Renewable Energy Target
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
S N. Name of TAC/ Telecom District Name of Nominee [Sh./Smt./Ms
Name of Nominated TAC members for TAC (2020-22) Name of TAC/ S N. Name of Nominee [Sh./Smt./Ms] Hon’ble MP (LS/RS) Telecom District 1 Allahabad Prof. Rita Bahuguna Joshi, Hon’ble MP (LS) 2 Allahabad Smt. Keshari Devi Patel, Hon’ble MP (LS) 3 Allahabad Sh. Vinod Kumar Sonkar, Hon’ble MP (LS) 4 Allahabad Sh. Rewati Raman Singh, Hon’ble MP (RS) 5 Azamgarh Smt. Sangeeta Azad, Hon’ble MP (LS) 6 Azamgarh Sh. Akhilesh Yadav, Hon’ble MP (LS) 7 Azamgarh Sh. Rajaram, Hon’ble MP (RS) 8 Ballia Sh. Virendra Singh, Hon’ble MP (LS) 9 Ballia Sh. Sakaldeep Rajbhar, Hon’ble MP (RS) 10 Ballia Sh. Neeraj Shekhar, Hon’ble MP (RS) 11 Banda Sh. R.K. Singh Patel, Hon’ble MP (LS) 12 Banda Sh. Vishambhar Prasad Nishad, Hon’ble MP (RS) 13 Barabanki Sh. Upendra Singh Rawat, Hon’ble MP (LS) 14 Barabanki Sh. P.L. Punia, Hon’ble MP (RS) 15 Basti Sh. Harish Dwivedi, Hon’ble MP (LS) 16 Basti Sh. Praveen Kumar Nishad, Hon’ble MP (LS) 17 Basti Sh. Jagdambika Pal, Hon’ble MP (LS) 18 Behraich Sh. Ram Shiromani Verma, Hon’ble MP (LS) 19 Behraich Sh. Brijbhushan Sharan Singh, Hon’ble MP (LS) 20 Behraich Sh. Akshaibar Lal, Hon’ble MP (LS) 21 Deoria Sh. Vijay Kumar Dubey, Hon’ble MP (LS) 22 Deoria Sh. Ravindra Kushawaha, Hon’ble MP (LS) 23 Deoria Sh. Ramapati Ram Tripathi, Hon’ble MP (LS) 24 Faizabad Sh. Ritesh Pandey, Hon’ble MP (LS) 25 Faizabad Sh. Lallu Singh, Hon’ble MP (LS) 26 Farrukhabad Sh. -
Automatic Sun Tracking System with Dual Axis
AUTOMATIC SUN TRACKING SYSTEM WITH DUAL AXIS K Srinivasa Rao1, G.Sreedhara Babu2 and M.Rajesh3 1,2,3Department of Mechanical Engineering,V.R.Siddhartha Engineering College Abstract— The aim of this paper is to solve the problem of energy crisis which is considerably serious issue in today’s period. It is becoming essential to increase use of renewable sources of energy namely solar energy as compared to conventional sources for energy generation. Solar energy is rapidly gaining notoriety as an important means of expanding renewable energy resources. As such, it is vital that those in engineering fields understand the technologies associated with this area. Our project will include the design and construction of a microcontroller-based solar panel tracking system. It uses 8051 microcontroller and stepper motor to move solar panel according to position of sun. Photo resistors are also used to detect light intensity. Solar tracking allows more energy to be produced because the solar array is able to remain aligned to the sun. A technology namely solar tracking system is introduced to improve efficiency of solar cells by tracking sun’s energy. A working system will ultimately be demonstrated to validate the design. Problems and possible improvements will also be presented. A solar panel receives the most sunlight when it is perpendicular to the sun’s rays, but the sunlight direction changes regularly with changing seasons and weather. Currently, most solar panels are fixed, i.e., the solar array has a fixed orientation to the sky and does not turn to follow the sun. To increase the unit area illumination of sunlight on solar panels, we designed a solar tracking electricity generation system. -
Parliament of India R a J Y a S a B H a Committees
Com. Co-ord. Sec. PARLIAMENT OF INDIA R A J Y A S A B H A COMMITTEES OF RAJYA SABHA AND OTHER PARLIAMENTARY COMMITTEES AND BODIES ON WHICH RAJYA SABHA IS REPRESENTED (Corrected upto 4th September, 2020) RAJYA SABHA SECRETARIAT NEW DELHI (4th September, 2020) Website: http://www.rajyasabha.nic.in E-mail: [email protected] OFFICERS OF RAJYA SABHA CHAIRMAN Shri M. Venkaiah Naidu SECRETARY-GENERAL Shri Desh Deepak Verma PREFACE The publication aims at providing information on Members of Rajya Sabha serving on various Committees of Rajya Sabha, Department-related Parliamentary Standing Committees, Joint Committees and other Bodies as on 30th June, 2020. The names of Chairmen of the various Standing Committees and Department-related Parliamentary Standing Committees along with their local residential addresses and telephone numbers have also been shown at the beginning of the publication. The names of Members of the Lok Sabha serving on the Joint Committees on which Rajya Sabha is represented have also been included under the respective Committees for information. Change of nominations/elections of Members of Rajya Sabha in various Parliamentary Committees/Statutory Bodies is an ongoing process. As such, some information contained in the publication may undergo change by the time this is brought out. When new nominations/elections of Members to Committees/Statutory Bodies are made or changes in these take place, the same get updated in the Rajya Sabha website. The main purpose of this publication, however, is to serve as a primary source of information on Members representing various Committees and other Bodies on which Rajya Sabha is represented upto a particular period. -
Techniques to Upgrade Indian Solar Power Sector by Analysing the Top Ranking Solar Power Countries
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 TECHNIQUES TO UPGRADE INDIAN SOLAR POWER SECTOR BY ANALYSING THE TOP RANKING SOLAR POWER COUNTRIES Shantanu Rawat1, Himanshi Rana2, Deepanvita Maurya3, Deepak Kumar4 1Department of Electrical, University of Petroleum & Energy Studies, Dehradun, India 2Department of Aerospace, University of Petroleum & Energy Studies, Dehradun, India 3Department of Mechanical, University of Petroleum & Energy Studies, Dehradun, India 4Assistant Professor, Department of Electrical, University of Petroleum & Energy Studies, Dehradun, India Abstract As fossil fuels are depleting day by day it is the high time to switch to renewable energy. Many countries have already realized this fact and have started focusing on the renewable energies. The main focus of all countries is on solar power [1]. Though many countries have developed themselves in solar power generation since last one decades but India hasn’t started yet. The major solar power producing countries are China, Germany and Japan and if we try to compare India with these countries we stand far apart in the queue. Though India has one of the best climatic conditions to support solar power generation. India is a sun-blessed country which has clear 300 days of sunshine, which is comparatively much more than the other countries [2]. The total power generated by India is 267,637.35 MW (till March 2015) and out of which we are generating only 5,050 MW through solar energy [3]. To satisfy the demand of power supply all over the country in future, we need to install more number of solar power plants such as to provide us maximum output as a result in much more advanced technique [4]. -
2 Feb-2018.Qxd
C M C M Y B Y B Postal Regd No- JK/485/2016-18 Internet Edition : www.truthprevail.com, E-paper : epaper.truthprevail.com RNI No. JKENG/2012/47637 T3 ru6th P8 revFaair and Fiearl ess * Chief Minister meets Governor * Janhvi Kapoor and Khushi step out in style... * JKNPP protests seeking revocation of FIRs slapped on Army * Bali for evolving efficient mechanism to improve.... * Study says smartphone use may make teenagers unhappy * Nothing for J&K state in Union Budget presented by the BJP Govt: JWAM email : [email protected] VOL 7, ISSUE NO. 32 JAMMU & KASHMIR FRIDAY FEBRUARY 02, 2018 DAILY 8 PAGE Re. 1/- IInnssiiddee Pensioners asked to JaNewi Dtelhie, Feyb 1 : sFinance ysMod ih goveirnsmen tb hadu takedn intgo efishteri esb aned annimale husfbaindtry sg raaminl lag;ri cBentrJes P(GR AcMSa) lwlorksing imitdd le' sclasas wbas tkhe aini tisate an inategrtatehd B,.E ds. prao - bhe ksaida. vikas' submit life certificates Minister Arun Jaitley’s Union account the recent electoral farmers. will be developed for the same. announcement of a Standard gramme for teachers. Training of To step up investments in by 31st March Budget 2018-19 brought a lot of results where the Bharatiya An agricultural market fund Big Healthcare Scheme Deduction of Rs 40,000 for trav - teachers during service is research and related infrastruc - cheer to the rural economy and Janata Party (BJP) had faced of Rs 2,000 crore will also be set In another massive el and medical reimbursement. extremely critical. We have ture in premier educational insti - JAMMU, FEBRUARY agricultural sector but left the reverses in rural areas. -
Union Budget 2020 - 2021 Index
UNION BUDGET 2020 - 2021 INDEX Key Highlights - Economy Key Highlights – Miscellaneous Tax Proposals Market Movements: Equity & Debt Economic Update: • Budget Summary • Revenue Snapshot • Expenditure Snapshot Sector Updates Equity Market: Outlook and Strategy Debt Market: Outlook and Strategy KEY HIGHLIGHTS Though the Union Budget is essentially a Statement of Account of public finances, it has historically become a significant opportunity to indicate the direction and the pace of India’s economic policy. The 2020-21 Union Budget was presented in continuation to strengthen its blueprint laid last year for creating a $5 trillion economy by 2025. This budget is woven around three prominent themes dedicated to provide “Ease of Living” to all citizens and to reinforce the Government’s intention to improve the rural economy by boosting credit and investment in the agriculture and rural sector. Overall, the Indian society, polity and economy have shown remarkable resilience in adjusting with the structural reforms. This year’s budget assumes importance for the current political regime due to it being the first full year budget of the government after coming back to power with a thumping majority. With this background, we present the key highlights of the Union Budget 2020-21. ECONOMY • Total expenditure in BE* 2020-21 is slotted to increase by 12.7% over RE* 2019-20. • Gross tax revenues are expected to grow by 10.8% in FY21, maintaining a double digit growth rate for the sixth year in a row. • Nominal GDP* is estimated to grow at 10% in 2020-21BE. Real GDP growth is expected to be 6.0% (assuming a 4% target inflation rate as per BE). -
Favourable Time for Embracing Sustainable Solar Energy in the Next Decade
RESEARCH PAPER Engineering Volume : 6 | Issue : 5 | May 2016 | ISSN - 2249-555X | IF : 3.919 | IC Value : 74.50 A Study on Solar Rise: Favourable Time for Embracing Sustainable Solar Energy in The Next Decade KEYWORDS Solar PV, National Solar Mission, carbon emissions, energy security. Kachita Kohli Tanya Navin Kohli BE Mech Engg Vth Sem, UIET, Punjab University, BTech, Power System Engg, UPES, Dehradun Chandigarh. ABSTRACT Solar PV technology converts sunlight directly into electricity, is among the fastest growing segments of the renewable energy industry in India. Solar PV already established in many countries including India, and set to become one of the key technologies of the 21st century. Some of the factors driving the growth of this seg- ment are concerns towards carbon emissions, energy security and the rising prices of fossil fuels. Union Cabinet on 15.06.2015, stepped up India’s solar power capacity target under the National Solar Mission by five times, reaching 1,00,000 MW by 2022, which will principally comprise of 40 GW Rooftop and 60 GW through Large/ Medium Scale Grid Connected Solar Power Projects. INTRODUCTION India being a tropical country receives adequate solar ra- “The importance of this Mission is not just limited to diation for 300 days, amounting to 3,000 hours of sunshine providing large-scale grid connected power. It has the equivalent to over 5,000 trillion kWh. Almost all the re- potential to provide significant multipliers in our efforts gions receive 4-7 kWh of solar radiation per sq mtrs with for transformation of India’s rural economy. -
Government of India Ministry of New and Renewable Energy Lok Sabha Unstarred Question No-1538
GOVERNMENT OF INDIA MINISTRY OF NEW AND RENEWABLE ENERGY LOK SABHA UNSTARRED QUESTION NO-1538 TO BE ANSWERED ON-26.07.2018 SOLAR PARK SCHEME 1538. SHRI GEORGE BAKER SHRI PARBHUBHAI NAGARBHAI VASAVA SHRI ANIL SHIROLE Will the Minister of NEW AND RENEWABLE ENERGY be pleased to state:- (a) the salient features of the Solar Park Scheme; (b) the details of the funds sanctioned, allocated and utilised for the setting up of these parks during the last three years and the current year across the country, State/UT-wise including Gujarat, Maharashtra and West Bengal; (c) the details of the number of solar parks approved and set up/in progress during the above-mentioned period across the country, State/UT-wise including Gujarat, Maharashtra and West Bengal; (d) the details of the target set and achievements made under this scheme so far; (e) the percentage of clean energy generated by these parks so far across the country, State/UT-wise; and (f) whether the Government has faced any difficulty in some of the States with regard to setting up of these parks after approval and if so, the details thereof and the reasons therefor along with the action taken by the Government in this regard? ANSWER THE MINISTER OF STATE FOR NEW & RENEWABLE ENERGY AND POWER (I/C) (SHRI R.K. SINGH) (a) The salient features of the Solar Park Scheme are given at Annexure-I. (b) The State/UT-wise details of the funds sanctioned for setting up of Solar parks during last three years and the current year are given at Annexure-II. -
Laying the Foundation for a Bright Future: Assessing Progress
Laying the Foundation for a Bright Future Assessing Progress Under Phase 1 of India’s National Solar Mission Interim Report: April 2012 Prepared by Council on Energy, Environment and Water Natural Resources Defense Council Supported in part by: ABOUT THIS REPORT About Council on Energy, Environment and Water The Council on Energy, Environment and Water (CEEW) is an independent nonprofit policy research institution that works to promote dialogue and common understanding on energy, environment, and water issues in India and elsewhere through high-quality research, partnerships with public and private institutions and engagement with and outreach to the wider public. (http://ceew.in). About Natural Resources Defense Council The Natural Resources Defense Council (NRDC) is an international nonprofit environmental organization with more than 1.3 million members and online activists. Since 1970, our lawyers, scientists, and other environmental specialists have worked to protect the world’s natural resources, public health, and the environment. NRDC has offices in New York City; Washington, D.C.; Los Angeles; San Francisco; Chicago; Livingston and Beijing. (www.nrdc.org). Authors and Investigators CEEW team: Arunabha Ghosh, Rajeev Palakshappa, Sanyukta Raje, Ankita Lamboria NRDC team: Anjali Jaiswal, Vignesh Gowrishankar, Meredith Connolly, Bhaskar Deol, Sameer Kwatra, Amrita Batra, Neha Mathew Neither CEEW nor NRDC has commercial interests in India’s National Solar Mission, nor has either organization received any funding from any commercial or governmental institution for this project. Acknowledgments The authors of this report thank government officials from India’s Ministry of New and Renewable Energy (MNRE), NTPC Vidyut Vyapar Nigam (NVVN), and other Government of India agencies, as well as United States government officials. -
Government of India Ministry of New and Renewable Energy Lok Sabha Unstarred Question No
GOVERNMENT OF INDIA MINISTRY OF NEW AND RENEWABLE ENERGY LOK SABHA UNSTARRED QUESTION NO. 2316 TO BE ANSWERED ON 16.03.2017 FUNDS UNDER JNNSM 2316. SHRI K.C. VENUGOPAL: Will the Minister of NEW & RENEWABLE ENERGY be pleased to state: (a) the funds sanctioned and released under Jawaharlal Nehru National Solar Mission (JNNSM) to various States including Kerala during each of the last three years and the current year, State-wise; and (b) the details of solar parks and ultra mega solar power projects started functioning under the Mission during the said period, State-wise? ANSWER THE MINISTER OF STATE FOR POWER, COAL, NEW & RENEWABLE ENERGY AND MINES (INDEPENDENT CHARGE) (SHRI PIYUSH GOYAL) (a): State-wise budgetary allocation is not made under the schemes/programmes. However, details of amount released by this Ministry for installation of solar energy projects during last three years and current year are given below:- Total funds sanctioned for release Year (Rs. Crore) 2013-14 692.28 2014-15 1158.19 2015-16 3146.24 2016-17 2140.92 (as on 28.2.2017) State-wise details of funds released during the last three years and current year under few schemes are given at Annexure-I. (b): 34 Solar Parks have been sanctioned in 21 States for solar power capacity of 20,000 MW. As on date, Ananthapuramu solar park in Andhra Pardesh, Bhadla-II solar park in Rajasthan, Kasargod solar park in Kerala are partly functional. The details of sanctioned solar parks and ultra-mega solar power projects under the Mission (JNNSM) are given at Annexure-II. -
SOLAR PARKS Accelerating the Growth of Solar Power in India
Cover Story SOLAR PARKS Accelerating the Growth of Solar Power in India Anindya S Parira, discusses about the objectives, targets, the progress made so far, the solar power park developers (SPPDs), and the challenges that lie ahead of the Solar Parks flagship scheme under the National Solar Mission of the Government of India. Solar Parks: Accelerating the Growth of Solar Power in India he recent downward trends in zone of development of solar various permissions, etc., which solar tariff may be attributed power generation projects and delays the project. To overcome to the factors like economies provides developers an area that these challenges, the scheme for Tof scale, assured availability is well characterized, with proper “Development of Solar Parks and of land, and power evacuation infrastructure and access to amenities Ultra-Mega Solar Power Projects” was systems under the Solar Park and where the risk of the projects rolled out in December 2014 with an Scheme. The scheme aims to provide can be minimized. Solar Park also objective to facilitate the solar project a huge impetus to solar energy facilitates developers by reducing the developers to set up projects in a generation by acting as a flagship number of required approvals. The plug-and-play model. demonstration facility to encourage most important benefit from the solar project developers and investors, park for the private developer is the Target prompting additional projects of significant time saved. It was planned to set up at least 25 similar nature, triggering economies solar parks, each with a capacity of of scale for cost-reductions, technical Objective 500 MW and above; thereby targeting improvements and achieving large Solar power projects can be set up around 20,000 MW of solar power scale reductions in greenhouse anywhere in the country, however installed capacity. -
Download Pdf of Monthly RE Update February 2021
monthly update February 2021 Lead Sponsors Delivering true value 丨 Higher power, lower LCOE Shaping the future. Once again. www.longi-solar.com Delivering true value 丨 Higher power, lower LCOE Shaping the future. Once again. www.longi-solar.com Contents 1. Tenders | 5 New RFS Issued | 5 Re-Tendered | 8 Date extension | 8 Auctions Completed | 9 2. Installed Capacity | 10 3. Investments/ Deals | 13 4. Monthly Import-Export Statistics | 15 5. Module Price Trends | 16 6. Policy and Regulation | 17 4 1. Tenders New RFS • About 1046 MW of renewable tenders were issued in February 2021 Issued • Auctions were completed for 6895 MW of solar projects. Maximum capacity of 3150 MW was won by Adani alone. Fig 1.1: Details of new tenders issued in February 2021 NTPC, 300 MW, Solar, Gujarat 5000 UPNEDA, 275 MW, Solar, Uttar Pradesh KSEB, 200 MW, Rooftop Solar, Kerala CESL, 100 MW, Solar, Maharashtra EESL, 70 MW, Solar Power Project, Goa NHPC, 25 MW, Floating Solar, Madhya Pradesh APGCL, 25 MW, Solar, Namrup Thermal Station, Assam TSCL, 20 MW, Floating Solar, Karnataka BHEL, 10 MW, Solar, (WBSEDCL) West Bengal HPGCL, 10 MW, Solar, Jhajjar, Haryana, Feb 2021 WBREDA, 9.9 MW, Rooftop Solar, West Bengal JREDA, 7 MW, Rooftop Solar, Jharkhand HPGCL, 6 MW, Solar, Chandpur, Faridabad, Haryana WBPDCL, 5 MW, Floating Solar, West Bengal NOIDA, 2.6 MW, Rooftop Solar NVVNL, 2 MW, Solar, Agartala Airport, Tripura CCMC, 2MW. Solar, Tamil Nadu TANGEDCO, 1MW, Solar, Tamil Nadu MES, 1 MW, Solar Power Plant, Hisar, Haryana 0 100 200 300 apacity M Source: JMK Research