GOVERNMENT OF Irrigation & Waterways Department Jalasampad Bhawan, 3rd Floor, Western Block, Salt Lake,

Memo No:G020210051151W Date: 28/01/2021 File No:IW/P/IB-SDS-11/2020-21

From:- JOINT SECRETARY Irrigation & Waterways GOVERNMENTOF WEST BENGAL Irrigation& Waterways

To:The Executive Engineer, Irrigation Division, Irrigation & Waterways Directorate

SubjectAdministrative Approval for the Scheme for Es aintenance works of functional and non• functional assets of Flood embankments 15.83 km i alchini, in PS and Jaigaon in the District of Alipurduar during 2020-21 . Scheme ID-IW/MRl26/2020-21

,Project ID:-IW202133190S000 The undersignedis directed, by order of the GovljJfnor,'to say that the Governor has been pleased to accord Administrative Approval for the Project Scheme for Essential ~cill1f~~nce" works of functional and non-functional assets of Flood embankments 15.83 km in Block Kalchini, in Pi$,Kalcniniand Jaigaon in the District of Alipurduar during 2020-21.

Scheme ID-IW/MRl26/2020-21 ev,

,the details of which has been given be Name of the Project: Scheme f Essential Maintenanceworks of functional and non-functionalassets of Flood embankments 15.83 km in Block Kalchini, in PS Kalchini and Jaigaon in the District of Alipurduar during 2020-21. Scheme ID-IW/MRl26/2020-21

Project ID: IW202133190S000

Address: Block Kalchini, in PS Kalchini and Jaigaon in the District of Alipurduar

AdministrativeApproval: Rs 9724000 (Ninety Seven Lakh Twenty Four Thousand Only.)

Phasing amount and chargeable head of accounts

Scheme Scheme Amount SI No. FinancialYear Head Type Name

Maintenance State Development Expenditure in Flood 9724000 1 2020-21 32-2711-01-001-00-002-19-00-V Schemes Control Sector Total 9724000 Additional Conditions

Conditions Description 1 List of the part estimates (total 05 numbers) of the main scheme is attached as Annex, which is an offline document and authenticated by the undersigned. The pdf version of the online AAFS generated G.O. of Administrative Approval together with the Annex is available on the Departmental website www.wbiwd.gov.in under Notification link. The part estimates are also deemed to have been administratively approved along with the main scheme. While submitting bills to the treasuries, the Divisional Engineers will quote the G.O. Number of the main scheme as reference to Administrative Approval to the part estimates and produce the relevant G.O. with Annex, with the part estimate duly marked.

"his order is issued with the concurrence of FINANCIAL ADVISOR ( Irrigation & Waterways) of this Department vide their / lis U.O No. AA2021019323FAOO Dated 19/01/2021.

JOINTSE~ Government of West Bengal Irrigation & Waterways Department

Memo No: G020210051151W Date: 28/01/2021

Copy forwarded for information and necessary action:

The Additional Chief Secretary / Secretary-(Irrigatidn & Waterways Department)

The Principal Accountant General(A&E)• gal

The Principal Accountant General(Au

The Principal Accountant General(

The Financial Advisor-(Irrigation &

The Finance department-(Group F & N)

~ JOINT SECRETARY Government of West Bengal Irrigation & Waterways Department Enclosure to I&W D's AA GO No. G02021005115IW Dated 28.01.2021. I&WD's Main scheme ID: IWIMRl26/2020-21 (Rs in lakh) Contingency Tendered @3%of Sl. Name of sub-estimates as per tender No. amount amount put to tender 1 2 3 4 i , , 1 [Emergent palliative work to Subhasini embankment at ch. 4.72 0.28 11550 m to ch. 1600 m (in between ch. 0.00 m to 2500 m) 'along the left bank of river Torsa in Block & P.S Kalchini,1 JQistrictAl!p~rduar. ------1--- L------~ 2 ,Emergent palliative work to Dalsingpara embankment for a' 8.99 I 0.27 i

I 1 ;[length of 200 m in between ch. 350 to ch. 800 m (from ch. , I

\0.00 m to 3600 m) along the left bank of river Torsa in P,SI '[' II'

I 1-- +-Jaigaon, Bock.. Kalchini, District Alipurduar...------..------_-_·..-----i i ------t------...------j ! 3 iMaintenance and repair to Radharani embankment (in] 6.98 0.21 I 1_ I~:e~np~·~:~hi::~is~~t:ii~::~.e leftbank Ofriverl . . : 4 [Raising and strengthening of Jayanti Bazar embankment! 13.69 0.57 I

I ialOngthe right bank of river Jayanti for a length of 450.0 ml ! I(in between ch. 0.00 m to 2600 m) in P.S Kalchini, District]

~ IAlipu_r_du_ar_. i______: 5 !Maintenance and repair of Basra embankment from Ch.1 58.99 2.54

I 12570 m to 6000 m (for a length of 3430 m) along the right!

bank of river Basra I Block Kalchini, P.S Jaigaon, District I

I 1 _ IAlipurduar. Total: I 93.37 3.87

Estimated Cost of Main Estimate: ~ 97.24 Lakh

(:V.J.,.j-."?!6 lI I"" Joint S~reiary Irrigation & Waterways Department Government of West Bengal

Sheet 1 of 1 GOVERNMENT OF WEST BENGAL Irrigation & Waterways Department Jalasampad Bhawan, 3rd Floor, Western Block, Salt Lake,

Memo No:G020210051171W Date: 28/01/2021 File No:IW/P/IB-SDS-11/2020-21

From:- JOINT SECRETARY Irrigation & Waterways GOVERNMENT OF WEST BENGAL Irrigation & Waterways

To:The Executive Engineer, Alipurduar Irrigation Division, Irrigation & Waterways Directorate

SubjectAdministrative Approval for the Scheme for Es aintenance works of functional and non• functional assets of river bank protection works of Ii re 10.776 km in Block Kalchini, in PS Jaigaon in the District of Alipurduar during 2020-2 Scheme ID-IW/MRl27/2020-21

,Project ID:- IW202133191 SOOO

The undersigned is directed, by order of the Gov~rn~.r, to say that the Governor has been pleased to accord Administrative Approval for the Project Scheme for Essential Mc:lfFttflJtanceworks of functional and non-functional assets of river bank protection works of liner nature 10.776 km in B!pck ~~lIchini, in PS Jaigaon in the District of Alipurduar during 2020-21. Scheme ID-IW/MRl27/2020-21 . ¥

,the details of which has been given be

Name of the Project: Scheme f Essential Maintenance works of functional and non-functional assets of river bank protection works of liner nature 10.776 km in Block Kalchini, in PS Jaigaon in the District of Alipurduar during 2020-21. Scheme ID-IW/MRl27/2020-21

Project ID: IW202133191 SOOO

Address: Block Kalchini, in PS Jaigaon in the District of Alipurduar

Administrative Approval: Rs 9999000 (Ninety Nine Lakh Ninety Nine Thousand Only.)

Phasing amount and chargeable head of accounts

Scheme Scheme Head Amount SI No. Financial Year Type Name

Maintenance State Development 32-2711-01-001-00-002-19-00-V Expenditure in Flood 9999000 1 2020-21 Schemes Control Sector Total 9999000 Additional Conditions

Conditions Description 1 List of the part estimates (total 07 numbers) of the main scheme is attached as Annex, which is an offline document and authenticated by the undersigned. The pdf version of the online AAFS generated G.O. of Administrative Approval together with the Annex is available on the Departmental website www.wbiwd.gov.in under Notification link. The part estimates are also deemed to have been administratively approved along with the main scheme. While submitting bills to the treasuries, the Divisional Engineers will quote the G.O. Number of the main scheme as reference to Administrative Approval to the part estimates and produce the relevant G.O. with Annex, with the part estimate duly marked.

This order is issued with the concurrence of FINANCIAL ADVISOR ( Irrigation & Waterways) of this Department vide their 1 his U.O No. AA2021019324FAOO Dated 19/01/2021.

Qy-(Vuh\'1 JOINT SECRETARY Government of West Bengal Irrigation & Waterways Department

Memo No: G020210051171W Date: 28/01/2021

Copy forwarded for information and necessary action:

The Principal Accountant General(Audit)-West BeFf9al

The Additional Chief Secretary 1 Secreta on & Waterways Department)

The Principal Accountant General(A&

The Principal Accountant General(

The Financial Advisor-(Irrigation &

The Finance department-(Group F & N)

()p..f",ll'"~ II r "1 JOINT SfCRETARY Government of West Bengal Irrigation & Waterways Department Enclosure to I&W D's AA GO No. G02021005117IW Dated 28.01.2021.

I&WD's Main scheme ID: IW/MRl27/2020-21 (Rs in lakh) Contingency Tendered @3%of Sl. Name of sub-estimates as per tender No. amount amount put to tender 1 2 3 4 1 IBank protection work at Mechiabasti area adjacent to Jaigaon 38.48 i 1.50 , i Electric Crematorium for a length of 250 m along the left bank

I ,eolof riv r T rsa in Block Ka,lchini PS Jaigaon, D'istrictl I IAlipurduar (in between ch. 0.00 m to 3500 m). il 12-IMaint~n~c~ and repair of Gaburjyoti protection wo~k along, 7.~~r-O.32 ----l

I !the both banks of river Gaburjyoti for a length of 800 m (in 'I : 1_ _l~:::~~~~~::';O~'OO km) i~BlOCkK~Chini,P.~ J:gaon'I __ I . __ ----1

, 3 .Memtenance and repair of Jogikhoda protection work alongl6.90 I 0.30 i [both banks of river Jogikhoda for a length of 700 m in Block ' L_ \Kalchini, P.S Jaigaon, District Alipurduar. ~:I~~_~~-----J ! 4 IMaintenance and repair of Kharkhola protection along both 5.82 0.26 I' banks of river Kharkhola in Block Kalchini, P.S Jaigaon, I I 'District Alipurduar (for a length of 600.00 m). ~ ; -SlProteciion ;ork by HDPE bags at Khokla bosty area adjacent 13.60! 0.67 ~

I Ito the dumping year, Himalitoll and Gorkha Bhawan for a, I'

i I'length of 576 m along the right bank of river Gaburjyoti inl I

I [Block Kalchini, P.S Jaigaon, District Alipurduar. ' :

1 6 Iprotection work by HDPE bangs at Jaigaon Industrial Hub for 7.91 0.39 I Ithe length of 300 m along the left bank of river Jhora ~ lin Block Kalchini, P.S Jaigaon, District Alipurduar.

i 7 !Bank protection work of right bank of river Bhandari at Uttar 15.89 0.61 Mendabari area adjacent to Jungle Camp in Block & P.S Kalchini, District Alipurduar (in between ch. 1.90 km to 4.00

L__ ~-+--='--km). ---! +-i _ Total: 95.94 4.05

Estimated Cost of Main Estimate: t 99.99 Lakh

Ar-\,J.," 'U' \\ ) "1 Joint Secr~ary '(Works) Irrigation & Waterways Department Government of West Bengal

Sheet 1 of 1 GOVERNMENT OF WEST BENGAL Irrigation & Waterways Department Jalasampad Bhawan, 3rd Floor, Western Block, Salt Lake,

Date: 28/01/2021 Memo No:G020210051211W File No:IW/P/IB-SDS-11/2020-21

From:- JOINT SECRETARY Irrigation & Waterways GOVERNMENT OF WEST BENGAL Irrigation & Waterways

To:The Executive Engineer, Alipurduar Irrigation Division, Irrigation & Waterways Directorate

SubjectAdministrative Approval for the Scheme for Es aintenance works of functional and non• functional assets of Flood embankments 8.20 km an els having designed discharge less than 5.0 cumec 3.00Km in Blocks Kalchini, , a, in PS Kalchini, Madarihat and in the District of Alipurduar, during 2020-21. Scheme ID-IW/MRl28/2020-21

,Project 10:- IW202133192S000

The undersigned is directed, by order of the G to say that the Governor has been pleased to accord Administrative Approval for the Project Scheme for Essential ance works of functional and non-functional assets of Flood embankments 8.20 km and Channels havi ed discharge less than 5.0 cumec 3.00Km in Blocks Kalchini, Madarihat, Falakata, in PS Kalchini, Ma and Falakata in the District of Alipurduar, during 2020-21. Scheme ID-IW1MR128/2020-21

,the details of which has been given below. Name of the Project: Scheme for Essential Maintenance works of functional and non-functional assets of Flood embankments 8.20 km and Channels having designed discharge less than 5.0 cumec 3.00Km in Blocks Kalchini, Madarihat, Falakata, in PS Kalchini, Madarihat and Falakata in the District of Alipurduar, during 2020-21. Scheme ID-IW/MRl28/2020-21

Project ID: IW202133192S000

Address: Blocks Kalchini, Madarihat, Falakata, in PS Kalchini, Madarihat and Falakata in the District of Alipurduar Administrative Approval: Rs 9646000 (Ninety Six Lakh Forty Six Thousand Only.)

Phasing amount and chargeable head of accounts

Scheme Scheme Amount SI No. Financial Year Head Type Name

Maintenance State Development Expenditure in Flood 9646000 1 2020-21 32-2711-01-001-00-002-19-00-V Schemes Control Sector Total 9646000 Additional Conditions

Conditions Description List of the part estimates (total 09 numbers) of the main scheme is attached as Annex, which is an offline document and authenticated by the undersigned. The pdf version of the online AAFS generated G.O. of Administrative Approval together with the Annex is available on the Departmental website www.wbiwd.gov.in under Notification link. The part estimates are also deemed to have been administratively approved along with the main scheme. While submitting bills to the treasuries, the Divisional Engineers will quote the G.O. Number of the main scheme as reference to Administrative Approval to the part estimates and produce the relevant G.O. with Annex, with the part estimate duly marked.

This order is issued with the concurrence of FINANCIALADVISOR ( & Waterways) of this Department vide their 1 his U.O No. AA2021019325FAOODated 19/01/2021.

QY1Jv' JOINT SECRETARY Government of West Bengal Irrigation & Waterways Department

Memo No: G020210051211W Date: 28/01/2021 Copy forwarded for informationand n

The Additional Chief Secretary 1 Sec ary-(Irrigation & Waterways Department)

The PrincipalAccountant General(A&E)-West Bengal

The PrincipalAccountant General(Audit)-West Bengal

The PrincipalAccountant General(RW/LBA)-West Bengal

The FinancialAdvisor-(Irrigation & Waterways Department)

The Finance department-(Group F & N) &1k- JOINT SECRETARY Government of West Bengal Irrigation & Waterways Department Enclosure to I&W D's AA GO No. G02021005121IW Dated 28.01.2021. I&WD's Main scheme ID: IWIMR/28/2020-21 (Rs.in lakh) Contingency Tendered @3%of si. Name of sub-estimates as per tender No. amount amount put to tender 1 2 3 4 1 Emergent palliative protection to Dakshin Satali area along the 9.40 0.28 Iboth banks of river Bhandari in Block & P.S Kalchini, District' ! I . I : [Alipurduar(in between ch. 0.00 to 1000.00 m). I 1--21E~~rgent p~lliative pr~tection to Paschim Sat~li area alo-n-g--th-e-+!~-8-.7-S~+--- 0.26

I both banks of river Bhandari in Block & P.S Kalchini, District

'l' -31.~~~.~T:~6:r{f.-.:~:::~~~~~~~~~:~::.h.~114.86 ,- 058.1• IG.P in P.S Madarihat, District Alipurduar. _+-1_

4- i P~~~~tio~-;-o~kon the leftbam. of ~iverKhanabhorti for a lengthI 18.67 i 0.90 :

.of 200 m (in between ch. 1200 m to 2000 m) at Nepania I I 'Nccchline area in Dheklapara T.G within Sishujhumra G.P in p.si !

. I Madarihat, District Alipurduar. I S iBank protection work on the right bank of river Sukti for a length 13.64 0.64 of 180 m (in between ch. 0.00 to SOO.OOm) near Rajen Lama House within -I G.P in P.S Madarihat, District 6 Maintenance and repair to the North Nabanagar bank protection l1.S0 0.61 i • ~ [work from ch. 300.00 m to ch. 1000.00 m (m between ch. 0.00 to! 12soo.00 m) along the left bank If river Mujnai at Nabanagar areal i in Block Falakata, District Alipurduar. I 0.64 I 7 -1M~i~tenan~~-and-repair~fSurti Irrigation Canal from ch. 0.00 ~I 3.7S ; .. _j~~s~:::~~:,~~gaon WithinJateswar-IG.Pin P S Falakal_ .... j. .. _ r 8 Emergent palliative protection work on right bank of river Birkutil 6.74 I 0.20

I Ifor a length of 200.00 m (in between ch. SOOm to 1400 m) near]

I IBankandi B.F.P Primary School within -I G.P in p.SI

I Falakata, District Alipurduar. ~ i9lE~~~gent pafliative protection work on right -bank of river! 4.-7-4~-l---~-0-.-30~-

I ,Mujnai at Nabanagar near Anath Sarkar house for a length of

I 1140.00 m (in between ch. 0 to SOOm) at Nabanagar Mouzal ' lwithin Jateswar-Il G.P in Block & P.S Falakata, District Total: i 92.05 4.41

Estimated Cost of Main Estimate : ~ 96.46 lakh

Gi..cr '1.f r. I'1 Joint Secretary (Works) Irrigation & Waterways Department Government of West Bengal

Sheet 1 of 1 GOVERNMENT OF WEST BENGAL Irrigation & Waterways Department Jalasampad Bhawan, 3rd Floor, Western Block, Salt Lake,

Memo No:G020210051231W Date: 28/01/2021 File No:IW/P/IB-SDS-11/2020-21

From:- JOINT SECRETARY Irrigation & Waterways GOVERNMENT OF WEST BENGAL Irrigation & Waterways

To:The Executive Engineer, Alipurduar Irrigation Division, Irrigation Waterways Directorate

SubjectAdministrative Approval for the Scheme for Es aintenance works of functional and non• functional assets of Flood embankments 3.75 km Ba ction works 8.50 Km, Maintenance of solid spur 2 No. Maintenance of sluice 17 Nos. Mainte Residential Building 4499 sqm in Blocks Kalchini and Alipurduar-I and Alipurduar-II and i gaon, Alipurduar, in the District of Alipurduar during 2020-21. Scheme 10 - IW/MRl29/2020-21

,Project 10:- IW202133193S000

The undersigned is directed, by order of the or, to say that the Governor has been pleased to accord Administrative Approval for the Project Scheme for Essent tenance works of functional and non-functional assets of Flood embankments 3.75 km Bank protection ~9, .50 Km, Maintenance of solid spur 2 No. Maintenance of sluice 17 Nos. Maintenance of Residential Building 4499" . in Blocks Kalchini and Alipurduar-I and Alipurduar-II and in PS Jaigaon, Alipurduar, in the District of Alipurduar du~bg 2020-21. Scheme ID - IW/MR/29/2020-21

,the details of which has been given below. Name of the Project: Scheme for Essential Maintenance works of functional and non-functional assets of Flood embankments 3.75 km Bank protection works 8.50 Km, Maintenance of solid spur 2 No. Maintenance of sluice 17 Nos. Maintenance of Residential Building 4499 sqm in Blocks Kalchini and Alipurduar-I and Alipurduar-II and in PS Jaigaon, Alipurduar, in the District of Alipurduar during 2020-21. Scheme ID - IW/MRl29/2020-21

Project ID: IW202133193S000

Address: Blocks Kalchini and Alipurduar-I and Alipurduar-II and in PS Jaigaon, Alipurduar, in the District of Alipurduar Administrative Approval: Rs 9978000 (Ninety Nine Lakh Seventy Eight Thousand Only.)

Phasing amount and chargeable head of accounts

Scheme Scheme Head Amount SI No. Financial Year Type Name

Maintenance State Development 32-2711-01-001-00-002-19-00-V Expenditure in Flood 9978000 1 2020-21 Schemes Control Sector

"T"_.L_I ,..."..,,..,,,..."',, Additional Conditions

Conditions Description List of the part estimates (total 12 numbers) of the main scheme is attached as Annex, which is an offline document and authenticated by the undersigned. The pdf version of the online AAFS generated G.O. of Administrative Approval together with the Annex is available on the Departmental website www.wbiwd.gov.in under Notification link. The part estimates are also deemed to have been administratively approved along with the main scheme. While submitting bills to the treasuries, the Divisional Engineers will quote the G.O. Number of the main scheme as reference to Administrative Approval to the part estimates and produce the relevant G.O. with Annex, with the part estimate duly marked.

This order is issued with the concurrence of FINANCIAL ADVISOR ( & Waterways) of this Department vide their 1 his U.O No. AA2021019326FAOO Dated 19/01/2021.

~,.. JOINT SECRETARY Government of West Bengal Irrigation & Waterways Department

Memo No: G020210051231W Date: 28/01/2021

Copy forwarded for information and ne

The Principal Accountant General(A

The Additional Chief Secretary 1 Secretary-(Irrigation & Waterways Department)

The Principal Accountant General(A&E)-West Bengal

The Principal Accountant General(RW/LBA)-West Bengal

The Financial Advisor-(Irrigation & Waterways Department)

The Finance department-(Group F&N) Q.-1b" JOINT SECRETARY Government of West Bengal Irrigation & Waterways Department Enclosure to I&W D's AA GO No. G02021005123IW Dated 28.01.2021. I&WD's Main scheme ID: IW/MR/29/2020-21 (Rs in lakh) Contingency Tendered @3%of SI. Name of sub-estimates as per tender No. amount amount put to tender 2 3 4 1 ... 0.30 1 ,MaIntenance and repair of sluice gates along with the adjoining II 10.39 i [concrete structures at different passage of Alipurduar Town i I'protection embankment under Alipurduar Municipality in P.S and

1 District Alipurduar. i2iMaintenance and repair of sluice gate at Jayanti embankment in 4.48 0.15 I ibetween ch. 0 m to 100 m in P.S Kalchini, District Alipurduar. 0.28 , 3 ! Maintenance and repair work of the campus of Madhab More I' 7.38 lIrr~gation Co~on~ along with the staff quarters and including

i Ahpurduar lITIgatIOnRest Shed. I i 4 'Maintenance and repair to the quarter of the Executive Engineer 12.36 0.47 Ialong with the adjoining Group-D Quarter of the bungalow caretaker I

1 , iunder Alipurduar Irrigation Division in P.S & District Alipurduar. 1 ---~-~j------~------~------~------~-~------t--~------~ i 5 llvlaintenance and repair of Alipurduar Town Protective embankment I 5.93 0.27 i ~n_Qetweench. Q_.QQ_ ~_!()_~_~O_~i_ny.S_§L District ~lp_u_1"~u~1"._. L_ _ __ .~ 6 Maintenance and repair to B.P work at Mouza Chandirjhar along thel 5.48 I 0.56 :left bank of river Checko for a length of 100 m (in between ch. 0 to I [900 m), Chaporerpar-I G.P, Block Alipurduar-II in P.S & District IAlipurduar. 7 IMaintenance and repair to protection work along the right bank of] 9.52 0.45

1 [river Kalkut from ch. 0.00 m to 700.00 m at Dakshin Panialguri &1 : IMajherdabri area within Block Alipurduar-II in P.S , I J i ~8~~:~:~~~~;r!!ct~~pair t~ Madhya Patkapara embankment from ch~I-7.66 0.30 ~ 10.00 m to 300.00 m along the left bank of river Kaljani underl I !Topsikhata G.P in Block Alipurduar-I, P.S & District Alipurduar. I J i-9- iM~i~t~n-a~~e--~nd--;:-epair to-Chak~kheti embankment at -it-s+-I-7-.-9-7--+----0-.3-3- 1 idownstream from ch. 300.0 m to 500 m along the right bank of river I ! [Kaljani under Chakoakheti G.P in Block Alipurduar-I, P.S & District I __JIAlipurduar. . . ~ .__ ~ ___l----+------,I 10 [Maintenance and repair at right bank of river Nonai for a length of 5.60 0.26 , i 140 m (in between ch. 2.00 to 4.15 km) at Ward No. 03 under l_ IAlie_~_d_u_!lLMunicipalityin ~:§& District Alipurduar. __ ---+I ---+ ---I i I11Maintenance and repair to spur no. 5 of Deodanga embankment along 8.24 0.33 lithe left bank of river Sil Torsa under Patlakhawa G.P in Block l___1\lipurduar-I, P.S & District Alipurdu~1": . .

Sheet 1 of2 I&WD's Main scheme ID: IW1MRJ29/2020-21 (Rs in lakh) Contingency 81. Tendered Name of sub-estimates as per tender @3%of No. amount amount put to tender 1 2 3 4 , i 12 ,Emergent palliative restoration work to Gaburbasra embankment with 10.50 0.57 breach closing for the length of 100 m in between 2070 m to 2170 m along the right bank of river Gabur Basra in P.S Jaigaon, Block Kalchini, District Alipurduar. I Total: 95.51 4.27

Estimated Cost of Main Estimate: ~ 99.78 Lakh

G-1U~q 'II"" Joint Secretary (Works) Irrigation & Waterways Department Government of West Bengal

Sheet 2 of2 GOVERNMENT OF WEST BENGAL Irrigation & Waterways Department Jalasampad Bhawan, 3rd Floor, Western Block, Salt Lake,

Date: 28/01/2021 'v1emoNo:G020210051261W ,=ile No:IW/P/IB-SDS-11/2020-21

From:- JOINT SECRETARY Irrigation & Waterways GOVERNMENT OF WEST BENGAL Irrigation & Waterways

To:The Executive Engineer, Alipurduar Irrigation Division, Irrigation & Waterways Directorate

SubjectAdministrative Approval for the Scheme for Es aintenance works of functional and non• functional assets of Maintenance of Irrigation Canal Bank protection works 3.13 Km Flood Embankment 12.37 Km in Blocks Kumargram and i, Alipurduar-I in PS Jaigaon, Kumargram and Alipurduar in the District of Alipurduar, during 20~ Scheme 10 -IW/MR/30/2020-21 ~

,Project 10:- IW202133195S000

The undersigned is directed, by order of the, nor, to say that the Governor has been pleased to accord Administrative Approval for the Project Scheme for Essentf~r'flAcc tenance works of functional and non-functional assets of Maintenance of Irrigation Canal 9.00km Bank protection ~ ,l! .13 Km Flood Embankment 12.37 Km in Blocks Kumargram and Kalchini, Alipurduar-I in PS Jaigaon, Kumargram lpurduar in the District of Alipurduar, during 2020-21. Scheme ID -IW/MRl30/2020-21

,the details of which has been given below. Scheme for Essential Maintenance works of functional and non-functional assets of Name of the Project: Maintenance of Irrigation Canal 9.00km Bank protection works 3.13 Km Flood Embankment 12.37 Km in Blocks Kumargram and Kalchini, Alipurduar-I in PS Jaigaon, Kumargram and Alipurduar in the District of Alipurduar, during 2020-21. Scheme ID -IW/MRl30/2020-21

Project ID: IW202133195S000

Address: Blocks Kumargram and Kalchini, Alipurduar-I in PS Jaigaon, Kumargram and Alipurduar in the District of Alipurduar, Administrative Approval: Rs 9799000 (Ninety Seven Lakh Ninety Nine Thousand Only.)

Phasing amount and chargeable head of accounts

Scheme Scheme Amount SI No. Financial Year Head Type Name

Maintenance State Development Expenditure in Flood 9799000 1 2020-21 32-2711-01-001-00-002-19-00-V Schemes Control Sector Total 9799000 Additional Conditions

Conditions Description 1 List of the part estimates (total 07 numbers) of the main scheme is attached as Annex, which is an offline document and authenticated by the undersigned. The pdf version of the online MFS generated G.O. of Administrative Approval together with the Annex is available on the Departmental website www.wbiwd.gov.in under Notification link. The part estimates are also deemed to have been administratively approved along with the main scheme. While submitting bills to the treasuries, the Divisional Engineers will quote the G.O. Number of the main scheme as reference to Administrative Approval to the part estimates and produce the relevant G.O. with Annex, with the part estimate duly marked.

.us order is issued with the concurrence of FINANCIAL ADVISOR ( & Waterways) of this Department vide their 1 ; U.O No. AA2021019327FAOO Dated 19/01/2021.

(?Y1,.tr JOINT SECRETARY Government of West Bengal Irrigation & Waterways Department

Date: 28/01/2021 .erno No: G020210051261W

Copy forwarded for information and n

The Additional Chief Secretary 1 Se tary-(Irrigation & Waterways Department)

The Principal Accountant General(A&E)-West Bengal

The Principal Accountant General(Audit)-West Bengal

The Principal Accountant General(RW/LBA)-West Bengal

The Financial Advisor-(Irrigation & Waterways Department)

The Finance department-(Group F&N) 0--1;" JOINT SECRETARY Government of West Bengal Irrigation & Waterways Department ------

Enclosure to I&W D's AA GO No. G02021005126IW Dated 28.01.2021. I&WD's Main scheme ID: IWIMRl30/2020-21 (Rs in lakh) Contingency Tendered @3%of si Name of sub-estimates as per tender No. amount amount put to tender 1 2 3 4 'Maintenance and repair to Turturi-Khanda boulder sausage: 15.43 0.64 !embankment in between ch. 0.00 m & ch. 300.00 m on the right [ I , 'bank of river Dhawlajhora in Turturi-Khanda G.P, P.S & Block I ~ Kumargram, District Alipurduar.

I 2 [Maintenance and repair to Nepali Basti bank protection work 13.56 0.72 i I from ch. 30.00 m to 150.00 m along the left bank of river Raidak I

iMain under Kumargram G.P in P.S & Block Kumargram, District!

1J\lipurduar.__ _ __ ~ _L_ --+ _ Maintenance and repair to Nararthali-Kamakhyaguri Irrigation' 3.35 0.18 Scheme in between ch. 300.0 m & ch. 600.0 m, ch. 6000.00 m & ch. 8000.00 m, ch. 8500 m & ch. 9000.00 m in P.S & Block. I

~Kumargram,. District..__ .__~~_~__Alipurduar. ------"------~1--- I 4 Maintenance and repair to Jaraguri bank protection work in; 15.08 0.76 lbetween ch. 0.00 m to ch. 250.00 m along the right bank of river [

I I Sankosh under Volka Barobisa-II G.P in P.S & Block L__ ,Kumargram, District Alipurduar. , 5 IMaintenance and repair to the Sisamara embankment along the 17.39 0.77

1 right bank of river Sisamara at Jaldapara area in G.P Salkumar-(I), I [Block Alipurduar-I, District Alipurduar. ! 6 Emergent palliative restoration work to Gaburbasra embankment! 10.48 0.56 with breach closing for the length of 100 m in between 2340 m to 2440 m along the right bank of river Gabur Basra in P.S Jaigaon,

Block Kalchini,Di~!rict Alipllrduar. ~ ------i--- 7 .Emergent palliative restoration work to Gaburbasra embankment! 18.50 0.57 I with breach closing for the length of 100 m in between 2470 m to I 2570 m along the right bank of river Gabur Basra in P.S Jaigaon,[ Block Kalchini, District Alipurduar. Total: 93.79 4.20

Estimated Cost of Main Estimate: ~ 97.99 lakh

G4,'\r Z4 11/"1 Joint Secretary (Works) Irrigation & Waterways Department Government of West Bengal

Sheet 1 of 1 GOVERNMENT OF WEST BENGAL Irrigation & Waterways Department Jalasampad Bhawan, 3rd Floor, Western Block, Salt Lake,

Memo No:G020210051281W Date: 28/01/2021 File No:IW/P/IB-SDS-11/2020-21

From:- JOINT SECRETARY Irrigation & Waterways GOVERNMENT OF WEST BENGAL Irrigation & Waterways

To:The Executive Engineer, Maida Irrigation Division, Irrigation & Waterways Directorate

SubjectAdministrative Approval for the Essential Maint works of functional and non-functional

assets ( I )flood embankments ( 8.738 KM) (II) linear k\ ion works (0.178 KM),(III) drainage sluices ( 1 No), in Block Manickchak and District-Maida, du~i 0-21. Scheme Id.-IW/MR/31/2020-21 ,Project ID:-IW202134836S000 The undersigned is directed, by order of the Governor, i> say that the Governor has been pleased to accord Administrative Approval for the Project Essential Maintenance wg&:ksof functional and non-functional assets ( I )flood embankments ( 8.738 KM) (II) linear protection works (0.178 KM),(III) clr6i~e sluices ( 1 No), in Block Manickchak and District-Maida, during 2020-21. ", '\ Scheme Id.-IW/MRl31/2020-21 ,the details of which has been given below. , 71 Name of the Project: Essenti mlenance works of functional and non-functional assets ( I )flood embankm ts ( 8.738 KM) (II) linear protection works (0.178 KM),(III) drainage sluices ( 1 No), in Block Manickchak and District-Maida, during 2020-21. Scheme Id.-IW/MRl31/2020-21

Project ID: IW202134836S000

Address: Block Manickchak and District-Maida

Administrative Approval: Rs 9513000 (Ninety Five Lakh Thirteen Thousand Only.)

Phasing amount and chargeable head of accounts

Scheme Scheme Amount SI No. Financial Year Head Type Name

Maintenance State Development Expenditure in Flood 9513000 2020-21 32-2711-01-001-00-002-19-00-V 1 Schemes Control Sector 9513000 Total Additional Conditions

Conditions Description 1 List of the part estimates (total 12 numbers) of the main scheme is attached as Annex, which is an offline document and authenticated by the undersigned. The pdf version of the online AAFS generated G.O. of Administrative Approval together with the Annex is available on the Departmental website www.wbiwd.gov.in under Notification link. The part estimates are also deemed to have been administratively approved along with the main scheme. While submitting bills to the treasuries, the Divisional Engineers will quote the G.O. Number of the main scheme as reference to Administrative Approval to the part estimates and produce the relevant G.O. with Annex, with the part estimate duly marked.

This order is issued with the concurrence of FINANCIAL ADVISOR ( Irrigation & Waterways) of this Department vide their 1 his U.O No. AA2021019328FAOODated 19/01/2021.

(;y{rlf JOINT SECRETARY Government of West Bengal Irrigation & Waterways Department

Memo No: G020210051281W Date: 28/01/2021 Copy forwarded for information and necessary action:

The PrincipalAccountant General(RW/LBA)-West The Additional Chief Secretary 1 Secretary-Ilrriqatiqn & Waterways Department) ::'/'" The PrincipalAccountant General(A&E)-W gal

The PrincipalAccountant General(Audit)

The FinancialAdvisor-(Irrigation & Wa

The Finance department-(Group F ~.I.J JOINT SECRETARY Government of West Bengal Irrigation & Waterways Department Enclosure to I&W D's AA GO No. G02021005128IW Dated 28.01.2021. I&WD's Main scheme ID: IWIMR/3112020-21 (Rs in lakh) Contingency Tendered @3%of Sl. No. Name of sub-estimates as per tender amount amount put to tender 1 2 3 4 1 Urgent palliative measures of damaged portion of 42.97 1.27 Marginal Embankment on the left bank of river Fulahar for a length of 88M near Bhutni bridge at Sankaritola in P.S. and Block Manikchak Dist. MaIda. 2 Maintenance and repair to the wahedmara sluice 4.84 0.15 (two vent) at ch.1.975 km. of 5th. retire embankment and ramp on 4th retire embankment at Dharampur in P.S. and lock -Manikchak, Dist:- MaIda. 3 Urgent repair to Marginal Embankment on the left 4.83 0.15 bank of river Fulahar in between Shankartola and Dharmatola ( i.e. Ch.8.00km to Ch.l0,45km ) in Block and P.S.:- Manikchak, Dist:- Malda. 4 Maintanance and Repair of bank protection work to 4.76 0.14 the left bank of River Ganga at Keshorrpur For a length of 10 M Near 16.500 Km Chainage, under Mouza Keshorpur in lock Manikchak ; P.S- Bhutni, Dist.- Malda under Malda Irrigation Division. (Reach-I). 5 Maintanance and Repair of Bank Protection work to 4.79 0.14 the left bank of River Ganga at Keshorpur For a length of 10 M Near 16.650 Km Chainage, under Mouza Keshorpur in lock Manikchak ; P.S- Bhutni ; Dist.- Malda under Malda Irrigation Division. (Reach-2). 6 Emergent Bank protection work to the right bank of 3.98 0.11 river Kalindri at near Rintu rajak house in village• Kalindri palpara under G.P- Chowki Mirdadpur, Block and P.S. Manikchak, District Malda. 7 Emergent Bank protection work to the right bank of 3.65 0.11 river Kalindri at near Ranjit Pal house in village• Kalindri palpara under G.P- Chowki Mirdadpur , Block and P.S. Manikchak, District Malda. 8 Bank protection and emergent Restoration work 4.63 0.14 beside Mango tree of Kasim Ali house to the right bank of river kalindri in village-Sahebnagar under G.P- Chowkirdadpur , Block and P.S. Manikchak, District Malda.

Page 1 of 2 Contingency Tendered @3%of Sl. No. Name of sub-estimates as per tender amount amount put to tender 0.15 9 Bank protection and emergent Restoration work to 4.84 the right bank of river kalindri in front of Sudhir Ghosh house III village-Sahebnagar under G.P. Chowki Mirdadpur ,Block and P.S. Manikchak , District Malda. 10 Maintenance and repair of Bhutnidiara Curcuit 4.10 0.12 Embankment on the right bank of river Fulahar in between ch. 20.200 KM to 23.250 KM under G.P. - Uttar Chandipur, Block-Manikchak, P.S. - Bhutni, Dist. MaIda. 11 Maintenance and repair of Bhutnidiara Curcuit 4.17 0.13 Embankment on the right bank of river Fulahar in between ch. 23.500 KM to 26.350 KM under G.P. - Uttar Chandipur, Block-anikchak, PS- Bhutni, Dist. MaIda. 12 Maintenance and repair to the left bank of River 4.82 0.14 Ganga at Rajkumartola for a length of 10M Near 13.240 Km to 13.250 Km under Mouza Naobarar jaigir in Block Manikchak, .S- Bhutni, Dist.- Malda under Malda Irrigation Division. Total: 92.38 2.75

Estimated Cost of Main Estimate: t 95.13 lakh

~'2.VIII'" Joint Secretary (Works) Irrigation and Waterways Department Government of West Bengal

Page 2 of 2 GOVERNMENT OF WEST BENGAL Irrigation & Waterways Department Jalasampad Bhawan, 3rd Floor, Western Block, Salt Lake,

Date: 28/01/2021 Memo No:G02021 0051321W File No:IW/P/IB-SDS-11/2020-21

From:- JOINT SECRETARY Irrigation & Waterways GOVERNMENT OF WEST BENGAL Irrigation & Waterways

To:The Executive Engineer, Maida Irrigation Division, Irrigation & Waterways Directorate

SubjectAdministrative Approval for the Essential Maint works of functional and non-functional assets ( I )flood embankments ( 3.640 KM) (1I)linear 'on works (1.040 KM),(III) drainage sluices ( 1 No), In Block Manickchak, Kaliachak-II, Kaliacha lstrict-Malda, during 2020-21. Scheme Id.-IW/MR/32/2020-21 ,Project 10:- IW202134837S000

The undersigned is directed, by order of the Gov~rnQr, say that the Governor has been pleased to accord Administrative Approval for the Project Essential Maintenance;wotl

District-Maida, during 2020-21. 'j,,, Scheme Id.-IW/MR/32/2020-21 ,the details of which has been given be Name of the Project: Essential aintenance works of functional and non-functional assets ( I )flood embankments ( 3.640 KM) (11)linearprotection works (1.040 KM),(III) drainage sluices ( 1 No), In Block Manickchak, Kaliachak-II, Kaliachak-III, District-Maida, during 2020-21. Scheme Id.-IW/MR/32/2020-21

Project ID: IW202134837S000

Address: Block Manickchak, Kaliachak-II, Kaliachak-III, District-Maida

Administrative Approval: Rs 4327000 (Forty Three Lakh Twenty Seven Thousand Only.)

Phasing amount and chargeable head of accounts

Scheme Scheme Amount SI No. Financial Year Head Type Name

Maintenance State Development Expenditure in Flood 4327000 32-2711-01-001-00-002-19-00-V 1 2020-21 Schemes Control Sector 4327000 Total Additional Conditions

Conditions Description 1 List of the part estimates (total 10 numbers) of the main scheme is attached as Annex, which is an offline document and authenticated by the undersigned. The pdf version of the online AAFS generated G.O. of Administrative Approval together with the Annex is available on the Departmental website www.wbiwd.gov.in under Notification link. The part estimates are also deemed to have been administratively approved along with the main scheme. While submitting bills to the treasuries, the Divisional Engineers will quote the G.O. Number of the main scheme as reference to Administrative Approval to the part estimates and produce the relevant G.O. with Annex, with the part estimate duly marked.

This order is issued with the concurrence of FINANCIAL ADVISOR ( Irrigation & Waterways) of this Department vide their 1 his U.O No. AA2021019329FAOODated 19/01/2021.

GYt~ JOINT SECRETARY Government of West Bengal Irrigation & Waterways Department Date: 28/01/2021 Memo No: G020210051321W Copy forwarded for information and necessary action:

The Additional Chief Secretary 1 Secretary-(Irrigatd)n& Waterways Department)

The PrincipalAccountant General(A&E)• gal

The PrincipalAccountant General(Audj!

The PrincipalAccountant General( ~A)-West Bengal

The FinancialAdvisor-(Irrigation & erways Department)

The Financedepartment-(Group F&N) 01..( .

JOINT SECRETARY Government of West Bengal Irrigation & Waterways Department Enclosure to I&W D's AA GO No. G02021005132IW Dated 28.01.2021. I&WD's Main scheme ID: IWIMR/32/2020-21 (Rs. in lakh) Contingency Tendered @3%of SI. No. Name of sub-estimates as per tender amount amount put to tender 3 4 1 2 4.79 0.15 1 Maintenance and repair to the left bank of River Ganga at Rajkumartola for a length of 10 M Near 13.230 Km to 13.240 Km under Mouza Naobarar jaigir in Block Manikchak, .S- Bhutni, Dist.- Malda under Malda Irrigation Division. 4.74 0.14 2 Repair and Maintence of Jugal tala sluice on forwarded embakment on river Ganga at G.P. Panchanandapur II. Block-Kaliachak II, P.S. Mothabari , Dist - Malda. 4.84 0.15 3 Repair and maintenance of inspection path over marginal embankment from Adarsha Bazar to Spur No- 8 in Block- Kaliachak-Il, P.S.-Mothabari, Dist- Malda 4.82 0.15 4 Repair and maintenance of inspection path over marginal embankment from laskoritola more to Barbadhha More in Block- Kaliachak- II, P.S.- Mothabari, Dist- Malda 4.74 0.14 5 Repair and Raising of dwarf embankment for spill protection over a length of 70 m (Reach-I) in the upstream of Chhakkutola more at Sakurullapur, under G.P:- Bangitola, Block:- Kaliachak-II, P.S:- Mothabari, Dist - Malda. 0.14 6 Repair and Raising of dwarf embankment for spill 4.75 protection over a length of 70 m (Reach-Il) near Shiv mandir and Maa Thakur J0V Ashram at Sakurullapur under G.P:- ngitola, Block:- Kaliachak -II, P.S:- Mothabari, Dist- Malda • over 4.85 0.15 7 Repair and maintenance of inspection path marginal embankment from Spur nO-8 to Bonkul in Block- Kaliachak-Il, P.S.-Mothabari, Dist- Malda 2.90 0.09 8 Emergent repair of rain cuts and large potholes over forward embankment of River Ganga, in different places between Ajgubi Ramp and Alamtola more under GP:- Uttar Panchanandapur-II, Block- Kaliachak-II, P.S. Mothabari, Dist.- Malda.

Page 1 of 2 Contingency Tendered @3%of Sl. No. Name of sub-estimates as per tender amount amount put to tender 2.99 0.09 9 Supplying and stacking of gunny bags for palliative works at Parlalpur in G. P - Pardeonapur-Sovapur, Block - Kaliachak III, P.S- Baishnabnagar, Dist- Malda

2.S7 0.08 10 Supplying and stacking of stone boulders for palliative works at Parlalpur in G. P - Pardeonapur-Sovapur, Block - Kaliachak III, P.S- Baishnabnagar, Dist- MaIda

Total: 41.99 1.28

Estimated Cost of Main Estimate: ~ 43.27 Lakh

() V"f,J.f 2-i II1 '1 Joint Secretary' (Works) Irrigation and Waterways Department Government of West Bengal

Page 2 of 2 GOVERNMENT OF WEST BENGAL Irrigation & Waterways Department Jalasampad Bhawan, 3rd Floor, Western Block, Salt Lake,

Date: 28/01/2021 Ilemo No:G020210051341W File No:IW/P/IB-SDS-11/2020-21

I From:- JOINT SECRETARY Irrigation & Waterways GOVERNMENT OF WEST BENGAL Irrigation & Waterways

To:The Executive Engineer, Maida Irrigation Division, Irrigation & Waterways Directorate

SubjectAdministrative Approval for the Essential Maint works of functional and non-functional assets ( I )flood embankments (2.518 KM) (1l)linear son works (1.143 KM), (III) drainage sluices ( 5 Nos), In Block Habibpur , Gazole, Bamongola, O· aida, during 2020-21. Scheme Id.-IW/MR/33/2020-21 ,Project 10:- IW202134838S000

The undersigned is directed, by order of the Gov or, say that the Governor has been pleased to accord Administrative f functional and non-functional assets ( I )flood embankments ( 2.518 Approval for the Project Essential Maintenance e sluices ( 5 Nos), In Block Habibpur , Gazole, Bamongola, District- KM) (1I)linear protection works (1.143 KM), (III Maida, during 2020-21. Scheme Id.-IW/MRl33/2020-21 ,the details of which has been given be Name of the Project: Essential aintenance works of functional and non-functional assets ( I )flood embankments ( 2.518 KM) (11)linearprotection works (1.143 KM), (III) drainage sluices ( 5 Nos), In Block Habibpur , Gazole, Bamongola, District-Maida, during 2020-21. Scheme Id.-IW/MRl33/2020-21

Project ID: IW202134838S000

Address: Block Habibpur , Gazole, Bamongola, District-Maida

Administrative Approval: Rs 9432000 (Ninety Four Lakh Thirty Two Thousand Only.)

Phasing amount and chargeable head of accounts

Scheme Scheme Amount SI No. Financial Year Head Type Name

Maintenance State Development Expenditure in Flood 9432000 1 2020-21 32-2711-01-001-00-002-19-00-V Schemes Control Sector Total 9432000 Additional Conditions

Conditions Description 1 List of the part estimates (total 17 numbers) of the main scheme is attached as Annex, which is an offline document and authenticated by the undersigned. The pdf version of the online AAFS generated G.O. of Administrative Approval together with the Annex is available on the Departmental website www.wbiwd.gov.in under Notification link. The part estimates are also deemed to have been administratively approved along with the main scheme. While submitting bills to the treasuries, the Divisional Engineers will quote the G.O. Number of the main scheme as reference to Administrative Approval to the part estimates and produce the relevant G.O. with Annex, with the part estimate duly marked.

This order is issued with the concurrence of FINANCIAL ADVISOR ( Irrigation & Waterways) of this Department vide their / his U.O No. AA2021019330FAOO Dated 19/01/2021.

&i~ JOINT SECRETARY Government of West Bengal Irrigation & Waterways Department Date: 28/01/2021 Memo No: G020210051341W

Copy forwarded for information and necessary action:

The Additional Chief Secretary / Secretary-(lrrigatiJll & Waterways Department)

The PrincipalAccountant General(A&E)• gal

The PrincipalAccountant General(Au

The PrincipalAccountant General(

The FinancialAdvisor-(Irrigation &

The Finance department-(Group F&N) Qr/V JOINT SECRETARY Government of West Bengal Irrigation & Waterways Department Enclosure to I&W D's AA GO No. G02021005134IW Dated 28.01.2021. I&WD's Main scheme ID: IWIMRl33/2020-21 (Rs.in lakh) Contingency Tendered @3%of Name of sub-estimates as per tender Sl. No. amount amount put to tender 1 2 3 4 1 Emergent palliative protection work at the left bank 33.57 1.03 of river Tangon near residence of Ajit Das and Sanatan Ch. Saha at Baruipara in G.P- Aiho, Block and P.S. Habibpur, istrict Malda. 2 Maintenance and Repair work on the left bank of 2.90 0.09 River Tangon at Aiho for a length of 27 m at Block Habibpur, Dist-Malda under MaIda Irrigation Division. 3 Maintenance and Repair work on the left bank of 2.91 0.09 River Tangon in between two bathing ghats at Aiho for a length of 25m at Block - Habibpur, Dist-Malda under Malda Irrigation Division. 4 Maintenance and Repair work on the left bank of 2.90 0.09 River Tangon near Catchwater Drain at Baruipara for a length of 25m at G.P.-Aiho, Block - Habibpur, Dist-Malda under MaIda Irrigation Division. 5 Maintenance and Repair work on the damaged left 2.87 0.09 bank of river Tangon at Aiho Baruipara adjecent to house of Barun Mitra for a length of 36m Block - Habibpur under Malda Irrigation Division 0.09 6 Maintenance and repair work on the damaged left 2.91 bank of river Tangon at Aiho near Mandir for a length of 36.5m at Block - Habibpur , Dist- Malda 0.09 7 Maintenance and repair work on the left bank of 2.83 river Tangen at Aiho near Pumphouse for a length of35.5m at Block - Habibpur, Dist- Malda 0.09 8 Maintenance and repair work on the damaged left 2.86 bank of river Tangon at Aiho near Bathing ghat for a length of 36m at Block - Habibpur , Dist- Malda 0.09 9 Maintenance and repair work on the river Tangon 2.90 (Left Bank) at Baruipara near Aiho Bridge for a length of 36.5m at Block - Habibpur , Dist- Malda 0.09 10 M/R work at Aiho for a length of 35.5m on the left 2.83 bank of river Tangon near Catch Water Drain at Block - Habibpur , Dist- Malda under Malda Irrigation Division

Page 1 of 2 Contingency Tendered @3%of Sl. No. Name of sub-estimates as per tender amount amount put to tender 0.13 11 M/R of protection work and Bathing Ghat at 4.42 Khoksan in Block and P .S. Bamongola, District- Malda 4.65 0.14 12 M/R of protection work and Construction of catchment water drain with cross drain at Khoksan in Block and P.S. Bamongola, District- Malda 4.82 0.15 13 Maintenance and repair work on damaged bank of Punarbhaba river at Dakshin Kupadaha adjecent to boulder protection work within Block - Bamongola under Malda rrigation Division 0.14 14 Repairing embankment and closing breach point 4.73 near ahora bus stand of Kanchanbeel Embankment, Block and P.S.-Gazole, District-MaIda. (REACH-S)

4.54 0.14 15 Repair and maintenance of three vented Dighir Danra Sluice at Alinagar GP in Block and P.S. Gazole, District- MaIda. (SLUICE-I) 4.08 0.12 16 Repair and maintenance of Ahora (02 vented) , Kanainagar (01 vented), Kuriadaha(Ol vented), Mashaldighi (02 vented) sluice gate in Block - Gazole , Malda under Malda Irrigation Division. 4.80 0.14 17 Repair and maintenance of Ahora (02 vented) , Kanainagar (01 vented), Kuriadaha(Ol vented), Mashaldighi (02 vented) sluice gate in Block - Gazole, Malda under Malda Irrigation Division. Total: 91.52 2.80

Estimated Cost of Main Estimate: t 94.32 lakh

~k ').I \ r/ -t Joint Secretary (Works) Irrigation and Waterways Department Government of West Bengal