Final Report Dioxin-Like Toxicity in the Saginaw Bay

Total Page:16

File Type:pdf, Size:1020Kb

Final Report Dioxin-Like Toxicity in the Saginaw Bay FINAL REPORT DIOXIN-LIKE TOXICITY IN THE SAGINAW BAY WATERSHED GREAT LAKES NATIONAL PROGRAM OFFICE GRANT PROJECT # GL965334010 AND PBDE DISTRIBUTION IN THE SAGINAW BAY WATERSHED GREAT LAKES NATIONAL PROGRAM OFFICE GRANT PROJECT # GL96558601-0 Prepared by Michigan Department of Environmental Quality Allan B. Taylor, Deborah R. MacKenzie-Taylor, Arthur Ostaszewski, John M. McCabe May 2, 2006 Revised August 31, 2006 Dioxin-Like Toxicity in the Saginaw Bay Watershed GLNPO Grant Project # GL965334010 PDDE Distribution in the Saginaw Bay Watershed GLNPO Grant Project # GL96558601-0 Table of Content List of Tables................................................................................................................................ iii List of Figures .............................................................................................................................. iv Abstract 1 Introduction 2 General......................................................................................................................................2 Study Area.................................................................................................................................3 Background ...............................................................................................................................4 Previously Collected Information: Dioxins, Furans, and Coplanar PCBs .............................4 Previously Collected Information: PBDEs.............................................................................4 Study Objectives .......................................................................................................................5 Materials and Methods..................................................................................................................5 Sample Collection .....................................................................................................................5 Floodplain Soils .....................................................................................................................6 Sediment Grab Samples........................................................................................................6 Sediment Core Samples........................................................................................................7 Sample Analysis........................................................................................................................8 Table 1. Laboratory Analysis and Preparation Methods.......................................................8 Results 9 Table 2. Sample Allocation by Location, Type, and Lab.......................................................9 Distribution of TEQ (Dioxins, Furans, and Coplanar PCBs) Concentrations...........................10 Floodplain TEQ Results ..........................................................................................................11 Table 3. Shiawassee River Floodplain Total TEQ in ppt ....................................................11 Table 4. Saginaw River Floodplain Total TEQ in ppt..........................................................12 Table 5. Saginaw Bay Floodplain Total TEQ in ppt ............................................................14 SEDIMENT TEQ RESULTS....................................................................................................15 Table 6. Shiawassee River Sediments Total TEQ in ppt....................................................15 Table 7. Saginaw River Sediments Total TEQ in ppt .........................................................16 Table 8. Saginaw Bay Sediments Total TEQ in ppt............................................................17 Distribution of PBDE Concentrations ......................................................................................17 Floodplain Soils PBDE Summary Results...............................................................................18 Table 9. Shiawassee River Floodplain PBDE Summary Results in ppb ............................18 Table 10. Saginaw River Floodplain PBDE Summary Results in ppb ................................19 Table 11. Saginaw Bay Floodplain PBDE Summary Results in ppb ..................................20 Sediment PBDE Summary Results .........................................................................................21 Table 12. Shiawassee River Sediment PBDE Summary Results in ppb............................21 Table 13. Saginaw River Sediment PBDE Summary Results in ppb .................................22 Table 14. Saginaw Bay Sediment PBDE Summary Results in ppb....................................24 Quality Assurance and Quality Control – Dioxins, Furans, and Coplanar PCBs ........................24 Table 15. Quality Control Limits..........................................................................................24 Accuracy..................................................................................................................................25 2004 Survey Lab Accuracy .....................................................................................................25 Total TEQ Field Replicates .....................................................................................................25 Table 16. Total TEQ FR Results.........................................................................................26 Representativeness.................................................................................................................26 2004 Survey Representativeness ...........................................................................................26 Comparability ..........................................................................................................................26 2004 Survey Comparability .....................................................................................................26 Table 17. NY Lab vs. Eno River Lab Total TEQ Results in ppt ..........................................27 Completeness .........................................................................................................................27 2004 Survey Completeness ....................................................................................................28 i Dioxin-Like Toxicity in the Saginaw Bay Watershed GLNPO Grant Project # GL965334010 PDDE Distribution in the Saginaw Bay Watershed GLNPO Grant Project # GL96558601-0 Quality Assurance and Quality Control - PBDEs.....................................................................28 Table 18. Quality Control Limits..........................................................................................28 Accuracy..................................................................................................................................28 2004 Survey Lab Accuracy .....................................................................................................28 Total PBDE FR........................................................................................................................28 Table 19. Total PBDE FR Results ......................................................................................29 Representativeness.................................................................................................................29 2004 Survey Representativeness ...........................................................................................29 Comparability ..........................................................................................................................29 2004 Survey Comparability .....................................................................................................29 Completeness .........................................................................................................................29 2004 Survey Completeness ....................................................................................................30 Discussion 30 Dioxins, Furans, and Coplanar PCBs......................................................................................30 Shiawassee River ................................................................................................................30 Saginaw River......................................................................................................................30 Saginaw Bay........................................................................................................................31 PBDEs.....................................................................................................................................32 Shiawassee River ................................................................................................................32 Saginaw River......................................................................................................................32 Saginaw Bay........................................................................................................................33 Table 20. Total TEQ Floodplain Soil Results......................................................................33 Table 21. Total TEQ Sediment Results ..............................................................................34 Conclusions and Recommendations ..........................................................................................34 Dioxins, Furans, and Coplanar PCBs Conclusions .................................................................34
Recommended publications
  • Thompson Lake Livingston County, T3N R4E,5E Section 25, 30, 31,36 Shiawassee River Watershed
    Michigan Department of Natural Resources 2006-21 Status of the Fishery Resource Report Page 1 Thompson Lake Livingston County, T3N R4E,5E Section 25, 30, 31,36 Shiawassee River Watershed Joseph M. Leonardi Environment Thompson Lake is located in the city limits of Howell in central Livingston County. It is an impoundment of Alger Creek, a tributary to Bogue Creek, which drains to the South Branch Shiawassee River. The South Branch Shiawassee River flows northerly to the mainstem Shiawassee River and to the Saginaw River and Lake Huron. The Howell area lies within the Ionia district of the Southern Lower Michigan Regional Landscape Ecosystem and is characterized by features identified in the Lansing sub-district (Albert 1995). The Lansing sub-district is described as gently sloping ground moraine broke by outwash channels and numerous end-moraine ridges. Undulating topography formed alternating well drained rises and poorly drained depressions of variable soils. Soils on raised moraines generally consist of medium texture sand and loam while depressions along end moraine ridges are typically fine texture, high in organic content. Outwash channels developed by glacial retreat generally formed the river and stream drainage pattern of the watershed. Shiawassee River basin groundwater and surface water patterns follow geological soils types. Medium textured soils found in the Howell area allow for greater permeability and hydraulic head pressure (groundwater elevation) resulting in groundwater deposits. Most groundwater deposits in the Shiawassee River watershed are largely concentrated in southern and southeastern portions where Thompson Lake is located (Cooper 2005). Groundwater inflow to Thompson Lake provides a stable water source necessary to maintain the aquatic ecosystem.
    [Show full text]
  • Shiatown Dam Assessment: Guiding a Community Decision for Action
    SHIATOWN DAM ASSESSMENT: GUIDING A COMMUNITY DECISION FOR ACTION PREPARED FOR: FRIENDS OF THE SHIAWASSEE RIVER BY: DAVID CHADWICK MEGAN HEARNE MICHAEL SCHULLER JOSEPH SHORT A PROJECT SUBMITTED IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE DEGREE OF MASTER OF SCIENCE OF NATURAL RESOURCES AND ENVIRONMENT UNIVERSITY OF MICHIGAN SCHOOL OF NATURAL RESOURCES AND ENVIRONMENT APRIL 2003 FACULTY ADVISORS: ASSOCIATE PROFESSOR MICHAEL MOORE ADJUNCT PROFESSOR PAUL SEELBACH Abstract The Shiatown Dam is in disrepair and potentially threatens life and property. It nearly failed during a high water event in February 2001. Shiatown Dam is a run-of-the-river structure in the Shiawassee River, a low gradient, warm water river that drains 1260 square miles of central Michigan. The dam no longer serves an economic purpose, and many of the recreational benefits of the impoundment have disappeared as a result of dam deterioration, sedimentation and poor water quality. County residents and the owner, the Michigan Department of Natural Resources, agree that action is necessary to prevent failure of the dam and to restore the value of the site. We defined the relative merits of dam repair, replacement, and removal by conducting ecological, social, and economic assessments at local and watershed levels. The cornerstone of our social assessment was a mail survey of 1500 people with a 43% response rate. Respondents greatly value the dam and river for historic significance and passive recreational opportunities. Survey results show 78% support restoring the dam despite known problems at the site. The Michigan Department of Environmental Quality, dam safety regulator for the state, has recommended major repairs for all parts of the dam.
    [Show full text]
  • PARKS, RECREATION and OPEN SPACE PLAN 2017-2021
    SHIAWASSEE COUNTY PARKS, RECREATION and OPEN SPACE PLAN 2017-2021 Shiawassee County Five-Year Parks Recreation and Open Space Plan 2017-2021 1 DEDICATION AND ACKNOWLEDGEMENTS This Parks, Recreation and Open Space Plan is dedicated to the citizens of Shiawassee County and to all the visitors and tourists who wish to engage the outdoors of our country scenic landscape through the use of our County Parks and all of the other spacious and well-equipped public recreational outlets available in our County community. ACKNOWLEDGEMENTS: SHIAWASSEE COUNTY BOARD OF COMMISSIONERS The Shiawassee County Board of Commissioners provided the funding for a new Plan and will oversee the public hearings, adoption and future budgeting processes. The elected members are: Hartmann Aue, Owosso Chair-District 1 John Horvath, Owosso District 2 Gary Holzhausen, Owosso/Corunna District 3 Les Schneider, Durand District 4 Jeremy Root, Byron District 5 Jeff Bartz, Owosso Vice-Chair & District 6 John Plowman, Perry District 7 SHIAWASSEE COUNTY PARKS AND RECREATION COMMISSION The Commission guided the planning process and provided oversight for the public input phase of the project. Year to year the Commission proposes a budget, elects officers, oversees park operations, secures philanthropy and volunteerism, and schedules improvements. The appointed members are: Cody Baker, Owosso Chair, At-Large Appointee Tony Newman, Corunna Vice-Chair/Shiawassee County Drain Commissioner Bonnie Reno, Corunna Secretary, At-Large Appointee Robert Downer, Bancroft At-Large Appointee
    [Show full text]
  • Indian Dave Article
    INDIAN DAVE The following are two newspaper articles on Indian Dave and an obituary. All from local newspapers. Three different sons are mentioned in the articles. Bill, John and James. --Dave Celani 05-10-1907 Vassar Times MORE ABOUT INDIAN DAVE Followed by his faithful son, "John" old "Indian Dave" as he is so familiarly known throughout the length and breadth of Tuscola county stepped into Vassar about noon Tuesday covered with mud and slush. Dave earned a huddle of bows, arrows, whip stalks and gun-wipers all made of the very best grade of hickory, which he endeavored to sell about town. John carried a sack containing the carcasses of a couple of muskrats, a number of hides and several traps. The inseparable pair, upon reaching the city made a bee-line for a place that served free lunch where they filled up, but owing to the exactness of the law, were unable to obtain a drop of liquor of any kind with which to wash down their eatables. Wednesday they started for Tuscola where Dave claims to have a canoe that he hides in a certain place and is always able to find when His eyes are still as bright, his step as quick and wanted. He does not think that a person has ever yet firm, and his glossy hair as black as when he discovered its hiding place. He will spend the next followed his chieftain father, as his son now follows few weeks trapping along the river from Tuscola to him, single file, through the primeval forests before the Shiawassee river and will do some fishing on the sound of the settlers ax and the hum of the white the side.
    [Show full text]
  • The Shiawassee River Canoe/Kayak Guide January 2, 2017
    The Shiawassee River Canoe/Kayak Guide January 2, 2017 Author: Phil Hathaway, and Member— Friends of the Shiawassee River For Its Course Principally through Shiawassee County, Michigan General Information. The Shiawassee River corridor has been called a “country scenic” valley with farm fields and forested flood plains and embankments forming the landscape. With a few exceptions, the Shiawassee River’s course in Shiawassee County is great for beginners with some interesting riffles and obstructions in the way of rocks and tree falls that provide a challenge for some. Frequent changes in the river height from storms or spring melt raise the navigation conditions to intermediate and advanced status and these high water periods are not recommended for beginners. There are six impoundments/dams along the way: Shiatown (partially dismantled and now 4 feet high, removal in summer, 2017), Corunna (5 feet high; removal summer, 2017), Parshallburg (partially dismantled) the Byron Mill Pond Dam, and the three impoundments (“weirs”) in Owosso. Only the Owosso weirs and Parshallburg impoundments are navigable and are recommended for canoeists with some experience. All the impoundment structures may be portaged with the temporary exceptions of the Shiatown and Corunna dams that will be removed. Another obstruction, a concrete deck, is located upstream from Corunna at the brick factory site and requires a sweep to the south embankment to navigate through a properly sized culvert. Except for flood stage or high water, the boating season is year-round for the hardiest. The ‘ordinary person’ season extends from mid-April to late October with a pre-trip check advised on low flow conditions that can occur anytime.
    [Show full text]
  • Restoring the Shiawassee Flats
    UNIVERSITY OF MICHIGAN SCHOOL OF NATURAL RESOURCES & ENVIRONMENT Restoring the Shiawassee Flats Estuarine Gateway to Saginaw Bay Prepared by: Janet Buchanan, Seta Chorbajian, Andrea Dominguez, Brandon Hartleben, Brianna Knoppow, Joshua Miller, Caitlin Schulze, Cecilia Seiter with historical land use analyses by Yohan Chang A project submitted in partial fulfillment of the requirements for the degree of Master of Science at the University of Michigan April 2013 Client: Shiawassee National Wildlife Refuge Faculty advisors: Dr. Michael J. Wiley, Dr. Sara Adlerstein-Gonzalez, Dr. Kurt Kowalski (USGS-GLSC) Preface In 2011, the U.S. Fish & Wildlife Service and Ducks Unlimited received a $1.5 million Sustain Our Great Lakes grant for the first phase of a wetland restoration project at the Shiawassee National Wildlife Refuge, outside Saginaw, Michigan. The ambitious project seeks to hydrologically reconnect a 2,260-acre complex of bottomland farm fields and diked wetlands to the dynamic river systems surrounding the Refuge. The goals of this restoration are to provide fish, birds, and insects with access to a large, restored wetland complex both through hydrologic reconnection and wetland restoration; and to contribute to the delisting of at least three of the Beneficial Use Impairments in the Saginaw River/Bay Area of Concern, just downstream of the Refuge. Phase I of the restoration project involves the conversion of 940 acres of former farmland, now owned by the Refuge, to ecologically productive wetland, and its hydrologic reconnection to the Shiawassee and Flint Rivers. The grant for Phase I included enough funds to complete the design, engineering, and implementation of the project.
    [Show full text]
  • Status of the Fishery Resource Report, 2016-220, Shiawassee River
    Michigan Dept. of Natural Resources 2016-220 Status of the Fishery Resource Report Page 1 Shiawassee River - Chesaning Rock Ramp Saginaw County, T09N/R03E/S16 Shiawassee River Watershed Joseph M. Leonardi, Fisheries Biologist Environment The Shiawassee River is one of four principle tributaries of the Saginaw River located in southeast Michigan (Figure 1). Originating in Oakland County, the Shiawassee River flows northerly for 110 miles before it joins the Flint, Cass, and Tittabawasee rivers to form the Saginaw River. The Saginaw River flows to Saginaw Bay of Lake Huron. The Village of Chesaning is located on the Shiawassee River in southern Saginaw County approximately 15 miles upstream of its confluence with the Saginaw River (Figure 1). Chesaning is a semi-rural community with a population of approximately 2,500. Residential housing, small businesses, and recreational park populate the 3 square mile Village limits. Agriculture dominates landuse outside of the Village limits. History Chesaning Dam was a centerpiece for the Village and enabled navigation of the Chesaning Showboat in the upstream impoundment giving credence to the Village moniker as "Showboat City". Since 1937, the Village hosted the "Chesaning Showboat Festival" which was key to the community's cultural identity and economic vitality. Chesaning Dam was built in 1863 for grist mill operations. The dam was a fixed crest "rock-crib" style structure covered with concrete and spanned 211 feet. The dam had a structural height of 9 feet and impounded an estimated 17 acres of water. Michigan Department of Environmental Quality (MDEQ) classified it as a low hazard dam. Current Status Although Chesaning Dam had been in need of repair for a number of years, conditions worsened in March 2005 when a center portion collapsed requiring emergency repair (Figure 2).
    [Show full text]
  • Shiawassee County, Michigan (All Jurisdictions)
    SHIAWASSEE COUNTY, MICHIGAN (ALL JURISDICTIONS) Community Community Community Community Name Number Name Number *ANTRIM, TOWNSHIP OF 261162 NEW LOTHROP, VILLAGE OF 260924 BANCROFT, VILLAGE OF 260520 *OVID, VILLAGE OF 260318 BENNINGTON, TOWNSHIP OF 261163 OWOSSO, CHARTER 260809 BURNS, TOWNSHIP OF 260762 TOWNSHIP OF BYRON, VILLAGE OF 260601 OWOSSO, CITY OF 260596 CALEDONIA, CHARTER 260300 *PERRY, CITY OF 261182 TOWNSHIP OF *PERRY, TOWNSHIP OF 261156 CORUNNA, CITY OF 260602 RUSH TOWNSHIP OF 260522 *DURAND, CITY OF 261181 *SCIOTA, TOWNSHIP OF 261157 *FAIRFIELD, TOWNSHIP OF 261164 SHIAWASSEE, 260523 HAZELTON, TOWNSHIP OF 260925 TOWNSHIP OF Shiawassee County *LAINGSBURG, CITY OF 260950 VENICE, TOWNSHIP OF 261158 *LENNON, VILLAGE OF 261183 VERNON, TOWNSHIP OF 261159 MIDDLEBURY, TOWNSHIP OF 261155 VERNON, VILLAGE OF 260524 *MORRICE, VILLAGE OF 261184 *WOODHULL, 261160 NEW HAVEN, TOWNSHIP OF 260521 TOWNSHIP OF *No Special Flood Hazard Areas Identified Preliminary: FLOOD INSURANCE STUDY NUMBER 26155CV000A NOTICE TO FLOOD INSURANCE STUDY USERS Communities participating in the National Flood Insurance Program have established repositories of flood hazard data for floodplain management and flood insurance purposes. This Flood Insurance Study (FIS) report may not contain all data available within the Community Map Repository. Please contact the Community Map Repository for any additional data. The Federal Emergency Management Agency (FEMA) may revise and republish part or all of this FIS report at any time. In addition, FEMA may revise part of this FIS report by the Letter of Map Revision process, which does not involve republication or redistribution of the FIS report. Therefore, users should consult with community officials and check the Community Map Repository to obtain the most current FIS report components.
    [Show full text]
  • Directoryfinal.Pdf
    Choose The Best. Choose Memorial. What if everyone cared like family?mily? At Memorial Healthcare, we understandd the power of compassion and are committed to being there for your family. That’s why we have a location right around the corner, with excellent providers you can trust, people who know you as neighbors, because this iss more than us helping patients, this is family. We are always there when it counts. Find a provider that’s right for you and your family by visiting our all new web site at memorialhealthcare.org. For more information, visit memorialhealthcare.org Caroline D. Wilson (R) County Clerk 208 N. Shiawassee Street Corunna, Michigan 48817 Vital Records: (989) 743-2242 Circuit Court Records: (989) 743-2262 Fax: (989) 743-2241 www.shiawassee.net Shiawassee Residents: As your Shiawassee County Clerk, it is my pleasure to provide the most up-to-date di- rectory as a tool for you to interact with your governmental community. This is a great resource to utilize when in need of contacting local, state and national offices as well as, local departments, agencies, schools, libraries, cities, townships and villages within Shiawassee County. It is my goal to provide you with all the vital services needed to thrive and also to improve your quality of life in providing these services. We will continue to work hard to be prepared, responsible and transparent. This Directory has been compiled with a team of individuals reflecting the posi- tive movement in Shiawassee County. The collaborative efforts of Elected Officials, Department Heads, School Officials, County Employees, Local Clerks and Local Businesses are thoroughly demonstrated within the following pages.
    [Show full text]
  • Navigable Waters of the United States Within the Regulatory Jurisdiction of the U.S
    Appendix I Section 10 Waters OHWM Lake Federal State Lake Michigan 580.5 581.5 Lake Superior 602.6 603.6 Lake Huron 580.5 581.5 Lake St. Clair 575.3 576.3 Lake Erie 572.2 573.2 USACE Public Notice application can be tracked at http://www.lre.usace.army.mil/functions/rf/html/pncur.htm NAVIGABLE WATERS OF THE UNITED STATES WITHIN THE REGULATORY JURISDICTION OF THE U.S. ARMY CORPS OF ENGINEERS DETROIT DISTRICT Updated: 7 January 2010 In administration of the laws enacted by Congress for the protection and preservation of the navigable waters of the United States, the Detroit District, under the authority of the Rivers and Harbors Act of 1899, currently exercises jurisdiction over the waterways listed below. Where applicable, we have listed the known or approximate upstream extent of our jurisdiction under the Rivers and Harbors Act. With respect to an upper limit to navigability, a river will, at some point along its length, change from navigable to non-navigable. Very often that point will be at a major fall or rapids, or other place where there is a marked decrease in the navigable capacity of the river. The upper limit is therefore often the same point traditionally recognized as the head of navigation. Navigable waters of the United States that are lakes typically do not possess a head of navigation and are usually considered to be “navigable throughout.” Examples of such “navigable throughout” waters in the Detroit District include the Great Lakes and their connecting channels. On navigable waters of the United States that are non- tidal lakes and rivers, Federal regulatory jurisdiction extends laterally to the entire water surface and bed of a waterbody, which includes all the land and waters below or waterward of the ordinary high water mark (OHWM).
    [Show full text]
  • Saginaw River/Bay Fish Tainting BUI Removal Documentation (PDF)
    UNITED STATES ENVIRONMENTAL PROTECTION AGENCY GREAT LAKES NATIONAL PROGRAM OFFICE 77 WEST JACKSON BOULEVARD CHICAGO, IL 60604-3590 SEP 2 4 2008 Mail Code: R-19J James K. Cleland, Acting Chief Water Division Michigan Department of Environmental Quality P.O. Box 30273 Lansing, Michigan 48909 Dear Mr. Cleland: This letter is the U.S. Environmental Protection Agency's (EPA) official response to your letter of July 21, 2008, requesting the delisting of the Tainting of Fish and Wildlife Flavor Beneficial Use Impairment (BUI) in the Saginaw River and Bay Area of Concern (AOC). As your request points out and the supplied data supports, the following restoration criteria for Tainting of Fish and Wildlife Flavor BUI in the Saginaw River and Bay AOC have been met: The Tainting of Fish and Wildlife Flavor BUI will be considered restored when: • No more than three reports offish tainting have been made to the MDNR or MDEQfor a period of three years; Or, if there have been reports oftaillfing: • A one-time analysis of representative fish species in an AOC in accordance with MDEQ's Great Lakes and Environmental Assessmellf Section (GLEAS) Procedure #55 for conducting taste and odor studies indicate that there is no tainting offish flavor. Based upon EPA's review of your request and the supporting data, and upon our shared desire to show progress as we move all of the Great Lakes AOCs toward restoration of all BUis and formal delisting, EPA approves your request for the delisting of the Tainting of Fish and Wildlife Flavor BUI in the Saginaw River and Bay AOC.
    [Show full text]
  • Remedial Action Plan
    Michigan Department of Natural Resources Remedial Action Plan for SAGINAW RIVER AND SAGINAW BAY Area of Concern September 1988 Michigan Department of Natural Resources Surface Water Quality Division Great Lakes and Environmental 'Assessment Section P.O. Box 30028 Lansing, Michigan 48909 PREFACE This Saginaw RiverIBay Remedial Action Plan (RAP) was prepared by the Michigan Department of Natural Resources (MDNR) from a first draft compiled for MDNR by the East Central Michigan Planning and Development Region, the National Wildlife Federation, and graduate students from the University of Michigan. The Remedial Action Section was prepared by MDNR and a regional public organization known as the Saginaw Basin Natural Resources Steering Committee. Public and technical comment was received throughout the RAP development and review process as described in Section VI. The RAP summarizes existing water quality data on the Saginaw Bay drainage basin and outlines initial perceptions of the remedial actions that should be taken to further address the eutrophication and toxic material problems in the Saginaw River and Saginaw Bay. The remedial actions presented here will be further refined in future versions of the RAP, which it is anticipated, will be periodically updated and revised as more data are acquired, remedial measures are implemented, and environmental conditions improve. ACKNOWLEDGEMENTS An extensive list of people and agencies contributed a great deal of time and effort to develop this plan. The complete list is too extensive to present
    [Show full text]