Council District Facilities Management Committee Committee Paper for 11.5.2021 SKDC(DFMC) Paper No. 63/21

Report on the Management of Recreation and Sports Facilities in Sai Kung District in March to April 2021 by the Leisure and Cultural Services Department

Purpose

This paper briefs Members on the management of recreation and sports facilities by the Sai Kung District Leisure Services Office of the Leisure and Cultural Services Department (LCSD) for the period from March to April 2021.

Background

2. The LCSD makes regular submissions reporting on the management and usage of recreation and sports facilities, and the performance of service contractors in Sai Kung District.

Management of Recreation and Sports Facilities

3. In view of the latest developments of COVID-19, the LCSD had reopened the outdoor children’s play facilities on 1 April 2021 and some public swimming pools and gazetted beaches on 2 April 2021. Indoor children’s play rooms and barbecue sites are still required to be temporarily closed until further notice. The LCSD will pay close attention to the development of the epidemic and the requirements under the Prevention and Control of Disease (Requirements and Directions) (Business and Premises) Regulation (Cap. 599F) to review the opening arrangements of the leisure facilities in timely manner. Besides, Tseung Kwan O Sports Centre will continue to be temporarily closed for serving as a Community Vaccination Centre. Details of the usage of recreation and sports facilities in Sai Kung District in March to April 2021 are tabulated in Annex I.

4. Cleansing, horticultural maintenance and security guard services have been contracted out. The performances of the respective service contractors

- 1 - were insofar satisfactory. The LCSD will continue keeping close surveillances on their performances to monitor their services to be up to the requirements.

Improvement Project

5. Please refer to Annex II for information on facility improvement project in Sai Kung District.

Greening Projects

6. The LCSD planted 11 trees, 7 727 shrubs and 1 400 seasonal flowers in March and April 2021 to beautify the environment. Details are tabulated in Annex III.

7. In addition, the LCSD removed 11 trees during the period concerned. Those trees had been infected by pests and diseases, or damaged by beset rendering structural problems. Despite intensive care and maintenance were provided, the health condition of the trees continued deteriorating and did not show any signs of recovery. The LCSD had therefore removed them for the sake of public safety. The LCSD will consider replanting suitable tree species with due consideration to the actual circumstances. The details of the felled trees are tabulated in Annex IV.

Large-scaled Competitions in Tseung Kwan O Sports Ground and Use of Floodlights

8. The Football Association (HKFA) and the Hong Kong Amateur Athletic Association (HKAAA) will organise large-scaled competitions at the Tseung Kwan O Sports Ground for the period from May to June 2021.

9. The HKFA is devising their competition schedules with related matters and will release them to their official website. The HKFA would require the provision of floodlights with the brightest setting whenever necessary in order to meet the competition lighting requirements. In this connection, property management offices or owners’ committees of the neighbouring housing estates will be notified in writing by the LCSD for informing them that the use of floodlights at the brightest setting during the competitions to be held at the Tseung Kwan O Sports Ground for their advance information.

- 2 - 10. The details of the competitions to be held by HKAAA are as follows:

Date Day Competition Booked Session

1 & 2 Hong Kong Athletics Sat & Sun May 2021 Championships 2021 0800-1800 hours

22 & 23 Hong Kong Athletics Sat & Sun May 2021 Series 2021 – Series 3 0800-1800 hours

Presentation

9. This paper is for Members’ reference at the meeting of the District Facilities Management Committee of the Sai Kung District Council on 11 May 2021. Members’ views are welcome.

Sai Kung District Leisure Services Office Leisure and Cultural Services Department April 2021

File No.: LCS 4/SK 175/06 Pt 22

- 3 -

Annex I

Report on the Usage of Recreation and Sports Facilities in Sai Kung District (March to April 2021)

The usage of recreation and sports facilities in Sai Kung District in March and April 2021 are as follows:

1. Swimming Pool (Reopened on 2 April) April (as at 10.4.2021) Area Venue Attendance Attendance (Individual) (Group) Sai Kung Sai Kung Swimming Pool 1 128 0 Tseung Kwan O Tseung Kwan O Swimming Pool@ 4 108 73 Remarks : @ The main pool in Tseung Kwan O Swimming pool is opened from 2 April to 15 April 2021 while the other pools are temporarily closed for conducting annual maintenance works.

2. Beach (Reopened on 2 April) Attendance (Man-time) Area Venue April (as at 10.4.2021) First Beach 4 810 Clear Water Bay Second Beach* 17 700 Sai Kung Silver Strand Beach * 3 920 5 070 * 10 240 3 510 Remarks: * Clear Water Bay Second Beach, Silver Strand Beach and Hap Mun Bay Beach have provided life-saving services from 2 April 2021.

- 1 -

3. Sports Centre – Arena Usage (%) April March (as at 10.4.2021) Area Venue Peak Non-peak Peak Non-peak Hours Hours Hours Hours (%) (%) (%) (%) Tseung Kwan O Sports Centre^ N.A. N.A. N.A. N.A. Sports Centre 99 80 99 96 Tseung Tsui Lam Sports Centre 96 58 98 84 Kwan O Sports Centre 94 84 91 94 Hong Kong Velodrome 94 61 93 89 Sports Centre 99 84 99 96 Remarks : ^ Tseung Kwan O Sports Centre is temporarily closed for serving as a Community Vaccination Centre.

4. Sports Ground Usage (%) April March (as at 10.4.2021) Area Venue Peak Non-peak Peak Non-peak Hours Hours Hours Hours (%) (%) (%) (%) Sai Kung Tang Shiu Kin Sports Sai Kung 100 100 100 100 Ground Tseung Kwan O Sports Ground 100 100 100 100 Tseung (Main Sports Ground) Kwan O Tseung Kwan O Sports Ground 100 100 100 100 (Secondary Sports Ground)

- 2 -

5. Squash Court Usage (%) April March (as at 10.4.2021) Area Venue Peak Non-peak Peak Non-peak Hours Hours Hours Hours (%) (%) (%) (%) Sai Kung Sai Kung Squash Courts 63 86 86 100 Tseung Kwan O Sports Centre^ N.A. N.A. N.A. N.A. Tseung Po Lam Sports Centre 79 85 79 91 Kwan O Tsui Lam Sports Centre 38 52 47 56 Remarks : ^ Tseung Kwan O Sports Centre is temporarily closed for serving as a Community Vaccination Centre.

6. Tennis Court Usage (%) April March (as at 10.4.2021) Area Venue Peak Non-peak Peak Non-peak Hours Hours Hours Hours (%) (%) (%) (%) Sai Kung Sai Kung Tennis Courts 98 96 98 99 Tseung Po Tsui Park 98 89 97 93 Kwan O

7. Bowling Green Usage (%) April March (as at 10.4.2021) Area Venue Peak Non-peak Peak Non-peak Hours Hours Hours Hours (%) (%) (%) (%) Artificial Turf Bowling Tseung Green of Hang Hau Man 50 54 49 67 Kwan O Kuk Lane Park

- 3 -

8. Soccer Pitch Usage (%) April March (as at 10.4.2021) Area Venue Peak Non-peak Peak Non-peak Hours Hours Hours Hours (%) (%) (%) (%) Grass Pitch of Sai Kung Sai Kung Tang Shiu Kin Sports 55 N.A. 75 N.A. Ground △ Grass Pitch of Tseung Kwan O Sports Ground (Main 100 100 100 N.A. Sports Ground) # Tseung Grass Pitch of Tseung Kwan Kwan O O Sports Ground (Secondary N.A. N.A. N.A. N.A. Sports Ground) + Artificial Turf Pitch of 98 35 89 46 Po Tsui Park Remarks : △ Sessions in non-peak hours for Grass Pitch of Sai Kung Tang Shiu Kin Sports Ground were not available for hiring in March and April 2021.

# Sessions in non-peak hours for Grass Pitch of Tseung Kwan O Sports Ground (Main Sports Ground) were not available for hiring in April 2021.

+ Sessions in peak hours and non-peak hours for Grass Pitch of Tseung Kwan O Sports Ground (Secondary Sports Ground) were not available for hiring in March and April 2021.

- 4 - Annex II

Progress of Improvement Works of Leisure Facilities in Sai Kung District (March to April 2021)

Construction Progress Area Venue Improvement Work Period of Work

Addition of Futsal Line Ho Chung 15 March to Works in Sai Kung Marking and Soccer Pitch 17 June 2021 Progress Resurfacing Works

- 1 - Annex III

Greening Projects in Sai Kung District (March to April 2021)

Quantity (as at 10.4.2021) Area Location of Planting Seasonal Trees Shrubs Flowers

1. Amenity Area at Po Tung Road 1 - -

2. Hong Kin Road Garden 1 - - Sai Kung Roadside Planter at 3. - 4 300 - Development Area (Tui Min Hoi)

4. Amenity Area at Tong Yin Street 2 - -

5. Po Tsui Park 2 - -

Amenity Area at Po Lam Road North Tseung 6. 5 - - (Po Ning Road to Po Fung Road) Kwan O 7. Roadside Flower Pots at Tong Ming Street - 125 -

Roadside Planter at Tseung Kwan O South 8. - 3 302 - Waterfront Promenade

9. Po Hong Park - - 1 400

Total: 11 7 727 1 400

- 1 - Annex IV

Tree Felling Details in Sai Kung District (March to April 2021)

Area Location of Tree Felling Quantity (as at 10.4.2021)

1. Amenity Area at Wai Man Road 2 Sai Kung 2. Tree Pit at Man Nin Street 1

Amenity Area at Po Lam Road North 3. 2 (Po Fung Road to Po Hong Road)

Amenity Area at Po Lam Road North 4. 2 Tseung (Near Hong Sing Garden) Kwan O 5. Hang Hau Village 1

6. Po Hong Park 3

Total: 11

- 1 -