World Bank Document PROCUREMENT PLAN (Textual Part) Project information: Maldives [Maldives Clean Environment Project P 160739 Project Implementation agency: Ministry of Environment and Energy Public Disclosure Authorized Date of the Procurement Plan: 23 August 2017 Period covered by this Procurement Plan: 23 August 2017 to 23 February 2019 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan Public Disclosure Authorized for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Public Disclosure Authorized Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Otherwise state “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is not applicable for those contracts identified in the Procurement Plan tables; Public Disclosure Authorized Works: is not applicable for those contracts identified in the Procurement Plan tables PROCUREMENT Maldives : Maldives Clean Environment Project PLAN General Information Country: Maldives Bank’s Approval Date of the Original Procurement Plan: 2017-08-23 Revised Plan Date(s): (comma delineated, leave blank if none)2020-02-29 Project ID: P160739 GPN Date: 2017-08-23 Project Name: Maldives Clean Environment Project Loan / Credit No: IDA / D1990 Executing Agency(ies):Ministry of Environment and Energy WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MV-MEE-60158-CW-RFB / Construction of Island Waste Component 3: Island Waste Single Stage - One IDA / D1990 Post Request for Bids Open - National 78,000.00 0.00 Canceled 2018-05-01 2018-05-10 2018-05-03 2018-05-24 2018-06-07 2018-07-05 2018-11-02 Management Centre in Management Systems Envelope M.Mulah MV-MEE-61003-CW-RFB / Construction of Island Waste Component 3: Island Waste Single Stage - One IDA / D1990 Post Request for Bids Open - National 78,000.00 0.00 Canceled 2018-05-01 2018-05-10 2018-05-03 2018-05-24 2018-06-07 2018-07-05 2018-11-02 Management Centre in Management Systems Envelope Madifushi, Meemu Atoll MV-MEE-61004-CW-RFB / Construction of Island Waste Component 3: Island Waste Single Stage - One IDA / D1990 Post Request for Bids Open - National 78,000.00 0.00 Canceled 2018-05-01 2018-05-10 2018-05-03 2018-05-24 2018-06-07 2018-07-05 2018-11-02 Management Centre in Management Systems Envelope Kinbidhoo, Thaa Atoll MV-MEE-91835-CW-RFB / Upgrading of Island Waste Component 3: Island Waste Single Stage - One IDA / D1990 Post Request for Bids Open - National 60,000.00 54,165.59 Signed 2018-12-17 2018-12-18 2018-12-18 2019-01-03 2019-01-13 2019-01-08 2019-01-17 2019-01-27 2019-02-06 2019-05-27 Management Centre at Lh. Management Systems Envelope Kurendhoo MV-MEE-92436-CW-RFQ / Provision of Three Phase Component 3: Island Waste Request for Single Stage - One IDA / D1990 Post Open - National 35,000.00 31,625.16 Signed 2018-12-25 2019-01-27 2019-02-20 2019-03-28 Electricity to IWMC of Management Systems Quotations Envelope B.Kihaadhoo & N.Maafaru MV-MEE-98538-CW-RFB / Component 2: Regional Single Stage - One Construction of RO Plant IDA / D1990 Post Request for Bids Open - National 90,000.00 58,418.92 Signed 2019-02-06 2019-02-03 2019-02-10 2019-02-24 2019-02-26 2019-03-10 2019-04-15 2019-04-14 2019-05-23 2019-06-28 Waste Management Systems Envelope Building at Vandhoo RWMF MV-MEE-98559-CW-RFB / Construction of a Store Component 2: Regional Single Stage - One IDA / D1990 Post Request for Bids Open - National 140,000.00 120,502.66 Signed 2019-02-06 2019-02-04 2019-02-10 2019-02-24 2019-02-26 2019-03-10 2019-04-15 2019-04-14 2019-05-23 2019-06-28 Room and Guard House in Waste Management Systems Envelope Vandhoo RWMF MV-MEE-106513-CW-RFB / Component 3: Island Waste Single Stage - One Upgrading of IWMC in IDA / D1990 Post Request for Bids Open - National 60,000.00 53,673.20 Signed 2019-03-18 2019-03-19 2019-03-19 2019-04-04 2019-04-10 2019-04-09 2019-06-30 2019-04-28 2019-07-17 2019-08-26 Management Systems Envelope Ungoofaaru, Raa Atoll MV-MEE-106522-CW-RFB / Construction of Island Waste Component 3: Island Waste Single Stage - One IDA / D1990 Post Request for Bids Open - National 135,000.00 135,036.52 Signed 2019-03-18 2019-03-17 2019-03-19 2019-04-04 2019-04-10 2019-04-18 2019-06-29 2019-05-16 2019-07-17 2019-10-13 Management Centre in B. Management Systems Envelope Dhonfanu MV-MEE-106524-CW-RFB / Construction of Island Waste Component 3: Island Waste Single Stage - One IDA / D1990 Post Request for Bids Open - National 135,000.00 112,173.96 Signed 2019-03-18 2019-03-19 2019-03-19 2019-04-04 2019-04-10 2019-04-18 2019-06-30 2019-05-16 2019-07-10 2019-09-13 Management Centre in B. Management Systems Envelope Hithaadhoo Page 1 MV-MEE-84075-CW-RFB / Component 2: Regional Single Stage - One Extension of Existing Utility IDA / D1990 Post Request for Bids Open - National 100,000.00 105,952.78 Signed 2019-05-21 2019-02-04 2019-05-22 2019-06-12 2019-02-26 2019-06-19 2019-04-15 2019-07-10 2019-05-20 2019-09-08 Waste Management Systems Envelope Building at Vandhoo RWMF MV-MEE-101303-CW-RFB / Upgrading of Waste Storage Facilities and Extension Component 2: Regional Single Stage - One IDA / D1990 Post Request for Bids Open - National 620,000.00 791,314.01 Signed 2019-05-10 2019-03-18 2019-05-13 2019-05-27 2019-04-08 2019-06-03 2019-06-15 2019-06-24 2019-07-17 2019-10-22 Works of the Existing Waste Management Systems Envelope Vehicle Shed in Vandhoo RWMF MV-MEE-121323-CW-RFB / Re-location of Existing Fuel Tanks, construction of new Component 2: Regional Single Stage - One fuel storage tank and pump IDA / D1990 Post Request for Bids Open - National 350,000.00 0.00 Canceled 2019-06-27 2019-06-30 2019-06-30 2019-07-14 2019-07-30 2019-08-19 2019-08-29 2019-10-03 2020-03-31 Waste Management Systems Envelope room and construction of 200 CBM Water storage Tank at R.Vandhoo MV-MEE-148349-CW-RFB / Under Component 3: Island Waste Single Stage - One Upgrading of IWMC in IDA / D1990 Post Request for Bids Open - National 110,000.00 0.00 Implementati 2019-12-15 2020-01-05 2019-12-18 2020-01-06 2020-01-08 2020-01-22 2020-02-19 2020-06-18 Management Systems Envelope Maakurathu, Raa Atoll on MV-MEE-148353-CW-RFB / Under Component 3: Island Waste Single Stage - One Upgrading of IWMC in IDA / D1990 Post Request for Bids Open - National 130,000.00 0.00 Implementati 2019-12-15 2019-12-30 2019-12-18 2020-01-06 2020-01-08 2020-01-22 2020-02-19 2020-06-18 Management Systems Envelope Holhudhoo, Noonu Atoll on MV-MEE-64621-CW-RFB / Pending Construction of Island Waste Component 3: Island Waste Single Stage - One IDA / D1990 Post Request for Bids Open - National 100,000.00 0.00 Implementati 2020-06-01 2020-06-04 2020-06-25 2020-07-09 2020-08-06 2020-12-04 management Centre in Management Systems Envelope on Omadhoo, Thaa Atoll MV-MEE-84206-CW-RFQ / Pending Rehabilitation of the Component 2: Regional Request for Single Stage - One IDA / D1990 Post Limited 50,000.00 0.00 Implementati 2020-06-04 2020-07-23 2020-09-21 Existing Landfill and Waste Management Systems Quotations Envelope on Leachate Pond (with pumps) MV-MEE-148352-CW-RFB / Pending Component 3: Island Waste Single Stage - One Upgrading of IWMC in IDA / D1990 Post Request for Bids Open - National 130,000.00 0.00 Implementati 2020-03-05 2020-03-12 2020-04-02 2020-04-16 2020-05-14 2020-10-11 Management Systems Envelope Eydhafushi, Baa Atoll on MV-MEE-64624-CW-RFB / Pending Construction of Island Waste Component 3: Island Waste Single Stage - One IDA / D1990 Post Request for Bids Open - National 100,000.00 0.00 Implementati 2020-06-01 2020-06-04 2020-06-25 2020-07-09 2020-08-06 2020-12-04 Management Centre in Management Systems Envelope on Thimarafushi, Thaa Atoll MV-MEE-64627-CW-RFB / Pending Construction of Island Waste Component 3: Island Waste
Recommended publications
  • Kudahuvadhoo and Nilandhoo Collection Centers Have Been Officially Opened 3
    Maldives Inland Revenue Authority Volume: 5 MIRAmaldives Number: 11 Mira Maldives November 2017 MIRAPost miramaldives Kudahuvadhoo and Nilandhoo MIRAcollection collects centers a record have MVR been 2.2 billion officially2 opened u3 MIRA’s teams to visit atolls to assist If annual income is over MVR 20 million, taxpayers in preparing financial statements GST returns must be filed online 11 and BPT Return 3 Additional leeway given over GST charged MIRA warns over non-licensed tax agents on complementary bills u2 u6 2 MIRAPost November 2017 MIRA October collection totals to 983.5 million Mariyam Juwairiyya date for payment of this fee was during October. Senior Tax Officer, Policy, Planning and Statistics Including the revenue of October, MIRA’s revenue collections add up to an aggregate of MVR 12.89 During October 2017, MIRA collected MVR billion so far. 983.5 million, including 38.1 million in US dollar. Other revenue types that contributed a This is a 10.7% rise compared to that of October significant share in October’s collection includes 2016 and a 4% rise in the expected revenue. GST (MVR 539.6 million), BPT (MVR 78.5 This increase was mainly contributed by Tourism million), Green Tax (MVR 53.9 million) and Land Rent (MVR 128.5 million), as the due Airport Service Charge (MVR 45.5 million). Additional leeway given over GST charged on complementary bills services provided free of charge to directors, employees Fathimath Amaanee Khalid and related parties, as specified under section 54 of Senior Tax Officer, Policy, Technical Service the GST Regulation, are not subject to GST for a period of 72 hours.
    [Show full text]
  • Coastal Adpatation Survey 2011
    Survey of Climate Change Adaptation Measures in Maldives Integration of Climate Change Risks into Resilient Island Planning in the Maldives Project January 2011 Prepared by Dr. Ahmed Shaig Ministry of Housing and Environment and United Nations Development Programme Survey of Climate Change Adaptation Measures in Maldives Integration of Climate Change Risks into Resilient Island Planning in the Maldives Project Draft Final Report Prepared by Dr Ahmed Shaig Prepared for Ministry of Housing and Environment January 2011 Table of Contents 1 INTRODUCTION 1 2 COASTAL ADAPTATION CONCEPTS 2 3 METHODOLOGY 3 3.1 Assessment Framework 3 3.1.1 Identifying potential survey islands 3 3.1.2 Designing Survey Instruments 8 3.1.3 Pre-testing the survey instruments 8 3.1.4 Implementing the survey 9 3.1.5 Analyzing survey results 9 3.1.6 Preparing a draft report and compendium with illustrations of examples of ‘soft’ measures 9 4 ADAPTATION MEASURES – HARD ENGINEERING SOLUTIONS 10 4.1 Introduction 10 4.2 Historical Perspective 10 4.3 Types of Hard Engineering Adaptation Measures 11 4.3.1 Erosion Mitigation Measures 14 4.3.2 Island Access Infrastructure 35 4.3.3 Rainfall Flooding Mitigation Measures 37 4.3.4 Measures to reduce land shortage and coastal flooding 39 4.4 Perception towards hard engineering Solutions 39 4.4.1 Resort Islands 39 4.4.2 Inhabited Islands 40 5 ADAPTATION MEASURES – SOFT ENGINEERING SOLUTIONS 41 5.1 Introduction 41 5.2 Historical Perspective 41 5.3 Types of Soft Engineering Adaptation Measures 42 5.3.1 Beach Replenishment 42 5.3.2 Temporary
    [Show full text]
  • List of MOE Approved Non-Profit Public Schools in the Maldives
    List of MOE approved non-profit public schools in the Maldives GS no Zone Atoll Island School Official Email GS78 North HA Kelaa Madhrasathul Sheikh Ibrahim - GS78 [email protected] GS39 North HA Utheem MadhrasathulGaazee Bandaarain Shaheed School Ali - GS39 [email protected] GS87 North HA Thakandhoo Thakurufuanu School - GS87 [email protected] GS85 North HA Filladhoo Madharusathul Sabaah - GS85 [email protected] GS08 North HA Dhidhdhoo Ha. Atoll Education Centre - GS08 [email protected] GS19 North HA Hoarafushi Ha. Atoll school - GS19 [email protected] GS79 North HA Ihavandhoo Ihavandhoo School - GS79 [email protected] GS76 North HA Baarah Baarashu School - GS76 [email protected] GS82 North HA Maarandhoo Maarandhoo School - GS82 [email protected] GS81 North HA Vashafaru Vasahfaru School - GS81 [email protected] GS84 North HA Molhadhoo Molhadhoo School - GS84 [email protected] GS83 North HA Muraidhoo Muraidhoo School - GS83 [email protected] GS86 North HA Thurakunu Thuraakunu School - GS86 [email protected] GS80 North HA Uligam Uligamu School - GS80 [email protected] GS72 North HDH Kulhudhuffushi Afeefudin School - GS72 [email protected] GS53 North HDH Kulhudhuffushi Jalaaludin school - GS53 [email protected] GS02 North HDH Kulhudhuffushi Hdh.Atoll Education Centre - GS02 [email protected] GS20 North HDH Vaikaradhoo Hdh.Atoll School - GS20 [email protected] GS60 North HDH Hanimaadhoo Hanimaadhoo School - GS60
    [Show full text]
  • Detailed Island Risk Assessment in Maldives, L
    Detailed Island Risk Assessment in Maldives Volume III: Detailed Island Reports L. Gan – Part 1 DIRAM team Disaster Risk Management Programme UNDP Maldives December 2007 Table of contents 1. Geographic background 1.1 Location 1.2 Physical Environment 2. Natural hazards 2.1 Historic events 2.2 Major hazards 2.3 Event Scenarios 2.4 Hazard zones 2.5 Recommendation for future study 3. Environment Vulnerabilities and Impacts 3.1 General environmental conditions 3.2 Environmental mitigation against historical hazard events 3.3 Environmental vulnerabilities to natural hazards 3.4 Environmental assets to hazard mitigation 3.5 Predicted environmental impacts from natural hazards 3.6 Findings and recommendations for safe island development 3.7 Recommendations for further study 4. Structural vulnerability and impacts 4.1 House vulnerability 4.2 Houses at risk 4.3 Critical facilities at risk 4.4 Functioning impacts 4.5 Recommendations for risk reduction 2 1. Geographic background 1.1 Location Gan is located on the eastern rim of Laamu Atoll, at approximately 73° 31' 50"E and 1° 52' 56" N, about 250 km from the nations capital Male’ and 3.5 km from the nearest airport, Kadhdhoo (Figure 1.1). Gan is the largest island in terms of land area and population amongst 13 inhabited islands of Laamu atoll. It’s nearest inhabited islands are Kalhaidhoo (7 km), Mundoo (10 km) and Atoll Capital Fonadhoo (10 km). Gan forms part of a stretch of 4 islands connected through causeways and bridges and is the second largest group of islands connected in this manner with a combined land area of 9.4km 2.
    [Show full text]
  • Greater Male Waste-To-Energy Project
    wr Report and Recommendation of the President to the Board of Directors Project Number: 51077-003 July 2020 Proposed Loan, Grant, Technical Assistance Grant, and Administration of Loan and Grant Republic of Maldives: Greater Malé Waste-to-Energy Project Distribution of this document is restricted until it has been approved by the Board of Directors. Following such approval, ADB will disclose the document to the public in accordance with ADB’s Access to Information Policy. CURRENCY EQUIVALENTS (as of 7 July 2020) Currency unit – Rufiyaa (Rf) Rf1.00 = $0.06 $1.00 = Rf15.40 ABBREVIATIONS 3R – reduce-reuse-recycle ADB – Asian Development Bank AIIB – Asian Infrastructure Investment Bank COVID-19 – coronavirus disease DBO – design–build–operate EIA – environmental impact assessment EIRR – economic internal rate of return EMP – environmental management plan EPA – Environmental Protection Agency FMA – financial management assessment ha – hectare JFJCM Japan Fund for the Joint Crediting Mechanism MOE – Ministry of Environment MOF – Ministry of Finance MW – megawatt O&M – operation and maintenance PAM – project administration manual PMU – project management unit SWM – solid waste management TA – technical assistance tpd – tons per day TRTA – transaction technical assistance WTE – waste-to-energy NOTE In this report, "$" refers to United States dollars. Vice-President Shixin Chen, Operations 1 Director General Kenichi Yokoyama, South Asia Department (SARD) Director Norio Saito, Urban Development and Water Division (SAUW), SARD Team leader Luca Di
    [Show full text]
  • Study on Post-Tsunami Restoration and Conservation Projects in the Maldives
    Study on Post-Tsunami Restoration and Conservation Projects in the Maldives Ecosystems and Livelihoods Group, Asia Study on Post-Tsunami Restoration and Conservation Projects in the Maldives Marie Saleem and Shahaama A. Sattar February 2009. Cover photo: Thaa Vilufushi after reclamation © Hissan Hassan Table of Contents 1 Introduction ................................................................................................... 3 2 Summary of post-tsunami restoration and conservation initiatives ............... 7 3 ARC/CRC Waste Management Programme .............................................. 11 3.1 Background ......................................................................................... 11 3.2 Summaries of outcomes in the Atolls .................................................. 12 3.2.1 Ari Atoll ......................................................................................... 13 3.2.2 Baa Atoll ....................................................................................... 13 3.2.3 Dhaalu Atoll .................................................................................. 13 3.2.4 Gaaf Alifu and Gaaf Dhaalu Atolls ................................................ 14 3.2.5 Haa Alifu Atoll............................................................................... 14 3.2.6 Haa Dhaalu Atoll .......................................................................... 15 3.2.7 Kaafu and Vaavu Atolls ................................................................ 15 3.2.8 Laamu Atoll .................................................................................
    [Show full text]
  • Backup of Livelihoods Report
    United Nations Development Programme 2005 - 2008 UNDP Tsunami Recovery Efforts in the Maldives RESTORATION OF LIVELIHOODS SHARING EXPERIENCES Table of Contents I Foreo w rd 1-2 Background 3-4 Livelihoods at a glance 5-6 Map 7-8 Donors & Partners 9-10 The Livelihoods Team 11-12 Profile: Agriculture 11 Story: The Young Agri-Shop Manager 13-14 Profile: Fisheries 13 Case Study: Naifaru Fish Market 15-16 Profile: Waste Management 15 Case Study: Waste Management in Baa Maalhos 17-18 Profile: Women's Livelihoods 17 Case Study: Hydroponics for Vilufushi Community 19-20 Profile: Small Grants Programme funded by South-South Grant Facility (SSGF) 19 Story: Broadband Internet to Hinnavaru Homes 21-22 Profile: Livelihood Support Activities - Micro Credit, Capacity Building & Decentralisation 23-24 Profile: Handicrafts Pilot Project 23 Story: A Woodworkers's Dream 25-28 Implementation Strategy 29-31 Primary Challenges 32 Case Study: Social Centre in Shaviyani Maroshi 33-36 Lessons Learnt & Best Practices 37-39 Conclusion & Way Forward FOREWORD Despite the overwhelming nature of the losses of the recovery intervention. December 2004 tsunami, many Maldivians are on the road to recovery; survivors have recommenced work, Our efforts to assist in the process of recovery for communities are close to completion, and several men and women determined to achieve self- have bounced back while others continue the steady sufficiency, has not been without obstacle. Human progress toward recovery. Through grants, loans and resource shortages, geographical barriers, the capacity building exercises, the United Nations construction boom and working with organizations Development Programme has worked to help with limited capacity in formal project management survivors of the tsunami restore their businesses and are just some of the challenges that had to be incomes, and find opportunities to remain outside addressed and overcome during our operations.
    [Show full text]
  • The Shark Fisheries of the Maldives
    The Shark Fisheries of the Maldives A review by R.C. Anderson and Hudha Ahmed Ministry of Fisheries and Agriculture, Republic of Maldives and Food and Agriculture Organization of the United Nations. 1993 Tuna fishing is the most important fisheries activity in the Maldives. Shark fishing is oneof the majorsecondary fishing activities. A large proportion of Maldivian fishermen fish for shark at least part-time, normally during seasons when the weather is calm and tuna scarce. Most shark products are exported, with export earnings in 1991 totalling MRf 12.1 million. There are three main shark fisheries. A deepwater vertical longline fishery for Gulper Shark (Kashi miyaru) which yields high-value oil for export. An offshore longline and handline fishery for oceanic shark, which yields fins andmeat for export. And an inshore gillnet, handline and longline fishery for reef and othe’r atoll-associated shark, which also yields fins and meat for export. The deepwater Gulper Shark stocks appear to be heavily fished, and would benefit from some control of fishing effort. The offshore oceanic shark fishery is small, compared to the size of the shark stocks, and could be expanded. The reef shark fisheries would probably run the risk of overfishing if expanded very much more. Reef shark fisheries are asource of conflict with the important tourism industry. ‘Shark- watching’ is a major activity among tourist divers. It is roughly estimated that shark- watching generates US $ 2.3 million per year in direct diving revenue. It is also roughly estimated that a Grey Reef Shark may be worth at least one hundred times more alive at a dive site than dead on a fishing boat.
    [Show full text]
  • Improving Efficiency of Schooling in the Maldives: Is De-Shifting a Desirable Policy Direction?
    Copyright is owned by the Author of the thesis. Permission is given for a copy to be downloaded by an individual for the purpose of research and private study only. The thesis may not be reproduced elsewhere without the permission of the Author. Improving Efficiency of Schooling in the Maldives: Is De-shifting a Desirable Policy Direction? A thesis presented in partial fulfillment of the requirements for the degree of Masters of Arts in Economics at Massey University, Palmerston North, New Zealand. Aishath Sheryn 2011 COPYRIGHT Copyright is owned by the Author of the thesis. Permission is given for a copy to be downloaded by an individual for the purpose of research and private study only. The thesis may not be reproduced elsewhere without the permission of the Author. ii Abstract Education, a vital component of human capital, is essential for the growth of nations. Developing countries, faced with limited resources and budget constraints, adopt strategies that they believe will improve access to education and at the same time reduce costs. This thesis explores the desirability of one such policy option, double-shift schooling, with respect to de-shifting, its reverse policy. Whether de-shifting is a desirable policy direction is assessed, based on other countries’ experiences, alternative strategies and the current education situation in the Maldives, a country presently under this transition. Some of these alternative strategies are explored for their effectiveness in improving the quality of education. In the case of the Maldives all schools were operating a double-shift system prior to 2009 and the government is now attempting to convert all schools to single-shift, by the end of 2013.
    [Show full text]
  • Click to View
    35 24/2010( 5 20 ، 35 24/2010 [email protected] [email protected] & ، State Bank of India Male’, Maldives NOTICE TO CUSTOMERS OF SBI BANK DORMANT ACCOUNTS • In terms of Section 35 of the Maldives Banking Act (Law No. 24/2010), accounts are required to be classified as DORMANT if an account holder has not conducted a transaction from the account or had not communicated with the bank for five (5) years. • As required under Section 35 of the Banking Act, we give below information relating to accounts of customers classified as dormant. • Any customer who believes that he/she has a dormant account with SBI Maldives is requested to contact the Branch at the address given below. • The Bank is trying to forward separate notices or attempt to communicate to the last known address or contact details of the customers whose accounts have been classified as dormant advising details of such accounts. • Accounts which are not claimed by customers before 20th June 2020 will be transferred to the Maldives Monetary Authority as required under the Maldives Banking Act. Hence, we request customers whose accounts are classified under this category mail us at [email protected] Savings Account customers or [email protected] for Current Account customers and activate the account. Thank you for the opportunity given to the Bank to serve you all and the co-operation extended by all concerned to the Bank, from time to time. Country Head & CEO State Bank of India Boduthakurufaanu Magu Phone: 3328615 / 3323751/ 3312111 Male’ Maldives NO.
    [Show full text]
  • Maldives: Post Tsunami Environmental Assessment
    MALDIVES Post-Tsunami Environmental Assessment United Nations Environment Programme MALDIVES Post-Tsunami Environmental Assessment United Nations Environment Programme CONTENTS Foreword 4 Introduction 6 Findings & conclusions 12 Geologic setting and tsunami characteristics 14 Impacts on the natural environment 17 Impacts on the human environment 32 Economy & livelihoods 48 Environmental management capacity 60 Recommendations 74 Rehabilitating natural resources 76 Rehabilitating the human environment 78 Livelihoods recovery 84 Strengthening environmental capacities Annex I. UNEP field mission, 21-27 February 2005 91 Annex II. Soil and groundwater sampling results 93 References 96 Acknowledgements 98 Contributors 99 Acronyms 100 Indian Ocean tsunami reaching Male’ a 2 at approximately 9:20 a.m. on 26 December 2004, approximately three hours after tremors were felt. Credit: L. Hiller 3 FOREWORD by Klaus Töpfer United Nations Under-Secretary General Executive Director of the United Nations Environment Programme Credit: UNEP In the immediate aftermath of the enormous devastation and suffering caused by the 26 December 2004 Indian Ocean Tsunami, UNEP established the Asian Tsunami Disaster Task Force. At the request of the governments of affected countries, the Task Force has assessed tsunami-related environmental damage, worked to ensure that environment is a part of national recovery agendas, and mobilised environmental recovery assistance. In February 2005, UNEP issued a rapid environmental assessment of seven of the tsunami-impacted countries (see http://www.unep.org/tsunami/tsunami_rpt.asp). This report, which was developed in close cooperation with the Ministry of Environment & Construction and with the generous support of the UK’s Department for International Development and the United Nations Office for the Coordination of Humanitarian Affairs (OCHA), elaborates the findings of the rapid 4 assessment in the Republic of Maldives, based on a detailed expert investigation of the tsunami’s environmental impacts.
    [Show full text]
  • Hulhumale Link Road, North Male’ Atoll – 2017 July
    ENVIRONMENTAL IMPACT ASSESSMENT, For the Hulhule-Hulhumale connecting link road development project, North Male’ Atoll. Proposed by Ministry of Environment and Energy Prepared by Hassan Shah For Water Solutions Pvt. Ltd., Maldives July 2017 EIA for the construction of Hulhule to Hulhumale link road, North Male’ Atoll – 2017 July Proposed by Housing Development Corporation (HDC) 2 EIA for the construction of Hulhule to Hulhumale link road, North Male’ Atoll – 2017 July 1 Table of Contents 1 TABLE OF CONTENTS ........................................................................................................ 3 2 DECLARATION OF THE CONSULTANTS ....................................................................... 9 3 PROPONENTS COMMITMENT ....................................................................................... 11 4 NON TECHNICAL SUMMARY .......................................................................................... 17 5 INTRODUCTION ................................................................................................................. 19 5.1 Structure of the Report ................................................................................................................ 19 5.2 Aims and Objectives of the report ............................................................................................... 19 5.3 EIA Implementation ..................................................................................................................... 20 5.4 Terms of Reference .....................................................................................................................
    [Show full text]