Appendix C Structural Maintenance Programme

Appendix C Structural Maintenance Programme

APPENDIX C STRUCTURAL MAINTENANCE PROGRAMME 2006/2007 – ‘A ROADS’ ROAD COST CURRENT SITE NO LOCATION DESCRIPTION NO BAND STATUS Braunstone Retexture P1 A47 Hinckley Road: Braunstone C Complete Carriageway Lane Junction Braunstone Resurface Phased back to P2 A563 Lubbesthorpe Way: Southbound C Carriageway Summer 2008 carriageway over Osiers Bridge Enderby Soar Valley Way: City Boundary – Everards Roundabout (West Surface Dress P3 A563 C Complete bound) and Everards Carriageway Roundabout – Grove Way (East bound) Leicester Forest East Surface Dress P4 A47 Hinckley Road: Kirby Lane – C Complete Carriageway Braunstone Lane Leicester Forest East Resurface P5 A47 Hinckley Road: Desford C Complete Carriageway Crossroads Leicester Forest West Surface Dress P6 A47 Hinckley Road: Desford C Complete Carriageway Crossroads – Dans Lane Cost Band Key:- C < £50k; B £50k - £200k; A > £200k APPENDIX C STRUCTURAL MAINTENANCE PROGRAMME 2006/2007 – OTHER ROADS ROAD COST CURRENT SITE NO LOCATION DESCRIPTION NO BAND STATUS Countesthorpe Resurface C1 C4603 Cosby Road: Cosby Road C Complete Carriageway Crossroads Glen Parva Resurface U1 U/C Featherby Drive: Cork Lane – C Complete Carriageway Bellamy Close Glenfield Resurface U2 U/C Liberty Road: Dominion Road – B Complete Carriageway City Boundary Narborough Resurface U3 U/C Leicester Road: Station Road – B Complete Carriageway King Edward Avenue Sapcote Hinckley Road:30mph signs Resurface C2 B4669 B Complete west of Sapcote – Fields Farm Carriageway Business Centre Sharnford Haunch and kerb March 07 U4 U/C Bumble Bee Lane: Full length of B where required to May 07 road Sharnford Resurface C3 B4114 Coventry Road: Church Lane B Complete Carriageway (Wigston Parva) – Sharnford Whetstone Resurface Phased back to C4 C4706 Warwick Road: Riverside Way – B Carriageway 08/09 The Dicken Cost Band Key:- C < £50k; B £50k - £200k; A > £200k APPENDIX C STRUCTURAL MAINTENANCE PROGRAMME 2006/2007 – FOOTWAY RECONSTRUCTION COST CURRENT SITE NO LOCATION DESCRIPTION BAND STATUS Blaby Resurface FW1 Welford Road: House No 24 – Hospital C Complete Footway Lane Countesthorpe Resurface FW2 Cosby Road: Westfield Avenue – C Complete Footway Willoughby Road Croft Resurface FW3 Broughton Road: Arbor Road – Salisbury C Complete Footway Avenue Glenfield Resurface FW4 B Complete Sports Road Footway Glenfield Resurface FW5 Liberty Road: Dominion Road – City C Complete Footway Boundary Glenfield Resurface FW6 Dominion Road: Unity Road – City B Complete Footway Boundary Narborough Resurface Phased back to FW7 Langham Drive: House No 20 – Coltbeck C Footway 08/09 due to Gas Avenue Sapcote Resurface FW8 Leicester Road: Morley Road – Sharnford C Complete Footway Road (Church side only) Sharnford Resurface FW9 C Complete Park View Footway Cost Band Key:- C < £50k; B £50k - £200k; A > £200k .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us