Virgin Trains East Coast

Total Page:16

File Type:pdf, Size:1020Kb

Virgin Trains East Coast Virgin Trains East Coast accesrail.com /products/virgin-trains-east-coast/ Product Information Availability Booking Information Check-in and Travel Resources About Virgin Trains East Coast is a train operating company in the United Kingdom that operates the InterCity East Coast franchise on the East Coast Main Line between London, Yorkshire, the North East and Scotland. Virgin Trains East Coast is a trusted household name and as part of the Virgin and Stagecoach family, is a company that confidence can be taken. In partnership with AccesRail, Virgin Trains opens up a number of journey opportunities to an international audience which previously were just not possible. Destinations Virgin Trains East Coast rail services are available between London King’s Cross (QQK) and Edinburgh Waverly (ZXE). Destination Code Approx. Time Edinburgh Waverly to London King’s Cross ZXE to QQK 4hrs 43 London King’s Cross to Edinburgh Waverly QQK to ZXE 4hrs 23 Virgin Trains East Coast E-tickets are available as follows: Standalone 9B/450 Interline Interline Standalone sales (ticketed on 9B plate) are possible in these BSP/ARC markets: ARC USA BSP Australia BSP Austria BSP Belgium/Netherlands/Luxembourg BSP Canada BSP Finland BSP France BSP Germany BSP Hong Kong 1/8 BSP Indonesia BSP Italy BSP Japan BSP Macao BSP Malaysia BSP Scandinavia – Open in Sweden, Denmark, Estonia, Latvia and Lithuania. BSP Singapore BSP South Korea BSP Spain BSP Switzerland/Liechtenstein BSP Taiwan BSP Thailand BSP UK Participating GDS’s Abacus Amadeus Apollo Axess Galileo Infini Sabre Sirena Travel SITA Travel Sky Topas Worldspan Eligibility Available worldwide. Train Range 9B 6600-6799 Booking Classes 9B/VT booking classes: J = 1st class Y = 2nd class 2/8 The Virgin Trains East Coast First Class offering includes complimentary food, drink and Wi-Fi. Inventory Schedules are filed minimum 11 months in advance. Schedules Flight info “Operated by Virgin Trains East Coast” TTL Minus 24 hrs to departure Tickets Offered Anytime tickets Minimum Connection Time London: 3 hours Auto Cancellation of Booking 24 hrs prior to departure Period of Validity Scheduled train departure time (indicated on the boarding pass). Discounts N/A How to book it Travel agents/airline ticket offices book the rail sector between London (QQK) and/or Edinburgh (ZXE). AccesRail replies to the booking that includes VTEC segment indicating need to check-in within 72 hours before departure of the rail segment at www.accesrail.com/checkin to retrieve their train ticket. GDS availability 3/8 PNR Booking Refunds: Before departure: 15% penalty until 24 hrs to departure Within 24 hours to departure and after Departure: non refundable Requests for refunds must be initiated at the point of sale. Check-in Earliest 72 hours before train departure, the passenger will have to check-in at www.accesrail.com to print the Virgin Trains East Coast ticket. At time of booking, please inform the passenger to keep the PNR locator or e-ticket number handy to facilitate check-in. Check-in Luggage Policy Virgin Trains East Coast luggage policy can be found in UK National Rail Conditions of Travel (Part II 47). Passengers can make a single booking that covers both the air and the rail segment (via a print at home ticket) to a selection of VT stations. 4/8 Travel documents At the time of purchase the travel agent issues the e-ticket and receives the ticket pickup number via Special Service Request (SSR). To retrieve their actual travel document, passengers must check-in prior to boarding the train. View sample travel documents. 5/8 6/8 Travel information Always check departure screens at Stations for the exact departure times and check platform numbers which can be altered at short notice. Due to ongoing engineering works, especially on weekends, always verify train schedules at https://www.virgintrainseastcoast.com/travel-information/timetable-changes/. To check live schedule updates on the day, verify https://www.virgintrainseastcoast.com/travel-information/journey-planner/. Airport Transfers Additionally, passengers receive information on transfer connections between the airport and the London King’s Cross train station. How to commute between Heathrow Airport and London King’s Cross station: By Taxi: The trip between Heathrow Airport and London Kong’s Cross takes about an hour, the cost is about 80 GBP By Tube: Take the Piccadilly line the whole way. The trip is 23 to 25 stops and takes approximately an hour. The cost is about 5.50 GBP By Heathrow Express: Take the train to Paddington Station (15 minutes). The cost is 25 GBP one way. From there, either take a taxi to King’s Cross Station (10 minutes) or take the Tube 5 stops on the Hammersmith & City Lines (13 minutes) How to commute between Gatwick Airport and London King’s Cross station: By Gatwick Express: Take a Gatwick Express train to Victoria station, then take the Victoria tube line to King’s Cross station. (51 minutes) By Train: Take the train from Gatwick to St Pancras station and then walk to King’s Cross station. (56 minutes) By Trains & Tube: Take a train to Victoria station from Gatwick, then take the Victoria tube line to King’s Cross station. (55 minutes) How to commute between Edinburgh Airport and Edinburgh Waverley station (City Center): By Tram: Edinburgh Trams run services from every 7 minutes to the City Centre with a journey time of 30 minutes. The tram features stops at the financial district, Murrayfield Stadium and railways stations at Edinburgh Gateway, Edinburgh Park, Haymarket and St Andrew Square (for Waverley). There are several luggage racks throughout the vehicle. Single tickets cost about 5.50 GBP. By Taxi: A journey to the city centre typically takes about 25 minutes. Terms & conditions: NATIONAL RAIL CONDITIONS OF CARRIAGE: Travel is subject to National Rail Conditions of Carriage (NRCoC) and to the conditions of carriage of other operators on whose services the ticket is valid. The NRCoC can be obtained from www.nationalrail.co.uk SPECIFIC e-TICKET CONDITIONS: Your travel document must be retained and available for inspection during your journey. The ticket must be clearly printed on plain, clean, white paper. Problems with printing will not be the responsibility of Virgin Trains East Coast. The ticket is for the named passenger only and is not transferable or for resale. 7/8 Proof of ID will need to be carried along with the ticket during your entire journey. Sales Manual Download Sales Manual Manual FAQ What if the passenger misses their train connection? The ticket is valid for the specific service listed and in the event of disruption or delay it will be accepted on the next available service, subject to availability. Customers may not travel on an earlier service than the booked rail service. 8/8.
Recommended publications
  • United States GOVERNMENT PUBLICATIONS Monthly Catalog ISSUED by the Superintendent of Documents
    United States GOVERNMENT PUBLICATIONS Monthly Catalog ISSUED BY THE Superintendent of Documents no . 608 SEPTEMBER I 945 UNITED STATES GOVERNMENT PRINTING OFFICE WASHINGTON : 194$ FOR SALE BY THE SUPERINTENDENT OF DOCUMENTS, U. S. GOVERNMENT PRINTING OFFICE, WASHINGTON 25, D. C., PRICE 20 CENTS PER COPY SUBSCRIPTION PRICE $2.25 PER YEAR FOREIGN SUBSCRIPTION $2.85 PER YEAR Contents Page Abbreviations, Explanation_________ iv Alphabetical List of Government Authors________________________ v General Information_______________ 927 Notes of General Interest__________ 930 New Classification Numbers, etc____ 931 Congressional Set_________________ 932 Monthly Catalog__________________ 933 m Abbreviations Amendment, amendments_____ amdt., amdts. Paragraph, paragraphs---------------- par., pars. Appendix---------------------------------------------- app. Part, parts------------------------------------- pt., pts. Article, articles________________________ art. Plate, plates____________________________ pi. Chapter, chapters_____________________ chap. Portrait, portraits_____________________ por. Congress-------------------------------------------- Cong. Quarto___________________________________40 Department__________________________Dept. Report_________________________________ rp. Document_____________________________ doc. Saint----------------------------------------------------- st. Facsimile, facsimiles_______________ facsim. Section, sections_______________________ sec. Folio____________________________________fo Senate, Senate bill______________________
    [Show full text]
  • Alternative Routes and Ticket Acceptance During Disruption on Virgin Trains West Coast See Map Page 2
    Alternative routes and ticket acceptance during disruption on Virgin Trains West Coast see map page 2 Virgin route Alternative route Operator Euston - West Midlands Marylebone - West Midlands Chiltern Railways Paddington - Reading / Oxford First Great Western Reading / Oxford - West Midlands CrossCountry Euston - North Wales Birmingham / Crewe / Wrexham - Holyhead Arriva Trains Wales Euston - Manchester St Pancras - Sheffield East Midlands Trains Sheffield - Manchester TransPennine Express / Northern King’s Cross - Leeds - Manchester Virgin Trains East Coast / TransPennine Express / Northern Euston - Liverpool Birmingham - Liverpool London Northwestern Chester - Liverpool Merseyrail Euston - Preston and Scotland King’s Cross - Newcastle / Scotland Virgin Trains East Coast West Midlands - York - Scotland CrossCountry Birmingham - Preston and Scotland West Midlands - York - Scotland CrossCountry Virgin WC alternative routes 6 29/11/17 www.projectmapping.co.uk Dyce Kingussie Spean Aberdeen Glenfinnan Bridge Mallaig Blair Atholl Fort Stonehaven William Rannoch Montrose Pitlochry Arbroath Tyndrum Oban Dalmally Alternative Crianlarichroutes and ticket acceptancePerth Dundee Gleneagles Cupar Dunblane during disruptionArrochar & Tarbet on Virgin Trains West Coast Stirling Dunfermline Kirkcaldy Larbert Alloa Inverkeithing Garelochhead Falkirk Balloch Grahamston EDINBURGH Helensburgh Upper Polmont Waverley Milngavie North Berwick Helensburgh Central Lenzie Falkirk Bathgate Dunbar High Dumbarton Central Maryhill Haymarket Westerton Springburn Cumbernauld
    [Show full text]
  • Midnight Train to Georgemas Report Final 08-12-2017
    Midnight Train to Georgemas 08/12/2017 Reference number 105983 MIDNIGHT TRAIN TO GEORGEMAS MIDNIGHT TRAIN TO GEORGEMAS MIDNIGHT TRAIN TO GEORGEMAS IDENTIFICATION TABLE Client/Project owner HITRANS Project Midnight Train to Georgemas Study Midnight Train to Georgemas Type of document Report Date 08/12/2017 File name Midnight Train to Georgemas Report v5 Reference number 105983 Number of pages 57 APPROVAL Version Name Position Date Modifications Claire Mackay Principal Author 03/07/2017 James Consultant Jackson David Project 1 Connolly, Checked Director 24/07/2017 by Alan Director Beswick Approved David Project 24/07/2017 by Connolly Director James Principal Author 21/11/2017 Jackson Consultant Alan Modifications Director Beswick to service Checked 2 21/11/2017 costs and by Project David demand Director Connolly forecasts Approved David Project 21/11/2017 by Connolly Director James Principal Author 08/12/2017 Jackson Consultant Alan Director Beswick Checked Final client 3 08/12/2017 by Project comments David Director Connolly Approved David Project 08/12/2017 by Connolly Director TABLE OF CONTENTS 1. INTRODUCTION 6 2. BACKGROUND INFORMATION 6 2.1 EXISTING COACH AND RAIL SERVICES 6 2.2 CALEDONIAN SLEEPER 7 2.3 CAR -BASED TRAVEL TO /FROM THE CAITHNESS /O RKNEY AREA 8 2.4 EXISTING FERRY SERVICES AND POTENTIAL CHANGES TO THESE 9 2.5 AIR SERVICES TO ORKNEY AND WICK 10 2.6 MOBILE PHONE -BASED ESTIMATES OF CURRENT TRAVEL PATTERNS 11 3. STAKEHOLDER CONSULTATION 14 4. PROBLEMS/ISSUES 14 4.2 CONSTRAINTS 16 4.3 RISKS : 16 5. OPPORTUNITIES 17 6. SLEEPER OPERATIONS 19 6.1 INTRODUCTION 19 6.2 SERVICE DESCRIPTION & ROUTING OPTIONS 19 6.3 MIXED TRAIN OPERATION 22 6.4 TRACTION & ROLLING STOCK OPTIONS 25 6.5 TIMETABLE PLANNING 32 7.
    [Show full text]
  • Local Plan for Passenger Information During Disruption (PIDD)
    SERVICE DELIVERY MANAGEMENT SYSTEM Local Plan for Passenger Information During Disruption (PIDD) Document Author: Synopsis & Briefing Note: This document outlines how Virgin Trains East Coast is working to improve information to customers in times of disruption. Service Delivery This document details the response of Virgin Trains East Coast aligned to Project Manager the ATOC Approved Code of Practice (July 2014 version). This document also acts as a status report on Virgin Trains East Coast’s Authorised by: progress against industry recommendations. Implementation Date: 30 September 2015 Head of Service Delivery Published by the Safety & Environment Section. If printed this document is UNCONTROLLED and not subject to update. Issue Number 01 Issue Date September 2015 Contents Page Section Description 1 Document History 2 Purpose 3 Scope 4 References 5 Aims and Objectives 6 Interfaces with Network Rail 7 Compliance 8 Key Requirements 9 Definitions and Glossary Appendices A On Call Checklists B Hub /Satellite Station Information C Virgin Trains East Coast On Call Structure D Virgin Trains East Coast On Call Information Flows E Industry PIDD Action Plan F Virgin Trains East Coast Website / App Screenshot Document Local Plan for Passenger Information During Disruption (PIDD) Issue No. 01 Issue Date September 2015 Page 2 of 31 1 Document History Issue Number Page Numbers Date Amended Details Initial Issue of document aligned to ATOC ACOP 1 All September 2015 format (July 2014 version) Document Local Plan for Passenger Information During Disruption (PIDD) Issue No. 01 Issue Date September 2015 Page 3 of 31 2 Purpose The below item is provided in compliance with PIDD recommendation 41: 2.0.1 Virgin Trains East Coast recognizes the importance of providing good information to customers in order to make informed travel decisions and the needs for this to be coordinated amongst the industry.
    [Show full text]
  • Great Britain Passenger Rail: the Current Expected Timetable
    Great Britain passenger rail: the current expected timetable Franchise Current operator 2017 2018 2019 2020 2021 Onwards DJFMA MJJASONDJFMA MJJASONDJFMA MJJASOND South West Stagecoach West Midlands Govia East Midlands Stagecoach O I South Eastern Govia O I Wales & Borders Arriva InterCity W.C./W.C. Partnership Virgin/Stagecoach O I Cross Country Arriva OI Great Western First Group OI Apr. Chiltern Chiltern OITo Dec. 2021 To Jul. 2022 TSGN Govia O I To Sep. 2021 To Sep. 2023 East West n/a Potential development and competition period InterCity East Coast Stagecoach/Virgin To Mar. 2023 To Mar. 2024 ScotRail Abellio To Apr. 2022 To Apr. 2025 TransPennine Express First Group To Apr. 2023 To Apr. 2025 Northern Arriva To Apr. 2025 To Apr. 2026 East Anglia Abellio To Oct. 2025 To Oct. 2026 Caledonian Sleeper Serco To Apr. 2030 Essex Thameside Trenitalia To Nov. 2029 To Jun. 2030 Concession London Rail Arriva To Apr. 2024 To Apr. 2026 Tyne and Wear PTE Nexus Crossrail MTR To May 2023 To May 2025 MerseyRail Serco/Abellio To Jul. 2028 Based on publicly available information as at 1 April 2017 Key Existing franchise/concession term O OJEU notice expected Extension/direct award I ITT expected Max. length at discretion of DfT/TS Contract award expected New franchise/concession Operated by PTE Nexus Rail Finance Firm Rail Finance Firm Rail Finance Firm Rail Finance Firm Band 1 for Rail Band 1 for Rail Band 1 for Rail of the Year of the Year of the Year of the Year Finance Franchising Global Transport Global Transport Global Transport Global Transport Chambers UK 2015 The Legal 500 Chambers UK 2017 Finance 2016 Finance 2015 Finance 2014 Finance 2013 UK 2016 Stephenson Harwood LLP is a law firm of over 900 people worldwide, including 150 partners.
    [Show full text]
  • Scotrail Franchise – Franchise Agreement
    ScotRail Franchise – Franchise Agreement THE SCOTTISH MINISTERS and ABELLIO SCOTRAIL LIMITED SCOTRAIL FRANCHISE AGREEMENT 6453447-13 ScotRail Franchise – Franchise Agreement TABLE OF CONTENTS 1. Interpretation and Definitions .................................................................................... 1 2. Commencement .......................................................................................................... 2 3. Term ............................................................................................................ 3 4 Franchisee’s Obligations ........................................................................................... 3 5 Unjustified Enrichment ............................................................................................... 4 6 Arm's Length Dealings ............................................................................................... 4 7 Compliance with Laws................................................................................................ 4 8 Entire Agreement ........................................................................................................ 4 9 Governing Law ............................................................................................................ 5 SCHEDULE 1 ............................................................................................................ 7 PASSENGER SERVICE OBLIGATIONS ............................................................................................. 7 SCHEDULE 1.1 ...........................................................................................................
    [Show full text]
  • Stakeholder Briefing Document, Intercity West Coast Re-Franchising
    Stakeholder Briefing Document, InterCity West Coast Re-Franchising MAY 2011 1 Consultation Process The Department is grateful to all the organisations and individuals who took the time and effort to respond to this consultation, and to those who attended the consultation events. Their valuable comments and suggestions have been considered and are summarised in this report. The Department has endeavoured, in good faith, to produce a synopsis of each response received. These are tabulated at Appendix B. Any significant omission or incorrect emphasis is entirely unintentional. Bidders for the franchise will have access to all consultation responses submitted. The consultation document for the proposed InterCity West Coast franchise was issued by the Department on the 19th of January 2011, and closed on the 21st of April 2011. The consultation gave details of the proposed specification for the new franchise, and posed a number of questions to consultees. The closed consultation document can be found at: http://www.dft.gov.uk/consultations/closed/ 325 local authorities, agencies (such as the Office of Rail Regulation), user groups and rail industry stakeholders (including Passenger Focus) were formally consulted and were sent electronic copies of the consultation document. No formal ‘hard copy’ document was produced for this consultation exercise as part of the Department’s overall drive for efficiency savings. In addition the document was posted on the DfT website and a press notice released. All MPs with one or more stations in their Constituency served by the current franchise were also sent a copy of the consultation document and copies were also placed in the House of Commons library.
    [Show full text]
  • Competitive Tendering of Rail Services EUROPEAN CONFERENCE of MINISTERS of TRANSPORT (ECMT)
    Competitive EUROPEAN CONFERENCE OF MINISTERS OF TRANSPORT Tendering of Rail Competitive tendering Services provides a way to introduce Competitive competition to railways whilst preserving an integrated network of services. It has been used for freight Tendering railways in some countries but is particularly attractive for passenger networks when subsidised services make competition of Rail between trains serving the same routes difficult or impossible to organise. Services Governments promote competition in railways to Competitive Tendering reduce costs, not least to the tax payer, and to improve levels of service to customers. Concessions are also designed to bring much needed private capital into the rail industry. The success of competitive tendering in achieving these outcomes depends critically on the way risks are assigned between the government and private train operators. It also depends on the transparency and durability of the regulatory framework established to protect both the public interest and the interests of concession holders, and on the incentives created by franchise agreements. This report examines experience to date from around the world in competitively tendering rail services. It seeks to draw lessons for effective design of concessions and regulation from both of the successful and less successful cases examined. The work RailServices is based on detailed examinations by leading experts of the experience of passenger rail concessions in the United Kingdom, Australia, Germany, Sweden and the Netherlands. It also
    [Show full text]
  • East Coast Main Line Route Study – Technical Appendices 5 MB
    East Coast Main Line Route Study East Coast Main Line Route Study: Technical Appendix Demand and Capacity Autumn 2017 Network Rail – East Coast Main Line Route Study 02 The sections shows how standard class passenger Key Sectors /Groups of services Baseline demand is assumed to develop over the East Coast Route Study area over the next 2 to 3 The East Coast Route Study predominantly consists of the East Coast Throughout this section forecast demand is compared with decades, and identifies where this presents a Main Line (ECML) route sections from London Kings Cross to Berwick “baseline capacity”. The baseline capacities are based on what is and Leeds, but also includes a number of other route sections. These proposed to operate once the following CP5 Enhancement Delivery challenge to provide additional capacity: include Nottingham to Lincoln, Stevenage to Cambridge, the Plan projects have been implemented: Hertford Loop and the GN/GE route between Peterborough and East Coast Connectivity Fund projects including Huntingdon to Doncaster via Lincoln. • • a definition of the key sectors (groups of services) Woodwalton 4 tracking and Werrington Grade Separation. This on the route The East Coast Route Study area accommodates a number of facilitates a service predominantly worked by new Class 800 and different types of train services (sectors), which meet a particular 801 units ordered through the Intercity Express Programme (IEP), • a summary of the baseline capacities assumed for market need: with up to 8 LDHS services per hour into London Kings Cross. the route. This also includes the proposed freight loops between Long Distance High Speed (LDHS) services.
    [Show full text]
  • Short-Term Intercity East Coast Train Operator: 2018 Options Report
    Short-term Intercity East Coast train operator 2018 options report Short-term Intercity East Coast train operator 2018 options report Presented to Parliament by the Secretary of State for Transport by Command of Her Majesty May 2018 Cm 9617 © Crown copyright 2018 This publication is licensed under the terms of the Open Government Licence v3.0 except where otherwise stated. To view this licence, visit nationalarchives.gov.uk/doc/open-government-licence/version/3 Where we have identified any third party copyright information you will need to obtain permission from the copyright holders concerned. This publication is available at www.gov.uk/government/publications ISBN 978-1-5286-0391-1 CCS0518621700 05/18 Printed on paper containing 75% recycled fibre content minimum Printed in the UK by the APS Group on behalf of the Controller of Her Majesty’s Stationery Office Contents Section 1: background to the current situation and the options .................................. 2 1. Virgin Trains East Coast franchise termination ............................................. 2 2. The Intercity East Coast operating business ................................................. 5 3. The immediate choice for the Department as franchising authority ............... 8 4. The Secretary of State’s franchising policy ................................................. 10 5. The options ................................................................................................. 11 Section 2: comparison of options ............................................................................
    [Show full text]
  • Firstgroup Plc Half-Yearly Results for the Six Months to 30 September 2014
    FirstGroup plc Half-yearly results for the six months to 30 September 2014 Wednesday 5 November 2014 Tim O’Toole Chief Executive 2 Overview • Trading for the Group in line with our expectations – Encouraging progress with First Student turnaround – Good performances in First Transit and UK Rail – Core Greyhound customers and some local UK Bus markets not seeing benefit from improving macroeconomic trends • Results more weighted to H2 than usual this year • Negotiating FGW and FTPE direct awards with DfT • Multi-year transformation programme on track; confident our plans will deliver sustainable improvements in shareholder value 3 Chris Surch Group Finance Director Financial review 4 Key highlights • Adjusted operating profit £103.6m up 2.4% • Adjusted EPS 1.8p up 63.6% • Net cash outflow of £91.0m (H1 2013: £103.0m outflow) – Expect full year outflow to be approx. £100m • Underlying capital investment £222m (ex-UK Rail) • Net debt to EBITDA: 2.5x due to seasonal swings (FY 2014: 2.2x) • ROCE 7.8% (H1 2013: 7.9%) 5 Financial summary Sep 2014 Sep 2013 restated1 Change Revenue £2,941.1m £3,300.7m (10.9)% Adjusted2 - EBITDA3 £253.3m £260.5m (2.8)% - Operating profit £103.6m £101.2m +2.4% - Margin % 3.5% 3.1% +0.4pp - Interest £(70.3)m £(81.6)m (13.8)% - Profit before tax £33.3m £19.6m +69.9% - Attributable profit £21.6m £10.3m +109.7% - EPS4 1.8p 1.1p +63.6% 1. Restated for the reclassification of UK Rail bid costs and property profits or losses 2. Before amortisation charges, ineffectiveness on financial derivatives and certain other items 3.
    [Show full text]
  • Register of Lords' Interests
    REGISTER OF LORDS’ INTERESTS _________________ The following Members of the House of Lords have registered relevant interests under the code of conduct: ABERDARE, LORD Category 10: Non-financial interests (a) Director, F.C.M. Limited (recording rights) Category 10: Non-financial interests (c) Trustee, Berlioz Society Trustee, St John Cymru-Wales Trustee, National Library of Wales Category 10: Non-financial interests (e) Trustee, Stephen Dodgson Trust (promotes continued awareness/performance of works of composer Stephen Dodgson) Trustee, West Wycombe Charitable Trust ADAMS OF CRAIGIELEA, BARONESS Nil No registrable interests ADDINGTON, LORD Category 1: Directorships Chairman, Microlink PC (UK) Ltd (computing and software) Category 7: Overseas visits Visit to Dublin, 6-7 May 2015, to talk on UK Election at seminar organised by Goodbody and the British Irish Chamber of Commerce who paid for airfares, accommodation and hospitality Category 8: Gifts, benefits and hospitality Gift of two tickets and lunch at Challenge Cup Final as guest of the Rugby League, 30 August 2015 * Gift of tickets for England-Australia game during Rugby World Cup as guest of Rugby Football Union, 3 October 2015 Gift of one ticket to the semi-finals of the Rugby World Cup, 24-25 October 2015, given by Rugby World Cup 2015 and RFU Category 10: Non-financial interests (d) President (formerly Vice President), British Dyslexia Association Category 10: Non-financial interests (e) Vice President, UK Sports Association Vice President, Lakenham Hewitt Rugby Club ADEBOWALE,
    [Show full text]