Railway Station –7 km. (SE) with distance in kms Chaudhary Charan Singh International Airport – 65 km. (NE) 11 Nearest town, city, district headquarters Kanpur (7 km from core city) along with distance in kms 12 Village Panchayats, Zilla Parishad, Kanpur Municipal Corporation(KMC)
    [Show full text]
  • Shine City Kanpur Galaxy - Chaubepur, Kanpur Wide Space with Good Features Shine City Kanpur Galaxy Is Presented by Shinecity Infra Project Pvt
    https://www.propertywala.com/shine-city-kanpur-galaxy-kanpur Shine City Kanpur Galaxy - Chaubepur, Kanpur Wide space with good features Shine City Kanpur Galaxy is presented by Shinecity Infra Project Pvt. Ltd. at Chaubepur, Kanpur offers residential project that host plots in various sizes with good features Project ID: J919025021 Builder: Shinecity Infra Project Pvt. Ltd. Location: Shine City Kanpur Galaxy, Chaubepur, Kanpur - 208027 (Uttar Pradesh) Completion Date: Oct, 2017 Status: Completed Description Shine City Kanpur Galaxy by Shinecity Infra Projects Pvt Ltd located at Chaubepur, Kanpur is spread over (3200, 2450, 1800,1500, 1250, 1000,800,648) sqft with good features. The project is equipped with key amenities including meditation hall, gymnasium, clubhouse etc. & well connected with other parts of city and has all the basic utilities. Amenities : Club House Gym Meditation Hall Swimming Pool Shinecity Infra Project Pvt. Ltd . today is one of the fastest emerging key players in the Indian real estate landscape. Known for its innovative approach to offer state-of-the art green structures, along with sustainable models, Shinecity Infra Project Pvt. Ltd. is committed to mark its excellence in Green Construction in skyline in India. Features Recreation Land Features Park Fitness Centre / GYM Clear Title Freehold Land Plot Boundary Wall Society Boundary Wall Corner Plot Feng Shui / Vaastu Compliant Club / Community Center Adjacent to Main Road Park/Green Belt Facing Water Connection Electric Connection Close to Hospital Close to School
    [Show full text]
  • 117/7, Sarvodaya Nagar, Kanpur-208 005. Phone: 0512-2218078 E Mail:[email protected]
    CGST & CENTRAL EXCISE COMMISSIONERATE, KANPUR Address: 117/7, Sarvodaya Nagar, Kanpur-208 005. Phone: 0512-2218078 E mail:[email protected] Jurisdiction of Kanpur Commissionerate The territorial jurisdiction of CGST and Central Excise Commissionerate Kanpur, extends to Districts of Kanpur Nagar, Kanpur Dehat, Hamirpur, Jalaun, Lalitpur, Mahoba, Jhansi, Kannauj, Farrukhabad and Mainpuri of the state of Uttar Pradesh. The CGST & Central Excise Commissionerate Kanpur comprises of following Divisions headed by Deputy/ Assistant Commissioners. 1. Division: Division-I, Kanpur 2. Division: Division-II-Kanpur 3. Division: Division-III, Kanpur 4. Division: Kanpur(Dehat)/MATI-AKBARPUR 5. Division: Jhansi 6. Division: Farrukhabad Jurisdiction of Divisions & Ranges: NAME OF DIVISION DIVISION NAME OF RANGE JURISDICTION OF RANGE JURISDICTION Division-I, Kanpur Area covering Range- I/Kanpur Left side area starting from Vijay Nagar South-West area Crossing on the Kalpi Road up-to Bhauti of Kanpur Nagar Crossing and right side area starting from including Dada Vijay Nagar Crossing on the Kalpi Road up- Nagar Industrial to Dada Nagar Crossing, and then right side Estate and Udyog area starting from Dada Nagar Crossing up- Kunj. to the Uptron Estate in the Panki. Range- II/Kanpur Left side of the road starting from M/s Hindustan Coca Cola Crossing up-to M/s Kanpur Fertilizer & Cement (P) Ltd. Right side of the road starting from M/s Hindustan Coca Cola Crossing up-to the Bye-pass and then from Bye-pass up-to Bhauti Crossing including M/s Kanpur Fertilizer & Cement (P) Ltd., M/s Azko Noble (P) Ltd. and LPG Bottling Plant.
    [Show full text]