Go Rail Options Benefits Case Assessment

Total Page:16

File Type:pdf, Size:1020Kb

Go Rail Options Benefits Case Assessment GO RAIL OPTIONS BENEFITS CASE ASSESSMENT June 2010 GO Rail Option Benefits Case Assessment Final Report June 2010 Prepared for: Prepared by: In Association with: Metrolinx Halcrow Consulting Inc Delcan Corporation 20 Bay Street, Suite 901 207 Queen’s Quay W Suite 550 625 Cochrane Drive, Suite 500 Toronto ON M5J 2N8 Toronto, ON M5J 1A7 Markham, ON L3R 9R9 www.delcan.com +1 416 363 8123 www.halcrow.com Hatch Mott MacDonald 2800 Speakman Drive Mississauga, ON L5K 2R7 www.hatchmott.com GO Rail Options Benefits Case Assessment Contents Executive Summary ...................................................................................................................I 1 Introduction ....................................................................................................................1 1.1 Introduction to Study................................................................................................................................1 1.2 Introduction to Report .............................................................................................................................2 2 Planning Context ...........................................................................................................3 2.1 Regional Transport Plan ...........................................................................................................................3 2.2 GO 2020......................................................................................................................................................4 2.2.1 Growth Plan for the Greater Golden Horseshoe..............................................................................................4 2.3 Land Use Projections for the Greater Golden Horseshoe .................................................................6 3 Options Assessed .........................................................................................................7 3.1 Current Services and Ridership ...............................................................................................................7 3.2 Development of Options .........................................................................................................................8 4 Approach to Assessment of Options....................................................................... 11 4.1 Metrolinx BCA Template.......................................................................................................................11 4.2 Capital Costs .............................................................................................................................................11 4.3 Operating and Maintenance Costs........................................................................................................12 4.4 Transport Modelling................................................................................................................................12 4.5 Transportation User Benefits.................................................................................................................14 4.5.1 Factoring for Different Ridership Forecasts ...................................................................................................14 4.6 Financial Account....................................................................................................................................15 4.7 Environmental Impacts ..........................................................................................................................15 4.8 Economic Impacts...................................................................................................................................15 4.9 Land Value Changes................................................................................................................................16 4.10 Social Community Impacts ....................................................................................................................19 5 Barrie (Allandale) Corridor.........................................................................................20 5.1 Introduction..............................................................................................................................................20 i GO Rail Options Benefits Case Assessment 5.2 Services Assessed .....................................................................................................................................20 5.3 Engineering Requirements .....................................................................................................................22 5.3.1 Infrastructure................................................................................................................................................22 5.3.2 Rolling Stock................................................................................................................................................26 5.4 Findings.....................................................................................................................................................27 5.4.1 Ridership......................................................................................................................................................27 5.5 Summary of Assessment.........................................................................................................................28 5.5.1 Off-Peak ......................................................................................................................................................29 5.5.2 Transportation User Benefits ........................................................................................................................30 5.5.3 Financial Account ........................................................................................................................................30 5.5.4 Environmental Impacts.................................................................................................................................31 5.5.5 Economic Impacts.........................................................................................................................................31 5.5.6 Social Community Impacts ...........................................................................................................................32 6 Lakeshore East (Bowmanville) Corridor .................................................................32 6.1 Introduction..............................................................................................................................................32 6.2 Services Assessed .....................................................................................................................................33 6.3 Engineering Requirements .....................................................................................................................34 6.3.1 Infrastructure................................................................................................................................................34 6.3.2 Rolling Stock................................................................................................................................................36 6.4 Findings.....................................................................................................................................................37 6.4.1 Ridership......................................................................................................................................................37 6.4.2 Summary of Assessment ...............................................................................................................................38 6.4.3 Off-Peak ......................................................................................................................................................39 6.4.4 Transportation User Benefits ........................................................................................................................40 6.4.5 Financial Account ........................................................................................................................................40 6.4.6 Environmental Impacts.................................................................................................................................41 6.4.7 Other Economic Impacts...............................................................................................................................41 6.4.8 Social Community Impacts ...........................................................................................................................42 7 Milton Corridor .............................................................................................................42 7.1 Introduction..............................................................................................................................................42 7.2 Services Assessed .....................................................................................................................................42 7.3 Engineering Requirements .....................................................................................................................44 7.3.1 Infrastructure................................................................................................................................................44 7.3.2 Rolling Stock................................................................................................................................................45
Recommended publications
  • Railway Investigation Report R07d0111 Crossing Collision
    RAILWAY INVESTIGATION REPORT R07D0111 CROSSING COLLISION VIA RAIL CANADA INC. PASSENGER TRAIN NUMBER 35 MILE 23.57, CANADIAN NATIONAL KINGSTON SUBDIVISION PINCOURT/TERRASSE-VAUDREUIL, QUEBEC 17 DECEMBER 2007 The Transportation Safety Board of Canada (TSB) investigated this occurrence for the purpose of advancing transportation safety. It is not the function of the Board to assign fault or determine civil or criminal liability. Railway Investigation Report Crossing Collision VIA Rail Canada Inc. Passenger Train Number 35 Mile 23.57, Canadian National Kingston Subdivision Pincourt/Terrasse-Vaudreuil, Quebec 17 December 2007 Report Number R07D0111 Synopsis On 17 December 2007, at approximately 1549 eastern standard time, VIA Rail Canada Inc. passenger train No. 35, travelling westward at 62 mph on the south main track of Canadian National’s Kingston Subdivision, struck an empty tractor-trailer that was immobilized on the 3e Avenue level public crossing located at Mile 23.57, near Pincourt/Terrasse-Vaudreuil, Quebec. The tractor-trailer was destroyed; the locomotive was damaged and was unable to continue. Subsequently, 76 passengers were transferred to another VIA Rail Canada Inc. train and rail traffic was delayed for up to 3 ½ hours. The truck driver sustained minor injuries. There was no derailment and no track damage. Ce rapport est également disponible en français. © Minister of Public Works and Government Services Canada 2009 Cat. No. TU3-6/07-1E ISBN 978-1-100-12406-3 TABLE OF CONTENTS 1.0 Factual Information .......................................................................
    [Show full text]
  • Railway Investigation Report R16t0162
    RAILWAY INVESTIGATION REPORT R16T0162 Main-track train collision and derailment Canadian Pacific Railway Freight trains 235-21 and 118-18 Mile 3.3, North Toronto Subdivision Toronto, Ontario 21 August 2016 Transportation Safety Board of Canada Place du Centre 200 Promenade du Portage, 4th floor Gatineau QC K1A 1K8 819-994-3741 1-800-387-3557 www.tsb.gc.ca [email protected] © Her Majesty the Queen in Right of Canada, as represented by the Transportation Safety Board of Canada, 2017 Railway Investigation Report R16T0162 Cat. No. TU3-6/16-0162E-PDF ISBN 978-0-660-09197-6 This report is available on the website of the Transportation Safety Board of Canada at www.tsb.gc.ca Le présent rapport est également disponible en français. The Transportation Safety Board of Canada (TSB) investigated this occurrence for the purpose of advancing transportation safety. It is not the function of the Board to assign fault or determine civil or criminal liability. Railway Investigation Report R16T0162 Main-track train collision and derailment Canadian Pacific Railway Freight trains 235-21 and 118-18 Mile 3.3, North Toronto Subdivision Toronto, Ontario 21 August 2016 Summary On 21 August 2016, at approximately 0517 Eastern Daylight Time, Canadian Pacific Railway freight train 118-18 was crossing from the north to the south track at approximately Mile 3.3 on the North Toronto Subdivision in Toronto, Ontario. Freight train 235-21, proceeding westward with 2 locomotives only, collided with the tail end of train 118-18. Four of train 118-18’s intermodal cars (10 platforms) were struck and damaged.
    [Show full text]
  • Bowmanville Rail Service Extension Initial Business Case Update February 2020
    Bowmanville Rail Service Extension Initial Business Case Update February 2020 Disclaimer This Initial Business Case evaluates the case for implementing rail service to Bowmanville on the Lakeshore East corridor through various alignments and service patterns. The options presented are based on Metrolinx’s initial view of achievable alignments and service patterns on a shared rail corridor, and the infrastructure requirements to enable the service extension. Variations in the preferred alignment’s infrastructure scope and/or service pattern will be assessed through a Preliminary Design Business Case. This business case uses the future GO Expansion electrified service on the Lakeshore East corridor to Oshawa as the baseline for analysis. As this project advances through the business case lifecycle, future analyses will consider the effects of re-baselining the existing service levels. All figures within this Initial Business Case Update represent preliminary results. Forecasted costs, revenues and ridership figures are at a high level and will be subject to refinement as analysis of the Bowmanville Rail Extension proceeds to the Preliminary Design Business Case phase, and later analyses in the Business Cases lifecycle. Bowmanville Rail Service Extension Initial Business Case Update February 2020 Contents Executive Summary vii Introduction vii Options for Analysis vii Method of Analysis x Ridership x Business Case Results xi 1. Introduction 1 Background 2 Business Case Overview 2 2. Problem Statement 5 Introduction 6 Case for Change 6 3. Investment Options 14 Introduction 15 Study Area 15 Option Development 16 Option Scoping 18 Service Patterns 20 New Stations (All Options) 20 iv 4. Strategic Case 21 Introduction 22 Strategic Evaluation: Alignment with Objectives 22 Strategic Evaluation: Alignment with Goals 24 Strategic Case Summary 43 5.
    [Show full text]
  • Railway Investigation Report R07t0110
    RAILWAY INVESTIGATION REPORT R07T0110 MAIN-TRACK DERAILMENT CANADIAN NATIONAL TRAIN M36321-26 MILE 264.94, KINGSTON SUBDIVISION COBOURG, ONTARIO 28 APRIL 2007 The Transportation Safety Board of Canada (TSB) investigated this occurrence for the purpose of advancing transportation safety. It is not the function of the Board to assign fault or determine civil or criminal liability. Railway Investigation Report Main-Track Derailment Canadian National Train M36321-26 Mile 264.94, Kingston Subdivision Cobourg, Ontario 28 April 2007 Report Number R07T0110 Summary At approximately 1044 eastern daylight time on 28 April 2007, westward Canadian National freight train M36321-26, travelling at 46 mph, experienced a train-initiated emergency brake application and derailed at Mile 264.94 of Canadian National’s Kingston Subdivision in Cobourg, Ontario. A Herzog track maintenance machine and 21 empty multi-level cars derailed. During the derailment, the fuel tank on the Herzog multi-purpose maintenance-of- way power unit was punctured, spilling approximately 9084 litres (2400 gallons) of diesel fuel. The fuel ignited, setting fire to approximately 1000 feet of track structure, including the Burnham Street level crossing. The local fire department responded and extinguished the fire. There were no injuries. Ce rapport est également disponible en français. - 2 - Other Factual Information On 28 April 2007, at 0440 eastern daylight time, 1 Canadian National (CN) freight train M36321-26 (train 363) arrived at Belleville, Ontario, destined for Toronto, Ontario. A crew change was made, and the empty Herzog multi-purpose maintenance-of-way equipment (Herzog machine), composed of a 430-foot articulated flat/gondola car combination (HZGX1750) and a Herzog locomotive (HZGX175), was marshalled at the head end of the train behind three high-capacity dynamic brake (DB) locomotives 2 and ahead of 45 empty multi-level cars.
    [Show full text]
  • Uinta Basin Railway Project
    PROPOSAL Professional Services for Engineering, Environmental, Permitting, Right-of-Way Planning, and Related Services Seven County Infrastructure Coalition Uinta Basin Railway Project November 1, 2018 November 1, 2018 ATTN: Mike McKee, Executive Director Seven County Infrastructure Coalition via secure link upload RE: Uinta Basin Railway Project Dear Mike McKee and Selection Committee Members: HDR is eager to help the Seven County Infrastructure Coalition deliver railroad service to the Uinta Basin by December 1, 2023. We know you need to complete your railroad with the least engineering, permitting, and construction cost, and the fastest possible environmental clearance. HDR has the vision and the proven methods to deliver your desired results. We understand the strategic value of speed to market. Our team has the experience and drive to accomplish this. From the 1,500-mile Alberta to Alaska Railway to the 150-mile CN-EJ&E merger to the 30-mile New Orleans & Gulf Coast, we have successfully delivered Surface Transportation Board (STB) and Federal Railroad Administration (FRA) environmental approvals, grants, loans and engineering for the largest freight railway projects across North America. Our team has been assembled for its experience, commitment, and performance. We possess the right blend of local knowledge and national expertise. We have partnered with Johansen & Tuttle Engineering, Juliano Consulting, Sunrise Engineering and other specialty consultants who also have deep Uinta Basin project experience and stakeholder understanding. Our outstanding Project Manager, Mark Hemphill, is a client-oriented professional with a proven track record in all of the skills needed to plan, engineer, permit, and construct a large greenfield railway.
    [Show full text]
  • Rail Transportation Safety Investigation Report R19c0002
    RAIL TRANSPORTATION SAFETY INVESTIGATION REPORT R19C0002 NON–MAIN-TRACK COLLISION AND DERAILMENT Canadian Pacific Railway Yard Assignment CW11-06 Alyth Classification Yard Calgary, Alberta 06 January 2019 ii | TRANSPORTATION SAFETY BOARD OF CANADA ABOUT THIS INVESTIGATION REPORT This report is the result of an investigation into a class 3 occurrence. For more information, see the Policy on Occurrence Classification at www.tsb.gc.ca The Transportation Safety Board of Canada (TSB) investigated this occurrence for the purpose of advancing transportation safety. It is not the function of the Board to assign fault or determine civil or criminal liability. TERMS OF USE Use in legal, disciplinary or other proceedings The Canadian Transportation Accident Investigation and Safety Board Act states the following: • 7(3) No finding of the Board shall be construed as assigning fault or determining civil or criminal liability. • 7(4) The findings of the Board are not binding on the parties to any legal, disciplinary or other proceedings. Therefore, the TSB’s investigations and the resulting reports are not created for use in the context of legal, disciplinary or other proceedings. Notify the TSB in writing if this report is being used or might be used in such proceedings. Non-commercial reproduction Unless otherwise specified, you may reproduce this investigation report in whole or in part for non-commercial purposes, and in any format, without charge or further permission, provided you do the following: • Exercise due diligence in ensuring the accuracy of the materials reproduced. • Indicate the complete title of the materials reproduced and name the Transportation Safety Board of Canada as the author.
    [Show full text]
  • Memr Emiswims
    INCORPORATED 1952 NUMBER 470 DECEMBER 1988 memr emiswiMs UPPER CANADA RAILWAY SOCIETY BOX 122 STATION "A" TORONTO, ONTARIO THE CPR station in PeterborouKh, Ont., whlcb tbe city nlans to take over and convert to a tourist information centre, possibly moving in tbe process (see November NEWSLETTER). The brick structure is located on George St., in tbe downtown area; VIA uses a shelter erected adjacent to tbe station, rather than pay CP rent for use of this facility. —Charlie Randall photo CNR K5a Hudson is towed through Bayview Junction on Oct. 22, 1988, en route to a new display site at St. Thomas, Ont. Note the main rod removed and stored on the running hoard to permit movement at track speed. The engine, ex-5703, is one of five 4-6-4s built for CN in 1930; sister 5702 survives at the CRHA Delson museum near Montreal. The CNR, ex-Grand Trunk Burlington West (formerly Burlington) station on Brant St., recently abandoned by VIA in favour of a new joint facility with GO Transit about half a mile to the east. The venerable building's future is not known, but railfans v/ould be wise to aim their cameras at it without delay. —Ben Mills photo December 1988 UGRS Newsletter 3 RECENT COMMUTER Omaro Government of Ontario Traneft BULLETINS GO TRAIN HONOR FARE SYSTEM STARTS OCTOBER 30 Beginning October 30, a new ticketing system called Proof of Payment, or POP, will put GO Train passengers on their honor. Under the new system, which takes effect on the Lakeshore line on Sunday the 30th, and on the weekday-service Georgetown, Milton, Richmond Hill, Bradford, and Stouffville lines en Monday the 31st, GO Train riders will no longer have to deposit their ticket or - show their pass to an attendant when entering and exiting" stations, instead', they will need to produce proof of fare payment — a valid ticket or pass — only when asked to in spot checks by GO's transit enforce- -ment; officers.
    [Show full text]
  • Railway Investigation Report R14t0160
    RAILWAY INVESTIGATION REPORT R14T0160 MAIN TRACK DERAILMENT CANADIAN NATIONAL RAILWAY FREIGHT TRAIN M-310-31-09 MILE 127.52, KINGSTON SUBDIVISION BROCKVILLE, ONTARIO 10 JULY 2014 The Transportation Safety Board of Canada (TSB) investigated this occurrence for the purpose of advancing transportation safety. It is not the function of the Board to assign fault or determine civil or criminal liability. Railway Investigation Report R14T0160 Main track derailment Canadian National Railway Freight train M-310-31-09 Mile 127.52, Kingston Subdivision Brockville, Ontario 10 July 2014 Summary On 10 July 2014, at approximately 0410 Eastern Daylight Time, while proceeding eastward at 60 miles per hour, approaching Brockville, Ontario, Canadian National freight train M-310- 31-09 derailed 26 cars at Mile 127.52 on the Kingston Subdivision. The derailed cars included 13 residue tank cars which last contained aviation fuel (UN1863). A small amount of product was released. There were no injuries. Le présent rapport est également disponible en français. Railway Investigation Report R14T0160 | 1 Factual information The accident On 09 July 2014, at approximately 2205,1 Canadian National (CN) freight train M-310-31-09 (the train) departed MacMillan Yard in Toronto, Ontario, destined for Montréal, Quebec (Figure 1). The train consisted of 2 head-end locomotives and 68 cars (29 loaded cars, 23 empty cars, and 16 residue tank cars). It weighed about 4664 tons and was approximately 4808 feet long. Prior to departure, the train received an inspection from a certified car inspector and a number 1 air brake test was performed. Figure 1. Derailment location (Source: Railway Association of Canada, Canadian Railway Atlas, with TSB annotations) After departure, the train proceeded on the Kingston Subdivision, stopping at Belleville, Ontario, (Mile 219.50) for a crew change.
    [Show full text]
  • Canadian Railway Observations
    50 • ES EN TA E BL É IS D H ISSN 0008-4875 N E O D CANADIAN RAIL Postal Permit No. 40066621 F PUBLISHED BI-MONTHLY BY THE CANADIAN RAILROAD HISTORICAL ASSOCIATION TABLE OF CONTENTS In Service to a Nation’s ‘Dream’, By Raymond S. Farand. 51 Stan’s Photo Gallery, By Stan J. Smaill. 70 Disaster at Almonte, By Stan J. Smaill . 96 FRONT COVER: Meet at ‘RV’!. Westbound No. 1, in the charge of VIA F40PH-2 6443, is at Chalk River on a chilly – but clear - January 13, 1990 as CPR transcontinental time freight 482 prepares to change crews and head for Smiths Falls. Number 482’s predecessor was No. 952, the so-called ‘Seaboard’ freight because it operated literally from coast to coast on the CPR system. Raymond Farand. BELOW: The last westbound CP Rail transcontinental passenger train between Montréal and Vancouver arrives on Track 4 at Ottawa Station on October 28, 1978. The ensuing VIA years will see many changes occur in and around the station complex including the total dismantlement of the coach yard visible to the left of ‘The Canadian’, along with the removal from service of the steam plant visible near Track 10 at the southern edge of the property. William H. Coo. PAGE COUVERTURE : La F-40PH-2 6443 de VIA est en tête du train no 1 «The Canadian » en direction ouest à Chalk River, Ontario, en cette belle et froide journée du 13 janvier 1990, au moment d’une rencontre avec le train de marchandises transcontinental du CP 482, qui fait un arrêt de changement d’équipe avant de continuer vers Smith Falls.
    [Show full text]
  • The VIA 1-4-10 Plan a Recovery Strategy for Canada’S Rail Passenger Service
    The VIA 1-4-10 Plan A Recovery Strategy for Canada’s Rail Passenger Service For Transport AcAon Canada By Greg Gormick On Track Strategies November 6, 2015 Table of Contents Acknowledgements.....................................................................................................iv Execu:ve Summary......................................................................................................v 1.0 Se@ng a New Course for VIA.................................................................................1 2.0 The Founda:on of VIA’s Recovery.........................................................................3 2.1 A New Rail Passenger Ac:on Force...................................................................4 2.2 A Reformed and Informed Board of Directors...................................................6 2.3 Managerial Redirec:on.....................................................................................7 2.4 A Clear Legisla:ve Mandate............................................................................10 3.0 Overhauling the Freight Railway Rela:onship.....................................................15 4.0 Modernizing VIA’s Fleet.......................................................................................23 4.1 Rolling Stock...................................................................................................26 4.2 Mo:ve Power.................................................................................................30 4.3 Fleet Procurement..........................................................................................33
    [Show full text]
  • Revitalizing New Brunswick's Rail Sector Report
    Revitalizing New Brunswick’s Rail Sector By Greg Gormick for The Cites of Moncton, Dieppe, Bathurst and Miramichi The Town of Riverview Enterprise Greater Moncton December 30, 2013 ON THE COVER (Clockwise from top lef) First Intercolonial train into Dalhousie, New Brunswick, June 30, 1884 (Canada Science and Technology Museum CN Collecton, Image CN008379) VIA Rail Canada’s Oceans meet near Belmont, Nova Scota, August 13, 2005 (Photo by Alan Macek) Moncton-rebuilt VIA Rail Canada RDCs west of Jasper, Alberta, November 29, 2013 (Photo by Tim Stevens) CN container train crossing the Salmon River Bridge on the Napadogan Subdivision, 1974 (Canada Science and Technology Museum CN Collecton, Image CN000162) © 2013 by Greg Gormick and Transport Acton Atlantc Table of Contents Acknowledgments ............................................................................. iii Executive Summary ........................................................................... v 1.0 New Brunswick Railroading in Turmoil ...................................... 1 2.0 A New Brunswick Railway Primer .............................................. 3 2.1 The Pioneer Era ....................................................................... 3 2.2 Growth and Competition ......................................................... 5 2.3 The Great Canadian Railway Fiasco ......................................... 5 2.4 The CN Era .............................................................................. 7 2.5 The Maritime Railway Retreat ................................................
    [Show full text]
  • Railway Investigation Report R15v0183
    RAILWAY INVESTIGATION REPORT R15V0183 Main-track train collision Canadian Pacific Railway Freight trains 602-242 and 113-01 Mile 62.0, Mountain Subdivision Beavermouth, British Columbia 06 September 2015 Transportation Safety Board of Canada Place du Centre 200 Promenade du Portage, 4th floor Gatineau QC K1A 1K8 819-994-3741 1-800-387-3557 www.tsb.gc.ca [email protected] © Her Majesty the Queen in Right of Canada, as represented by the Transportation Safety Board of Canada, 2017 Railway Investigation Report R15V0183 Cat. No. TU3-6/15-0183E-1-PDF ISBN 978-0-660-09304-8 This report is available on the website of the Transportation Safety Board of Canada at www.tsb.gc.ca Le présent rapport est également disponible en français. The Transportation Safety Board of Canada (TSB) investigated this occurrence for the purpose of advancing transportation safety. It is not the function of the Board to assign fault or determine civil or criminal liability. Railway Investigation Report R15V0183 Main-track train collision Canadian Pacific Railway Freight trains 602-242 and 113-01 Mile 62.0, Mountain Subdivision Beavermouth, British Columbia 06 September 2015 Summary On 06 September 2015, at approximately 0223 Pacific Daylight Time, Canadian Pacific Railway Train 602-242, travelling eastward on the main track of the Mountain Subdivision, collided with westbound Canadian Pacific Railway Train 113-01, which was entering the siding track near Beavermouth, British Columbia. As a result of the collision, 2 locomotives and the first car behind the locomotives on train 602-242 as well as one set of trucks on the 64th car on train 113-01 derailed.
    [Show full text]