APPENDIX C

STRUCTURAL MAINTENANCE PROGRAMME 2006/2007 – ‘A ROADS’

ROAD COST CURRENT SITE NO LOCATION DESCRIPTION NO BAND STATUS

Braunstone Retexture P1 A47 Hinckley Road: Braunstone C Complete Carriageway Lane Junction Braunstone Resurface Phased back to P2 A563 Lubbesthorpe Way: Southbound C Carriageway Summer 2008 carriageway over Osiers Bridge Enderby Soar Valley Way: City Boundary – Everards Roundabout (West Surface Dress P3 A563 C Complete bound) and Everards Carriageway Roundabout – Grove Way (East bound) Forest East Surface Dress P4 A47 Hinckley Road: Kirby Lane – C Complete Carriageway Braunstone Lane Resurface P5 A47 Hinckley Road: Desford C Complete Carriageway Crossroads Surface Dress P6 A47 Hinckley Road: Desford C Complete Carriageway Crossroads – Dans Lane

Cost Band Key:- C < £50k; B £50k - £200k; A > £200k

APPENDIX C

STRUCTURAL MAINTENANCE PROGRAMME 2006/2007 – OTHER ROADS

ROAD COST CURRENT SITE NO LOCATION DESCRIPTION NO BAND STATUS

Countesthorpe Resurface C1 C4603 Cosby Road: Cosby Road C Complete Carriageway Crossroads Resurface U1 U/C Featherby Drive: Cork Lane – C Complete Carriageway Bellamy Close Glenfield Resurface U2 U/C Liberty Road: Dominion Road – B Complete Carriageway City Boundary Narborough Resurface U3 U/C Leicester Road: Station Road – B Complete Carriageway King Edward Avenue Hinckley Road:30mph signs Resurface C2 B4669 B Complete west of Sapcote – Fields Farm Carriageway Business Centre Haunch and kerb March 07 U4 U/C Bumble Bee Lane: Full length of B where required to May 07 road Sharnford Resurface C3 B4114 Coventry Road: Church Lane B Complete Carriageway ( Parva) – Sharnford Whetstone Resurface Phased back to C4 C4706 Warwick Road: Riverside Way – B Carriageway 08/09 The Dicken

Cost Band Key:- C < £50k; B £50k - £200k; A > £200k

APPENDIX C

STRUCTURAL MAINTENANCE PROGRAMME 2006/2007 – FOOTWAY RECONSTRUCTION

COST CURRENT SITE NO LOCATION DESCRIPTION BAND STATUS

Blaby Resurface FW1 Welford Road: House No 24 – Hospital C Complete Footway Lane Resurface FW2 Cosby Road: Westfield Avenue – C Complete Footway Willoughby Road Croft Resurface FW3 Broughton Road: Arbor Road – Salisbury C Complete Footway Avenue Glenfield Resurface FW4 B Complete Sports Road Footway Glenfield Resurface FW5 Liberty Road: Dominion Road – City C Complete Footway Boundary Glenfield Resurface FW6 Dominion Road: Unity Road – City B Complete Footway Boundary Narborough Resurface Phased back to FW7 Langham Drive: House No 20 – Coltbeck C Footway 08/09 due to Gas Avenue Sapcote Resurface FW8 Leicester Road: Morley Road – Sharnford C Complete Footway Road (Church side only) Sharnford Resurface FW9 C Complete Park View Footway

Cost Band Key:- C < £50k; B £50k - £200k; A > £200k