Installation Notes / Sparcraft Bowsprit

Total Page:16

File Type:pdf, Size:1020Kb

Installation Notes / Sparcraft Bowsprit Installation notes / Sparcraft Bowsprit 1. Kit components / Tools needed for assembly List of standard kit components List of needed tools for assembly - section with central collar & end fittings - 2 working deck plates + 4x M8 screws + reinforcing plates = - 1 parking deck plate + 1x M10 screw + round reinforcing plates - drill - BTR 5 & 6 allen keys - Ø8.5 & Ø10.5mm drill bits - chamfer mills - torque driver (socket drive Ø 10.7 & Ø13mm) - sillicone 2. Assembly drawing (example) / Marking the maximum outside length Maximum outside length : Marking the maximum outside length (see chart against) Ø bowsprit Longueur utile MAX section maximum Front 70mm 800mm working 80mm 900mm plate 90mm 950mm 100mm 1000mm MAX Maximum sail area Back max Max working Boat Ø bowsprit asymmetric Gennaker plate length section Spinnaker area* area 25’-36’ 70mm 60m² 37m²* Parking 36’-40’ 80mm 82m² 52m²* A B plate 40’-47’ 90mm 102m² 65m²* 48’-57’ 100mm 130/150m²* 105m²* Measure Mark with sellotape Installation notes – Sparcraft bowsprit 1/4 3. Measure on deck and under deck to valid bowsprit position A B C E D Measure Check position on and under the deck of the working & parking plates Mark 4. Fixing the front working plate allen key BTR 5 Chamfer mill Drill Foret bit Ø8.5mmØ8.5mm Sillicone + torque driver Ø10.7mm A B D D E C C Drill Chamfer Clean & waterproof Screw Check 5. Fixing the back working plate (same instructions as the §3.) Installation notes – Sparcraft bowsprit 2/4 6. Fixing the parking plate Chamfer mill allen key BTR 6 Drill bitØ10.5mm Ø13mm Sillicone + torque driver A B C D E D C Chamfer Drill Clean & waterproof Screw Check 7. Installation is over (example on boar of an First 36.7) Picture of under deck fitting Working position Parking position Installation notes – Sparcraft bowsprit 3/4 8. Options et accessories Stem adaptation option Altitude of the stem fixation drill Stem β A plate delivered pre-fitted BDH 70 BDH 80 BDH 90 BDH 100 Outside length 800mm 900mm 950mm 1000mm 110mm β = maximum angle 5° 5° 3.15° 3.15° A = Altitude of the stem fixation drill 38,5mm 53,5mm 28mm 31mm L L A B C D E F Measure Cut Position Screw Lean Secure Nota: It is possible to fit extra plate underneath the back working plate in order to make it higher. Option for fitting the Gennaker/Code Zero/Asummetric Spinnaker Accessory : plate cover fl Installation notes – Sparcraft bowsprit 4/4 Notice de montage / Bout dehors Sparcraft 1. Composants du kit / Outils nécessaires Liste composants du kit standard Liste des outils nécessaires - section équipée d’un collier central + embouts avant & arrière - 2 plots de travail + 4 vis M8 + contre-plaque = - 1 plot de repos + 1 vis M10 + contre-plaque ronde - perceuse - clés allen BTR 5 & 6 - forets Ø8.5 & Ø10.5mm - fraise à chanfreiner - cliquet (douilles Ø 10.7 & Ø13mm) - sillicone 2. Plan d’ensemble (exemple) / Marquage longueur dehors max Longueur utile maximum : Marquagelongueur dehors max (cf tableau ci-contre) Ø section Longueur utile MAX bout dehors maximum 70mm 800mm Plot de 80mm 900mm travail 90mm 950mm 100mm 1000mm MAX Surface voile maximum Ø section Surface max Surface Plot de Lg bout spi max travail bateau dehors asymétrique gennaker* 25’-36’ 70mm 60m² 37m²* 36’-40’ 80mm 82m² 52m²* Plot de 40’-47’ 90mm 102m² 65m²* A B repos 48’-57’ 100mm 130/150m²* 105m²* * avec utilisation d’une sous-barbe Mesurer Marquer Notice de montage bout dehors Sparcraft 1/4 3. Repérage sur le pont de l’emplacement du bout dehors et des plots et sous le pont également A B C E D Repérer Vérifier emplacement & fixation des plots de travail+repos sur et sous le pont Marquer 4. Fixation du plot de travail avant Clé allen BTR 5 Fraise Foret Foret Ø8.5 Ø8.5mmmm Sillicone + cliquet Ø10.7mm A B D D E C C Percer Chanfreiner Nettoyer & étanchéifier Visser Vérifier 5. Fixation du plot de travail arrière (même procédure de montage que le plot de travail avant, cf §3.) Notice de montage bout dehors Sparcraft 2/4 6. Fixation du plot de repos Fraise Clé allen BTR 6 Foret Ø10.5mm Ø13mm Sillicone + cliquet A B C D E D C Chanfreiner Percer Nettoyer & Etanchéifier Visser Vérifier 7. Montage terminé (exemple sur un First 36.7) Vue de l’intérieure Position travail Position repos Notice de montage bout dehors Sparcraft 3/4 8. Options et accessoires Option adaptation davier Altitude trou de fixation davier Semelle β A davier livrée pré- BDH 100 BDH 70 BDH 80 BDH 90 montée Longueur utile 800mm 900mm 950mm 1000mm 110mm β = Angle maxi 5° 5° 3.15° 3.15° A = Altitude trou de fixation davier 38,5mm 53,5mm 28mm 31mm L L A B C D E F Mesurer Couper Positionner Visser Incliner Sécuriser NB : Possibilité de mettre une cale sous le champignon travail arrière pour que la position du trou de fixation davier soit plus haute. Option bague d’amure / fixation emmagasineur Accessoire : protection plot Notice de montage bout dehors Sparcraft 4/4 RDM SPARCRAFT FICHE TECHNIQUE BOUT-DEHORS / RDM Rue Blaise Pascal - ZI de PERIGNY RANGE BOWSPRIT DATA SHEET F-17185 PERIGNY CEDEX tel. +33 (0)5 46 45 90 45 fax. +33 (0)5 46 45 36 59 Bowsprit dimensions / Encombrement de la gamme bout-dehors BOWSPRIT INSTALLATION ON DECK / MONTAGE BOUT DEHORS SUR PONT A On deck / Sur pont Cotes ( mm ) Ø70 Ø80 Ø90 Ø100 B max A 1600 1800 1900 2000 B 800 900 950 1000 C mini 135,6 135,6 155,6 155,6 C' mini 139,5 151,9 159,8 166 D° 1,3° 1,2° 1,1° 1,1° D° E c' mini c' ØE 70 80 90 100 Deck plan/ Surface pont Bowsprit equipement / equipement bout-dehors C min C Cotes ( mm ) Ø70 Ø80 Ø90 Ø100 Back end fitting / Embout arrière CENTRAL COLLAR /COLLIER CENTRAL F 61,8 61,8 72 72 FURLER FITTING RING BACK END FITTING / EMBOUT ARRIERE /ATTACHE EMMAGASINEUR ØG 66 66 84 84 M P FRONT END FITTING/ H 97 97 117,5 117,5 V EMBOUT AVANT I 60 60 60 60 J ØJ 12 12 14 14 X K 80 80 80 80 L° 5° 5° 3° 3° W G Central collar / Collier central O U G H ØM 93 93 115 115 N 80 80 80 80 O 125,6 125,6 146 146 P 44 44 44 44 I K N Q T Q 60 60 60 60 Maximum angle for fitting / Maximum angle for fitting / R 78,6 78,6 88,5 88,5 Angle d'inlinaison tolérable Angle d'inlinaison tolérable S° 5° 5° 3° 3° Furler fitting ring / Attache emmagasineur ØT 83 93 103 113 U 68,5 83,5 93,5 98,5 Z V 13,5 19 19 19 BOWSPRIT FITTING Y W 15 19 20 20 F L° R S° X 8,25 12 13,9 13,8 EQUIPEMENT BOUT-DEHORS Y 45 45 55 55 Front end fitting / Embout avant ØZ 25,6 25,6 29,5 29,5 Deck fitting / Equipemement de fixation pont WORKING DECK FITTING / PLOT TRAVAIL STEM HEAD FITTING / OPTION ADAPTATION DAVIER PARKING DECK FITTING / Cotes ( mm ) Ø70 Ø80 Ø90 Ø100 PLOT PARKING working deck fitting / plot travail L4 L1 22,75 L15 L11 L16 L2 39 L7 L1 L3 12,3 L12 L13 ØL4 90 L2 ØL5 60 L3 ØL6 109,7 L6 Stem head fitting / Adaptation Davier option L5 L8 L7 13 L8 110 L9 94 Deck plan / Surface pont L14 ( Horizontal / Flat ) L10 max 44,5 53,5 28 28 DECK FITTINH L9 Parking deck fitting / Plot parking L11 15,75 EQUIPEMENT FIXATION L12 32,7 L10 max L10 L13 13,3 Ø L14 90 L15 3 L16 10 8 4 1 3 2 5 8 7 6 9 Protection plot Deck fitting cover Ind Auteur Vérificat° Description de la modification: Date Vers. Author Approved Change description: RDM SPARCRAFT Eclaté bout-dehors Rue Blaise Pascal - ZI de PERIGNY A3 F-17185 PERIGNY CEDEX 110 Bowsprit exploded drawing tel. +33 (0)5 46 45 90 45 Ech/Sc:1:5 fax. +33 (0)5 46 45 36 59 Ce plan est la propriété intellectuelle de Sparcraft SAS. Option davier Plot travail Plot parking Date:12/07/2010 Tol. Gén.:+/-0.14 Etude/project Il ne peut être divulgué à des tiers sans notre autorisation Auteur:J.Chollet Matière: écrite,ni servir à d'autres fabrications. Stem head fitting Prod°: "Working" deck fitting "Parking" deck fitting Author: Material: This drawing strictly belongs to Sparcraft SAS. Appro.: Finition/Finishing It cannot be disclosed without our written authorization Indice/Version: nor can it be used for other manufactures. .
Recommended publications
  • Spinnakers and Poles/Bowsprits Explained
    SPINNAKERS AND POLES/BOWSPRITS EXPLAINED The RORC Rating Office is sometimes asked whether symmetric and asymmetric spinnakers are rated differently, and whether there is a rating increase if you use both types. The question is often prompted by the IRC application form asking questions about the spinnakers of each type carried aboard, rather than just the largest spinnaker area (SPA) and total number of spinnakers. There are two aspects of downwind sail rating: the sail itself and the type of pole (if any) it is set on - as explained below. Text in italics is taken from the IRC 2018 Rule text. SPINNAKERS For the calculation of your rating, IRC considers the largest spinnaker area (SPA) and the total number of spinnakers carried. 21.6 Spinnakers 21.6.1 Boats carrying more than three spinnakers in total on board while racing will incur an increase in rating. 21.6.2 Spinnaker area (SPA) shall be calculated from: SPA = ((SLU + SLE)/2) * ((SFL + (4 * SHW))/5) * 0.83 SLU, SLE, SFL and SHW of the largest area spinnaker on board shall be declared. The calculated area of this spinnaker will be shown on a boat’s certificate as the maximum permitted SPA. 8.10.1 Values stated on certificates for LH, Hull Beam, Bulb Weight, Draft, x, P, E, J, FL, MUW, MTW, MHW, HLUmax, HSA, PY, EY, LLY, LPY, Cutter Rig HLUmax, SPA, STL are maximum values. Are symmetric or asymmetric spinnakers rated differently? Not directly, but see the section on pole type below. Is there a rating increase if I carry both symmetric and asymmetric spinnakers? Not directly, but see the section on pole type below.
    [Show full text]
  • Build Your Own S/V Denis Sullivan Schooner
    Build Your Own S/V Denis Sullivan Schooner Materials: Directions: n Recyclable Materials: Collect building materials and supplies. ● Body (Hull) of the schooner: 1 aluminum foil, egg cartons, Before building, fill in the blanks on the S/V Denis Sullivan on next page. Label plastic bottle, carboard, etc. 2 the following parts of the schooner: ● Sails: Paper, Tissues, Paper (*Answer Key can be found at the Introduction: Towel, etc. bottom of the Activity Sheet) The S/V Denis Sullivan is the only re- ● Mast and Bowsprit: Skewers, a. Sails (Upper and Lower) creation of a 19th century Great Lakes Cargo Schooner and Wisconsin’s Flagship. Build Chopsticks, Pen, Pencils, b. Raffee Sail Schooner Straws, etc. you own S/V Denis Sullivan Schooner with c. Jib Sails (Head Sails) recyclable materials found in your home. n Pencil/Pen d. Pilot House n Paper for drawing design e. Hull Think About It: n Scissors What does a schooner look like? A sailboat n Tape/Glue f. Mast with a minimum of 2 masts that can have Denis Sullivan Denis Sullivan g. Bowsprit up to 7 with the foremast slightly shorter than the mainmast. A schooner usually has Design and draw a schooner with fore-and-aft rigged sails, but may also have 3 pencil and paper. square-rigged sails. Construct the body (hull) of the Do Ahead of Time: 4 schooner. n Gather all supplies Draw and cut out the sails using n To Take It Further: Fill testing 5 scissors. Make at least 3 sails, one Build Your Own S/V Build Your container with enough water so that for each mast, and at least one sail the boat can float freely and cannot for the bowsprit.
    [Show full text]
  • Marshall 22 Catboat T’S Hard to Pinpoint Exactly What Drew Me to a Centerboard Up, Onto the Soft Sands of Cape Cod Where Catboat, and Specifically a Marshall 22
    Welcome to SAILING Magazine’s annual guide to retrofitting, where we chronicle theoretical refits of three boats readily available on the used-boat market. The projects described are typical for boats of this age and type, and the scope and pricing reflect what a retrofit would actually cost. MARSHALL 22 CATBOAT t’s hard to pinpoint exactly what drew me to a centerboard up, onto the soft sands of Cape Cod where catboat, and specifically a Marshall 22. Perhaps it we might spend the night sleeping under the stars on was some romantic notion conjured from gazing at the 10-foot-wide deck. an Edward Hopper or Winslow Homer painting, or But I set out to find a Marshall 22 in need of a Imaybe it was because these boats seem to exude a retrofit. And no, I wasn’t in the market for a project simple elegance. boat requiring complete restoration and carpentry skills The idea of sailing with a single sail was intriguing, found only in legendary boatyards. as was the prospect of exploring shallow bays where a It helped to know a bit about the history of Marshall full-keel sloop certainly would run aground. I envisioned Marine and the late Breck Marshall, the designer and bringing the hull, which draws a mere 2 feet with the builder who founded the company in the early 1960s Originally published in December 2014/ January 2015 issue of SAILING Magazine. All rights reserved. May not be copied, printed or distributed without written permission from SAILING Magazine. Copyright © 2015 by SAILING Magazine.
    [Show full text]
  • Farr 30 Flyer
    YACHT DESIGN Farr 30 IRC-Optimized Bowsprit Farr Yacht Design has designed a removable, IRC optimized bowsprit for the Farr 30 One Design. The bowsprit measures 1.79m from the stem, a length which was chosen after evaluating similar boats and determining that the increased downwind boat speed eclipsed the induced rating penalty. The bowsprit’s cross sectional shape was derived from FYD’s proprietary formula that minimizes aerodynamic drag without compromising structural rigidity. 3D modeling tools were used to ensure that the bowsprit conforms perfectly to the bow geometry. The tackline is routed through existing hardware on the bow, reducing the amount of additional hardware required. A single bolt per side attaches the bowsprit to the hull; the bowsprit is easily removed so that the boat can get back into its one design configuration. Competition Composites Inc. (CCI) is an authorized manufacturer for the new bowsprit design. CCI is a unique Canadian manufacturing business focused on designing and building composites products for various industries, especially for the boating market. For the past several years, CCI has been manufacturing our Farr 395 and Beneteau 10R rudder upgrades. The feedback from these boat owners has been very positive regarding the craftsmanship, feel, and performance of the rudder designed by FYD, and manufactured by CCI. CCI offers the new IRC-optimized bowsprit for $3,900 USD, not including packaging & handling. For more details and to order, please contact CCI at [email protected] or +1-613-599-6951. If you wish to speak with FYD, please contact us at [email protected] or +1-410-267-0780.
    [Show full text]
  • Leopard 58' Catamaran – RABBLE ROUSER
    Leopard 58' Catamaran – RABBLE ROUSER Make: Leopard Boat Name: RABBLE ROUSER Model: 58' Catamaran Hull Material: Fiberglass Length: 58 ft Draft: 5 ft 7 in Price: $ 1,550,000 Builder: Robertson & Caine Year: 2014 Designer: Simonis Voogd Location: Ft. Lauderdale, FL, United States RABBLE ROUSER RABBLE ROUSER is an exceptional Owner’s version of the Leopard 58 with 4 cabin layout. Built and launched as a Leopard 58 but that’s where it starts and ends. In the hands of her current and original owner she was transformed into one of the most customized, highly detailed, well equipped and unique Leopard 58’s in existence. From her Carbon fiber roller furling boom to make sailing easy, to the custom cabinetry to enhance the already generous storage space, and a custom electrical system, where there was an opportunity to improve or make better, it was done. With low hours on both her engines and generators, this boat has East Coast Yacht Sales - Allen Schiller, CPYB at Dion's Yacht Yard, 23 Glendale Street, Salem, MA 01970, United States Tel: 617-529-5553 cell Tel: 707-414-0414 Fax: 978-744-7071 [email protected] seen very light use. You owe it to yourself to at least get onboard and see if RABBLE ROUSER is the boat for you. An Addendum section captures many of the changes and the thought process behind them. Measurements Cruising Speed: 9.5 kn Displacement: 61730 Cruising Speed RPM: 2200 lb LOA: 57 ft 7 in Fuel Tanks #: 4 LWL: 54 ft 2 in Fuel Tanks Capacity: 394 gal Beam: 27 ft 9 in Fresh Water Tanks #: 2 Max Bridge Clearance: 90 ft 3 in Fresh Water
    [Show full text]
  • Study, Design, Planning Process and Manufacturing of a Polyvalent Bowsprit
    Study, design, planning process and manufacturing of a polyvalent bowsprit Daniel Sanz Alonso Industrial Engineering Óbuda University 12th January 2015 Péter Zentay ii STUDY, DESIGN, PLANNING PROCESS AND MANUFACTURING OF A POLYVALENT BOWSPRIT by Daniel Sanz Alonso A Thesis Submitted in Partial Fulfillment of the Requirements for the Degree of INDUSTRIAL ENGINEERING TECHNOLOGY in Bánki Donát Faculty Óbuda University Escuela de Ingeniería y Arquitectura University of Zaragoza January 2015 Copyright © Daniel Sanz Alonso, 2015 iii iv DEDICATION To my parents and sister, For all the times you helped me to take the correct decision v vi ACKNOWLEDGEMENTS After four years studying this degree, at two universities in different countries, I have learned one thing – I could never have done any of this, particularly the research and writing that went into this dissertation, without the support and encouragement of a lot of people. First, I would like to thank the University of Zaragoza by good management and offered me the possibility to study abroad; I thank my Spanish coordinator, Francisco José Pérez Cebolla, and staff of the international relations office at being able to advise me and resolve all problems I have come to finish my degree in Budapest. Also, thank the University of Obuda offer the possibility to study at this university and perform my thesis. I thank the International office staff, especially Péter Holicza for his great work. I would also like to express my thanks to my thesis coordinator, Péter Zentay, professor in Bánki Donát Faculty, for helping with the project and giving me all the facilities that I've had.
    [Show full text]
  • Glossary of Terms
    Glossary of Terms Below are new words for our Glossary of Terms based on AB Barlow’s activities the last couple of weeks. To see all the terms from AB Barlow’s past activities, please scroll down. Battle of Cape St. Vincent – one of the first battles of the Anglo-Spanish War (1796-1808). The battle was a decisive English victory and saw four Spanish ships of the line captured by the British; two by Horatio Nelson Battle of Flamborough Head – a battle fought during the American War of Independence during which Captain John Paul Jones captured the British frigate Serapis even as his own ship, Bonhomme Richard, sank out from under him Boarding – the act of sending sailors or soldiers from one’s own ship to an enemy ship for the purpose of capturing the other vessel. In modern context, boarding can also occur for more peaceful purposes such as a safety or customs inspection Brig – a ship with two masts, both carrying square sails. Also, a jail located on board a ship Cutting Out – the act of attacking a ship from small boats filled with sailors or marines. Often used as a surprise tactic Fighting Top – a platform part way up a ship’s mast used as a firing position by sharpshooters during a naval engagement First-Rate – the largest warships in the now-obsolete Royal Navy ranking system. Generally, first-rates mounted around 100 carriage guns Frigate – a small, fast warship; usually built for maneuverability and speed over firepower Gangway – traditionally, a narrow passage connecting a ship’s quarterdeck and forecastle.
    [Show full text]
  • A Reference for Rigging, Storing, and Troubleshooting RS Quests
    Questland A Reference for Rigging, Storing, and Troubleshooting RS Quests Developed by Benjamin Geffken Last Updated: July 1, 2018 2 Table of Contents Rigging 4 Sails 5 Jib 5 Spinnaker 5 Attaching the Tackline (1 of 2) 6 Check Spin Halyard goes up to Port of Everything, comes down to Starboard 8 Attaching the Head of the Spinnaker (1 of 2) 9 Locating the Downhaul 11 Leading the Downhaul through the Bow Opening 12 Leading the Downhaul up through the Silver Ring 13 Leading the Downhaul up to the Canvas X 14 Tying the Downhaul to the Canvas X 15 Attaching the Spin Sheets to the Clew - Luggage Tag 16 Leading a Spin Sheet through its Block 18 Tying the Spin Sheets Together - Water Knot (1 of 4) 19 Rigged Spinnaker 24 Mainsail 25 Steps of Reefing 25 Rigging the Tack Strap 26 Rigged Outhaul 27 Rigged Cunningham 28 Tying a Bobble Knot (1 of 2) 29 Line Control 31 Rigged Reefing Outhaul (1 of 2) 32 Starboard View of Reefed Quest 34 Port View of Reefed Quest 35 Blades 35 Centerboard 36 Rudder 36 3 Derigging 37 Sails 37 Jib 37 Spinnaker 38 Mainsail 38 Rolling the Mainsail (1 of 2) 39 Attaching the Jib Sock 41 Blades 42 Storage 43 Charlestown 44 Jamaica Pond 45 Quest-specific Quirks 46 Roller Furler 47 Gnav 47 Beam Drainage Hole 49 Rudder Safety Release 50 Popping a Rudder Back into Place (1 of 2) 50 The Three Rudder Positions: Sailing, Beaching, Beached 52 Maintenance 53 Forestay Tension Clip - Self-Destructive (1 of 2) 54 Solution 55 The Rig Tension Problem 56 Current Compromise 56 Taping the Forestay Swivel 57 Caulked Seam near Spinnaker Sleeve on Bow 58 Using the Drop Nose Pins 59 Controlling the Extension of the Bowsprit 60 Distance between the Base of the Bowsprit and the Hull 61 Fusing the Lines 62 Adding Rudder Safety Lines 63 Masthead Floats 64 Bent Reefing Tack-Hook Pins 65 Notes on Maintenance 66 4 Rigging 5 Sails Jib Jibs are normally left furled around the forestay, covered by a jib sock.
    [Show full text]
  • Glossary of Terms (List Will Be Updated on a Continual Basis)
    Glossary of Terms (list will be updated on a continual basis) The words below are new to our Glossary of Terms. These words will be integrated into our overall list, which is below the new words. Chafing Gear – pads, mats, ropes and other materials tied around pieces of rigging to protect them from rubbing on spars and other parts of the rig Foxes – pieces of scrap line made by twisting together several strands or yarns Hand, Reef & Steer – traditional qualifications of an able seaman, to hand is to take in or furl a sail and to reef is to shorten sail and to steer is to take a turn at the helm Helmsman – the Sailor stationed at the ship’s helm (wheel) in charge of steering and keeping a straight course Marline – light, two-stranded line; often tarred and used for seizings Marlinespike – a tapered metal spike used to separate strands of rope, untie knots and as a handle for hauling away on seizings, whippings, etc. Merchant Service – the industry concerned with commercial shipping ventures (i.e., non-military) Rating – denotes a Sailor’s rank, responsibilities and rate of pay (i.e., able seaman, ordinary seaman, boy, etc.) Rigging – the lines and ropes that hold the masts, spars and sails Sail Making – the work of mending, replacing and sewing sails; the sail maker would often advise on how best to set and trim sails Seizing – method of binding two ropes or objects together involving wrapping them tightly with line Splice – weaving together to strands of separate ropes to form one longer rope Watches – division of labor aboard ship; the
    [Show full text]
  • Mom and Pop Go Sailing
    Mom and Pop Go Sailing Long after their new boat, Beowulf, was ready for sea, Skip and Linda Dashew held their patience and studied the weather maps. As the systems marched across the Tasman Sea to New Zealand and on into the Pacific, Skip said, "What we want is a big high to go through and then we will leave on the back of it." Nothing the matter with waiting for the right departure weather. After all, on a long passage, it is the only weather you get to choose. But, more than just comfort was at issue here. Their 80ft water-ballasted ketch is fleet-footed enough to keep pace with most weather systems. If they picked their departure right, they could ride the north-westerlies far out across the Pacific on their passage to the Austral Isles in the southern part of French Polynesia. With just the two of them on board, their goal was to reel off regular 300-plus mile days and, with the right conditions, there was every likelyhood they would achieve it. Skip likes to deprecate his latest creation as a "Mom and Pop motorsailor," but, in truth, it's much more than that. Having designed and built 45 yachts between 58-80 ft (probably the best known being their Deerfoot range) and having sailed just under 200k000 miles, Skip and Linda had an awful lot of experience to distill into Beowulf. The result is a quite singular yacht: long and lean with plumb bow and stern, a generous sailplan set on a ketch configuration of nearly equal masts - both of which carry asymmetrical spinnakers - and an articulating bowsprit to achieve the optimum angles downwind.
    [Show full text]
  • The History of the Tall Ship Regina Maris
    Linfield University DigitalCommons@Linfield Linfield Alumni Book Gallery Linfield Alumni Collections 2019 Dreamers before the Mast: The History of the Tall Ship Regina Maris John Kerr Follow this and additional works at: https://digitalcommons.linfield.edu/lca_alumni_books Part of the Cultural History Commons, and the United States History Commons Recommended Citation Kerr, John, "Dreamers before the Mast: The History of the Tall Ship Regina Maris" (2019). Linfield Alumni Book Gallery. 1. https://digitalcommons.linfield.edu/lca_alumni_books/1 This Book is protected by copyright and/or related rights. It is brought to you for free via open access, courtesy of DigitalCommons@Linfield, with permission from the rights-holder(s). Your use of this Book must comply with the Terms of Use for material posted in DigitalCommons@Linfield, or with other stated terms (such as a Creative Commons license) indicated in the record and/or on the work itself. For more information, or if you have questions about permitted uses, please contact [email protected]. Dreamers Before the Mast, The History of the Tall Ship Regina Maris By John Kerr Carol Lew Simons, Contributing Editor Cover photo by Shep Root Third Edition This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License. To view a copy of this license, visit http://creativecommons.org/licenses/by-nc- nd/4.0/. 1 PREFACE AND A TRIBUTE TO REGINA Steven Katona Somehow wood, steel, cable, rope, and scores of other inanimate materials and parts create a living thing when they are fastened together to make a ship. I have often wondered why ships have souls but cars, trucks, and skyscrapers don’t.
    [Show full text]
  • Trogear Bowsprit Through Hull Installation Manual
    Trogear SAS www.trogear.com [email protected] France: +33 (0)9 70 44 58 11 USA: 866-616-2978 Trogear Bowsprit Through Hull Installation Manual Congratulations on your purchase of the Trogear Bowspritwhich can be installed on most sailboats. The through hull installation is not a complicated process, but it does require careful measurements. Please read the instructions thoroughly first, and if in doubt contact us or your boat rigger with any questions. Keep in mind that these instructions present the basic process. As each boat is designed differently, your boat may require specific installation modifications. Again, please consult your rigger if in any doubt, and you may decide that it is best to have your rigger install the Bowsprit for you. NOTE: If you are not able to install our bowsprit using this method, our side mounts or deck mounting solution might be right for your yacht. Custom options are also possible and we can work with you to devise a suitable method for your yacht. See our website or contact us for details. Materials and Tools Required ● Masking Tape ● Isopropyl alcohol or acetone ● Marker or pencil ● Vinyl gloves ● Tape measure ● Paper towels ● Drill motor ● Sandpaper grid 60 ● Pilot drill bit and 1 inch drill bit ● Blue Loctite ● Round or rotary file ● Safety Goggles ● Structural Epoxy –West System Six10 or similar Parts for the Adjustable Bobstay Attachment(not included ) ● 5/16 Dyneema (The bobstay purchase is 2:1. Measurements are specific to each boat) ● U Bolt for Bob stay attachment (consult your rigger or sailmaker to determine the working loads for your boat) ● Low friction rings, Stainless steel rings or blocks ● Bungee cord (Recommended from Davis - MiniShockleTM) ● Preventer Dyneema (Safety feature - see page 6) Trogear Bowsprit Install Manual | www.trogear.com | [email protected] 1 OVERVIEW The bowsprit is attached to the boat via a removable shaft connecting the bowsprit ends.
    [Show full text]