Electric Vehicle Charging Station for Toyota Level 2 EV Charging: 40A, 240V, 9.6Kw Output

Total Page:16

File Type:pdf, Size:1020Kb

Electric Vehicle Charging Station for Toyota Level 2 EV Charging: 40A, 240V, 9.6Kw Output Product Bulletin for the Toyota Electric Vehicle 40A Charging Station 40 Amp Electric Vehicle Charging Station for Toyota Level 2 EV Charging: 40A, 240V, 9.6kW output Leviton introduces its next generation electric vehicle charging station -- designed with a durable thermoplastic enclosure. The Level 2 (240V) 40A charging station was designed exclusively for the Toyota RAV4 EV and is recommended by Toyota for optimizing the onboard charger on your vehicle. Designed, tested and assembled in the United States, the new charging station will charge the RAV4 EV in approximately 5 to 6 hours. The 40A charging station includes a 25-foot charging cable, which offers flexibility in the mounting location. Features and Benefits: n Compatible with all Electric Vehicle Supply Equipment (EVSE) Standards and Recommended Practices, including SAE J1772™, NEC 625, UL 2231, and UL 2594 n Built-in communication verifies proper connection with the vehicle before charging n Auto-Reclosure feature enables charging to restart following a minor power interruption, thereby reducing the chance of being stranded with an uncharged battery 40 Amp n Ideal for home charging or light commercial applications n Plug-In unit is capable of being converted to a “hard-wired” installation if required Prius Plug-in RAV4 EV n Plug-in unit ideal for indoor applications Charger Charge Time Charge Time n Watertight NEMA Type 4 enclosure for electronic housing n Wrap-around cord management for easy storage between uses Level 1 ~3 Hours Emergency Use Only n Ground monitor interrupter circuit for additional safety Level 2, 16A ~1.5 Hours Not Recommended n Charge connector lockout hole prevents unauthorized use Level 2, 30A ~1.5 Hours ~ 6.5 - 8 Hours n Industry exclusive 10-year warranty with Leviton-certified installation Level 2, 40A ~1.5 Hours ~ 5 - 6 Hours 1-(855)-5-PLUGIN n Leviton.com/Toyota n [email protected] Features Dimensions 5.19 Cable 3.01 0.21 Cat No. EVB40-5PT Management 13.660 System provides for convenient storage Watertight and dust-tight enclosure for electronic housing Charge Connector lockout hole prevents unauthorized use 20.36 SAE J1772™ Compliant Charging Connector Status Indicator lights alert power, charging status and faults 25’ Charging Cable Length provides flexibility in Installation mounting location The charging station box can not be mounted higher than 48” and the bottom of the box no lower than 18” from the floor for indoor Cord-Connected applications only per NEC 625. For surface mount applications order (plug-in) for surface EVB40-SPT. For EVB40-5PT (flush mount) and EVB40-SPT (surface mount) the NEMA 6-50R receptacle can not be greater than 12” from mount applications* the bottom of the box. Measurement taken from the bottom of the *EVB40-SPT only mounting bracket to the middle of the receptacle. See mounting Specifications template in EVK05-M. Electrical Input EVB40-5PT Standards, Code & Recommended Practice Standards for Plugs, Receptacles and Couplers for Amperage 40A (50A dedicated circuit) UL 2251 Electric Vehicles Voltage 208VAC - 240VAC Standard for Tests for Safety-Related Controls UL 991 Breaker 50A, 2P Employing Solid-State Devices Standard for Personal Protection Systems for Electric UL 2231 Plug Configuration NEMA 6-50P Vehicle (EV) Supply Circuits Electrical Output UL 1998 Standard for Software in Programmable Components Power 9.6kW (40A @ 240V) Outline of Investigation for Electric Vehicle Supply UL 2594 Equipment SAE J1772™ Charge Connector on Charge Connector Cord 25’ (7.62m) long cable UL 62 Standard for EV Flexible Cables SAE J1772™ Electric Vehicle Conductive Charge Coupler Standard Material Specifications NEC Article 625 Electric Vehicle Charging System Equipment Enclosure Valox™ PBT Federal Communications Commission Part 15 Radio FCC Part 15 Charge Cable UL Type EV Frequency Devices Class B Residential Use Environmental Specifications EMI Per UL 2231 Radiated Immunity Risk Operating Temperature -35°C to 50°C Ordering Information Storage Temperature -50°C to 80°C Cat. No Description Enclosure NEMA Type 4 Leviton Electric Vehicle Charging Station: 40 Amp, EVB40-5PT 9.6kW output, cord-connected (plug-in), Flush Mount or Hard-Wired Leviton Electric Vehicle Charging Station: 40 Amp, EVB40-SPT For more information call 1-(855)-5-PLUGIN 9.6kW output, cord-connected (plug-in), Surface Mount or visit Leviton.com/Toyota Installation kit for plug-in application of EVB40-5PT EVK05-M or email us at [email protected] and EVB40-SPT required for plug-in applications Leviton Manufacturing Co., Inc. 201 N Service Rd, Melville, NY 11747 © 2012 Leviton Manufacturing Co., Inc. All rights reserved. Specifications subject to change without notice. J1772 is a trademark of SAE International. Toyota is a trademark of Toyota Motor Sales, U.S.A., Inc. Valox is a trademark of SABIC Innovative Plastics IP BV. 062812.
Recommended publications
  • RESIDENTIAL CHARGING STATION INSTALLATION HANDBOOK for Single-Family Homeowners and Renters
    RESIDENTIAL CHARGING STATION INSTALLATION HANDBOOK for Single-Family Homeowners and Renters Version 4.0 ©2011 Advanced Energy 1 RESIDENTIAL CHARGING STATION INSTALLATION HANDBOOK for Single-Family Homeowners and Renters Version 4.0 This handbook was made possible through the support of Duke Energy, the North Carolina Electric Membership Corporation, Dominion Energy and Plug-in NC. 2 Residential Charging Station Installation Handbook for Single-Family Homeowners and Renters CHARGING LEVELS DRIVING THE FUTURE OF TRANSPORTATION Advanced Energy is working to assist utilities, charging station vendors, municipalities and all stakeholders in understanding, planning for and Plug-in NC implementing electric transportation initiatives. As your trusted resource for advancing electric transportation, we can assist you in creating a strong foundation for successful change through: y Consulting and Planning y Technical Evaluation y Education and Outreach Our day-to-day means of transportation is changing, and the more communities and consumers know about Plug-in Electric Vehicles (PEVs), the more prepared they will be to embrace them. This handbook has been developed to assist in assessing your options for vehicle charging at a multifamily home. For more than 10 years, Advanced Energy has been collaborating with stakeholders across the United States on PEV technologies and initiatives. We share our expertise with you to simplify the integration of electric transportation into your community. Advanced Energy works with North Caroilna Stakeholders to
    [Show full text]
  • Plugged In: How Americans Charge Their Electric Vehicles Findings from the Largest Plug-In Electric Vehicle Infrastructure Demonstration in the World
    Plugged In: How Americans Charge Their Electric Vehicles Findings from the largest plug-in electric vehicle infrastructure demonstration in the world Building the Laboratory Widespread adoption of plug-in electric vehicles (PEVs) has the potential to significantly reduce our nation’s transportation petroleum consumption and greenhouse gas emissions. Barriers to PEV adoption Chevrolet Volts and more for researchers to collect remain, however. One of than 300 Smart ForTwo and analyze data from their the most commonly cited Electric Drive vehicles in home charging units and barriers is the need for places Car2Go car-sharing fleets their PEVs. Data also was for PEV drivers to plug in their were enrolled in the project. collected from publicly vehicles. How many and what accessible charging stations kind of charging stations are This project was not just installed at a wide variety needed? Where and how about installing charging of venues in and between often do PEV drivers charge? infrastructure; the pur- metropolitan areas around pose was to build a living the United States. To answer these questions, laboratory to study its use the U.S. Department of and learn. Data collected from vehicles Energy launched The EV and charging infrastructure Project and the ChargePoint To accomplish this, Idaho over the 3-year project America project. Combined, National Laboratory part- period captured almost 125 these projects form the nered with the Blink Net- million miles of driving and largest PEV infrastructure work, ChargePoint, General 6 million charging events, demonstration in the world. Motors and OnStar, Nissan providing the most com- Between Jan. 1, 2011, and North America, and Car2Go prehensive view of PEV and Dec.
    [Show full text]
  • Download Paper
    Charging the Future: Challenges and Opportunities for Electric Vehicle Adoption Faculty Research Working Paper Series Henry Lee Harvard Kennedy School Alex Clark Climate Policy Initiative September 2018 RWP18-026 Visit the HKS Faculty Research Working Paper Series at: https://www.hks.harvard.edu/research-insights/publications?f%5B0%5D=publication_types%3A121 The views expressed in the HKS Faculty Research Working Paper Series are those of the author(s) and do not necessarily reflect those of the John F. Kennedy School of Government or of Harvard University. Faculty Research Working Papers have not undergone formal review and approval. Such papers are included in this series to elicit feedback and to encourage debate on important public policy challenges. Copyright belongs to the author(s). Papers may be downloaded for personal use only. www.hks.harvard.edu ENVIRONMENT AND NATURAL RESOURCES Charging the Future Challenges and Opportunities for Electric Vehicle Adoption Henry Lee Alex Clark PAPER AUGUST 2018 Environment and Natural Resources Program Belfer Center for Science and International Affairs Harvard Kennedy School 79 JFK Street Cambridge, MA 02138 www.belfercenter.org/ENRP The authors of this report invites use of this information for educational purposes, requiring only that the reproduced material clearly cite the full source: Lee, Henry, and Alex Clark, “Charging the Future: Challenges and Opportunities for Electric Vehicle Adoption.” Belfer Center for Science and International Affairs, Cambridge, Mass: Harvard University, August 2018. Statements and views expressed in this report are solely those of the authors and do not imply endorsement by Harvard University, the Harvard Kennedy School, or the Belfer Center for Science and International Affairs.
    [Show full text]
  • An Employer's Guide to EV Charging in the Workplace
    AnCharging Employer’s Guide Forward to EV The Charging State of EV Charging in in 2016the Workplace What’s Inside Your Current and Future Employees Are EV Drivers 2 The Rise of the EV Market 3 Why EV Charging Is Good for Every Business 5 EV Charging Installation 101 6 Why ChargePoint 8 © 2017 ChargePoint, Inc. Your Current and Future Employees Are EV Drivers Who’s buying electric vehicles (EVs)? Everyone from the environmentally aware to the financially savvy to lovers of technology. EV drivers are also highly educated and earn twice the average national income—they are the talent your employer wants to attract. EV charging is becoming a popular employee benefit that today’s brightest and most ambitious talent not only seek out, but also take into consideration when choosing where to work. In order to use their EVs for commuting—or to even consider switching to an EV—your employees need on-site EV charging at work. Offering EV Charging Has Many Benefits for You and 60% of workplace drivers surveyed Your Company at a Fortune 500 company said they Easily accommodate requests for EV charging, with minimal effort are likely to switch to EVs if workplace Centrally manage an EV charging charging becomes available. solution that meets the needs of employees Source: 2016 ChargePoint Webinar, Making the Business Case for EV Charging Align sustainability initiatives with business goals Reduce Green House Gas (GHG) emissions Understand your environmental and financial ROI Establish your brand as a green leader Guide to Workplace EV Charging for Facilities and Sustainability Managers | © 2017 ChargePoint, Inc.
    [Show full text]
  • A U.S. Consumer's Guide to Electric Vehicle Charging
    CONSUMER GUIDE TO ELECTRIC VEHICLES JUNE 2021 11570437 WHY BUY AN ELECTRIC CAR? Electric vehicles (EVs) are fun to drive, safe, comfortable, and convenient to refuel. They also cost less to operate per mile and produce no tailpipe emissions. Today’s electric cars do everything a gas car can do—and more. Most are high-performing vehicles with silent, instant torque, superb handling, and the latest technology and safety features. Most can travel 200–250 miles on a charge; many can go farther. Most EV drivers prefer to charge at home for its convenience and savings. A growing national network of public charging sites enables more consumers—even those who can’t plug in at home—to consider purchasing an EV. Because EVs are powered by electricity instead of gasoline, they shift our energy reliance to domestic sources while also reducing emissions. Cutting vehicle emissions is especially critical in communities adjacent to heavily trafficked roadways. As local power generation grows cleaner, every electric car charged on that grid gets cleaner too—and the broader public health and climate benefits increase. Electrifying light-duty transport would reduce overall greenhouse gas emissions by 17% relative to 2018 levels. EV 101 This guide highlights the two types of electric vehicles that plug into the grid to recharge their batteries. They are battery-electric (or all-electric) vehicles and plug-in hybrids. All-electric vehicles are powered solely Plug-in hybrids pair an electric motor by an electric motor and battery. They and battery with an internal-combustion burn no gasoline or diesel fuel, so they engine.
    [Show full text]
  • Lessons Learned: the Early Adoption of Electric Vehicle Charging Stations from the Perspective of Oahu’S Commercial Properties
    Lessons Learned: The Early Adoption of Electric Vehicle Charging Stations from the Perspective of Oahu’s Commercial Properties October 2012 Table of Contents Executive Summary ............................................................................................................... 4 1.0 Introduction .................................................................................................................... 6 1.1 Background to the ProJect.........................................................................................................6 1.1.1 Electric Vehicles (EVs) ..................................................................................................................6 1.1.2 Electric Vehicle Supply Equipment (EVSE) ...................................................................................7 1.1.3 Additional Terminology................................................................................................................8 1.1.4 Hawaii’s EV Ready Program .........................................................................................................8 1.1.5 Hawaii State Electric Vehicle (EV) Parking Requirement .............................................................9 1.2 ProJect Overview ....................................................................................................................10 1.2.1 Honolulu Clean Cities' Role ........................................................................................................10 1.3 Methodology..........................................................................................................................10
    [Show full text]
  • Better Place: a Green Ecosystem for the Mass Adoption of Electric Cars
    Global Case Writing Competition 2010 Corporate Sustainability Track 3rd Place Business Model Innovation by Better Place: A Green Ecosystem for the Mass Adoption of Electric Cars Prof. Ramalingam Meenakshisundaram and Besta Shankar ICMR Center for Management Research, Hyderabad, India This is an Online Inspection Copy. Protected under Copyright Law. Reproduction Forbidden unless Authorized. Licensed copies of the case are available at www.icmrindia.org. Copyright © 2010 by the Author. All rights reserved. This case was prepared by Prof. Ramalingam Meenakshisundaram as a basis for class discussion rather than to illustrate the effective or ineffective handling of an administrative situation. No part of this publication may be reproduced, stored in a retrieval system, used in a spreadsheet, or transmitted in any form by any means without permission oikos sustainability case collection http://www.oikos-international.org/projects/cwc oikos Global Case Writing Competition 2010 3rd Place “After a century of being joined at the hip, the car industry and the oil industry are headed for a divorce. Cars are about to leave behind the dirty fuel—in this case, gasoline—that has powered them. It’s going to have dramatic consequences throughout the energy and car industries.” 1 Vijay Vaitheeswaran, Correspondent at The Economist and co-author of ‘Zoom: The Global Race to Fuel the Car of the Future’ “It’s a subscription system much like cellular providers have. You sign up for a certain number of miles a month.” 2 Shai Agassi, Founder and CEO of Better Place “It makes so much sense from the environmental point of view as well as the business point of view.” 3 Idan Ofer, Chairman of Israel Corp 4 and Board Chairman of Better Place “When I first heard about it, I thought it was just another crazy idea.
    [Show full text]
  • Extreme Fast Charging Technology—Prospects to Enhance Sustainable Electric Transportation
    energies Review Extreme Fast Charging Technology—Prospects to Enhance Sustainable Electric Transportation Deepak Ronanki *,† , Apoorva Kelkar † , Sheldon S. Williamson *,† Electric Mobility and Transportation Innovation (E-MOTION) Laboratory, Smart Transportation Electrification and Energy Research (STEER) Group, Department of Electrical, Faculty of Engineering and Applied Science, Computer and Software Engineering, University of Ontario Institute of Technology, Oshawa, ON L1G 0C5, Canada; [email protected] * Correspondence: [email protected] (D.R.); [email protected] (S.S.W.) † These authors contributed equally to this work. Received: 27 August 2019; Accepted: 25 September 2019; Published: 29 September 2019 Abstract: With the growing fleet of a new generation electric vehicles (EVs), it is essential to develop an adequate high power charging infrastructure that can mimic conventional gasoline fuel stations. Therefore, much research attention must be focused on the development of off-board DC fast chargers which can quickly replenish the charge in an EV battery. However, use of the service transformer in the existing fast charging architecture adds to the system cost, size and complicates the installation process while directly connected to medium-voltage (MV) line. With continual improvements in power electronics and magnetics, solid state transformer (SST) technology can be adopted to enhance power density and efficiency of the system. This paper aims to review the current state of the art architectures and challenges of fast charging infrastructure using SST technology while directly connected to the MV line. Finally, this paper discusses technical considerations, challenges and introduces future research possibilities. Keywords: electric vehicles; energy storage; fast charging station; power converters; solid state transformer; transportation electrification 1.
    [Show full text]
  • Public Utilities Regulatory Authority Ten Franklin Square New Britain, Ct 06051
    STATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY TEN FRANKLIN SQUARE NEW BRITAIN, CT 06051 DOCKET NO. 17-12-03RE04 PURA INVESTIGATION INTO DISTRIBUTION SYSTEM PLANNING OF THE ELECTRIC DISTRIBUTION COMPANIES – ZERO EMISSION VEHICLES July 14, 2021 By the following Commissioners: Marissa P. Gillett John W. Betkoski, III Michael A. Caron DECISION TABLE OF CONTENTS I. INTRODUCTION ...................................................................................................... 1 A. SUMMARY ............................................................................................................ 1 B. BACKGROUND OF THE PROCEEDING....................................................................... 1 C. CONDUCT OF THE PROCEEDING ............................................................................. 1 D. PARTICIPANTS ...................................................................................................... 2 II. STATUTORY AUTHORITY ...................................................................................... 2 III. PROGRAM OBJECTIVES ....................................................................................... 4 IV. OVERARCHING PROGRAM DESIGN..................................................................... 6 A. EV CHARGING PROGRAM SUMMARY ...................................................................... 6 B. PROGRAM LENGTH AND REVIEW PROCESS ............................................................. 6 C. STATEWIDE EVSE DEPLOYMENT TARGETS ...........................................................
    [Show full text]
  • Guide to Installing Electric Vehicle Charging Equipment
    Guide to Installing Electric Vehicle Charging Equipment City of Somerville Office of Sustainability and Environment Photo Credit: Ivan Radic on Flickr 1 Table of Contents Purpose ......................................................................................................................................................... 2 How to Install Your EV Charger ..................................................................................................................... 1 1. Hire an Electrician ................................................................................................................................. 1 2. Determine Your Charging Needs: Choosing Between Level 1 & Level 2 Chargers ............................... 1 3. Choose Your Charging Equipment ........................................................................................................ 4 4. Determine if electrical upgrades are necessary .................................................................................... 5 5. Choose the Location for your EVSE ....................................................................................................... 6 6. Obtain Electrical Permits ....................................................................................................................... 7 7. Install EVSE ............................................................................................................................................ 8 Saving Opportunities ....................................................................................................................................
    [Show full text]
  • Solar Power + Electric Vehicle Charging
    SEPTEMBER 2020 Solar Power + Electric Vehicle Charging CAPTURING SYNERGIES IN MINNESOTA PREPARED BY THE GREAT PLAINS INSTITUTE Solar Power + Electric Vehicle Charging: Capturing Synergies in Minnesota Acknowledgements MINNESOTA SOLAR ENERGY INNOVATION NETWORK (SEIN) TEAM Led by the Great Plains Institute (GPI), a Minnesota team of agencies, nongovernmental organizations (NGOs), utilities, cities, and solar and EV stakeholders (the Minnesota SEIN Team) investigated the market potential, both opportunities and barriers, of EV charging infrastructure synchronized with solar energy production as a means of accelerating the EV market and expanding solar deployment. The initiative was part of the Solar Energy Innovation Network (SEIN), a national effort led by the National Renewable Energy Laboratory (NREL) that works with multi-stakeholder teams to research solutions to challenges associated with solar energy adoption. This project would not have been possible without the substantial contribution of the following organizations and individuals: • Michelle Gransee, Minnesota Department of Commerce, State Energy Office • Jordan Wente, Minnesota Department of Administration, Office of Enterprise Sustainability • Cameron Bailey, Metropolitan Council, Community Development Division • Jeff Freeman, Metro Transit • Matthew Blackler, ZEF Energy • Elizabeth Lucente, Minnesota Solar Energy Industry Association • Megan Hoye, Center for Energy and Environment • Eric Maurer, Xcel Energy • Rebecca Place, Minnesota Pollution Control Agency • Tracy Hodel, City of St. Cloud • Kevin Bright, City of Rochester • Stacy Miller, City of Minneapolis The GPI team leading the project included: Brian Ross, Katelyn Bocklund, Matthew Prorok, Dane McFarlane, Abby Finis, Brendan Jordan, Jenna Greene, Kristoffer Acuña The Minnesota SEIN team would like to thank SEIN staff from NREL and the Rocky Mountain Institute (RMI) for their input and guidance, including: • Eric Lockhart, NREL • Emma Elgqvist, NREL • Anthony Teixeira, RMI This work was authored by the Great Plains Institute under Subcontract No.
    [Show full text]
  • Charging Your EV at Home Never Visit a Petrol Station Again…
    Charging your EV at home Never visit a petrol station again…. Unlike petrol or diesel cars, you can ‘re-fuel’ your electric car from the comfort of your own home by installing a home wallbox. If you have a private driveway or off-street parking, you may be able to install a home wallbox that you can use to do the majority of your charging. Most people’s houses have an electricity supply capable of supporting a 7kW home wallbox. A 7kW wallbox will charge a Renault ZOE with Z.E. 50 battery from 0-100% in about 9.5 hours but the likelihood is you won’t be charging from flat to full very much, just topping up, as and when you need. Charging from home really is the simplest, cheapest and most convenient way to charge your electric car. Pull up on your driveway, plug your car in and leave it to top itself up whilst you enjoy your evening. How much will it cost to charge my car at home? The good news is, charging your electric car at home is the most cost effective way unless you are lucky enough to come across a free charging station at work or out and about! You can work out your cost to charge by multiplying the battery size by the rate you pay for your electricity: 52kWh battery in a ZOE x 14.4^ pence per kWh = £7.48 for a 0-100% charge Even better, unlike petrol or diesel prices, you can choose your energy provider and tariff so you could opt for a tariff that gives you cheaper electricity overnight and bring your cost to charge down to £3-4.
    [Show full text]