Formwork Code of Practice 2016 (PN11965) Page 2 of 54 Contents 1 Introduction 6 1.1 What Is Formwork?

Total Page:16

File Type:pdf, Size:1020Kb

Formwork Code of Practice 2016 (PN11965) Page 2 of 54 Contents 1 Introduction 6 1.1 What Is Formwork? Formwork Code of Practice 2016 This Queensland code of practice was been approved by the Minister for Employment and Industrial Relations, Minister for Racing and Minister for Multicultural Affairs under section 274 of the Work Health and Safety Act 2011 and commenced on 31 March 2016. This code was varied by the Minister for Education and Industrial Relations on 1 July 2018. PN11965 © The State of Queensland 2020 Copyright protects this document. The State of Queensland has no objection to this material being reproduced, but asserts its right to be recognised as author of the original material and the right to have the material unaltered. The material presented in this publication is distributed by the Queensland Government as an information source only. The State of Queensland makes no statements, representations, or warranties about the accuracy or completeness of the information contained in this publication, and the reader should not rely on it. The Queensland Government disclaims all responsibility and all liability (including, without limitation, liability in negligence) for all expenses, losses, damages and costs you might incur as a result of the information being inaccurate or incomplete in any way, and for any reason. Formwork Code of Practice 2016 (PN11965) Page 2 of 54 Contents 1 Introduction 6 1.1 What is formwork? ....................................................................................................................... 6 1.2 Who has health and safety duties in relation to formwork activities? ......................................... 6 1.3 What is involved in managing risks associated with formwork activities? ................................. 7 1.4 Information, training, instruction and supervision ....................................................................... 8 2 Design 10 2.1 Safe design of buildings in relation to formwork ..................................................................... 11 2.1.1 Build-ability .............................................................................................................. 11 2.1.2 Materials – traditional formwork .............................................................................. 12 2.2 Formwork systems .................................................................................................................... 13 2.2.1 Safe formwork design and certification ................................................................... 13 2.2.2 Modular proprietary system design ......................................................................... 15 2.2.3 Documentation ........................................................................................................ 15 2.2.4 Design variations ..................................................................................................... 17 2.2.5 On site coordination and verification ....................................................................... 17 3 Coordination and administration 18 3.1 Work program ............................................................................................................................ 18 3.2 The work environment ............................................................................................................... 18 3.2.1 Entry and exit ........................................................................................................... 19 3.2.2 Material storage ....................................................................................................... 19 3.2.3 Rubbish storage and removal ................................................................................. 20 3.2.4 Lighting .................................................................................................................... 20 3.3 Safe work method statements .................................................................................................. 20 4 Work systems 21 4.1 Formwork erection – traditional systems .................................................................................. 21 4.1.1 Foundations ............................................................................................................. 21 4.1.2 False deck ............................................................................................................... 22 4.1.3 Erecting frames ....................................................................................................... 22 4.1.4 Installing bearers ..................................................................................................... 23 4.1.5 Fall protection from the formwork deck ................................................................... 23 4.1.6 Laying formply on the deck ..................................................................................... 25 4.1.7 Cantilevers ............................................................................................................... 26 4.1.8 Penetrations ............................................................................................................ 27 4.1.9 Working areas for steel fixers and others ............................................................... 28 4.2 Formwork erection – modular formwork systems ..................................................................... 29 4.3 Stripping formwork .................................................................................................................... 29 4.3.1 Safe work method statement .................................................................................. 29 4.3.2 Certification prior to stripping .................................................................................. 30 4.3.3 Exclusion zone ........................................................................................................ 30 4.3.4 Drop stripping .......................................................................................................... 30 4.4 Crane and load handling systems ............................................................................................. 31 4.4.1 Loading materials during formwork construction .................................................... 31 4.4.2 Access for persons slinging loads ........................................................................... 31 4.4.3 Lifting gear ............................................................................................................... 32 4.4.4 Lifting formwork materials ....................................................................................... 32 Formwork Code of Practice 2016 (PN11965) Page 3 of 54 4.4.5 Lifting lugs ............................................................................................................... 33 4.5 Use of stair tread systems and ladders .................................................................................... 33 5 Falling objects 34 5.1 Preventing objects from falling .................................................................................................. 34 5.1.1 Perimeter containment screening ........................................................................... 35 5.2 Building step-ins ........................................................................................................................ 37 5.3 Gaps .......................................................................................................................................... 37 5.4 Prior to lifting .............................................................................................................................. 38 6 Special requirements for wall and column forms 38 6.1 Bracing for wind loading ............................................................................................................ 38 6.2 Access platforms ....................................................................................................................... 38 6.3 Lifting methods .......................................................................................................................... 39 7 Requirements for slip forms, jump forms, self-climbing and crane lifted vertical formwork ..... 40 7.1 Access and egress .................................................................................................................... 40 7.2 Working platforms and penetrations ......................................................................................... 41 7.2.1 Trapdoors ................................................................................................................ 41 7.3 Trailing screens and platforms .................................................................................................. 42 7.4 Climbing the form ...................................................................................................................... 42 7.5 Ventilation and amenities .......................................................................................................... 43 7.6 Engineering issues .................................................................................................................... 43 7.7 Emergency issues ..................................................................................................................... 44 Appendix 1: Dictionary 45 Appendix 2: Sample engineer’s certification letters 47 Appendix 3: Construction checklist 49 Appendix 4: Sample structural (pre-pour) certificate 51 Appendix 5: Defects commonly found in formwork systems 52 Appendix
Recommended publications
  • Brochure Show the Situation During Formwork Assembly and Are Therefore Incomplete from the Safety Aspect
    Understanding how to build high faster. Formwork solutions for your highrise project The Formwork Experts. _Understanding your highrise project as a partner _Understanding the construction process truly and being knowledgeable about it is the prerequisite for being a partner in the construction industry. We have this un- derstanding from the initial planning stage through to completion of construction. _Understanding such as this is based on more than 40 years' experience in self- climbing technology and more than 1,000 highrise projects successfully realised worldwide. Construction of the world’s tallest building, the Burj Khalifa in Dubai, 828 metres tall, is an outstanding example. With this comprehensive know-how, we are well-qualified to be your high- performing and reliable partner in highrise construction. 2 Doka is able to look back on a long history of _ understanding. Listening intently, understanding the world as seen through the eyes of our custom- ers, learning to understand all aspects and thinking ahead. We are passionate about not being satisfied with the first solution that might get the job done. Rather, we continue fine-tuning it until we come up with a true benefit for our customers. This is the only way a small woodworking shop could grow into a globally operating form- work company, known by the brand name Doka since 1956. "Thanks to the reliable technology and efficient on-site support provided by Doka, we were able to meet the schedule of Colombo Costruzioni S.p.A. with its detailed plan for completion of the Torre Isozaki build in Milan. As a result, we were able to shorten the original schedule for finishing the building shell by approximate- ly three months." Gianfranco Cesana, Engineering Manager for Colombo Important information: Always observe all relevant safety regulations (e.g.
    [Show full text]
  • A Special Compilation of Formwork Articles a Special Compilation of Formwork Articles from the Masterbuilder from the Masterbuilder
    SNAP THE MASTERBUILDER A Pioneering Initiative from SALES, NETWORKING AND PROMOTIONS The Masterbuilder FORMWORK FV1: No:O 1 RMWORK digest A Special Compilation of Formwork Articles A Special Compilation of Formwork Articles from The Masterbuilder from The Masterbuilder What you will find in this edition of formwork digest MB's ‘Formwork Digest’ is a special compilation of articles, case studies, communication features on formwork contributed by industry experts. This special compilation is meant to disseminate critical information on a broad range of topics with the objective of improving quality, safety and economy in all types of formwork and a must read for any- For more information on this edition one working with concrete. please contact: ‘Formwork Digest’ is also meant to be a one stop source for those who would like to Call: +91 9343833191 or alternatively gather information on leading formwork and scaffolding products that are available in Email: [email protected] the country at a simple click of a button. If you need information on any or all of the below featured companies, write to: [email protected] This special compilation is brought to you by: Doka India Pvt. Ltd. GCI Wall Forms Private Ltd. Hi-Lite Systems Indigo Multitrade Pvt. Ltd. Kumkang Kind India The Formwork Experts Mass Customizer of Concrete India Private Limited Composite Fiberglass The Total Formwork Solutions Forming Systems Experince the Advantage Formwork System Provider for Gang-Formwork, Only Mantra of Construction Aluminum Formwork, System Formwork “Speed-speed & Speed” Build with Confidence MFE Formwork Technology Nav Nirman Beam Technics Nova Plasmold P.
    [Show full text]
  • Innovation in Construction Technology
    GRD Journals | Global Research and Development Journal for Engineering | Recent Advances in Civil Engineering for Global Sustainability | March 2016 e-ISSN: 2455-5703 Innovation in Construction Technology 1Vivek Mishra 2Nidhi Gandhi 3Parth Desani 4Darshan Mehta 1,2,3U.G Student 4Assistant Professor 1,2,3,4Department of Civil Engineering 1,2,3,4SSASIT, Surat, Gujarat, India Abstract The innovations originated in more than 20 countries, and cover all facets of construction, including design, fabrication, construction, rehabilitation, labor, management, equipment, and materials. From simple tools to complex systems, innovation makes construction of higher quality that is less expensive, safer, more beautiful, less environmentally intrusive, and better understood and accepted. It helps preserve and renew the old and makes the new more enduring, it provides much of the spirit and challenges that excites and rives the great industry. One of the major issues to be addressed when coming to construction is the choice of the appropriate material. An already, classical implementation of the field techniques, widely used for construction is Cement, Steel, Glass, Wood etc are the main components of any construction now a days. In recent years, several emerging high strength materials have attracted enormous attention as potential candidates for construction. High strength steels has been used as main part of building for more than 40 years because of its manufacturability and ability to deliver continued tensile improvements as it has been made ever stronger. The innovations in construction here are such that they have helped us improve quality, efficiency and cost effectiveness of construction. Keyword- AAC, Construction Technology, FCDD __________________________________________________________________________________________________ I.
    [Show full text]
  • High-Rise Towers: an Integrated Approach Between Climbing Formworks and Stationary Booms
    High-Rise Towers: an Integrated Approach between Climbing Formworks and Stationary Booms Ciribini, A.L.C. DICATA, Università degli Studi di Brescia (email: [email protected]) Tramajoni, M. Peri Italia (email: [email protected]) Abstract The Research aims to investigate how a Construction Management System dealing with the erection of the High-rise Towers could be enhanced. Furthermore, such an effective and proactive Management System purports that the integration between the climbing concrete forming machines and the concrete pumping, pouring and placing devices must be achieved. First of all, the methodology adopted by the Research Unit required to perform a comparative analysis, in close co- operation with the Leading World Manufacturers, through the investigation of the most effective managerial and technical available options. Furthermore, the investigation performed by the Research Unit took into account some meaningful case-studies (located in Germany, Italy, Spain, Sweden, and Switzerland). The main conclusion lies with the need for distinguishing amongst different kinds of High-rise Tower (depending on its heights and shapes) and the preferred models of Site Management to be followed. Keywords: high-rise towers, site management, formworks, concrete pumping system. 1 1. The formwork and steel fixing systems In Italy, the poor performances and the lack of managerial skills affecting the construction sites are due to an absence of the co-operation amongst the various Players (Client Organizations, Main Contractors, Sub-Contractors, and Suppliers). Indeed, quite often it happens that a Public or Private Client Awarding Organization seems to neglect the Site Management-oriented topics. Likewise, the Main Contractor does not want to be really involved into the Site Management-related solutions, preferring to leave the choice of the preferred formwork, steel fixing and pumping systems to its first- tier Sub-Contractors.
    [Show full text]
  • CONCRETE TECHNOLOGY Second Edition Press
    CONCRETE TECHNOLOGY Second Edition Press A.R. SANTHAKUMAR Former Dean and Chairman Faculty of Civil Engineering AnnaUniversity University Former Emeritus Professor Department of Civil Engineering Indian Institute of Technology Madras Oxford © Oxford University Press. All rights reserved. FM.indd 1 2/2/2018 6:08:06 PM 3 Oxford University Press is a department of the University of Oxford. It furthers the University’s objective of excellence in research, scholarship, and education by publishing worldwide. Oxford is a registered trade mark of Oxford University Press in the UK and in certain other countries. Published in India by Oxford University Press Ground Floor, 2/11, Ansari Road, Daryaganj, New Delhi 110002, India © Oxford University Press 2007, 2018 The moral rights of the author/s have been asserted. First Edition published in 2007 Second Edition published in 2018 All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, without the prior permission in writing of Oxford University Press, or as expressly permitted by law, by licence, or under terms agreed with the appropriate reprographics rights organization. Enquiries concerning reproduction outside the scope of the above should be sent to the Rights Department, Oxford University Press, at the address above. Press You must not circulate this work in any other form and you must impose this same condition on any acquirer. ISBN-13: 978-0-19-945852-3 ISBN-10: 0-19-945852-9 Typeset in Times New Roman by E-Edit Infotech Private Limited (Santype), Chennai Printed in India by Magic International (P) Ltd., Greater Noida Cover image:University Atmosphere1 / Shutterstock Third-party website addresses mentioned in this book are provided by Oxford University Press in good faith and for information only.
    [Show full text]
  • Advanced Construction and Building Technology for Society
    Publication 367 Advanced Construction and Building Technology for Society Joint CIB - IAARC Commission on “Customized Industrial Construction” Proceedings of the CIB*IAARC W119 CIC 2012 Workshop “Advanced Construction and Building Technology for Society” Editors: Thomas Bock (Prof. Prof. h. c./SRSTU Dr.-Ing./Univ.Tokio) Christos Georgoulas (Dr.-Ing.) Thomas Linner (Dipl.-Ing.) 24 Oct 2012 Laboratory of Building Realization and Robotics (br)2 Technische Universität München (TUM), Germany Foreword CIB Working Commission, W119 on “Customized Industrial Construction” has been established as the successor of former TG57 on Industrialization in Construction and as a joint CIB-IAARC Commission. Prof Dr Ing Gerhard Girmscheid, ETH Zurich, Switzerland (Coordinator of the former TG57) and Prof Dr Ing Thomas Bock, Technische Universität München, Germany are the appointed Coordinators of this Working Commission. The workshop is hosted by the Chair for Building Realization and Robotics located at TUM within the Bavarian high tech cluster, the Master of Science Course “Advanced Construction and Building Technology” and by IAARC-Academy representing the research training program of the International Association for Automation and Robotics in Construction (IAARC). The workshop will concentrates international researchers, practitioners and selected top-students coming from 8 different professional backgrounds (Architecture, Industrial Engineering, Electrical Engineering, Civil Engineering, Business Science, Interior Design, Informatics, Mechanical Engineering). Industrialization in Construction will become more customer oriented. Systems for adaptable manufacturing and robot technologies will merge the best aspects of industrialization and automation with aspects of traditional manufacturing. Concepts of mass customization can be implemented via the application of robots in construction and building project/product life cycle as prefabrication processes, on site and in service as socio technical systems.
    [Show full text]
  • Perfect Form Formwork Meets Challenges of Towering Bridge Project Pg 21
    INSIDE: CONCRETE SURFACES March 2016 An Offi cial Magazine of World of Concrete Perfect Form Formwork meets challenges of towering bridge project pg 21 Rebuilt section of highway in Utah wins 2016 Triad Award pg 29 How-to Zone: Curing concrete fl atwork pg 56 See Oztec’s full line of concrete vibrating equipment and concrete grinders on our web site: www.oztec.com Concrete Vibrating Equipment BLOCK STAINS With A One-Two Punch: LIQUI-HARD® + BELLATRIX® W. R. MEADOWS delivers a winning combination for protecting and keeping concrete floors looking newer…longer: LIQUI-HARD® Concrete Densifier and Hardener + BELLATRIX® Premium Concrete Enhancer. LIQUI-HARD penetrates concrete surfaces to produce an ultra-tough homogenous surface while proprietar BELLATRIX technolog produces a clear, high-gloss finish with superior resistance to stains. And for even more protection, check out LIQUI-HARD ULTRA for fast hardening and dust proofing at a molecular level! For more information, visit www.wrmeadows.com or call 1-800-342-5976. © W. R. MEADOWS, INC. 2016 2/16 CONTENTS March 2016 / Volume 61 / Number 2 29 FEATURES DEPARTMENTS CS-39 News & Views 21 Tall Towers Carry High Hopes 7 Insider Information It’s a miracle clients ever Expert planning and construction helps Concrete Fundamentals, Infrastructure Challenges, get the polished concrete crews on the East End Crossing Bridge and Staining for Success. floor that they envision. spanning the Ohio River. 13 Your Business CS-41 Decorative Concrete 29 Elevating Concrete Pavement Design Contractor to Watch, bauma, Quick Poll, and More. The best way to improve The clock was ticking for all involved in our 18 Uncommon Sense your acid-staining winning 2016 Triad Award project.
    [Show full text]
  • An Improvement of a Hydraulic Self-Climbing Formwork
    ARCHIVEOFMECHANICALENGINEERING Volume 66 2019 Number 4 DOI: 10.24425/ame.2019.131419 Key words: climbing formwork, self-climbing formwork, hydraulic self-climbing formwork Van Tinh Nguyen,1 Kiem Anh Nguyen,1 Van Linh Nguyen2 An improvement of a hydraulic self-climbing formwork Nowadays, self-climbing formworks are commonly used in the construction of concrete buildings with a great height, such as high-rise buildings, silos, and bridge piers. A regular formwork can be improved to have more functions, e.g., the formwork itself can climb to the desired construction site. Climbing characteristics of the form- work as well as opening and closing characteristics of the formwork shell are essential criteria for evaluating the performance of a self-climbing formwork. The effective ones were mentioned in different studies, where most of them were published in patents of countries, e.g., the United States and China. Dissimilar from these studies, this paper presents several improvements for some certain groups to enhance the features of a hydraulic self-climbing formwork. Based on the analysis of the composition and the working principle of the actual climbing formwork types, a new opening and closing method of the formwork shells and a new rail clamping device are suggested. They are applied to design a self-climbing formwork with the shell’s working size of 4 m × 3 m. Their load capacity, as well as the flatness of the concrete surface after casting, are assessed. The proposed solutions can result in various advantages, e.g., the shorter initial alignment time, the increase of the quality concrete surface, and the maximal automation for construction operations.
    [Show full text]
  • “Advanced Construction and Building Technology for Society”
    Proceedings of the CIBW119 CIC 2012 Workshop “Advanced Construction and Building Technology for Society” Editors: Thomas Bock (Prof. Prof. h. c./SRSTU Dr.-Ing./Univ.Tokio) Christos Georgoulas (Dr.-Ing.) Thomas Linner (Dipl.-Ing.) 24 Oct 2012 Laboratory of Building Realization and Robotics (br)2 Technische Universität München (TUM), Germany Foreword CIB Working Commission, W119 on “Customized Industrial Construction” has been established as the successor of former TG57 on Industrialization in Construction and as a joint CIB-IAARC Commission. Prof Dr Ing Gerhard Girmscheid, ETH Zurich, Switzerland (Coordinator of the former TG57) and Prof Dr Ing Thomas Bock, Technische Universität München, Germany are the appointed Coordinators of this Working Commission. The workshop is hosted by the Chair for Building Realization and Robotics located at TUM within the Bavarian high tech cluster, the Master of Science Course “Advanced Construction and Building Technology” and by IAARC-Academy representing the research training program of the International Association for Automation and Robotics in Construction (IAARC). The workshop will concentrates international researchers, practitioners and selected top-students coming from 8 different professional backgrounds (Architecture, Industrial Engineering, Electrical Engineering, Civil Engineering, Business Science, Interior Design, Informatics, Mechanical Engineering). Industrialization in Construction will become more customer oriented. Systems for adaptable manufacturing and robot technologies will merge
    [Show full text]
  • Concrete in an AM Process to the Requirements That Have to Be Set Regarding a Matching Fresh Concrete Mixture
    This report examines the additive manufacturing (AM) of concrete, its possibilities, feasibility and advantages over existing techniques. The possibilities for products made with an additive process are endless, but just replacing existing production methods with additive ones is still impossible. Although improved freeform production techniques are the aim of this research, this does not mean that more freedom in form is by definition the largest improvement that AM can offer at the moment. From another point of view the implementation of additional functions in traditional products can be of great value. A roadmap envisions how the technique has to evolve in order to implement the characteristic properties of concrete. Product ideas and an evaluation of the techniques shown in the roadmap are related to the developments to achieve an increase in speed, surface quality and strength in the AM production technique, next Dennis de Witte | Concrete in an AM process to the requirements that have to be set regarding a matching fresh concrete mixture. Freeform concrete processing Concrete in an AM process Freeform concrete processing Dennis de Witte Dennis de Witte Freeform concrete processing Concrete in an AM process to the requirements that have to be set regarding a matching fresh concrete mixture. increase in speed, surface quality and strength in the AM production technique, next techniques shown in the roadmap are related to the developments to achieve an the characteristic properties of concrete. Product ideas and an evaluation of the A roadmap envisions how the technique has to evolve in order to implement products can be of great value.
    [Show full text]
  • Brochures, Catalogues of Which Amounts the Buyer Shall Pay in Addition When It Is Due to Pay for the Goods
    About Us The Capital Construction Products team has over 30 years’ experience in the construction industry. We pride ourselves on our exceptional customer service and the long-term relationships we build with our clients and suppliers. Capital Construction Products supplies goods for groundworkers, R C Framework companies and general building contractors. Our high-quality product range includes, but is not limited to, Mesh Reinforcements; Concrete, Plastic & Wire Spacers; Construction Chemicals; Waterproofing Products and Concrete Repair Products. Contents About Us Tying Wires Concrete Spacers Plastic Spacers Wire Spacers Reinforcement Bolt Boxes and Holding Down Bolts Slab Accessories Damp Proof Membranes and Damp Proof Courses Joint Fillerboards Crack Inducers and Void Formers Construction Chemicals Formwork Tie Rod System Formwork Accessories Formwork Systems Plexus Rebar Continuity Systems Rebar Couplers and Formrib Concrete Finishing Tools Concrete Test Equipment Protection Products Tapes Ancillaries Grouts and Concrete Repair Terms & Conditions Tying Wires Black Annealed Tying Stainless Steel Tying Wire Soft black annealed 17 gauge wire 18STAINLES TEELgauge YING IRE stainless steel wire used use for tying reinforcement. for reinforcement. CODE GAUGE PACK CODE GAUGE PACK TW17 17 gauge Coil SSTW18 18 gauge Coil TW17M 17 gauge 2kg SSTW18M 18 gauge 2kg Reelfix Reelix is a comprehensive tie wire system using a belt worn dispencer. Supplied black annealed to BS 4482 and stainless 304 to BS EN 10088-3. CODE DESCRIPTION LENGTH PACK REEL/TW16 Black refill spool 16 gauge Each REEL/SSTW18 Stainless refill spool 17 gauge Each ADVANTAGES REEL/DISP Reel dispenser N/A Each • Eliminates wire trip hazards • Minimises waste wire • Reduced back injury risk REEL/BELT Reel dispenser belt N/A Each • Light weight only 2kg coil REEL/PAD Reel dispenser pad N/A Each Double Loop Wire Ties Tying Wire Nips An alternative way to tying The preferred tool used by reinforcement.
    [Show full text]
  • Section 602-1 of This Manual
    STRUCTURES April 2006 601 CONCRETE STRUCTURES 601-1 Description A structure is an arrangement of materials that sustains loads. Loads can be the weight of an automobile, the force of the wind, or the pressure of soil and water. A structure must withstand loads without collapsing or deflecting excessively. A safe structure is one that can carry its intended loads without the risk of injury to the people using the structure. Structures can be made up of different materials. For example, bridges can be built out of timber, steel or concrete. Sometimes these materials are combined to form composite structures where two or more materials share the loading. The structures that ADOT builds are made primarily of structural steel or structural concrete. Structural steel is a group of ASTM designated steels with material properties that are specifically intended for structural applications such as buildings and bridges. Structural steel is very different from the steel found in automobiles, washing machines, and hand tools. Structural steel is of higher grade, designed to have high strength, and stretches (or yields) just before failure as a warning to those in or near the structure. Structural concrete is a composite material consisting of concrete and steel. It must meet higher standards of quality than concrete found in sidewalks or driveways. Like structural steel, it is designed to have a high strength and yield before failure. Types of Structural Concrete Structural concrete can be divided into two types: reinforced concrete and prestressed concrete. Reinforced concrete consists of concrete and reinforcing steel. Concrete is strong in compression and weak in tension.
    [Show full text]