GAZPROM IN EASTERN

PRESS CONFERENCE JUNE 18, 2012 Section of Unified Gas Supply System General Development Scheme

Yakutsk

Yakutsk center Оkha center

Komsomolsk- Yuzhno- on- Sakhalinsk Skovorodino Sovgavan

Blagoveshchensk Chita Zabaikalsk Ulan-Ude

MONGOLIA Ulaanbaatar Tokyo DEMOCRATIC PEOPLE’S REPUBLIC OF REPUBLIC OF KOREA Seoul

Beijing

Gas production centers Existing gas pipelines

LNG/CNG plant and export terminal Gas pipelines being designed and under construction Projected gas processing plants

2 Kamchatka Territory Gas Supply Project Commissioned in September 2010

Gas pipeline length – 392 km BERING SEA Gas pipeline diameter – 530 mm Pressure – 6.37 MPa Annual throughput – 750 million m3/yr First gas supplied to consumers in 2010 Zapadno- Kamchatsky licensed block

Kshukskoye

Nizhne- Kvakchikskoye Sobolevo

Yelizovo AGDS Severnye Koryaki AGDS SEA OF Yuzhnye Koryaki AGDS Razdolny AGDS Nachinki AGDS AGDS 2 Kavalerovskoye AGDS AGDS 1 Apacha AGDS Petropavlovsk- Kamchatsky

3 Zapadno-Kamchatsky Licensed Block

Hydrocarbon resources of Zapadno-Kamchatsky licensed block 1,800 1,600 1,400 1,621.4 1,200 1,000 Kamchatka 800 Territory 600 400 523.3 200 0 Gas, billion m3 Oil, million t

Sredne-Kunzhinskoye field Kshukskoye field Nizhne-Kvakchikskoye field Severo-Kolpakovskoye field

Hydrocarbon traps

Gas and condensate fields

Zapadno-Kamchatsky licensed block

4 First Startup Complex of Sakhalin – Khabarovsk – Vladivostok Gas Transmission System Commissioned in September 2011

Length of first startup complex within gas trunkline – 1,350 km, Sakhalin III GULF OF SAKHALIN Vostochno- Odoptinsky including: Okha block Sakhalin I •Submerged crossing under the Nevelsky Strait – Nikolaevsk- Chaivo field on-Amur Sakhalin II 2 strings with 1,000 mm diameter and 23 km length each Piltun- RUSSIA CS -1 Astokhskoye field MCS, Nogliki •Gas lateral running to Vladivostok gas distribution station – 0 km Sakhalin III Ayashsky block 116 km CS -2 Sakhalin III CS -3 Kirinskoye Komsomolsk- Alexandrov- field on-Amur Sakhalinsky CS -4 Sakhalin II Gas pipeline diameter – 1,220 mm, lateral diameter – 1,020/720 mm Lunskoye field Pressure – 9.8 MPa, lateral pressure – 7.4 MPa CS -5 Khabarovsk SEA OF CS -6 Sakhalin main compressor station – 2 gas pumping units, 32 MW OKHOTSK CS -7 Yuzhno- Vladivostok gas distribution station – 265,000 m3/hr CHINA Sakhalinsk CS-8 Korsakov

CS -9 CS -10

CS -11 CS -12 Fields within Sakhalin I project CS -13

SEA OF JAPAN Fields within Sakhalin II project Vladivostok

Vladivostok GDS Main compressor station (MCS) at Sakhalin – Khabarovsk – Vladivostok gas transmission system; o km

RUSSKY Okha – Komsomolsk-on-Amur existing gas pipeline

ISLAND First startup complex at Sakhalin – Khabarovsk – Vladivostok gas transmission system

Komsomolsk-on-Amur existing gas pipeline

5 Construction of Submerged Crossing under Strait

6

Kirinskoye Field Pre-Development Project. Kirinskoye Field OPF – Sakhalin MCS Gas Pipeline Project

Gas pipeline parameters:

• Diameter – 1,020х19 mm

• Operating pressure – 9.8 MPa

• Length – 137 km

• Throughput – 19 billion m3/yr

7 Raw Hydrocarbon Reserves and Resources in Republic of

АВС1 С2 С3 Republic of Sakha gas, billion m3 1,313.80 1,223.30 233.000 condensate, million t 33.50 20.00 oil, million t 245.50 189.00 191.0 00 GAZPROM / Chayandinskoye field gas, billion m3 631.10 694.30 condensate, million t 9.40 10.20 oil, million t 50.20 9.70 Incremental growth through geological exploration in 2011, billion m3

С1 – 178.2

8 Measures of State Support for Projects in Eastern Russia (I)

Income tax Severance tax • Reducing the income tax rate • Removing social contributions from salary increments for • Reimbursing 50% of the paid income tax in case of staff members employed in the Extreme North or similar reinvesting the income received from projects territories implementation in and the Far East • Applying 0% severance tax rate to newly discovered hydrocarbon fields located in Yakutia and the Shelf Federal target programs • Financing part of expenses on investment projects for Property tax gasification of Russian regions through targeted • Applying 0% property tax rate until completion of an allocation of funds to regional budgets for inter- investment project being executed in Siberia and the Far settlement and intra-settlement gas pipelines East construction • Creating power supply, power generation and transport infrastructure in a prioritized manner

Social fees • Reducing employer’s social contribution rates on the gross wage fund for the employees from other Russian regions during the first three years of employment

9 Measures of State Support for Projects in Eastern Russia (II)

Pricing • Creating the pricing mechanisms that promote a wider use of natural gas by consumers due to its environmental and technological advantages

Gas processing and gas chemicals • Providing tax benefits to gas chemical facilities • Creating helium concentrate storage facilities and strategic helium reserves funded by the state • Boosting creation of the national vehicle fleet designed for helium transportation • Applying 0% import duties to the process equipment used in the oil and gas sector and having no analogs in Russia – during the project payback period

10