World Bank Document

Total Page:16

File Type:pdf, Size:1020Kb

World Bank Document EDUCATION PROJECT UNDER CATALYTIC FUND GRANT PROCUREMENT PLAN FOR THE 1st part OF THE 2nd TRANCHE IMPLEMENTATION: 2008 - 2010 (Goods by component) (As per August 10, 2010) Date of Date of Submissio Preparation ER submitted Date of Proc sending Issuance Contract Completion Review by Component Ref. # Description Pack Lot Type Estimated cost WB’s no n of Bids/ Evaluation of Evaluation to WB for no WB’s no meth BD/ ITQ to of BD/ITQ signature of Contract the Bank objection Proposals Report objection objection WB P 1 4 G ICB $269,250.0 23/05/08 06/06/08 09/06/08 24/07/08 12/12/08 16/12/08 17/12/08 31/01/09 07/02/09 20/12/09 Prior review Component B.1 MOE/FTI-2/ICB/2008/01 Textbooks printing (10 titles) A $241,200.0 30/09/08 10/10/08 15/10/08 28/11/08 30/12/08 08/01/09 15/01/09 18/02/09 28/02/09 30/08/10 P 1 2 G ICB $450,000.0 27/05/08 10/06/08 13/06/08 28/07/08 26/12/08 30/12/08 31/12/08 29/01/09 05/02/09 30/09/09 Prior review A 1 $229,500.0 09/10/08 20/10/08 20/06/09 23/07/09 07/10/09 07/10/09 07/10/09 22/01/09 10/02/10 04/08/10 Component B.3 MOE/FTI-2/ICB/2008/02 Maps and equipment for math A 2 $192,957.50 09/10/08 20/10/08 25/10/08 12/12/08 25/12/08 29/12/08 31/12/08 18/02/09 14/03/09 03/07/09 Public Disclosure Authorized Public Disclosure Authorized P 1 1 G ICB $540,000.0 27/01/08 19/05/08 22/05/08 06/07/08 12/11/08 16/11/08 17/11/08 30/01/09 17/04/09 16/07/09 Prior review Component D MOE/FTI-2/ICB/2008/03 Procurement of IT equipmeent A 09.12.2008 $429,027.0 24/05/08 11/09/08 18/09/08 29/10/08 27/11/08 04/12/08 18/03/09 06/04/09 14.01.2009 13/08/09 Total ICB: $1,259,250.0 P Printing of Teachers Guide for English language 1 G SH $22,500.0 02/06/08 30/01/09 02/02/09 23/02/09 31/03/09 03/04/09 04/04/09 18/04/09 21/04/09 19/08/09 Prior review Component B.1 MOE/FTI-2/SH/2008/01 (developed under the OSI project) A 06.08.2008 $10,128.9 18.08.2008 18/02/09 06/03/09 20/03/09 27/03/09 31/03/09 02/04/09 28/05/09 30/05/09 27/11/09 P Component B.3 MOE/FTI-2/SH/2010/01 Procurement of school furnuture 1 G SH $90,300.0 02/06/08 30/01/09 02/02/09 23/02/09 31/03/09 03/04/09 04/04/09 18/04/09 21/04/09 19/08/09 Post review A $89,040.0 N/A N/A 04/06/10 14/06/10 15/06/10 16/06/10 N/A N/A 15/06/10 15/07/10 P 1 G SH $8,000.0 N/A N/A 05/06/09 19/06/09 23/06/09 26/06/09 N/A N/A 28/06/09 26/10/09 Post review Component C.1 MOE/FTI-2/SH/2008/02 Printing of mentoring materials and training modules A $4,337.5 N/A N/A 30/05/09 15/06/09 22/06/09 23/06/09 N/A N/A 29/06/09 04/11/09 P Printing of teacher training modules and materials; Component C.1 MOE/FTI-2/SH/2008/03 1 G SH $13,000.0 N/A N/A 26/04/09 12/05/09 16/05/09 19/05/09 N/A N/A 22/05/09 19/09/09 Post review materials on continuation of teacher training A $12,347.3 N/A N/A 15/07/09 30/07/09 01/08/09 03/08/09 N/A N/A 10/08/09 19/10/09 Printing of school director training modules and P Component C.1 MOE/FTI-2/SH/2008/03-1 materials; materials on continuation of school director 1 G SH $17,000.0 N/A N/A 26/04/09 12/05/09 16/05/09 19/05/09 N/A N/A 22/05/09 19/09/09 Post review training A N/A N/A 01/12/09 18/12/09 22/12/09 22/12/09 N/A N/A 23/12/09 30/12/09 P 1 G SH $9,500.0 N/A N/A 05/11/09 26/11/09 03/12/09 06/12/09 N/A N/A 09/12/09 18/01/10 Post review Component C.1 MOE/FTI-2/SH/2009/01 Procurement of computer equipment Public Disclosure Authorized Public Disclosure Authorized A $9,409.2 N/A N/A 04/01/10 25/01/10 26/01/10 27/01/10 N/A N/A 27/01/10 15/02/10 Testing and printing of materials, final report and P Component D MOE/FTI-2/SH/2008/04 training manuals on census, training materials and 1 G SH $55,500.0 N/A N/A 20/06/08 11/07/08 15/07/08 18/07/08 N/A N/A 25/07/08 25/05/09 Post review manuals on EMIS A $54,894.0 N/A N/A 14/06/08 27/06/08 04/07/08 07/07/08 N/A N/A 14/07/08 02/09/08 P 1 G SH $16,000.0 20/03/08 20/05/08 23/05/08 13/06/08 20/06/08 23/06/08 24/06/08 08/07/08 11/07/08 08/11/08 Prior review Component E.1 MOE/FTI-2/SH/2008/05 Procurement of computer equipment A $15,812.7 24/05/08 19/06/08 19/06/08 03/07/08 04/07/08 07/07/08 14/07/08 13/08/08 29/08/08 16/09/08 P 1 G SH $50,000.0 16/06/08 30/06/08 01/07/08 22/07/08 26/07/08 29/07/08 30/07/08 13/08/08 16/08/08 12/12/08 Prior review Component E.1 MOE/FTI-2/SH/2008/06 Procurement of three vehicles A 17.06.2008 26.09.2008 $52,000.0 04.07.2008 01/09/08 01/09/08 15/09/08 16/09/08 20/09/08 08.10.2008 09/10/08 13/10/08 29/10/08 P 1 G SH $82,500.0 N/A N/A 20/07/10 25/07/10 28/07/10 29/07/10 N/A N/A 31/07/10 30/08/10 Post review Component B.3 MOE/FTI-2/SH/2010/01-1 Procurement of school furnuture A $83,232.5 N/A N/A 20/07/10 27/07/10 03/08/10 03/08/10 N/A N/A 04/08/10 19/08/10 P 1 G SH $99,500.0 N/A N/A 20/07/10 25/07/10 28/07/10 29/07/10 N/A N/A 31/07/10 30/08/10 Post review Component E.1 MOE/FTI-2/SH/2010/06-1 Procurement of four vehicles A $99,994.0 N/A N/A 20/07/10 27/07/10 03/08/10 03/08/10 N/A N/A 04/08/10 27/08/10 Total Goods: $1,358,750 Public Disclosure Authorized Public Disclosure Authorized 1 of 5 564200PROP0P1011130108120101revised.xls Goods by components Public Disclosure Authorized Public Disclosure Authorized EDUCATION PROJECT UNDER CATALYTIC FUND GRANT PROCUREMENT PLAN FOR THE 1st part OF THE 2nd TRANCHE IMPLEMENTATION: 2008 - 2010 (Works by component) (As per August 10, 2010) Date of Date of Submission Preparation ER submitted Proc Estimated Issuance Date of WB’s Contract Completion Review by the Component Ref. # Description Pack Type sending WB’s no of Bids/ Evaluation of Evaluation to WB for no meth cost of BD/ITQ no objection signature of Contract Bank BD to WB objection Proposals Report objection Component A MOE/FTI-2/NCB/2008/01 Construction of building for 6 classrooms in School P No.19 in Frunze village, Kumsangir District 1 W NCB $180,000.00 12/06/08 26/06/08 27/06/08 01/08/08 15/08/08 22/08/08 23/08/08 11/11/08 18/11/08 25/11/09 Prior review A $169,957.66 16/07/08 25/08/08 27/08/08 25/09/08 09/10/08 13/10/08 21/10/08 20/11/08 25/11/08 25/02/10 Component A MOE/FTI-2/NCB/2008/02 Construction of building for 6 classrooms in School P No.8 in Dektur village, Baljuvon District 1 W NCB $180,000.00 16/06/08 30/06/08 02/07/08 04/08/08 01/12/08 05/12/08 06/12/08 20/12/08 27/12/08 25/11/09 Prior review A $156,547.65 06/09/08 07/10/08 11/10/08 17/11/08 01/12/08 04/12/08 02/12/08 23/12/08 26/12/08 28/02/10 Component A MOE/FTI-2/NCB/2008/03 Construction of building for 8 classrooms in School P No.
Recommended publications
  • The Republic of Tajikistan Ministry of Energy and Industry
    The Republic of Tajikistan Ministry of Energy and Industry DATA COLLECTION SURVEY ON THE INSTALLMENT OF SMALL HYDROPOWER STATIONS FOR THE COMMUNITIES OF KHATLON OBLAST IN THE REPUBLIC OF TAJIKISTAN FINAL REPORT September 2012 Japan International Cooperation Agency NEWJEC Inc. E C C CR (1) 12-005 Final Report Contents, List of Figures, Abbreviations Data Collection Survey on the Installment of Small Hydropower Stations for the Communities of Khatlon Oblast in the Republic of Tajikistan FINAL REPORT Table of Contents Summary Chapter 1 Preface 1.1 Objectives and Scope of the Study .................................................................................. 1 - 1 1.2 Arrangement of Small Hydropower Potential Sites ......................................................... 1 - 2 1.3 Flowchart of the Study Implementation ........................................................................... 1 - 7 Chapter 2 Overview of Energy Situation in Tajikistan 2.1 Economic Activities and Electricity ................................................................................ 2 - 1 2.1.1 Social and Economic situation in Tajikistan ....................................................... 2 - 1 2.1.2 Energy and Electricity ......................................................................................... 2 - 2 2.1.3 Current Situation and Planning for Power Development .................................... 2 - 9 2.2 Natural Condition ............................................................................................................
    [Show full text]
  • Analysis of the Situation on Inclusive Education for People with Disabilities in the Republic of Tajikistan Report on the Results of the Baseline Research
    Public Organization - League of women with disabilities «Ishtirok» April - July 2018 Analysis of the situation on inclusive education for people with disabilities in the Republic of Tajikistan Report on the results of the baseline research 1 EXPRESSION OF APPRECIATION A basic study on the inclusive education of people with disabilities in the Republic of Tajikistan (RT) conducted by the Public Organization Disabled Women's League “Ishtirok”. This study was conducted under financial support from ASIA SOUTH PACIFIC ASSOCIATION FOR BASIC AND ADULT EDUCATION (ASPBAE) The research team expresses special thanks to the Executive Office of the President of the RT for assistance in collecting data at the national, regional, and district levels. In addition, we express our gratitude for the timely provision of data to the Centre for adult education of Tajikistan of the Ministry of labor, migration, and employment of population of RT, the Ministry of education and science of RT. We express our deep gratitude to all public organizations, departments of social protection and education in the cities of Dushanbe, Bokhtar, Khujand, Konibodom, and Vahdat. Moreover, we are grateful to all parents of children with disabilities, secondary school teachers, teachers of primary and secondary vocational education, who have made a significant contribution to the collection of high-quality data on the development of the situation of inclusive education for persons with disabilities in the country. Research team: Saida Inoyatova – coordinator, director, Public Organization - League of women with disabilities «Ishtirok»; Salomat Asoeva – Assistant Coordinator, Public Organization - League of women with disabilities «Ishtirok»; Larisa Alexandrova – lawyer, director of the Public Foundation “Your Choice”; Margarita Khegay – socio-economist, candidate of economic sciences.
    [Show full text]
  • Annual Report
    FUNDED BY THE GOVERNMENT OF THE RUSSIAN FEDERATION IMPLEMENTED BY THE UNITED NATIONS DEVELOPMENT PROGRAMME With financial support from the Russian Federation ANNUAL REPORT ON IMPLEMENTATION PROGRESS OF THE PROJECT “LIVELIHOOD IMPROVEMENT OF RURAL POPULATION IN 9 DISTRICTS OF THE REPUBLIC OF TAJIKISTAN” FROM JANUARY 1 TO DECEMBER 31, 2017 Dushanbe 2017 1 Russian Federation-UNDP Trust Fund for Development (TFD) Project Annual Narrative and Financial Progress Report for January 1 – December 31, 2017 Project title: "Livelihood Improvement of Rural Population in 9 districts of the Republic of Tajikistan" Project ID: 00092014 Implementing partner: United Nations Development Programme, Tajikistan Project budget: Total: 6,700,000 USD TFD: Government of the Russian Federation: 6,700,000 USD Project start and end date: November 2014 – December 2017 Period covered in this report: 1st January to 31st December 2017 Date of the last Project Board 17th January 2017 meeting: SDGs supported by the project: 1, 2, 5, 8, 9, 10, 12 1. EXECUTIVE SUMMARY Please provide a short summary of the results, highlighting one or two main achievements during the period covered by the report. Outline main challenges, risks and mitigation measures. The project "Livelihood Improvement of Rural Population in 9 districts of the Republic of Tajikistan", is funded by the Government of the Russian Federation, and implemented by UNDP Communities’ Program in the Republic of Tajikistan through its regional offices. Project target areas are Isfara, Istaravshan, Ayni, Penjikent in Sughd region; Vose and Temurmalik in Khatlon region; Rasht, Tojikobod and Lakhsh (Jirgatal) in the Districts of Republican Subordination (DRS). The main objective of the project is to ensure sustainable local economic development of the target districts of Tajikistan.
    [Show full text]
  • Selection of Geographical Areas for Tajikistan Water Supply and Sanitation Project (Tajwss)
    Funded by Swiss Agency for Development Implemented by Oxfam GB in and Cooperation (SDC) Tajikistan (OGB) Selection of Geographical Areas for Tajikistan Water Supply and Sanitation project (TajWSS) Field Assessment Report July 2010 Contents ACRONYMS ................................................................................................................... 3 EXECUTIVE SUMMARY................................................................................................. 4 INTRODUCTION ............................................................................................................. 5 METHODOLOGY ............................................................................................................ 6 FINDINGS IN PRE-SELECTED DISTRICTS .................................................................. 7 Temurmalik District.................................................................................................. 7 Vose District ............................................................................................................. 9 Muminobad District ................................................................................................ 12 Rudaki District: ...................................................................................................... 15 CONCLUSIONS ............................................................................................................ 18 RECOMMENDATIONS ................................................................................................
    [Show full text]
  • White Gold Or Women's Grief the Gendered Cotton
    ‘White Gold’ or Women’s Grief? The Gendered Cotton of Tajikistan – Oxfam GB October 2005 I. xecutive ummary 1 E S kept in the dark concerning their labour rights Contrary to dominant institutional and land rights; rural communities are not belief, cotton in Tajikistan, especially given its given any details about the extend of the farm present production structure, is not a cotton debt (estimated on a whole to have ‘strategic’ commodity; is highly inequitable in surpassed US$280 million by July 2005); for its distribution of financial gains in favour of nearly all female cotton workers, major investors rather than the majority-female farm incentives to work is the opportunity to collect workers; exploits the well-being and labour the meagre cotton picking earnings (about rights of children and rural households; leads US$0.03/kg) and the reward of collecting the ghuzapoya to rampant indebtedness of farms; induces end-of-season dried cotton stalks ( ) food insecurity, hunger, and poverty; is used as fuel, bartered or sold; the conditions socially destructive, causing widespread of many farms and farm workers is not unlike migration and dislocation of families; damages ‘bonded labour’ and ‘financial servitude’; not the micro and macro environments, cotton is thus a strategic commodity for contradicting principles of sustainable Tajikistan nor is it a ‘cash crop’ for rural economic development; and if not mitigated women and their households, with the crop of will likely lead to social and economic choice for the far majority being food crops aggravations. such as wheat, corn, potatoes and vegetables. A rapid qualitative study was con- The following advocacy and program- ducted during a three week period in March ming recommendations are presented to and April 2005 in the southern Khatlon Oxfam GB on the issue of gender and cotton province of Tajikistan and the capital city, production in Tajikistan.
    [Show full text]
  • Appendix 7 Tajikistan Prisoner List 2016
    APPENDIX 7 TAJIKISTAN PRISONER LIST 2016 BIRTH DATE OF THE NO. NAME DATE RESIDENCY RESPONSIBILITIES ARREST COMMENTS 1 Saidumar Huseyini 1961 Dushanbe Political council member and the 09.16.2015 Various extremism (Umarali Khusaini) first deputy chairman of the Islamic charges. Case went to the Renaissance Party of Tajikistan (IRPT) Constitutional Court on 9 February 2016. 2 Muhammadalii Hayit 1957 Dushanbe Political council member and 09.16.2015 Various extremism deputy chairman of IRPT charges. Case went to the Constitutional Court on 9 February 2016. 3 Vohidkhon Kosidinov 1956 Dushanbe Political council member and 09.17.2015 Various extremism chairman of the charges. Case went to the elections department of IRPT Constitutional Court on 9 February 2016. 4 Fayzmuhammad 1959 Dushanbe IRPT chairman of research, 09.16.2015 Various extremism Muhammadalii political council member charges. Case went to the Constitutional Court on 9 February 2016. 5 Davlat Abdukahhori 1975 Dushanbe IRPT foreign relations, 09.16.2015 Various extremism political council member charges. Case went to the Constitutional Court on 9 February 2016. 6 Zarafo Rahmoni 1972 Dushanbe IRPT chairman advisor, 09.16.2015 Various extremism political council member charges. Case went to the Constitutional Court on 9 February 2016. 7 Rozik Zubaydullohi 1946 Dushanbe IRPT academic chairman, 09.16.2015 Various extremism political council member charges. Case went to the Constitutional Court on 9 February 2016. 8 Mahmud Jaloliddini 1955 Hisor District IRPT chairman advisor, 02.10.2015 political council member 9 Hikmatulloh 1950 Dushanbe Editor of “Najot” newspaper, 09.16.2015 Various extremism Sayfullozoda IRPT political council member charges.
    [Show full text]
  • Formative Research on Infant and Young Child Feeding
    FORMATIVE RESEARCH ON INFANT AND YOUNG CHILD FEEDING Final Report AND MATERNAL NUTRITION 2016 IN TAJIKISTAN Conducted by Dornsife School of Public Health & College of Nursing and Health Professions, Drexel University, Philadelphia, PA USA For UNICEF Tajikistan Under Drexel’s Long Term Agreement for Services In Communication for Development (C4D) with UNICEF And Contract # 43192550 January 11 through November 30, 2016 Principal Investigator Ann C Klassen, PhD , Professor, Department of Community Health and Prevention Co-Investigators Brandy Joe Milliron PhD, Assistant Professor, Department of Nutrition Sciences Beth Leonberg, MA, MS, RD – Assistant Clinical Professor, Department of Nutrition Sciences Graduate Research Staff Lisa Bossert, MPH, Margaret Chenault, MS, Suzanne Grossman, MSc, Jalal Maqsood, MD Professional Translation Staff Rauf Abduzhalilov, Shokhin Asadov, Malika Iskandari, Muhiddin Tojiev This research is conducted with the financial support of the Government of the Russian Federation Appendices : (Available Separately) Additional Bibliography Data Collector Training, Dushanbe, March, 2016 Data Collection Instruments Drexel Presentations at National Nutrition Forum, Dushanbe, July, 2016 cover page photo © mromanyuk/2014 FORMATIVE RESEARCH ON INFANT AND YOUNG CHILD FEEDING AND MATERNAL NUTRITION IN TAJIKISTAN TABLE OF CONTENTS Section 1: Executive Summary 5 Section 2: Overview of Project 12 Section 3: Review of the Literature 65 Section 4: Field Work Report 75 Section 4a: Methods 86 Section 4b: Results 101 Section 5: Conclusions and Recommendations 120 Section 6: Literature Cited 138 FORMATIVE RESEARCH ON INFANT AND YOUNG CHILD FEEDING FORMATIVE RESEARCH ON INFANT AND YOUNG CHILD FEEDING 3 AND MATERNAL NUTRITION IN TAJIKISTAN AND MATERNAL NUTRITION IN TAJIKISTAN SECTION 1: EXECUTIVE SUMMARY Introduction Tajikistan is a mountainous, primarily rural country of approximately 8 million residents in Central Asia.
    [Show full text]
  • Semi-Annual Environmental Monitoring Report
    SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT Project No.47181-002 ADB Loan No.3434-TAJ/Grant: No.0498-TAJ Reporting period: July – December 2020 REPUBLIC OF TAJIKISTAN: WATER RESOURCES MANAGEMENT IN PYANJ RIVER BASIN (Financed by Asian Development Bank) Prepared by BETS Consulting Services Ltd. Bangladesh in association with LLC “Panasia” Ltd. Tajikistan for the Project Implementation Group “Water resources management in Pyanj river basin” under the State institution "Capital and Land reclamation construction" Agency of Land Reclamation and Irrigation under the Government of the Republic of Tajikistan and the Asian Development Bank This environmental monitoring report is a document of the Borrower. The views expressed in this document do not necessarily reflect the views of ADB's board of directors, management or staff and may be preliminary. In preparing a Country Program or Strategy, financing a project, or by indicating or referencing a specific territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments regarding the legal or other status of any territory or region. January 2021 1 CONTENT I. INTRODUCTION……………………………………………………………………………….5 II. PROJECT DESCRIPTION AND CURRENT ACTIVITY……………………………………6 2.1. Project Description……………………………………………………………………………..6 2.2 Project Location………………………………………………………………………………...7 2.3. Agreements (contracts) for project implementation and management………………...…8 2.4. Project activities during the reporting period……………………………………………….12 2.4.1. Modernization and rehabilitation of irrigation infrastructure in Hamadoni district………13 2.4.2. Modernization and rehabilitation of irrigation infrastructure in Farkhor district………...17 2.4.3. Modernization and rehabilitation of irrigation infrastructure in Vose district…………....23 2.4.4. Construction of the lake-type sediment excluding basin in Hamadoni district…………24 2.4.5.
    [Show full text]
  • Initial Environmental Examination
    Draft Initial Environmental Examination September 2020 TAJ: Road Network Sustainability Project (Hulbuk-Temurmalik-Kangurt Section) Prepared by the KOCKS Consult GmbH for Ministry of Transport of Tajikistan and Ministry of Transport. The IEE is a document of the Borrower. ABBREVIATIONS AADT - Annual Average Daily Traffic ADB - Asian Development Bank Aids - Acquired immune deficiency syndrome AP - Affected People CAREC - Central Asia Regional Economic Cooperation CS - Construction Supervision CEP - Committee for Environmental Protection under the Government of Tajikistan EA - Executive Agency EMP - Environmental Management Plan FS - Feasibility Study GoT - Government of Tajikistan HIV - Human Immune Deficiency Virus IEE - Initial Environmental Examination IBA - Important Bird Area IBAT - Integrated Biodiversity Assessment Tool KM - Kilometre LAR - Land Acquisition and Resettlement LARP - Land Acquisition and Resettlement Plan MoT - Ministry of Transport PAP - Project-Affected Person PIURR - Project Implementation Unit for Road Rehabilitation (of MoT) PRC - Peoples Republic of China RAP - Resettlement Action Plan RoW - Right-of-Way SC - Supervision Consultant SSEMP - Site Specific Environmental Management Plan TOR - Terms of Reference USD - United States Dollar This initial environmental examination report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. CONTENTS EXECUTIVE SUMMARY ................................................................................................... 5 I. INTRODUCTION ..................................................................................................
    [Show full text]
  • Wfp255696.Pdf
    Summary of Findings, Methods, and Next Steps Key Findings and Issues Overall, the food security situation was analyzed in 13 livelihood zones for September–December 2012. About 870,277 people in 12 livelihood zones is classified in Phase 3- Crisis. Another 2,381,754 people are classified in Phase 2- Stressed and 2,055,402 in Phase 1- Minimal. In general, the food security status of analyzed zones has relatively improved in the reporting months compared to the previous year thanks to increased remittances received, good rainfall and good cereal production reaching 1.2 million tons, by end 2012, by 12 percent higher than in last season. The availability of water and pasture has also increased in some parts of the country, leading to improvement in livestock productivity and value. Remittances also played a major role in many household’ livelihoods and became the main source of income to meet their daily basic needs. The inflow of remittances in 2012 peaked at more than 3.5 billion USD, surpassing the 2011 record of 3.0 billion USD and accounting for almost half of the country’s GDP. Despite above facts that led to recovery from last year’s prolong and extreme cold and in improvement of overall situation, the food insecure are not able to benefit from it due to low purchasing capacity, fewer harvest and low livestock asset holding. Several shocks, particularly high food fuel prices, lack of drinking and irrigation water in many areas, unavailability or high cost of fertilizers, and animal diseases, have contributed to acute food insecurity (stressed or crisis) for thousands of people.
    [Show full text]
  • The Study on Natural Disaster Prevention in Pyanj River
    No. JAPAN INTERNATIONAL COOPERATION AGENCY COMMITTEE OF EMERGENCY SITUATIONS AND CIVIL DEFENSE THE REPUBLIC OF TAJIKISTAN THE STUDY ON NATURAL DISASTER PREVENTION IN PYANJ RIVER FINAL REPORT VOLUME 1 MAIN REPORT DECEMBER 2007 CTI ENGINEERING INTERNATIONAL CO., LTD. GE JR 07-071 JAPAN INTERNATIONAL COOPERATION AGENCY COMMITTEE OF EMERGENCY SITUATIONS AND CIVIL DEFENSE THE REPUBLIC OF TAJIKISTAN THE STUDY ON NATURAL DISASTER PREVENTION IN PYANJ RIVER FINAL REPORT VOLUME 1 MAIN REPORT DECEMBER 2007 CTI ENGINEERING INTERNATIONAL CO., LTD. PROJECT COST ESTIMATE Price Level : Average Prevailing Market Price in February 2007 Currency Exchange Rate : USD 1 = 3.4386 Tjs. = JPY 121.720; JPY 10 = 0.2825 Tjs. and 1 Euro = 4.4430 Tjs. LIST OF REPORTS VOLUME 1 MAIN REPORT VOLUME 2 SUPPORTING REPORT SECTOR 1 RIVER PLANNING AND HAZARD MAPPING SECTOR 2 HYDROLOGY AND HYDRAULICS SECTOR 3 SEDIMENT AND EROSION SECTOR 4 SATELLITE IMAGE ANALYSIS SECTOR 5 RIVER FACILITY DESIGN SECTOR 6 CONSTRUCTION PLAN AND COST ESTIMATE SECTOR 7 SOCIO-ENVIRONMENT AND INSTITUTION SECTOR 8 PREPAREDNESS, FORECASTING, WARNING AND EVACUATION SECTOR 9 ECONOMIC AND FINANCE SECTOR 10 PILOT PROJECT ON LOCAL COMMUNICATION NETWORK FOR DISASTER MANAGEMENT IN RAYON HAMADONI SECTOR 11 FLOOD MONITORING FOR RIVER STRUCTURES VOLUME 3 DATA BOOK VOLUME 4 PHOTOGRAPH COLLECTION Border Road Basin Boundary River Legend Border River Road Dike Town Intake for Irrigation Dike Break (4 places) Spur Dike (2003) Dike (under construction) 1.0km Planed Dike 1.8km Planed Dike 1.8km GENERALGENERAL MAPMAP PREFACE In response to a request from the Republic of Tajikistan, the Government of Japan decided to conduct a Study on Natural Disaster Prevention in Pyanj River in the Republic of Tajikistan and entrusted to the study to the Japan International Cooperation Agency (JICA).
    [Show full text]
  • Republic of the Philippines
    Chapter 3 Final Report Power Development Plan (1st Screening) CHAPTER 3 POWER DEVELOPMENT PLAN (1ST SCREENING) Data Collection Survey on the Installment of Small Hydropower Stations for the Communities of Khatlon Oblast, Tajikistan Chapter 3 Final Report Power Development Plan (1st Screening) CHAPTER 3 POWER DEVELOPMENT PLAN (1ST SCREENING) 3.1 CONSIDERATION OF POWER DISCHARGE 3.1.1 Collection on Hydrological Data Hydrological data of nine hydropower potential sites will be collected. Potential sites are classified into two types, sites using natural rivers (Yokunch and Baljuvon) and artificial canals (Nurbakhsh, Surhak-1, Sathad, Shibanai, Pakhtakor, Faizobod and Bohtar). Hydrological data are essential factor for power generation plan such as maximum power discharge, annual power generation, plant capacity factor and so on. Therefore it is important to ensure the reliability of the data by using various documents. Meanwhile, it is difficult to collect reliable hydrological data in Tajikistan due to lack of observation stations, aging facilities and inadequacy of operation record of intake weirs. As discharge data of artificial canals is particularly unavailable, discharge is estimated by means of site surveys, relevant data and interviews at the 1st screening stage. (1) Natural River River observation stations at Khatlon province are as shown in Table 3.1-1. Since hydrological data is not observed at Yokunch and Baljuvon rivers, the discharge data at these sites is estimated by hydrological data of Yaksu river and Kizilsu river Fig. 3.1-1 River Observation Stations at Khatlon Province Data Collection Survey on the Installment 3 - 1 of Small Hydropower Stations for the Communities of Khatlon Oblast, Tajikistan Chapter 3 Power Development Plan (1st Screening) Final Report Table 3.1-1 Hydrological Gauging Stations at Khatlon Province Station Observation Period (Data Availability) Period of Data Station Name River No.
    [Show full text]